OAC 252:628-7-9
Sampling, recordkeeping and reporting requirements
Cite as Okla. Admin. Code § 252:628-7-9
(a) Sampling. Sampling shall be in accordance with DEQ-approved sampling plans required in
this Chapter and OAC 252:606, and OAC 252:690.
(b) Recordkeeping. The following recordkeeping requirements apply:
(1) Operational records. All IPR SWTPs shall meet the following requirements:
(A) Keep a daily record of the operations performed in the treatment process;
(B) Record observations, costs, and occurrences related to the operation of the plant;
(C) Record the process control tests and laboratory checks;
(D) For each required measurement or sample, record:
(i) The date, exact place and time of sample and indicate whether a grab sample or
composite;
(ii) The dates the analyses were performed;
(iii) The laboratory and name of the operator who performed each analysis;
(iv) The results of all analyses;
(v) The instantaneous flow at the time of grab sample collection or a record of each
flow taken while collecting a composite sample; and
(vi) The method of composite sample calculations and other calculations;
(E) If applicable, the results of direct integrity testing and indirect integrity monitoring for
membrane filtration as required in OAC 252:626-9-9(f); and
(F) Record any other applicable data.
(2) Maintain records. The facility owner shall keep records of all control and compliance
testing, copies of MORs, DMRs, LMRs, laboratory bench sheets, and other applicable records
for at least three (3) years. These records shall be available for inspection by DEQ personnel.
(c) Reporting requirements. The following reporting requirements apply:
(1) Immediate notification to DEQ. Each IPR SWTP shall report to DEQ within 24 hours
if there are any losses of treatment reliability, statistically significant process trends, or changes
in the IPR SWTP influent water quality that may cause a negative effect to the IPR SWTP
discharge water quality. Should effluent monitoring indicate a violation or serious violation
as described in Subchapter 3 of this Chapter, the violation(s) shall be reported to the DEQ
within 24 hours and reduction or cessation of discharge may be required. A written report
describing the reason(s) for the violation(s) and the steps taken to correct the violation(s) shall
be submitted to the DEQ within five (5) days.
(2) Reports to be submitted to DEQ. The following reports shall be submitted:
(A) Discharge monitoring reports. All DMRs shall be completed and submitted in
accordance with the requirements in OAC 252:606, OAC 252:690, and the OPDES
discharge permit.
3
(B) Monthly operational reports. Keep a daily record of minimum control tests on forms
prepared or approved by DEQ. Make entries for the date samples are collected and indicate
where and by whom the observations were made. Include the results of all analyses on the
monthly report and use them to calculate weekly or monthly averages. The IPR SWTP
shall complete and submit the original of required MOR to DEQ no later than the fifteenth
(15) day of the following month.
(C) Lake and stream monitoring reports. The LMR form required in Subchapter 11 of
this Chapter shall be submitted with the OPDES waterbody monitoring sampling plan for
DEQ approval. The report shall include results from samples taken to characterize the
accumulation and concentration of conservative substances, trend monitoring, and results
from statistical significance tests. The reporting frequency shall be determined by DEQ.
(d) Additional reporting, records and/or sampling. Additional sampling, reporting, and/or
records requirements may be included by DEQ in any permit, authorization, order, consent decree,
closure plan, remediation plan, or other official document issued by DEQ pursuant to applicable
law and the provisions of this Chapter.
SUBCHAPTER 9. PERMITTING REQUIREMENTS FOR IPR SOURCE WATER