Regl. 8682, art. 8.01
ECM-SPECIFIC M&V PLAN AND SAVINGS CALCULATION
Length: 172 wordsOfficial source
Cite as Reglamento Núm. 8682, Art. 8.01
METHODS
Follow-up measurement and verification enables the Government Unit to ensure that it is getting
full value from its ESPC. The success of the M&V effort depends on the level of detail provided
in the contract.
At least once every three (3) months per contract year, the ESCO shall submit a report of cost
savings (corroborate the results of the measures of conservation and energy efficiency). This report
must be prepared and certified by the ESCOs Professional Engineer and reviewed and approved
by the Government Unit's Contract Administrator. The ESCO shall:
1. Summarize the scope of work, location, and how cost savings are generated. Describe
source of all savings including energy, water, O&M, and other (if applicable).
2. Work in conjunction with SOEP to specify the M&V guideline, and the option used from
the International Performance Measurement and Verification Protocol (IPMVP).
30 I Page
Energy Savings Performance Contract Program Amended Regulation
3. Provide an overview of savings calculation methods for ECM. Provide a general
description of analysis methods used for savings calculations.