Regl. 1277, art. 902.5 dup2
Reglamento General de Seguridad e Higiene Industrial, Cap. IV -- Ascensores de personas. No incluido en el Ãndice bajo Ley 149 de 12 dic, 2005
Cite as Reglamento Núm. 1277, Art. 902.5 dup2
Each oil buffer with oil portings as submitted
shall be adjusted to tests for retardation, strength,
oil leakage, plunger return, and lateral movement of
the plunger, as hereinafter specified.
902.5a - Retardation Test
902.5a
The following drop test shall be made for each
buffer porting specified in Part II, Section 201, Rule
201.4g(1), from a height such that the striking velocity
of the falling weight will be equal to one hundred and
fifteen (115) per cent of the rated car speed for which
the buffer is designed.
1. Three (3) drop test, with a total test
weight equal to the manufacturer's rated
maximum load for which the porting is
designed (See Part II, Section 201, Rule
201.4g-la).
2. One (1) drop test with a total test weight
equal to the manufacturer's rated minimum
load for which the porting is designed
(See Part II, Section 201, Rule 201.4g-lb).
Following each drop test, the buffer shall be held
in its fully compressed position for a period of five
(5) minutes; and shall then be allowed to return freely
to its fully extended position, and stand for thirty
(30) minutes, to permit return of the oil to the reservoir and to permit the escape of any air entrained in
the oil.
On each of these tests the average retardation of
the test weight, over the stroke of the buffer, shall
not exceed thirty-two and two tenth (32.2) feet per
second per second; and any retardation peak having a
duration of more than one twenty fifth (1/25) of a
second shall not exceed eighty and one half (80-1/2)
feet per second per second.
95
TEXTO EN ESPAÑOL
USAS, A17.1
3. Si el nivel del aceite tiende a mantenerse so-
Ibid
bre el nivel al cual se llenő, se comprobarán