Regl. 1277, art. 112.2b
Reglamento General de Seguridad e Higiene Industrial, Cap. IV -- Ascensores de personas. No incluido en el Ãndice bajo Ley 149 de 12 dic, 2005
Cite as Reglamento Núm. 1277, Art. 112.2b
Power-opening of a hoistway door shall conform
to the following:
1. Power-opening shall occur only at the landing where the car is stopping, or is leveling or is at rest, and shall start only when
the car is within the landing zone or is
within the leveling or is at rest, and shall
start only when the car is within the landing zone or is within the leveling zone
where an automatic car-leveling device is
provided.
2. Power-opening may be initiated automatically through control circuits provided that
the car is being automatically stopped or
leveled and provided that, when stopping
under normal operating conditions, the car
shall be at rest or substantially level
with the landings before the hoistway door
is in the fully open position.
3. Sequence operation of a vertical sliding
hoistway door and adjacent car door or gate
shall be provided where required by Rule
112.6.
Ibid