Regl. 9049, art. 107-110
INSPECTIONS
Length: 1,023 wordsOfficial source
Cite as Reglamento Núm. 9049, Art. 107-110
[A]110.1 General. Construction or work for which a permit is required shall be subject to
inspection by the designated inspector and the building official and such construction or work shall
remain visible and able to be accessed for inspection purposes until approved. Approval as a result
of an inspection shall not be construed to be an approval of a violation of the provisions of this
code or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate
or cancel the provisions of this code or of other ordinances of the jurisdiction shall not be valid. It
shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible
and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction
shall be liable for expense entailed in the removal or replacement of any material required to allow
inspection.
[A]110.2 Preliminary inspection. Before issuing a permit, the building official is authorized to
examine or cause to be examined buildings, structures and sites for which an application has been
filed.
[A]110.3 Required inspections. The designated inspector and the building official, upon
notification, shall make the inspections set forth in Sections 110.3.1 through 110.3.11.
[A]110.3.1 Footing and foundation inspection. Footing and foundation inspections shall be
made after excavations for footings are complete and any required reinforcing steel is in place.
For concrete foundations, any required forms shall be in place prior to inspection. Materials
for the foundation shall be on the job, except where concrete is ready mixed in accordance with
ASTM C94, the concrete need not be on the job.
[A]110.3.2 Concrete slab and under-floor inspection. Concrete slab and under-floor
inspections shall be made after in-slab or under-floor reinforcing steel and building service
equipment, conduit, piping accessories and other ancillary equipment items are in place, but
before any concrete is placed or floor sheathing installed, including the subfloor.
[A]110.3.3 Lowest floor elevation. In flood hazard areas, upon placement of the lowest floor,
including the basement, and prior to further vertical construction, the elevation certification
required in Section 1612.4 shall be submitted to the building official.
[A]110.3.4 Frame inspection. Framing inspections shall be made after the roof deck or
sheathing, all framing, fire-blocking and bracing are in place and pipes, chimneys and vents to
be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts
are approved.
[A]110.3.5 Lath, gypsum board and gypsum panel product inspection. Lath, gypsum board
and gypsum panel product inspections shall be made after lathing, gypsum board and gypsum
panel products, interior and exterior, are in place, but before any plastering is applied or
gypsum board and gypsum panel product joints and fasteners are taped and finished.
41
Exception: Gypsum board and gypsum panel products that are not part of a fire-resistancerated assembly or a shear assembly.
[A]110.3.6 Weather-exposed balcony and walking surface waterproofing. Where
balconies or other elevated walking surfaces are exposed to water from direct or blowing rain,
snow or irrigation, and the structural framing is protected by an impervious moisture barrier,
all elements of the impervious moisture barrier system shall not be concealed until inspected
and approved.
Exception: Where special inspections are provided in accordance with Section 1705.1.1,
Item 3.
[A]110.3.7 Fire- and smoke-resistant penetrations. Protection of joints and penetrations in
fire-resistance rated assemblies, smoke barriers and smoke partitions shall not be concealed
from view until inspected and approved.
[A]110.3.8 Energy efficiency inspections. Inspections shall be made to determine compliance
with Chapter 13 and shall include, but not be limited to, inspections for: envelope insulation
R- and U-values, fenestration U-value, duct system R-value, and HVAC and water-heating
equipment
efficiency.
[A]110.3.9 Masonry wall inspections.
Inspections shall be made after masonry wall is in place with required reinforcements, conduit
piping accessories and other ancillary equipment items are in place, but before any plastering
or architectural specified coverings are placed.
[A]110.3.10 Rough In inspections.
Rough-in inspection shall be made after the roof, framing systems, fire blocking, fire stopping
draft stopping and bracing is in place and all sanitary, storm and water distribution piping is
roughed-in and prior to the installation of wall or ceiling membranes.
[A]110.3.11 Underground Utilities
Underground utilities inspections shall be made after trenches or ditches are excavated and
bedded piping installed and before any backfill is put in place.
[A]110.3.12 Other inspections. In addition to the inspections specified in Sections 110.3.1
through 110.3.8, the building official is authorized to make or require other inspections of any
construction work to ascertain compliance with the provisions of this code and other laws that
are enforced by the building enforcement agencies.
[A]110.3.13 Special inspections. For special inspections, see Chapter 17.
[A]110.3.14 Final inspection. The final inspection shall be made after all work required by
the building permit is completed.
42
[A]110.3.14.1 Flood hazard documentation. If located in a flood hazard area,
documentation of the elevation of the lowest floor as required in Section 1612.4 shall be
submitted to the building official prior to the final inspection.
[A]110.4 Inspection agencies. The building official is authorized to accept reports of approved
inspection agencies, provided that such agencies satisfy the requirements as to qualifications and
reliability, as established by the Joint Regulation.
[A]110.5 Inspection requests. It shall be the duty of the holder of the building permit or their duly
authorized agent to notify the building official and the designated inspector when work is ready
for inspection. It shall be the duty of the permit holder to provide access to and means for
inspections of such work that are required by this code.
[A]110.6 Approval required. Work shall not be done beyond the point indicated in each
successive inspection without first obtaining the approval of the building official. The building
official and/or the designated inspector, upon notification, shall make the requested inspections
and shall either indicate the portion of the construction that is satisfactory as completed, or notify
the permit holder or his or her agent wherein the same fails to comply with this code. Any portions
that do not comply shall be corrected and such portion shall not be covered or concealed until
authorized by the building official.