Regl. 5293, art. 110-34-110 dup3

REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 70-29

Last amended: 1993Length: 47 wordsOfficial source

Cite as Reglamento Núm. 5293, Art. 110-34-110 dup3

Table 110-34(e). Elevation of Unguarded Live Parts above Working Space Nominal Voltage Between Phases Elevation 1001-7500 8'6" 7501-35000 9' Over 35kV 9' + 0.37" per kV above 35 For SI units: one inch = 25.4 millimeters; one foot = 0.3048 meter. 70-31 Chapter 2. Wiring and Protection
Regl. 5293, art. 110-34-110 dup3: REQUIREMENTS FOR ELECTRICAL INSTALLATIONS 70-29 | Justis AI