This Subpart applies to the following sources:
1) PREPA San Juan (Mercado Central Ave. Lot 28, Zona Portuaria Puerto Nuevo, San Juan)
2) PREPA Palo Seco (Road PR 165 Km. 30.8, Toa Baja)
3) PREPA Aguirre (Road PR 3 Km. 152.7 Aguirre, Salinas)
4) Any other major source in or nearby the San Juan or Guayama-Salinas SOâ‚‚ non-attainment
areas that has not undergone a major modification or construction of a new emission unit
subject to Rule 210; in which case, the SOâ‚‚ emission limit will be determined by a lowest
achievable emission rate (LAER) analysis pursuant to Rule 210.
The limitations set forth applies to current and future owners and operators of the
aforementioned sources.
II. Emission Limitations for PREPA San Juan and PREPA Palo Seco
The owner or operator of a stationary emission source at PREPA San Juan and PREPA Palo Seco
must comply with the following emission limitations:
(A) San Juan SOâ‚‚ Non-Attainment Area Emission Limit -Interim Plan (Fuel switching to Ultra Low
Sulfur Diesel)
(1) No owner or operator of any combustion turbine units located at the PREPA San Juan or
Palo Seco facilities shall cause or permit the burning of any fuel oil above a maximum
sulfur content of 0.0015 percent by weight (15ppm), by no later than February 1, 2023,
as established as follow:
Table 1: PREPA San Juan and PREPA Palo Seco Fuel Switching to Ultra Low Sulfur Diesel
Facility
Units
Compliance Start Date
Projected Fuel Conversion
PREPA San Juan
SJ5/SJ6
2/1/2023
ULSD
PREPA Palo Seco
PSGT 1-1
2/1/2023
ULSD
PREPA Palo Seco
PSGT 1-2
2/1/2023
ULSD
PREPA Palo Seco
PSGT 2-1
2/1/2023
ULSD
PREPA Palo Seco
Mobile Pac 1
2/1/2023
ULSD
PREPA Palo Seco
Mobile Pac 2
2/1/2023
ULSD
PREPA Palo Seco
Mobile Pac 3
2/1/2023
ULSD
Page 60
(B) San Juan SOâ‚‚ Non-Attainment Area Emission Limits-Final Plan (IRP Emission Units
Retirements)
(1) The emission units from PREPA Palo Seco shall be retired by the dates in Table 2 unless
an alternative date is authorized by the PREB. This alternative date shall be no later than
December 31, 2025.
(2)
PREPA must submit a revision of the construction and operation emission source permits and
provide DNER a copy of PREB's alternative retirement date authorization and an explanation of
why an alternative date is necessary.
Table 2: PREPA Palo Seco Emission Units Retirement Schedule
Facility
Units
Retirements Date¹
PREPA Palo Seco
PS1
6/30/2023
PREPA Palo Seco
PS2 *
6/30/2023
PREPA Palo Seco
PS3
12/31/2024
PREPA Palo Seco
PS4
12/31/2025
PREPA Palo Seco
PSGT 2-2 *
6/30/2023
PREPA Palo Seco
PSGT 3-1
6/30/2023
PREPA Palo Seco
PSGT 3-2 *
6/30/2023
* The PS2, PSGT 2-2 and PSGT 3-2 units were permanently shut down and out of use on November 9,
2022 to generate netting credits for the MobilePac units according to EPA's determination regarding the
PSD/SOâ‚‚ NNSR Non-Applicability Analysis per 40CFR Part 52.21 and 40 CFR Part 51, Appendix S and
DNER's emission source construction permit PFE-70-0120-0010-II-C.
(3) The following PREPA Palo Seco emission units will stay operating after the IRP emission
units retirements, with the emission limits presented below:
1 Dates were provided by the Puerto Rico Energy Bureau via letter to DNER on October 18, 2022 and updated
on November 15, 2022. According to the letter, these dates are estimated "based on capacity balance and
planned." If PREB issues any order or IRP amendment requiring retirement of these units prior to the dates
provided herein, PREPA must comply with such order or IRP amendment.
