OAR 918-050-0150

OAR 918-050-0150. Statewide Fee Methodology for Medical Gas Installations

Last amended: 2009Length: 70 wordsOfficial source
(1) A plumbing permit fee for the installation of a medical gas system shall be determined based on the value of installation costs and the system equipment, including but not limited to, inlets, outlets, fixtures, and appliances and applied to the municipality’s fee schedule, with a set minimum fee. (2) The plan review fee shall be based on a predetermined percentage of the permit fee as set by the municipality.
OAR 918-050-0150: OAR 918-050-0150. Statewide Fee Methodology for Medical Gas Installations | Justis AI