OAC 252:641-21-12
Duties and responsibilities
Cite as Okla. Admin. Code § 252:641-21-12
(a) Systems installed. For each new installation, modification or repair self-inspected and
approved a certified installer shall comply with the following:
(1) Notify DEQ. The installer must give DEQ an opportunity to inspect a portion of the
system to ascertain that the certified installer continues to meet certification requirements.
The certified installer shall notify the local DEQ office, before construction begins, of the time,
date and location that an on-site sewage treatment system will be installed, modified or
repaired. The installer shall pay DEQ a Fifty-Dollar ($50.00) fee each time the installer fails
to notify the DEQ prior to commencing construction.
(2) Submittals to DEQ. Within fifteen (15) working days after the work has been
completed, the certified installer shall submit an accurate, completed DEQ Form 641-576AS
or 641-576S to the local DEQ office. The installer shall pay DEQ a Thirty Dollar ($30.00)
fee each time the installer fails to submit a completed DEQ Form 641-576AS or 641-576S
within fifteen (15) days of completing the work.
(b) Record keeping. Certified installers are responsible for maintaining their own records for:
(1) each system installed; and
(2) all training classes completed.; and
(3) a period of three (3) years.
(c) Identification. Each certified installer shall present their identification card to DEQ
personnel upon request.
SUBCHAPTER 22. CERTIFICATION FOR PERSONS WHO PERFORM SOIL
PROFILERS DESCRIPTIONS