Regl. 5293, art. 210-5-220 dup7
BRANCH-CIRCUIT, FEEDER, AND SERVICE CALCS 70-61
Cite as Reglamento Núm. 5293, Art. 210-5-220 dup7
(3) Each dwelling unit is equipped with either electric space heating or
air conditioning or both.
Feeders and service-entrance conductors whose demand load is determined by this optional calculation shall be permitted to have the neutral
load determined by Section 220-22.
(b) House Loads. House loads shall be computed in accordance with
Part B of this article and shall be in addition to the dwelling unit loads
computed in accordance with Table 220-32.
(c) Connected Loads. The connected load to which the demand factors
of Table 220-32 apply shall include the following:
(1) 1500 volt-amperes for each 2-wire, 20-ampere small appliance
branch circuit and each laundry branch circuit specified in Section 220-16.
(2) 3 volt-amperes per square foot (0.093 sq m) for general lighting and
general-use receptacles.
(3) The nameplate rating of all appliances that are fastened in place,
permanently connected or located to be on a specific circuit, ranges, wallmounted ovens, counter-mounted cooking units, clothes dryers, water
heaters, and space heaters.
Table 220-32.
Optional Calculation-Demand Factors for Three or More
Multifamily Dwelling Units
Number of
Demand
Dwelling
Factor
Units
Percent
3-5
45
6-7
44
8-10
43
11
42
12-13
41
14-15
40
16-17
39
18-20
38
21
37
22-23
36
24-25
35
26-27
34
28-30
33
31
32
32-33
31
34-36
30
37-38
29
39-42
28
43-45
27
46-50
26
51-55
25
56-61
24
62 and over
23
70-62
NATIONAL ELECTRICAL CODE
If water heater elements are so interlocked that all elements cannot be
used at the same time, the maximum possible load shall be considered the
nameplate load.
(4) The nameplate ampere or kVA rating of all motors and of all lowpower-factor loads.
(5) The larger of the air-conditioning load or the space heating load.
220-33. Optional Calculation - Two Dwelling Units. Where two dwelling
units are supplied by a single feeder and the computed load under Part B
of this article exceeds that for three identical units computed under Section
220-32, the lesser of the two loads shall be permitted to be used.
220-34. Optional Method - Schools. The calculation of a feeder or service load for schools shall be permitted in accordance with Table 220-34
in lieu of Part B of this article where equipped with electric space heating or air conditioning, or both. The connected load to which the
demand factors of Table 220-34 apply shall include all of the interior and
exterior lighting, power, water heating, cooking, other loads, and the
larger of the air-conditioning load or space heating load within the building or structure.
Feeders and service-entrance conductors whose demand load is determined by this optional calculation shall be permitted to have the neutral
load determined by Section 220-22. Where the building or structure load is
calculated by this optional method, feeders within the building or structure
shall have ampacity as permitted in Part B of this article; however, the
ampacity of an individual feeder need not be larger than the ampacity for
the entire building.
This section shall not apply to portable classroom buildings.
Table 220-34.
Optional Method-Demand Factors for Feeders
and Service-Entrance Conductors for Schools
Connected Load
Demand Factors
Volt-Amperes per Square Foot
Percent
Connected load up to and including 3, plus
100
Conected load over 3 and including 20, plus
75
Connected load over 20 at
25
For SI units: one square foot = 0.093 square meter.
220-35. Optional Calculations for Additional Loads to Existing Installations. For the purpose of allowing additional loads to be connected to
existing feeders and services, it shall be permitted to use actual maximum
kVA demand figures to determine the existing load on a service or feeder
when all the following conditions are met:
(1) The maximum demand data is available in kVA for a minimum of a
one-year period.