Regl. 9049, art. 107-1704
CONTRACTOR RESPONSIBILITY
Length: 91 wordsOfficial source
Cite as Reglamento Núm. 9049, Art. 107-1704
1704.4 Contractor responsibility. Each contractor responsible for the construction of a main
wind- or seismic force- resisting system, designated seismic system or a wind- or seismic forceresisting component listed in the statement of special inspections shall submit a written statement
of responsibility to the designated inspector and to the building official and the owner or the
owner's authorized agent prior to the commencement of work on the system or component. The
contractor's statement of responsibility shall contain acknowledgement of awareness of the special
requirements contained in the statement of special inspections.