OAC 310:680-5-11
Self-certification of plans
Cite as Okla. Admin. Code § 310:680-5-11
(a)
The Department shall make available consultation and technical
assistance services covering the requirements of this section to a
residential care home considering self-certification of plans. The
consultation and technical assistance is subject to the fees specified
in OAC 310: 680-5-9, The consultation is optional and not a
prerequisite for filing a request through the self-certification
review process.
(b)
The residential care home and the project architect or engineer
may elect to request approval of design and construction plans through
a self-certification review process. The residential care home and
the project architect or engineer shall submit a self-certification
request on a form provided by the Department, along with the review
OAC 310:680
OKLAHOMA STATE DEPARTMENT OF HEALTH
20
October 01, 2017
fee specified in OAC 310:680-5-9. The form shall be signed by the
residential care home and the project architect or engineer attesting
that the plans and specifications are based upon and comply with the
requirements of this Chapter. The form shall require information
necessary to demonstrate compliance with OAC 310:680-5-11(c).
(c)
To be eligible for self-certification, projects must comply with
the following requirements:
(1)
The project involves any portion of the residential care
home where residents are intended to be examined or treated and the
total cost of design and construction is two million five hundred
thousand dollars ($2,500,000) or less; or
(2)
The project involves only portions of the residential care
home where residents are not intended to be examined or treated; and
(3)
The project architect or engineer attesting the application
has held a license to practice architecture or engineering for at
least five (5) years prior to the submittal of the application, is
licensed to practice in Oklahoma; and
(4)
The residential care home owner/operator acknowledges that
the Department retains the authority to:
(A)
Perform audits of the self-certification review program and
select projects at random for review;
(B)
Review final construction documents;
(C)
Conduct on-site inspections of the project;
(D)
Withdraw approval based on the failure of the residential
care home or project architect or engineer to comply with the
requirements of this Chapter; and
(5)
The residential care home agrees to make changes required
by the Department to bring the construction project into compliance
with this Chapter.
(d)
Within twenty-one (21) calendar days after receipt of a complete
application, the Department shall approve or deny the application for
self-certification and send notification to the residential care home.
If the application is denied, the residential care home shall have
thirty (30) calendar days to submit additional or supplemental
information demonstrating that the application complies with the
requirements for self-certification of plans and specifications. The
Department shall have fourteen (14) calendar days after receipt of
supplemental information to reconsider the initial denial and issue a
final approval or denial of the self-certification request.
(e)
After denial of the application for self-certification and prior
to the start of construction, the residential care home shall pay the
applicable fee for plan review specified in OAC 310:680-5-9. Upon
receipt of the plan review fee, the Department shall review the
residential care home's plans in accordance with the process in OAC
310:680-5-9.
SUBCHAPTER 7. ENVIRONMENTAL HEALTH AND SANITARY REQUIREMENTS