OAC 252:690-3-8
C95 for determining reasonable potential for parameters other than
Cite as Okla. Admin. Code § 252:690-3-8
temperature [REVOKED]
(a) Existing discharges. If fewer than ten (10) effluent data points are available, the C95 effluent
concentration is determined by multiplying CE(mean) by 2.135 where CE(mean) is the arithmetic mean.
If only a single effluent data point is available, it is CE(mean) for the purpose of determining C95.
Where ten (10) or more effluent data points are available, the C95 concentration is calculated
directly from the effluent data set according to Equation C-8.
(b) New discharges. For new discharges, C95 is estimated by multiplying the expected average
effluent quality, CE(mean), by 2.135. Where new industrial facility discharges include cooling tower
blowdown from a recirculating cooling water system, permit applicants must submit the results of
at least three (3) water samples collected from the cooling water source. The samples must be
collected on different days no more than one (1) year prior to submission of the application. The
applicant must estimate the C95 concentration of the blowdown discharge using the source water
monitoring data, based on the projected number of recirculation cycles.