Page 61
Table 3: PREPA Palo Seco Emission Limits
Power
PTE 100% load in ULSD 0.0015%/wt
Block/Boiler
Stack
(Lb/hr SOâ‚‚)
Units
PSGT 1-1
0.5
PB1
PSGT 1-2
0.5
PB2
PSGT 2-1
0.5
PS MP1
PSMP1-1
0.4
PSMP2
PSMP2-1
0.4
PS MP3
PSMP3-1
0.4
(4) The emission units from PREPA San Juan shall be retired by the dates in Table 4 unless an
alternative date is authorized by the PREB. This alternative date shall be no later than
December 31, 2025.
(5) PREPA must submit a revision of the construction and operation emission source permits and
provide DNER a copy of PREB's alternative retirement date authorization and an explanation of
why an alternative date is necessary.
Table 4: PREPA San Juan Emission Units Retirement Schedule
Facility
Units
Retirements Date²
PREPA San Juan
SJ7
6/30/2023
PREPA San Juan
SJ8
6/30/2023
PREPA San Juan
SJ9
12/31/2024
PREPA San Juan
SJ10
6/30/2023
(6) The following PREPA San Juan emission units will stay operating after the IRP emission
units retirements, with the emission limits presented below:
2 Dates were provided by the Puerto Rico Energy Bureau via letter to DNER on October 18, 2022 and updated
on November 15, 2022. According to the letter, these dates are estimated "based on capacity balance and
planned." If PREB issues any order or IRP amendment requiring retirement of these units prior to the dates
provided herein, PREPA must comply with such order or IRP amendment.
Page 62
Table 5: PREPA San Juan Emission Limits
PREPA
PTE. 100% load Natural Gas
Sulfur Content in LNG
Stack
San Juan
(Lb/hr SOâ‚‚)
SJ 5+6
SJ5&6
9.8
1 gr/100 dscf
* The units SJ5&6 have been operating as dual-fuel units since late 2019 and shall be switched to ULSD
in no later than 2/1/2023. PRDNER used the most conservative rate or LNG 100% load.
Page I 63
III. Emission Limitations for PREPA Aguirre
The owner or operator of an emission source at PREPA Aguirre must comply with the following
emission limitations:
(A) Guayama - Salinas SOâ‚‚ Non-Attainment Area Emission Limit -Interim Plan (Fuel switching to
Ultra Low Sulfur Diesel)
(1) No owner or operator of any combustion turbine units located at the PREPA Aguirre
facility shall cause or permit the burning of any fuel oil above a maximum sulfur content
of 0.0015 percent by weight (15 ppm), by no later than February 1, 2023, as follow:
Table 6: PREPA Aguirre Fuel Switching to Ultra Low Sulfur Diesel
Compliance Start
Facility
Units
Projected Fuel Conversion
Date
PREPA Aguirre
AGGT2-1
2/1/2023
ULSD
PREPA Aguirre
AGGT2-2
2/1/2023
ULSD
PREPA Aguirre
CC1-1HRSG
2/1/2023
ULSD
PREPA Aguirre
CC1-2HRSG
2/1/2023
ULSD
PREPA Aguirre
CC1-3HRSG
2/1/2023
ULSD
PREPA Aguirre
CC 1-4HRSG
2/1/2023
ULSD
PREPA Aguirre
CC 2-1HRSG
2/1/2023
ULSD
PREPA Aguirre
CC2-2HRSG
2/1/2023
ULSD
PREPA Aguirre
CC2-3HRSG
2/1/2023
ULSD
PREPA Aguirre
CC2-4HRSG
2/1/2023
ULSD
Page 64
(B) Guayama - Salinas SOâ‚‚ Non-Attainment Area Emission Limit -Final Plan (IRP Emission Units
Retirements)
(1) The emission units from PREPA Aguirre shall be retired by the dates in Table 7 unless an
alternative date is authorized by the PREB. This alternative date shall be no later than
December 31, 2029.
(2) PREPA must submit a revision of the construction and operation emission source permits and
provide DNER a copy of PREB's alternative retirement date authorization and an explanation of
why an alternative date is necessary.
