216-RICR-50-15-1
216-RICR-50-15-1. Asbestos Control (version Amendment, 12/10/2012 to 01/01/2019)
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS
DEPARTMENT OF HEALTH
July 1985 (E)
AS AMENDED:
November 1985 (E)
February 1992 (E)
January 1986
June 1996(E)
February 1986 (E)
October 1996(E)
June 1986 (E)
December 1996
August 1986
May 1987 (E)
September 1987 (E)
October 1988
September 1989 (E)
January 2002 (re-filing in
accordance with the provisions of
section 42-35-4.1 of the Rhode
Island General Laws, as amended)
January 1990 (E)
June 1990
June 1990 (E)
July 1990 (E)
November 1990 (E)
January 2007 (re-filing in
accordance with the provisions of
section 42-35-4.1 of the Rhode
Island General Laws, as amended)
February 1992
September 2007
January 2012 (re-filing in accordance
with the provisions of section 42-35-
4.1 of the Rhode Island General Laws,
as amended)
September 2012
i
SUMMARY OF MOST RECENT AMENDMENT ACTIONS
These amended Rules and Regulations for Asbestos Control (R23-24.5-ASB) are promulgated pursuant to
the authority conferred under section 23-24.5-5(c) of the General Laws of Rhode Island, 1956, as amended,
and were established for the purpose of adopting standards for asbestos control to implement the provisions of
Chapter 23-24.5 of the General Laws of Rhode Island, 1956, as amended, and for adopting revised initial and
renewal licensure fees.
Furthermore, pursuant to the provisions of sections 42-35-3(c)(3) and (c)(4) of the General Laws of
Rhode Island, 1956, as amended, the following issues have been given serious consideration in arriving at the
amended regulations:
(a) Alternative approaches; and
(b) Overlap and duplication with other state regulations."
Based on the available information, no known overlap, duplication, or alternative approach was
identified.
These amended rules and regulations shall supersede all previous Rules and Regulations for Asbestos
Control promulgated by the Department of Health and filed with the Secretary of State.
ii
TABLE OF CONTENTS
PART A - DEFINITIONS, GENERAL PROVISIONS, ASBESTOS EXPOSURE STANDARD AND
SUBMISSION OF ASBESTOS ABATEMENT PLANS
Page
A.1
Definitions
A-1
A.2
General Provisions
A-7
Purpose and Scope
A-7
Exemptions, Variance and Practices and Procedures
A-7
Prohibitions
A-8
Closing of Buildings
A-9
A.3
Indoor Non-Occupational Air Exposure Standard
A-9
A.4
Submission of Asbestos Abatement Plans
A-9
General Requirement
A-9
Emergency Asbestos Abatement Projects
A-9
PART B - ASBESTOS CONTRACTORS
B.1
Licensing of Asbestos Contractors, Site Supervisors and Workers
B-1
General Licensing Requirement
B-1
Applicability
B-1
License Application
B-1
License Fees and Issuance/Renewal of Licenses
B-2
Denial of Applications
B-3
Suspension or Revocation of a License and/or Imposition of Civil Penalties
B-3
Replacement of Lost or Damaged License
B-3
Renewal of a License
B-3
Additional Requirements
B-3
Communications
B-4
B.2
Recordkeeping and Notification
B-4
Notification of Asbestos Abatement Projects
B-4
Retention of Records
B-5
Required Records
B-5
B.3
Training Requirements
B-6
General Training Requirement
B-6
Certification of Training
B-7
Content of Initial Training Courses
B-7
Content of Annual Training Courses
B-8
B.4
Respiratory Protection
B-8
General Requirement
B-8
Selection Requirements
B-8
Fitting of Respirators
B-9
Prohibited Activity
B-9
B.5
Protective Clothing
B-9
General Requirement
B-9
B.6
Medical Monitoring
B-9
General Requirement
B-9
B.7
Worker Air Monitoring.
B-10
General Requirement
B-10
iii
TABLE OF CONTENTS
Page
B.8
Work Practice Requirements
B-10
Applicability
B-10
General Requirements for Removal, Encapsulation and/or Enclosure of
Regulated Asbestos Containing Material (RACM)
B-10
Specific Requirements for Removal of Regulated Asbestos Containing Material (RACM)
B-13
Specific Requirements for Encapsulation of Regulated Asbestos Containing
Material (RACM)
B-14
Specific Requirements for Enclosure of Regulated Asbestos Containing Material (RACM)
B-14
Specific Requirements for Demolition of Structures Containing Asbestos
B-14
General Requirements for Use of Glove Bags During Removal and/or
Encapsulation of Regulated Asbestos Containing Material (RACM)
B-15
Specific Requirements for Removal of Category I Nonfriable ACM -
Asphalt Roofing Products
B-17
B.9
[DELETED]
B.10
Work Practice Requirements - Spot Repairs.
