OAC 252:641-15-1
General provisions
Cite as Okla. Admin. Code § 252:641-15-1
(a) Primary settling. All sewage entering a lagoon must first pass through a septic tank for
primary settling.
(b) Total retention. All lagoons shall be total retention.
(c) Location. Installers shall not locate lagoons where vegetation, timber, or terrain could
interfere with prevailing wind action or shade the lagoon during daylight hours.
(d) Prohibitions. The owner/operator shall not dispose or store wastes or contaminants other
than sewage in the lagoon. The owner/operator shall not discharge or dispose of sludge from the
lagoon prior to obtaining approval from the DEQ.
(e) Closure. The DEQ may, when public health or safety issues arise, require the owner/operator
to properly close a lagoon when it is no longer in use. A closure plan shall be submitted for all
lagoons being classified as small public on-site sewage treatment systems or when DEQ requires
closure of a lagoon when a public health or safety issue arises and will include:
(1) A description of how the wastewater will be disposed.
(2) A description of how the sludge will be disposed if more than six (6) inches are present.
(3) A description of final grading and erosion controls.
(4) A time schedule indicating:
(A) a time schedule for completion of each activity.
(B) the estimated date of final completion of the closure activity.
(f) Examples. Refer to Appendix O, "Examples of Lagoon Installation" for examples.
21