Table 7: PREPA Aguirre Emission Units Retirement Schedule
Facility
Units
Retirements Date³
PREPA Aguirre
AG1
12/31/2025
PREPA Aguirre
AG2
12/31/2026
PREPA Aguirre
CC1-1HRSG
12/31/2028
PREPA Aguirre
CC1-2HRSG
12/31/2028
PREPA Aguirre
CC1-3HRSG
12/31/2028
PREPA Aguirre
CC 1-4HRSG
12/31/2028
PREPA Aguirre
CC 2-1HRSG
12/31/2029
PREPA Aguirre
CC2-2HRSG
12/31/2029
PREPA Aguirre
CC2-3HRSG
12/31/2029
PREPA Aguirre
CC2-4HRSG
12/31/2029
(2) The following PREPA Aguirre emission units will stay operating after the IRP emission
units retirements, with the emission limits presented below:
3 Dates were provided by the Puerto Rico Energy Bureau via letter to DNER on October 18, 2022 and updated
on November 15, 2022. According to the letter, these dates are estimated "based on capacity balance and
planned." If PREB issues any order or IRP amendment requiring retirement of these units prior to the dates
provided herein, PREPA must comply with such order or IRP amendment.
Page I 65
Table 2: PREPA Aguirre Emission Limits
Power
Stack *
PTE. 100% load in ULSD 0.0015%/wt
Block/Boiler Units
(Lb/hr SOâ‚‚)
AGGT2-1
0.46
AGGT2
AGGT2-2
0.46
*According to IRP, only gas turbines AGGT2-1, 2-2 will stay operating in PREPA Aguirre.
IV. Emission Limitations for San Juan and Guayama-Salinas Non-Attainment Areas
(A) Any emission source, except PREPA emission units, within the boundaries of San Juan and
Guayama-Salinas Non-Attainment Areas or nearby sources having a significant air quality
impact on sulfur dioxide on a SOâ‚‚ Non-Attainment Area, shall comply with all the prohibitions
provided in Rules 401 through 421 and meet the limitations specified in this subsection.
(1) No owner or operator of any combustion units within the boundaries of San Juan and
Guayama-Salinas Non-Attainment Areas, shall cause or permit the burning of any fuel oil
above a maximum sulfur content of 0.0015 percent by weight (15 ppm) by no later than
April 9, 2023.
(2) No owner or operator of any combustion units from a nearby sources having a significant
air quality impact in the San Juan and Guayama-Salinas SOâ‚‚ Non-Attainment Areas shall
cause or permit the burn of any fuel oil with a maximum sulfur content above 0.0015
percent by weight (15 ppm) by April 9, 2023.
(3) Notwithstanding the provisions of paragraphs IV(A)(1) to IV(A)(2) of this rule, the
requirements of 40 CFR Part 60 shall be followed where applicable.
(B) The owner or operator of any stationary source subject to the limitations of paragraph IV(A)
that comply with the emission limits established by the date required in this Rule shall:
(1) Certify in writing to the DNER that such source is in full compliance with all requirements
of this rule. Such certification shall include the following:
a. Equipment description.
b. DNER permit number (if assigned).
C. All necessary data (consistent with the appropriate permit appendices) and
calculations which confirm the compliance status.
d. The test method for determining compliance as specified in paragraph (V) of
this rule, "Measurement methods and procedures", whichever is applicable.
Page 66
(C) The owner or operator of any stationary source subject to the limitations of paragraph IV(A)
that cannot comply with the emission limits established by the date required in this Rule shall:
(1) Submit for approval a compliance plan under Rule 205 in which the owner or operator of
such stationary source demonstrates compliance with all applicable limitations specified
in Rule 425 and provides for the implementation of RACT requirements, if applicable. The
compliance plan shall be in writing and must include:
(a) the name of the responsible official for compliance demonstration activities at the
stationary source;
(b) a description of the air pollution control system, specific control equipment, stacks,
vents, raw materials, fuels, and other items or parameters which will be tested,
monitored, sampled, analyzed, or measured to determine that the stationary source
is in compliance on a continuous basis;
(c) a description of the specific testing methods, monitoring techniques, sampling and
analysis methods, and measurements that will be used to demonstrate compliance
on a continuous basis;
(d) a description of other relevant records or reports reasonably needed to demonstrate
compliance on a continuous basis;
(e) the frequency of testing, monitoring, sampling, analyzing, or measuring necessary to
demonstrate compliance on a continuous basis.