B-19
Applicability
B-19
Documentation
B-19
B.11
Alternative Procedures
B-20
PART C - ABATEMENT (MANAGEMENT) PLANS AND OWNER RESPONSIBILITIES
Purpose and Scope
C-1
Contents of an Abatement (Management) Plan
C-1
Post-Abatement Requirements
C-2
Revocation of Agency Approval for Asbestos Abatement (Management) Plan
C-4
Expiration of Agency Approval for Asbestos Abatement (Management) Plan
C-4
Asbestos Abatement (Management) Plan Fees
C-5
Recordkeeping Requirements for AHERA Management Plans
C-6
PART D - CERTIFICATION OF TRAINING COURSES, COMPETENT PERSONS, ANALYTICAL
SERVICES AND CONSULTANTS
D.1
Certification of Asbestos Abatement Training Courses
D-1
General Requirement
D-1
Application for Certification of Training Courses
D-1
Criteria for Instructors
D-3
Recordkeeping Requirements
D-3
Suspension or Revocation of Certification
D-4
Asbestos Training Course Fees and Issuance/Renewal of Certificates
D-4
Renewal of Certification
D-5
Certified Training Courses - Types, Content and Duration
D-5
D.2
Certification of Competent Persons
D-7
General Requirement
D-7
Content of Competent Person Training Courses
D-8
Suspension or Revocation of Competent Person Certification and/or
Imposition of Civil Penalties
D-8
Expiration of Certification
D-9
iv
TABLE OF CONTENTS
Page
Renewal of Certification
D-9
D.3
Certification of Asbestos Analytical Services
D-9
General Requirement
D-9
Application for Certification of Asbestos Analytical Services
D-9
Suspension or Revocation of Laboratory Certification
D-11
Asbestos Analytical Services Fees and Issuance/Renewal of Certificates
D-11
Renewal of Certification
D-12
D.4
Certification of Asbestos Consultants
D-12
General Requirement
D-12
Certification of Consultants
D-12
Suspension or Revocation of Consultant Certification
D-13
Asbestos Consultant Fees and Issuance/Renewal of Certificates
D-13
Renewal of Certification
D-14
Assessment Criteria
D-15
Annual Training Requirement
D-15
PART E - HAZARD ASSESSMENT CRITERIA
E.1
Inspection of Buildings
E-1
General Requirement
E-1
Establishing the Asbestos Content of Materials
E-1
Conducting Information Surveys for Asbestos Containing Materials
E-1
Determining the Degree of Hazard Posed by Asbestos Containing Material
E-1
E.2
Development of Asbestos Abatement Remedies
E-1
General Requirement
E-1
E.3
Reinspection of Schools and School Buildings
E-2
General Requirement
E-2
Appendix A - Sampling and Analysis Criteria
E-3
Appendix B - Evaluation & Rating of Asbestos Hazards in Buildings
E-6
Appendix C - Walk-Through Survey for Information on Asbestos Hazards in Buildings
E-9
PART F - NESHAP REQUIREMENTS
F.1
General Provisions
F-1
Authority
F-1
Implementation
F-1
Applicability and Scope
F-1
F.2
Standard for Demolition and Renovation
F-1
Applicability
F-1
Notification Requirements
F-2
Procedures for Asbestos Emission Control
F-5
F.3
Standards for Waste Disposal for Demolition and Renovation Operations
F-7
Applicability and Scope
F-7
Visible Emissions
F-8
Disposal of Asbestos Containing Waste Material
F-9
Placarding
F-9
Recordkeeping
F-10
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
PART A
DEFINITIONS, GENERAL PROVISIONS, ASBESTOS EXPOSURE STANDARD
AND SUBMISSION OF ASBESTOS ABATEMENT PLANS
JANUARY 1986
AS AMENDED:
AUGUST 1986
OCTOBER 1988
FEBRUARY 1992
Section A
1
PART A
DEFINITIONS, GENERAL PROVISIONS, ASBESTOS EXPOSURE STANDARD
AND SUBMISSION OF ASBESTOS ABATEMENT PLANS
A.1
DEFINITIONS
Whenever used in these rules and regulations, the following terms shall be construed as follows:
Act - Title 23, Chapter 24.5 of the General Laws of the State of Rhode Island entitled Asbestos Abatement.
Adequately Wet - Sufficiently mixed or penetrated with liquid to prevent the release of particulates. If visible
emissions are observed coming from ACM, then that material has not been adequately wetted. However, the
absence of visible emissions is not sufficient evidence of being adequately wet.
Agency - The Rhode Island Department of Health, Division of Occupational and Radiological Health.
Agent - Any individual performing work on an asbestos abatement project for the Asbestos Contractor, that is
not an employee of the Contractor (e.g. industrial hygiene subcontractor).
Amended Water - Water to which a surfactant has been added.
Asbestiform Materials - Those naturally occurring fibers of similar shape, size, strength, surface and
characteristics of asbestos fibers as are otherwise described in the publication entitled "Non Occupational
Health Risks of Asbestiform Fibers" published by the Committee on Non Occupational Health Risks of
Asbestiform Fibers, Board on Toxicology and Health Hazards of the Commission on Life Sciences of the
National Research Council; U. S. Environmental Protection Agency and National Academy of Sciences,
National Academy Press, Washington, DC, 1984, E.P.A. 68-01-4655.
