OAC 252:100-7-2
Requirement for permits for minor facilities
Cite as Okla. Admin. Code § 252:100-7-2
(a) Permit required. Except as provided in OAC 252:100-7-2 and 252:100-7-18(b), no person
may commence construction or modification of any minor facility, may operate any new minor
facility, or may relocate any minor portable source without obtaining a permit from the DEQ. For
11
2021_OCT_SC1_7_8_RUL_REVISED_REVISED
October 20, 2021
additional application and permitting procedures, see OAC 252:4, Subchapter 7. Environmental
Permit Process.
(b) Exceptions.
(1) De minimis facilities. De minimis facilities are exempted from the permitting
requirements of OAC 252:100-7. De minimis facilities remain subject only to the following
air quality control
(A) De minimis facilities must comply with OAC 252:100-13, Open Burning.
(B) With the exception of those de minimis cotton gin facilities or grain, feed or seed
facilities that comply with the requirements of 252:100-23, Control of Emissions from
Cotton Gins or 252:100-24, Particulate Matter Emissions from Grain, Feed or Seed
Operations, de minimis facilities remain subject to OAC 252:100-25, Visible Emissions
and Particulates.
(C) With the exception of those de minimis cotton gin facilities or grain, feed or seed
facilities that comply with the requirements of 252:100-23, Control of Emissions from
Cotton Gins or 252:100-24, Particulate Matter Emissions from Grain, Feed or Seed
Operations, de minimis facilities remain subject to OAC 252:100-29, Control of Fugitive
Dust.
(D) De minimis facilities must comply with OAC 252:100-42 Control of Toxic Air
Contaminants.
(E) De minimis facilities must comply with 252:100-5, Registration, Emission Inventory
and Annual Operating Fees.
(2) Permit exempt facilities. Permit exempt facilities are exempted from the permitting
requirements of OAC 252:100-7. Permit exempt facilities remain subject to all other
applicable State and Federal air quality control rules and standards.
(3) Emergency engines at residential and school facilities. Primary and secondary schools
and single family residences with an emergency engine are exempted from the permitting
requirements of OAC 252:100-7.
(4) Gasoline dispensing facilities with throughput of less than 100,000 gallons per month.
Gasoline dispensing facilities in compliance with 40 CFR Part 63 Subpart CCCCCC, and
whose primary or only obligation to obtain a permit is due to the construction (installation)
and/or operation of a gasoline dispensing facility, with throughput of less than 100,000 gallons
per month on a rolling annual average are exempt from the permitting requirements of OAC
252:100-7.
(5) Construction Activities Prior to Issuance of a Minor NSR (Construction) Permit. After
the submission of an administratively complete minor NSR construction permit application,
but prior to the issuance of the corresponding construction permit, an applicant may begin
construction up to, but not including, making any new, modified, or reconstructed unit
operational such that it has the ability to emit any regulated air pollutant. The applicant assumes
the risk of losing any investment it makes toward implementing such construction prior to the
issuance of a construction permit authorizing the construction. DEQ retains the authority to
deny the permit application without consideration of and regardless of any investment the
applicant has made prior to permit issuance. This paragraph does not serve as authorization by
DEQ of the requested construction. In addition, this exception does not exempt the owner or
operator from any applicable requirements under federal rules (e.g., NSPS or NESHAP) or
state-only regulations.
(c) Permit application.
12
2021_OCT_SC1_7_8_RUL_REVISED_REVISED
October 20, 2021
(1) All applications shall be signed by the applicant.
(2) The signature on an application for a permit shall constitute an implied agreement that the
applicant shall be responsible for assuring construction or operation, as applicable, in
accordance with the application and OAC 252:100.
(3) Any applicant who fails to submit any relevant facts or who has submitted incorrect
information in a permit application shall, upon becoming aware of such failure or incorrect
submittal, submit such supplementary facts or corrected information within 30 days unless the
applicant's request for more time has been approved by the DEQ. In addition, an applicant
shall provide additional information as necessary to address any requirements that become
applicable to the source after the date it filed a complete application but prior to release of the
draft permit.
(d) Applicability determination. Upon written request along with the required fee and any
relevant information needed, the DEQ will make a determination of whether a permit is required.
(e) Change in permit status. The owner or operator of a permitted facility may at any time notify
the DEQ that the facility:
(1) Is de minimis, requesting termination of the permit, or
(2) Qualifies for either a permit by rule or a general permit, submitting the appropriate
application for such permit, or
(3) Is permit exempt, requesting termination of the permit.
(f) Transfer of permit. The transfer of ownership of a stationary source or a facility is an
administrative amendment that shall subject the new owner or operator to existing permit
conditions and/or compliance schedules. A new permit is not required. The transferor shall notify
the DEQ using a prescribed form no later than 30 days following the change in ownership.
(g) Emission calculation methods. The methods in OAC 252:100-5-2.1(d) shall be used when
calculating regulated air pollutant emission rates for purposes of determining if a DEQ-issued air
quality permit is required or what type of permit is required.
PART 3. CONSTRUCTION PERMITS