(f) the schedule and a detailed explanation when a physical modification of the stationary
source is needed to achieve compliance.
(g) In case of a non-permitted source, the compliance plan shall include the emission
source permit application in accordance of Part II or Part VI of the RCAP, as applicable.
(h) the date by which the source will achieve compliance with Rule 425.
(2) Implement the DNER's approved compliance plan and demonstrate final compliance with
applicable limitations established in Rule 425.
(3) Certify compliance by a responsible official, who shall state, based on information and
belief formed after reasonable inquiry, that the information certified is true and accurate.
Page 67
V. Measurement methods and procedures
(A) Unless otherwise specified in paragraph V(B) of this rule, the non-continuous test
methods used for determining compliance with the allowable emission limits in this rule
shall be those specified in 40 CFR Part 60.
(B) The test methods and procedures for PREPA to determine compliance with the allowable
emission limit for any fuel, other than coal, shall be the following:
(1) On site fuel sampling of the ULSD to be fired at PREPA San Juan, PREPA Palo Seco, and
PREPA Aguirre facilities and LNG at PREPA San Juan facility.
(2) Each batch of fuel that is received at the PREPA San Juan, PREPA Palo Seco, and PREPA
Aguirre facilities should be sampled in accordance with USEPA Method 19, ASTM
D2622, D4294, D5453, D7039, or other appropriate EPA or ASTM method.
(3) A representative and sufficient amount of a sample shall be obtained for each batch
of fuel prior to use. This fuel sample shall be analyzed for:
a. Sulfur content (percent by weight)
b. Heat value
C. Density
(4) PREPA shall ensure that each of the affected units from PREPA San Juan, PREPA Palo
Seco, and PREPA Aguirre facilities shall have a fuel monitor for each of the type of fuel
burned. PREPA shall monitor and record the amount of each fuel type burned at each
of the units on an hourly basis.
(5) Each sample shall be submitted in a timely manner to a qualified laboratory and an
analysis obtained for the constituents/properties PREPA shall maintain records of
each laboratory analysis performed for a period of at least five (5) years.
(6) PREPA shall calculate and record SOâ‚‚ emissions for each unit on a monthly basis. In
calculating the SOâ‚‚ emissions, PREPA shall assume that 100% of the sulfur in fuel is
converted to SOâ‚‚.
(7) PREPA shall maintain a monthly record of the following information for each unit:
a. Fuel used, including hourly usage and total fuel used for the month
b. Sulfur content of the fuel, fuel density, fuel heating value, and the basis for the
sulfur content used (fuel analysis showing date sample collected, type of fuel,
sulfur content, and fuel heating value)
C. SOâ‚‚ emission rates (lb/hr)
(C) All data, calculations and reports from any performance test or fuel sample developed for
the purpose of demonstrating compliance with this rule shall be retained for a minimum
of five years and shall be available for inspection by DNER's representative.
Page 68
(D) Any owner or operator of any sulfur dioxide emission source subject to this rule, shall
document any compliance test or applicable emission tracking procedure, shall document
compliance with any applicable emission rate limits and shall retain all data, calculations
and reports from any performance test, fuel sample, or operating rate monitor utilized
for the purpose of demonstrating compliance with the applicable emission limits,
emission tracking requirements, or emission rate limits for a period of not less than five
years and shall make such records available for inspection by and submittal to the DNER
upon request.
(E) Nothing in this rule shall be interpreted to prevent the DNER from issuing orders to require
performance testing, or fuel sampling or to require record-keeping and reporting of
emission information. Any such data may be used to further evaluate compliance with
this rule.
(F) Any owner or operator of any sulfur dioxide source subject to this rule, shall demonstrate
compliance with the combined hourly emission limits by performing emission tests in
accordance with V(A) and V(B) of this rule.
Page 69
VI. Contingency Measures
(A) If emission sources do not achieve compliance with the emission limits established in
Rule 425 (II), (III) and (IV) by the dates provided in these subparagraphs, it will be subject
to a compliance inspection and enforcement action. This includes expedited
procedures for establishing enforceable consent agreements pending the adoption of
revised SIPs. Any source that is found in violation of any compliance plan approved by
the DNER or any requirement within such plan will be subject to sanctions specified in