Asbestos - That unique group of naturally occurring minerals that separate into fibers of high tensile strength,
resistant to heat, wear and chemicals, described as the following types: chrysotile, amosite, crocidolite,
tremolite, anthophyllite, and actinolite, and every product containing any of these materials that have been
chemically treated and/or altered which, after manufacture, are used for such products and end uses as
insulation, textiles, paper, cement sheets, floor tile, wall covering, decorations, coating, sealants, cement pipe
and reinforced plastics and other compounds.
Asbestos Abatement - Any activity involving the removal, encapsulation, enclosure, renovation, repair,
demolition or other disturbance of friable asbestos containing materials. Asbestos Abatement shall be
synonymous with Asbestos Management for the purposes of these regulations.
Asbestos Abatement Planning Consultant - An individual who develops asbestos abatement/management
plans required by Subpart A.4 of these regulations.
Asbestos Abatement Project - All activities, including site preparation and clean-up, associated with asbestos
abatement, from the time of initial arrival of the contractor on-site through obtaining an acceptable final
clearance air sample in the abatement area(s) and/or removal of all abated ACM from the project site,
whichever is later.
Asbestos Abatement Site Supervisor - Any Asbestos Abatement Worker of a licensed Asbestos Contractor
who has been specifically licensed as a supervisor by the Agency and is named on the Asbestos Contractor's
license.
Section A
2
Asbestos Abatement Worker - Any employee of a licensed Asbestos Contractor who engages in Asbestos
Abatement.
Asbestos Containing Material (ACM) - Any material or product which contains more than one percent (1%)
asbestos, as determined using the method specified in Appendix A, Subpart F, 40 CFR Part 763, Section 1,
Polarized Light Microscopy (PLM). If the asbestos content of friable material is less than 10 percent as
determined by a method other than point counting by PLM, the asbestos content must be verified by point
counting using PLM.
Asbestos Containing Waste Materials - RACM waste and materials contaminated with asbestos including
disposable equipment and clothing.
Asbestos Contractor - Any person or entity engaged in asbestos abatement as a business and whose
employees actually perform the asbestos abatement work. (see also: Asbestos Abatement)
Asbestos Hazard Emergency Response Act (AHERA) Regulations - Refers to specific amendments to Title II
of the Toxic Substances Control Act enacted by 15 USC Sections 2641-2654 and the regulations of the U.S.
Environmental Protection Agency contained in 40 CFR 763.80 through 763.99 (Subpart E).
Asbestos Inspection Consultant - An individual who: (1) conducts inspections and reinspections to identify
locations of friable and nonfriable ACM; (2) collects bulk samples of homogeneous areas of friable surfacing
materials; (3) conducts surveillance of thermal systems insulation; and/or (4) discharges other such related
activities.
Asbestos Management Planner Consultant - An individual who, for any school or school building subject to
the AHERA regulations: (1) develops an asbestos abatement/management plan for abatement action(s) no
larger than small-scale short-duration maintenance activities, as defined by 29 CFR 1926.58 - Appendix G,
that disturb friable ACM and/or for minor fiber release episode(s); (2) maintains records and reports of
asbestos activities relating to the implementation of abatement/management plans; (3) is responsible for the
implementation and administration of the abatement/management plan; and/or (4) discharges other such
related activities.
Asbestos Project Designer Consultant - An individual who: (1) designs all types of abatement actions
including other than small-scale, short-duration maintenance activities, as defined by 29 CFR 1926.58 -
Appendix G, and major fiber release episodes; and/or (2) discharges other such related activities.
Authorized Asbestos Disposal Facility - A location approved for handling asbestos waste by the Rhode Island
Department of Environmental Management or by an equivalent regulatory agency if the material is disposed
of outside the state of Rhode Island.
Auxiliary Work - Work activity which does not directly involve the performance of an asbestos abatement
project but may, in the process of assisting in the performance of that project, disturb or cause exposure to
asbestos or asbestos-containing materials.
Category I Nonfriable Asbestos Containing Material (ACM) - Any ACM in the form of packings, gaskets,
resilient floor covering, and asphalt roofing products.
Category II Nonfriable Asbestos Containing Material (ACM) - Any ACM, excluding Category I nonfriable
ACM, that, when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Section A
3
Clean Room - An uncontaminated area or room which is a part of the worker decontamination enclosure
system with provisions for storage of worker's street clothes and clean protective equipment.
Competent Person - A designated public employee, designated public maintenance person, maintenance
worker in the private sector, teacher and/or parent representative certified under the provision of Subpart D.2
of these regulations.
Cutting - Penetrating with a sharp-edged instrument. This term also includes sawing, but does not include
shearing, slicing, or punching.
Demolition - The wrecking or taking out of any load-supporting structural member of a facility together with
any related handling operations or the intentional burning of any facility. (see also: Structural Member)
Emergency Asbestos Abatement Project - Any Asbestos Abatement Project which was not planned but results
from a sudden, unexpected event. This includes operations required by non-routine failures of equipment.
