Regl. 9049, art. 107-109 dup3
INSPECTIONS
Length: 844 wordsOfficial source
Cite as Reglamento Núm. 9049, Art. 107-109 dup3
[A]109.1 General. Construction or work for which a permit is required shall be subject to
inspection by the designated inspector and the code official, and such construction or work shall
remain visible and able to be accessed for inspection purposes until approved. Approval as a result
of an inspection shall not be construed to be an approval of a violation of the provisions of this
code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate
or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It
shall be the duty of the permit applicant to cause the work to remain visible and able to be accessed
for inspection purposes. Neither the code official nor the jurisdiction shall be liable for expense
entailed in the removal or replacement of any material required to allow inspection.
[A]109.2 Preliminary inspection. Before issuing a permit, the code official is authorized to
examine or cause to be examined buildings and sites for which an application has been filed.
[A]109.3 Required inspections. The designated inspector and the code official, on notification,
shall make the inspections set forth in Sections
820
109.3.1 through 109.3.10.
[A]109.3.1 Footing or foundation inspection. Footing and foundation inspections shall be
made after excavations for footings are complete and any required reinforcing steel is in place.
For concrete foundations, any required forms shall be in place prior to inspection. Materials
for the foundation shall be on the job, except where concrete is ready-mixed in accordance
with ASTM C94, the concrete need not be on the job.
[A]109.3.2 Concrete slab or under-floor inspection. Concrete slab and under-floor
inspections shall be made after in-slab or under-floor reinforcing steel and building service
equipment, conduit, piping accessories, and other ancillary equipment items are in place but
before any concrete is placed or floor sheathing installed, including the subfloor.
[A]109.3.3 Lowest floor elevation. For additions and substantial improvements to .existing
buildings in flood hazard areas, on placement of the lowest floor, including basement, and
prior to further vertical construction, the elevation documentation required in the Puerto Rico
Building Code shall be submitted to the code official.
[A]109.3.4 Frame inspection. Framing inspections shall be made after the roof deck or
sheathing, framing, fire blocking, and bracing are in place and pipes, chimneys, and vents to
be concealed are complete and the rough electrical, plumbing, heating wires, pipes, and ducts
are approved.
[A]109.3.5 Lath or gypsum board inspection. Lath and gypsum board inspections shall be
made after lathing and gypsum board, interior and exterior, is in place but before any plastering
is applied or before gypsum board joints and fasteners are taped and finished.
Exception: Gypsum board that is not part of a fireresistance-rated assembly or a shear
assembly.
[A]109.3.6 Weather-exposed balcony and walking surface waterproofing. Where the
scope of work involves balconies or other elevated walking surfaces exposed to water from
direct or blowing rain, snow or irrigation, and the structural framing is protected by an
impervious moisture barrier, all elements of the impervious moisture barrier system shall not
be concealed until inspected and approved.
Exception: Where special inspections are provided in accordance with Section 1705.1.1,
Item 3, of the Puerto Rico Building Code.
[A]109.3.7 Fire and smoke-resistant penetrations. Protection of joints and penetrations in
fire-resistance-rated assemblies, smoke barriers and smoke partitions shall not be concealed
from view until inspected and approved.
[A]109.3.8 Other inspections. In addition to the inspections specified in Sections 109.2
through 109.3.7, the code official is authorized to make or require other inspections of any
821
construction work to ascertain compliance with the provisions of this code and other laws that
are enforced by the building enforcement agencies.
[A]109.3.9 Special inspections. Special inspections shall be required in accordance with the
Puerto Rico Building Code.
[A]109.3.10 Final inspection. The final inspection shall be made after work required by the
building permit is completed.
[A]109.4 Inspection agencies. The code official is authorized to accept reports of approved
inspection agencies, provided that such agencies satisfy the requirements as to qualifications and
reliability, as established by the Joint Regulation.
[A]109.5 Inspection requests. It shall be the duty of the holder of the building permit or their duly
authorized agent to notify the code official and the designated inspector when work is ready for
inspection. It shall be the duty of the permit holder to provide access to and means for any
inspections of such work that are required by this code.
[A]109.6 Approval required. Work shall not be done beyond the point indicated in each
successive inspection without first obtaining the approval of the code official. The code official
and/or the designated inspector, on notification, shall make the requested inspections and shall
either indicate the portion of the construction that is satisfactory as completed or shall notify the
permit holder or an agent of the permit holder wherein the same fails to comply with this code.
Any portions that do not comply shall be corrected and such portion shall not be covered or
concealed until authorized by the code official.