Regl. 8682, art. 7.03
DESCRIPTION OF PROJECT SITE(S); PRE-EXISTING EQUIPMENT
Length: 102 wordsOfficial source
Cite as Reglamento Núm. 8682, Art. 7.03
INVENTORY
The ESPC will include a Schedule that will contain basic information about the condition of the
Project Site at the time of contract execution. Such information will include facility square footage,
building construction, use, occupancy, hours of operation and any other conditions or special
conditions that may exist.
The inventory is important to include for the purpose of identifying what equipment was in place
and how it was configured at the time of contract execution. This schedule is important to the
accurate establishment of baseline, savings measurement and may need to be referred to in the
later years of the contract.