Emergency Renovation Operation - A renovation operation that was not planned but: (a) results from a
sudden, unexpected event that, if not immediately attended to, presents a safety or public health hazard; (b) is
necessary to protect equipment from damage; or (c) is necessary to avoid imposing an unreasonable financial
burden. This term also includes operations necessitated by nonroutine failures of equipment.
Encapsulation - The application of an encapsulant to asbestos containing materials to control the release of
asbestos fibers into the air. The encapsulant creates a membrane over the surface (bridging encapsulant) or
penetrates the material and binds its components together (penetrating encapsulant). [c.f. also: Removal
Encapsulant]
EPA - The U.S. Environmental Protection Agency.
Equipment Room - A contaminated area or room which is part of the worker decontamination enclosure
system with provisions for storage of contaminated clothing and equipment.
Facility - Any institutional, commercial, public or industrial structure, installation or building. For the
purpose of compliance with Part F of these regulations, this definition also includes any ship and any
structure, installation, or building containing condominiums or individual units operated as a residential
cooperative, but excluding residential buildings having four or fewer dwelling units. For the purposes of this
definition, any building, structure, or installation that contains a loft used as a dwelling is not considered a
residential structure, installation, or building. Any structure, installation, or building that was previously
subject to either the NESHAP regulations [40 CFR 61, Subpart M] or these regulations is not excluded,
regardless of its current use or function. This term does not include a private residence as defined in the Act.
Facility Component - Any part of a facility including equipment.
Friable Asbestos Material - Any ACM that, when dry, can be crumbled, pulverized or reduced to powder by
hand pressure.
Glove Bag - A sealed compartment with attached inner gloves used for the handling of asbestos containing
materials. Properly installed and used, glove bags provide a small work area enclosure typically used for
small-scale asbestos stripping operations.
Section A
4
Grinding - Reducing to powder or small fragments. This term also includes mechanical chipping or drilling.
HVAC - Heating, ventilation and air conditioning system.
HEPA Filtration - High efficiency particulate air filtration found in respirators and vacuum systems capable of
filtering 0.3 micron particles with 99.97% efficiency, for use in asbestos contaminated environments.
High Priority Areas - Those areas of a building which are used or occupied by a high percentage of the
building population on a regular basis. Such areas include classrooms, cafeterias, gymnasiums, offices, places
of assembly, work stations, corridors, lobbies, restrooms, and others that may be determined by the Director
of Health.
High Priority Building - A child inhabited or child frequented structure either privately or publicly owned.
This category shall include, but not be limited to, public and parochial schools (Grades pre-K to 12), day care
centers, nurseries, acute or chronic children's hospitals (or wardrooms thereof) as otherwise defined by the
National Building Code Use Groups E, B and I. Private residences used for the above purposes and housing
or occupied by ten (10) children or less are excluded from this group.
Homogeneous Material - Asbestos containing material having a similar distribution of mineralogical types of
asbestos and approximately the same percentages of each type throughout.
Individual - Any human being.
Industrial Hygiene Consultant - An individual who provides industrial hygiene services in one or more of the
following categories: Collection of Air Samples; Compliance Monitoring of Asbestos Abatement/
Management Plans; and/or Respiratory Protection Programs.
In Poor Condition - The binding of the material is losing its integrity as indicated by peeling, cracking, or
crumbling of the material.
Installation - Any building or structure or any groups of buildings or structures at a single demolition or
renovation site that are under the control of the same owner or operator (or owner or operator under common
control).
Intermediate Priority Building - Public buildings, other than those in the high and low priority groups, which
are designated within the National Building Code Use Groups as follows: Places of public assembly (Group
A); structures occupied by adult inmates and/or patients, and state employees (Group I); colleges, hospitals,
and auditoriums (Group I); and occupied places of employment (Group F). Also included are private
buildings which are: private colleges, hospitals, banks, and other business, industrial, educational and
mercantile institutions (Groups M, H, I, R1 and R2) including, but not limited to, hotels, motels, multi-family
dwellings and places of employment with more than ten (10) employees.
Leak-Tight - Solids or liquids cannot escape or spill out. This term also means dust-tight.
Section A
5
License - The permit issued by the Agency to allow an Asbestos Contractor to engage in asbestos abatement
projects.
Low Priority Areas - Those areas of a building which are used or occupied by a small fraction of the building
population or very infrequently used. Such areas include general access storage rooms and manned boiler
rooms unless these areas supply ventilation air to other parts of the building, in which case they would be
classed according to the areas served by the ventilation air. These are areas where exposure to asbestos would
be limited to a small number of people and where a reasonable course of action would be educating occupants
or users of these areas in proper prevention and safety techniques.
Low Priority Building - Public or private buildings which are not in the other groups and which are
infrequently used or closed, or abandoned or scheduled for same in the immediate future and those structures
which are private residences (Groups S, R3 and 4).
Major Fiber Release Episode - The falling or dislodging of greater than three (3) square or linear feet of
friable ACM.
Minor Fiber Release Episode - The falling or dislodging of three (3) square or linear feet or less of friable
ACM.
NESHAP - The National Emission Standards for Hazardous Air Pollutants.
