OAC 252:656-3-5
Plans and specifications
Cite as Okla. Admin. Code § 252:656-3-5
(a) General plans. Applicants shall submit to DEQ two (2) copies of general plans that
include the following:
(1) Plan view. Include a plan view of the plant and any discharge points, using at
least 10- foot contours.
(2) Flood elevations. Show both the 25-year and 100-year flood elevations and
their boundaries.
(3) Existing and proposed treatment works. Show the physical arrangement
of all treatment units on a project site plat.
(4) Existing collection systems. Show the location, size and direction of flow of all
existing sanitary sewers at the point of connection with proposed new sanitary sewers. Show
the elevations of all sewer inverts close to the manholes.
(5) Proposed collection systems. Show the location of all proposed sewers, sewer
easements and direction of flow. Number all manholes on the layout and correspondingly on
the profile. Provide a summary of quantities that includes, at a minimum, linear feet of
trenching, number of manholes, size, materials and linear feet of piping, types of testing and
number and size of pumps (if applicable).
(6) Existing and proposed reclaimed water distribution systems. Show the location,
size, and direction of flow of all existing and proposed reclaimed water distribution lines from
the point of connection with the existing or proposed treatment works or storage locations to
9
the end user. Provide a summary of quantities for proposed reclaimed water distribution lines
that includes, at a minimum, pipe size, materials and linear feet of piping, types of testing and
the number and size of pumps. Testing specifications shall include requirements for flushing
mains to remove any construction debris before placing the system into service. Construction
of reclaimed water distribution systems shall be in accordance with OAC 252:626-19-2,
except as follows:
(A) locate reclaimed waterlines at least 5 feet horizontally from any existing
or proposed potable waterlines;
(B) locate reclaimed waterlines at least 5 feet horizontally from any existing
or proposed sewer lines;
(C) locate reclaimed waterlines crossing any existing or proposed potable
waterlines at least 2 feet vertically below the potable waterlines; and
(D) locate reclaimed waterlines crossing any existing or proposed sewer lines
at least 2 feet vertically above the sewer lines.
(7) Drawings. Show the name of the municipality, sewer district, or institution; scale in
feet; north point; date; and name, telephone number, address, signature of engineer and/or
imprint of engineer's seal on the drawings. In the case of bound documents, engineers
must affix their seal, signature and date to the cover sheet or index page, which identifies
all documents bound together for which the registrant has responsible charge. In the
absence of a cover sheet or index page each sheet must have the seal, and dated signature
of the registrant who has responsible charge. For bound documents involving multiple
registrants, either each document in the bound set must be sealed, signed and dated by
the registrant in responsible charge for that portion of the work, or the cover sheet or
index page must be sealed, signed and dated by each registrant with a breakdown of
responsibility for each document clearly identified. Draw general plans to a scale of 100
feet per inch. Establish and reference a permanent benchmark. The minimum plan size
must be 11" x 17", one-sided and of adequate contrast sufficient for electronic imaging
and storage.
(8) Authorized design-build projects must label cover documents prominently as
“Design-Build,” specify the design package number, and reference the approved
engineering report number.
(b) Detailed plans. The applicant shall submit to DEQ two (2) copies of detailed plans
drawn to a suitable scale. Plans to modify or extend existing wastewater treatment systems
or water reuse systems shall clearly indicate the changes.
(1) Non-industrial wastewater systems. Detailed plans for non-industrial
wastewater systems shall include the following:
(A) Sewer plan and profile. Include a plan and profile of all sewers to be
constructed showing all special features, such as inverted siphons, extra
strength pipe, concrete encasements, outfall structures and sewer bridges.
Show all stream crossings on the profile with stream bed elevations, normal
flow elevation and extreme high and low water levels. Scale the profiles to not
more than 100 feet per inch horizontal and 10 feet per inch vertical. Show the
scale on the profiles. Show all known existing structures both above and below
ground that might interfere with the proposed construction; including water
mains, gas mains, storm drains, and nature of street surfacing. Show wyes on
the plan view and dimensions from the nearest down-stream manhole recorded
on maps.
(B) Sewer details. Include profiles showing manhole stationing, size of
10
sewers, top of rim and sewer invert elevations at each manhole and the grade
and length of sewers between adjacent manholes. Show ground elevations at
the house line or at approximately 50 to 75 feet from the centerline of the sewer
in each direction except in the case of out-fall and/or relief sewers, where no
wyes for house connections are needed.
(C) Sewer appurtenances. Include the details of all ordinary sewer
appurtenances such as manholes, drop manholes, inverted siphons and
pumping stations. A sufficiently detailed drawing of each structure must show
dimensions, equipment, elevations, capacities, and any explanatory notes
necessary to make them easily interpreted.
(D) Sewer cross sections. Include cross sections for manholes, outfall
structures, headwalls, pipe cradling and encasement, and similar structures.
(E) Sewage pumping station details. Include complete construction details
showing number and size of pumps, isolation valves, check valves, alarm
system and emergency operation provisions.
(F) Treatment works hydraulic profile. Show hydraulic profiles with
sewage, supernatant liquor and sludge flow through the plant.
(G) Schematic diagrams. Label schematic piping diagrams with all lines,
appurtenances and direction of flow.
(H) Treatment units. Provide complete construction details of all treatment
units including high and low water levels of receiving stream.
(I) Fillets. Eliminate dead spots in all tanks by designing fillets and otherwise
rounding edges.
(2) Water reuse systems. Detailed plans for water reuse systems shall include the
following information:
(A) Treatment works hydraulic profile. Show hydraulic profiles with
sewage, supernatant liquor and sludge flow through the system.
(B) Schematic diagrams. Label schematic piping diagrams with all lines,
appurtenances and direction of flow.
(C) Treatment units. Provide complete construction details of all treatment
units including high and low water levels of receiving stream.
(D) Distribution system. Provide complete construction details of the
distribution system, which shall be designed in compliance with Subchapter
27.
(c) Specifications. Applicants shall submit to DEQ complete detailed specifications for
the proposed project with the plans and shall include a detailed summary of equipment and
design data, with references to the specific applicable standards (e.g., ASTM, UL, etc.) for
construction, installation and testing of said equipment.
(d) Construction materials. Applicants are responsible for complying with any
occupational, safety and building codes. Reference in the plans or specifications where
these codes require special construction materials, such as the National Electrical Code
requirement for explosion- proof wiring where gases may accumulate. The DEQ will not,
however, determine whether the proposed construction will meet such codes.
(e) Redundant equipment. Provide redundant treatment units and equipment for
maintenance and repair.
(f) Maintenance and cleaning. For maintenance and operational controls, all units must
be equipped with means for cleaning. Direct discharge of untreated sewage is prohibited.
(g) Weather protection. Protect the structures and all electrical and mechanical
11
equipment and controls from elements and a 100-year flood. Protect mechanical units,
pumps, valves and piping from freezing.
(h) Construction sequence. Include a program for keeping existing wastewater facilities
in compliance with all applicable water quality permit conditions during construction of
additional facilities in accordance with OAC 252:656-3-4(a)(4) and/or OAC 252:656-3-
4(b)(4).