OAR 918-020-0440

OAR 918-020-0440. Statewide Master Builder Program — Inspection Requirements that May Be Waived

Last amended: 2002Length: 100 wordsOfficial source
(1) Subject to OAR 918-020-0430 and 918-020-0450, a building official may waive certain jurisdictional responsibilities to a master builder on a project by project basis for the following inspections: (a) Drywall; (b) Footings and setbacks; (c) Foundation walls, concrete encased electrode; (d) Insulation; (e) Masonry fireplace pre-cover; (f) Masonry rebar; (g) Gutters, downspouts and foundation drains; (h) Roof sheathing nailing; (i) Suspended ceiling; (j) Underfloor structural; and (k) Wall sheathing nailing. (2) A building official for a jurisdiction that has a master builder program shall conduct inspections of at least 10 percent of projects built under a master builder program.