NIOSH - The National Institute for Occupational Safety and Health.
Nonfriable Asbestos Containing Material (ACM) - Any ACM that, when dry, cannot be crumbled, pulverized,
or reduced to powder by hand pressure.
Nonscheduled Renovation Operation - A renovation operation necessitated by the routine failure of
equipment, which is expected to occur within a given period based on past operating experience, but for
which an exact date cannot be predicted.
Outside Air - The air outside buildings and structures including, but not limited to, the air under a bridge or in
an open air ferry dock.
Owner - The person or entity having legal title to property and/or buildings. For purposes of publicly owned
property only, the owner shall be defined to be the chief executive officer of the state or municipal agency
which owns, leases or controls the use of the property.
Owner or Operator of a Demolition or Renovation Activity - Any person who owns, leases, operates, controls,
or supervises the facility being demolished or renovated or any person who owns, leases, operates, controls,
or supervises the demolition or renovation operation, or both.
OSHA - The Occupational Health and Safety Administration of the U.S. Department of Labor.
Particulate Asbestos Material - finely divided particles of asbestos or material containing asbestos.
Person - Any individual, corporation, partnership, firm, association, trust, estate, public or private institution,
group, agency, political subdivision of this State, and other State or political subdivision or agency thereof,
and the legal successor, representative, agent or agency of the foregoing.
Planned Asbestos Abatement Project - An asbestos abatement project or a number of such projects in which
Section A
6
the amount of asbestos containing material to be removed, stripped or otherwise disturbed within a given
period of time can be predicted. Individual, non-scheduled abatements are included if a number of such
operations can be predicted to occur during a given period of time based on operating experiences.
Planned Renovation Operations - A renovation operation, or a number of such operations, in which some
RACM will be removed or stripped within a given period of time and that can be predicted. Individual
nonscheduled operations are included if a number of such operations can be predicted to occur during a given
period of time based on operating experience.
Private Residence - Any structure which is designated within National Building Code Use Groups R3 or R4.
Regulated Asbestos Containing Material (RACM) - (a) Friable asbestos material; (b) Category I nonfriable
ACM that has become friable; (c) Category I nonfriable ACM that will be or has been subjected to sanding,
grinding, cutting, or abrading; or (d) Category II nonfriable ACM that has a high probability of becoming or
has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the
course of the demolition or renovation operations regulated by these regulations.
Removal - The taking out of RACM or facility components that contain, or are covered with, RACM from
any facility.
Removal Encapsulant - A penetrating encapsulant specifically designed for use in removal of asbestos
containing material rather than for permanent encapsulation.
Renovation - Altering a facility or one or more facility components in any way, including the stripping or
removal of RACM from a facility component. Operations in which load-supporting structural members are
wrecked or taken out are demolitions.
Repair - The restoration of asbestos containing insulation that has been damaged, usually located on pipes,
boilers, tanks, turbines, ducts or other facility components. Repair usually consists of the application of duct
tape, rewettable glass cloth, canvas, cement or other suitable material to seal exposed areas where asbestos
fibers may be released. Repair of previously encapsulated asbestos containing materials may involve filling
damaged areas with non-asbestos substitutes and re-encapsulating. Repair of enclosures around asbestos
containing materials is also included in this category of abatement.
Restricted Use Areas - Those areas of a building which have infrequent occupancy such as unmanned boiler
rooms, mechanical rooms, electrical rooms and secured storage rooms unless those areas supply ventilation
air to the other parts of the building, in which case they would be classed according to the areas served by the
ventilation air.
Resilient Floor Covering - Asbestos containing floor tile, including asphalt and vinyl floor tile, and sheet
vinyl floor covering containing more than 1 percent asbestos as determined using the methods specified in
Appendix A, Subpart F, 40 CFR Part 763, Section 1, Polarized Light Microscopy or any other method
approved by the EPA for this type of analysis.
Shower Room - A room between the clean room and the equipment room in the worker decontamination
enclosure with hot and cold or warm running water controllable at the tap and suitably arranged for complete
showering during decontamination.
Spot Repair - Any removal, repair, encapsulation, enclosure or other disturbance which encompasses: (1) up
to ten (10) linear feet of asbestos from piping and/or (2) up to twenty five (25) square feet of asbestos from
Section A
7
any surfaces other than pipes. Large project divided into smaller segments are not Spot Repairs.
Strip - To take off RACM from any part of a facility or facility components.
Structural Component - Any pipe, duct, boiler, tank, reactor, turbine or furnace at or in a facility or any
structural member of a facility. (see also: Structural Member)
Structural Member - Any load-supporting member of a facility, such as beams and load-supporting walls or
any non-load-supporting member, such as ceilings and non-load-supporting walls.
Structure - A whole facility, building or a major portion thereof, such as a building wing.
These Regulations - All Parts of the Rhode Island Rules and Regulations for Asbestos Control.
Visible Emissions - Any emissions, which are visually detectable without the aid of instruments, coming from
RACM or Asbestos Containing Waste Material.
Waste Generator - Any owner or operator of a facility covered by these regulation whose act or process
produces Asbestos Containing Waste Material.
