(a) Applicability. A permit by rule (PBR) may be adopted for an industry(s) to streamline the air
quality permitting procedures required by OAC 252:100-7-15 and -18, if there are a sufficient
number of facilities that meet the requirements of 252:100-7-15(b)(1) and that have the same or
substantially similar operations, emissions, and activities that are subject to the same standards,
limitations, and operating and monitoring requirements.
(1) A facility may be constructed or operated under this rule and will be exempt from any
other permitting requirements in this Chapter if it meets the requirements of 252:100-7-
15(b)(1), 252:100-7-60, and the appropriate PBR.
(2) A facility cannot be registered under more than one PBR at the same time or under a PBR
and a general or individual permit at the same time. However, the owner or operator may apply
for a change in a facility's registration from one PBR to another PBR if the facility meets the
criteria of the "new" PBR. The owner or operator may apply for a change in a facility's air
quality permit from a general or an individual permit to registration under a PBR for which the
facility qualifies.
(b) General requirements. No construction under a PBR may commence until the request and
application fee are received by the DEQ. Operation under the PBR is not authorized beyond the
time limit contained in 252:100-7-18(a) unless a request for operation under the PBR and the
application fee are received by the DEQ.
(1) Application for registration under a PBR.
(A) Construction or operation. The owner or operator wishing to construct or operate a
facility under a PBR, must submit a request for registration under the PBR using the
form(s) provided by the DEQ for that PBR. The request must contain written certification
by the owner or operator that the facility will be constructed and/or operated in compliance
with such PBR. A construction and/or operating permit application fee, as specified in
252:100-7-3, must accompany the form(s).
(B) Modification. A physical change or change in the method of operation to a facility
covered by a PBR that would cause the facility to no longer qualify for the PBR is a
modification, and will result in a change in permit status as provided by 252:100-7-
60(b)(4). Other physical or operational changes are not modifications, and do not require
submittal of an amended registration.
(2) Reporting requirements. The owner or operator of a facility covered by a PBR must
comply with the reporting requirements in 252:100-7-60(b)(2)(A), (B), and (C). No other
reporting requirements shall apply.
(A) The owner or operator must submit emission inventories as required by 252:100-5-
2.1;
(B) The owner or operator must comply with the excess emission reporting requirements
in 252:100-9; and
(C) The owner or operator must comply with reporting requirements contained in any
applicable NSPS or NESHAP.
(3) Compliance inspections. Compliance inspections will be conducted by the DEQ in
response to complaints and as necessary to determine compliance.
(4) Change in permit status. The owner or operator shall apply for an individual permit or,
if applicable, coverage under a general permit in the event that a change causes a facility to no
longer qualify for a PBR.
(c) Registration. Registration under a PBR shall constitute compliance with the requirements of
252:100-7-15(a) (for construction permits) or 252:100-7-18(a) (for operating permits).
(1) Registration under the PBR will be effective upon receipt of the requisite form(s)
(including the appropriate application fee) by the DEQ.
(2) Acceptable documentation of receipt of the PBR registration is the earliest of:
(A) a legible, dated U.S. Postal Service postmark (private metered postmarks are not
acceptable);
(B) a dated receipt from a commercial carrier or the U.S. Postal Service; or
(C) a DEQ date-stamped registration.;
(D) an electronic submission via email or other electronic submittal system as designated
by the Division; or
(E) a combination of A through D resulting in a complete registration package (including
all forms and the appropriate fees).
(3) After receiving the appropriate PBR registration request and application fee and confirming
that the facility is eligible for coverage under the PBR, the DEQ will acknowledge in writing that
the facility is registered to construct or operate under the PBR.