INSPECTIONS

Length: 1,023 wordsOfficial source

Cite as Reglamento Núm. 9049, Art. 107-110

[A]110.1 General. Construction or work for which a permit is required shall be subject to inspection by the designated inspector and the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. [A]110.2 Preliminary inspection. Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been filed. [A]110.3 Required inspections. The designated inspector and the building official, upon notification, shall make the inspections set forth in Sections 110.3.1 through 110.3.11. [A]110.3.1 Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the job, except where concrete is ready mixed in accordance with ASTM C94, the concrete need not be on the job. [A]110.3.2 Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor. [A]110.3.3 Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor, including the basement, and prior to further vertical construction, the elevation certification required in Section 1612.4 shall be submitted to the building official. [A]110.3.4 Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire-blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved. [A]110.3.5 Lath, gypsum board and gypsum panel product inspection. Lath, gypsum board and gypsum panel product inspections shall be made after lathing, gypsum board and gypsum panel products, interior and exterior, are in place, but before any plastering is applied or gypsum board and gypsum panel product joints and fasteners are taped and finished. 41 Exception: Gypsum board and gypsum panel products that are not part of a fire-resistancerated assembly or a shear assembly. [A]110.3.6 Weather-exposed balcony and walking surface waterproofing. Where balconies or other elevated walking surfaces are exposed to water from direct or blowing rain, snow or irrigation, and the structural framing is protected by an impervious moisture barrier, all elements of the impervious moisture barrier system shall not be concealed until inspected and approved. Exception: Where special inspections are provided in accordance with Section 1705.1.1, Item 3. [A]110.3.7 Fire- and smoke-resistant penetrations. Protection of joints and penetrations in fire-resistance rated assemblies, smoke barriers and smoke partitions shall not be concealed from view until inspected and approved. [A]110.3.8 Energy efficiency inspections. Inspections shall be made to determine compliance with Chapter 13 and shall include, but not be limited to, inspections for: envelope insulation R- and U-values, fenestration U-value, duct system R-value, and HVAC and water-heating equipment efficiency. [A]110.3.9 Masonry wall inspections. Inspections shall be made after masonry wall is in place with required reinforcements, conduit piping accessories and other ancillary equipment items are in place, but before any plastering or architectural specified coverings are placed. [A]110.3.10 Rough In inspections. Rough-in inspection shall be made after the roof, framing systems, fire blocking, fire stopping draft stopping and bracing is in place and all sanitary, storm and water distribution piping is roughed-in and prior to the installation of wall or ceiling membranes. [A]110.3.11 Underground Utilities Underground utilities inspections shall be made after trenches or ditches are excavated and bedded piping installed and before any backfill is put in place. [A]110.3.12 Other inspections. In addition to the inspections specified in Sections 110.3.1 through 110.3.8, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other laws that are enforced by the building enforcement agencies. [A]110.3.13 Special inspections. For special inspections, see Chapter 17. [A]110.3.14 Final inspection. The final inspection shall be made after all work required by the building permit is completed. 42 [A]110.3.14.1 Flood hazard documentation. If located in a flood hazard area, documentation of the elevation of the lowest floor as required in Section 1612.4 shall be submitted to the building official prior to the final inspection. [A]110.4 Inspection agencies. The building official is authorized to accept reports of approved inspection agencies, provided that such agencies satisfy the requirements as to qualifications and reliability, as established by the Joint Regulation. [A]110.5 Inspection requests. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official and the designated inspector when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. [A]110.6 Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official and/or the designated inspector, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until authorized by the building official.
Regl. 9049, art. 107-110: INSPECTIONS | Justis AI