Waste Shipment Record - The shipping document, required to be originated and signed by the waste
generator, used to track and substantiate the disposition of Asbestos Containing Waste Material.
Wet Cleaning - The process of eliminating asbestos contamination from building surfaces and objects by
using cloths, mops or other cleaning utensils which have been dampened with amended water or diluted
removal encapsulant and afterwards thoroughly decontaminated or disposed of as asbestos contaminated
waste.
Wet Methods, Wetted or Wetting Agents - The use of amended water or removal encapsulants to control fiber
release from asbestos containing materials.
Working Day - Monday through Friday and includes holidays that fall on any of the days Monday through
Friday.
A.2
GENERAL PROVISIONS
A.2.1 Purpose and Scope
These regulations provide for the licensing of Asbestos Contractors, the submission of asbestos abatement
plans and other requirements related to the safe abatement of asbestos hazards.
A.2.2 Exemptions, Variance and Practices and Procedures
(a) The requirements for licensing and the submission of an asbestos abatement plan shall not apply
to the performance of spot repairs.
(b) The requirements for licensing and the submission of an asbestos abatement plan shall not apply
to private residences as defined in these regulations.
Section A
8
(c) Variance Procedures
(1) The Agency may grant a variance, either upon its own motion or upon request of the
applicant, from the provisions of any rule or regulation in a specific case if it finds that a
literal enforcement of such provision will result in unnecessary hardship to the applicant and
that such a variance will not be contrary to the public interest, public health and/or health
and safety of the public.
(2) A request for a variance shall be filed by an applicant in writing, setting forth in detail the
basis upon which the request is made. Upon filing of each request for a variance with the
Agency, and within thirty (30) days thereafter, the Agency shall notify the applicant by
certified mail of its approval, or in the case of a denial, a hearing date, time and place may be
scheduled if the applicant appeals the denial and in accordance with the provisions of
Paragraph A.2.2(d) of these regulations.
(d) Rules Governing Practices and Procedures
All hearings and reviews required under the provisions of Chapter 23-24.5 of the General Laws
of Rhode Island, 1956, as amended, shall be held in accordance with the provisions of the rules
and regulations promulgated by the Rhode Island Department of Health entitled, Rules and
Regulations Governing the Practices and Procedures Before the Rhode Island Department of
Health (R42-35-PP).
A.2.3 Prohibitions
(a) No asbestos abatement project shall be undertaken unless the Asbestos Contractor is licensed
with the Agency and an asbestos abatement plan has been approved by the Agency.
(b) No on-site work for an approved asbestos abatement project may be conducted unless at least one
of the Asbestos Contractor's licensed Asbestos Abatement Site Supervisors and an individual
certified by the American Red Cross (or equivalent) in Cardio-Pulmonary Resuscitation and
basic first-aid are physically present on the job site.
(c) No owner shall allow any person to be exposed to friable asbestos materials when such exposure
is a violation of the provisions of the Act, these regulations or the indoor non-occupational air
exposure standard defined in Subpart A.3 of these regulations.
(d) No building or demolition permit involving asbestos abatement shall be issued by any municipal
or state official unless the application for the permit includes a certified copy of an approved
abatement plan and a certified copy of the license of the Asbestos Contractor who shall undertake
the work.
(e) Individuals certified only for spot repairs in accordance with Subpart D.2 of these regulations
shall not undertake any asbestos abatement project which is: (1) larger than the size limits for a
Spot Repair as defined by these regulations; or (2) in buildings other than those specifically
authorized on their Certification.
A.2.4 Closing of Buildings
(a) The Director of Health may prohibit and/or limit access to any building or portion of a building
in which the Director of Health, after notice and hearing, has found to contain friable asbestos in
Section A
9
such condition or amount that there exists a public health danger. Access to such areas shall be
limited to individuals designated as competent persons for said area or certified as consultants in
accordance with Subpart D.4 of these regulations.
(b) No building or portion thereof to which access has been prohibited and/or limited in accordance
with the provisions of Paragraph A.2.4(a) of these regulations shall be reopened to unlimited
access until the Director of Health issues a reoccupancy permit.
A.3
INDOOR NON-OCCUPATIONAL AIR EXPOSURE STANDARD
A.3.1 For the purposes of these regulations, the Indoor Non-Occupational Air Exposure Standard for
asbestos exposure shall be 0.01 fibers per cubic centimeter (f/cc) for fibers greater than five (5)
microns in length as measured by OSHA-NIOSH phase contrast optical microscopic methods and
calculated as an eight (8) hour time weighted average (or 300 nanograms per cubic meter).
A.4
SUBMISSION OF ASBESTOS ABATEMENT PLANS
A.4.1 General Requirements
(a) Any building owner who intends to conduct an asbestos abatement project, with the exception of
spot repairs as defined in these regulations, must submit an asbestos abatement plan in
compliance with the requirements of Part C of these regulations and must not proceed with said
project until written approval of said plan has been received from the Agency.
