Regl. 8682, art. 8.05 dup2

POST-ACCEPTANCE PERFORMANCE PERIOD VERIFICATION

Length: 271 wordsOfficial source

Cite as Reglamento Núm. 8682, Art. 8.05 dup2

ACTIVITIES In order to be able to responsibly monitor and verify the Energy and Water Conservation Measures proposed in the IGA Report, SOEP and the Government Unit shall, in coordination with the ESCO, that must: 1. Describe variables affecting post-acceptance performance period energy or water use. Include variables such as weather, operating hours, set point changes, etc. Describe how each variable will be quantified, i.e., measurements, monitoring, assumptions, manufacturer data, maintenance logs, engineering resources, etc. 2. Define key system performance factors characterizing the post-acceptance performance period conditions. Include factors such as comfort conditions, lighting intensities, temperature set points, etc. 3. Describe the intent of post-acceptance performance period verification activities. 4. Provide detailed schedule of post-acceptance performance period verification activities and inspections. 5. Define requirements for the Government Unit witnessing of measurements if different than whole project data requirements. 6. Provide details of post-acceptance performance period data to be collected, including, but not limited to: Parameters to be monitored; Details of equipment to be monitored (location, type, model, quantity, etc.); Sampling plan, including details of usage groups and sample 32 I Page Energy Savings Performance Contract Program Amended Regulation sizes, Duration, frequency, interval, and seasonal or other requirements of measurements; Monitoring equipment to be used; Installation requirements for monitoring equipment; Calibration requirements/procedures; Expected accuracy of measurements/monitoring equipment; Quality control procedures to be used; Form of data to be collected (.xls, .CVS, etc.), among others. 7. Detail data analysis to be performed. 8. Define O&M and repair reporting requirements. Detail verification activities and reporting responsibilities of the Government and contractor on operations and maintenance items. Define reporting schedule. CHAPTER NINE - ADDITIONAL PROVISIONS
Regl. 8682, art. 8.05 dup2: POST-ACCEPTANCE PERFORMANCE PERIOD VERIFICATION | Justis AI