(b) Any building owner who is notified that the results of an Agency evaluation conducted in
accordance with Part E of these regulation indicate that an asbestos abatement plan is required
shall submit said plan to the Agency within one hundred twenty (120) days of receipt of said
notice.
(c) In addition to the requirements of Paragraph A.4.1(b) of these regulations, any building owner
who is notified that areas have received an Asbestos Hazard Rating greater than ninety (90) shall,
within ten (10) days of receipt of said notice, submit to the Agency the immediate corrective
action(s) to be taken, as well as an Interim Operations and Maintenance Plan in accordance with
Paragraphs C.1.2(b) and (c) of these regulations.
A.4.2 Emergency Asbestos Abatement Projects
(a) The work procedures contained in Subpart B.8 of these regulations will apply to all Emergency
Asbestos Abatement Projects unless specific alternative procedures have been approved by the
Agency.
(b) A building owner shall contact the Agency in advance for permission to conduct an Emergency
Asbestos Abatement Project in the absence of an approved asbestos abatement plan. Ordinarily
permission will be granted only to prevent personnel injury or property damage. However, if the
emergency is of such a nature that immediate action is deemed essential, the building owner may
proceed to resolve the emergency in the most expeditious manner possible. Nevertheless, all
asbestos abatement that is beyond the scope of Spot Repairs, as defined by these regulations,
Section A
10
must be performed by a licensed asbestos contractor. The building owner shall notify the
Agency no later than one (1) working day following the beginning of an emergency asbestos
abatement project and confirm the name and license number of the Asbestos Contractor, the
amount of asbestos containing material involved and the expected length of the abatement
project. Within ten (10) working days of completing the project, the building owner shall submit
a written report to the Agency which includes as a minimum: a narrative description of the
area(s) abated, including the type and quantity of asbestos containing material; annotated
blueprint(s), floorplan(s) or other engineering drawing(s) which show the location(s) of abated
and remaining asbestos containing material; specific work procedures followed during the
abatement process; copies of the results of clearance air testing; copies of disposal receipts for all
asbestos that was removed; and any other information specifically requested by the Agency.
(c) Removal of asbestos containing material from a building ordered demolished by a municipal
building official in accordance with Section 23-27.3-125.5 of the General Laws of Rhode Island
may be handled as an Emergency Asbestos Abatement Project under the following conditions:
(1) All asbestos abatement work is performed by a licensed Asbestos Contractor under the
provisions of an Asbestos Abatement Plan previously approved for the demolition of unsafe
structures in the jurisdiction of the municipal building official ordering the demolition;
(2) The licensed Asbestos Contractor complies with the provisions of Paragraphs A.4.2(a) and
(b) of these regulations;
(3) The Asbestos Contractor provides the Agency with all project specific information required
by the approval letter for the previously approved Asbestos Abatement Plan and not included
with the reports required by Paragraph B.2.2(a) of these regulations; and
(4) All asbestos containing material is removed from the building prior to its demolition.
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
PART B
ASBESTOS CONTRACTORS
JANUARY 1986
AS AMENDED:
AUGUST 1986
OCTOBER 1988
JUNE 1990
FEBRUARY 1992
SEPTEMBER 2007
Section B
1
PART B
ASBESTOS CONTRACTORS
B.1
LICENSING OF ASBESTOS CONTRACTORS, SITE SUPERVISORS AND WORKERS
B.1.1
General Licensing Requirement
No person shall engage in any asbestos abatement project at a facility unless he is licensed to do so by the
Agency under the provisions of this Subpart.
B.1.2
Applicability
(a) The licensing requirements of this Subpart apply to all Asbestos Contractors, as defined in these
regulations, and each of their Asbestos Abatement Site Supervisory Personnel and Asbestos
Abatement Workers.
(b) Persons who perform only spot repairs are exempted from the licensing requirement contained in
Paragraph B.1.2(a) of these regulations. However, persons performing spot repairs must be
certified in accordance with Subpart D.2 of these regulations.
B.1.3
License Application
(a) To apply for a license, an Asbestos Contractor or Asbestos Abatement Worker shall submit a
completed application to the Agency on forms provided by the Agency. The application shall
include all information required by the Act, as well as by the form and accompanying
instructions.
(b) The Agency may at any time after the filing of the original application require further
information in order to enable the Agency to determine whether the application should be
approved or denied.
(c) Each application for an Asbestos Contractor License shall be signed by the applicant or a person
duly authorized to act on behalf of the applicant. Each application for an Asbestos Abatement
Worker License shall be signed by the applicant. All applications shall include a certification by
the applicant that his License or other authorization to perform asbestos abatement work has not
been suspended or revoked by any other state and that no enforcement actions by any state or
federal agency are pending against the applicant.
(d) Site supervisors shall be licensed in conjunction with an application for a license by an Asbestos
Contractor. Subsequent to the issuance of an Asbestos Contractor's license, the licensed
Asbestos Contractor shall not utilize any individual as an Asbestos Abatement Site Supervisor
until the individual's qualifications have been approved by the Agency and an amended license
document has been issued.
(e) Effective 1 September 1990, all Asbestos Abatement Workers must be licensed on an individual
basis. As of this date, licensed Asbestos Contractors shall not utilize any individual as an
Asbestos Abatement Worker until the individual's qualifications have been approved by the
Agency and an Asbestos Abatement Worker License has been issued. Any person possessing a
valid Asbestos Abatement Site Supervisor License issued by the Agency shall be considered to
Section B
2
also possess an Asbestos Abatement Worker License for the purpose of these regulations.
B.1.4
License Fees and Issuance/Renewal of Licenses
(a) Asbestos Abatement Contractors
Pursuant to the provisions of Section 23-24.5-12(h) of the General Laws of Rhode Island, 1956,
as amended, the Agency shall grant a license to an Asbestos Abatement Contractor who meets
the licensure requirements set forth in these regulations, and upon submission of the licensure fee
as set forth in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health. Said license
shall expire two (2) years from the date of issuance unless sooner suspended or revoked. Said
license may be renewed every two (2) years in accordance with the provisions of Section B.1.8
of these regulations and upon payment of the licensure renewal fee as set forth in the Rules and
Regulations Pertaining to the Fee Structure for Licensing, Laboratory and Administrative
Services Provided by the Department of Health.
(b) Asbestos Abatement Site Supervisors
Pursuant to the provisions of Section 23-24.5-12(h) of the General Laws of Rhode Island, 1956,
as amended, the Agency shall grant a license for an Asbestos Abatement Site Supervisor, as
requested by an Asbestos Abatement Contractor, provided said Asbestos Abatement Site
Supervisor(s) meet the licensure requirements set forth in these regulations, and upon submission
of the licensure fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health for
each Asbestos Abatement Site Supervisor. Said license shall be issued for a period no longer
than two (2) years and shall expire on the same date as the license of the requesting Asbestos
Abatement Contractor unless sooner suspended or revoked. Said license may be renewed every
two (2) years in accordance with the provisions of Section B.1.8 of these regulations, upon
documentation of compliance with the requirements of Section B.3.1 of these regulations, and
upon payment of the licensure renewal fee as set forth in the Rules and Regulations Pertaining to
the Fee Structure for Licensing, Laboratory and Administrative Services Provided by the
Department of Health.
(c) No license shall be issued or renewed until the correct fee has been remitted. Fees will not be
prorated for a period of time less than the full term of a license.
(d) Asbestos Abatement Workers
Pursuant to the provisions of Section 23-24.5-12(e) of the General Laws of Rhode Island, 1956,
as amended, the Agency shall grant a license for an Asbestos Abatement Worker provided said
Asbestos Abatement Worker meets the licensure requirements set forth in these regulations, and
upon submission of the licensure fee as set forth in the Rules and Regulations Pertaining to the
Fee Structure for Licensing, Laboratory and Administrative Services Provided by the
Department of Health. Said license shall be issued for a period no longer than one (1) year and
shall expire on the last day of the month in which the Asbestos Abatement Worker's initial or
annual review training expires, unless sooner suspended or revoked. Said license may be
renewed annually in accordance with the provisions of Section B.1.8 of these regulations, upon
documentation of compliance with the requirements of Section B.3.1 of these regulations, and
upon payment of the licensure renewal fee as set forth in the Rules and Regulations Pertaining to
the Fee Structure for Licensing, Laboratory and Administrative Services Provided by the
Department of Health.
Section B
3
B.1.5
Denial of Applications
(a) The Agency may deny an application if it determines that the applicant has not demonstrated the
ability to comply fully with applicable requirements established by the Act and/or by these
regulations.
(b) An applicant whose application is denied may request a hearing in accordance with the
Administrative Procedures of the Rhode Island Department of Health.
B.1.6
Suspension or Revocation of a License and/or Imposition of Civil Penalties
The Agency may, for cause or for violation of these regulations, suspend or revoke any license issued under
this Subpart and/or impose civil penalties in accordance with the Act.
B.1.7
Replacement of Lost or Damaged License
(a) Application for replacement of a lost or damaged Site Supervisor License must be made by the
Asbestos Abatement Contractor employing said Site Supervisor and must be accompanied by the
fee required in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health.
(b) Application for replacement of a lost or damaged Asbestos Abatement Worker License must be
made by the licensed individual and must be accompanied by the fee required in the Rules and
Regulations Pertaining to the Fee Structure for Licensing, Laboratory and Administrative
Services Provided by the Department of Health.
B.1.8
Renewal of a License
(a) Requests for renewal of licenses issued under this Subpart must contain all the information
requested by Section B.1.3 of these regulations without reference to any previously submitted
material.
(b) In any case in which an Asbestos Contractor or Asbestos Abatement Worker, not less than 30
days prior to expiration of his existing license, has filed an application in proper form for
renewal, such existing license shall not expire until final action on the application has been taken
by the Agency.
B.1.9
Additional Requirements
The Agency may, by rule, regulations, or order, impose upon any licensee such requirements in addition to
those established in these regulations as it deems appropriate or necessary to minimize danger to public health
and safety or property.
Section B
4
B.1.10
Communications
All communications and reports concerning these regulations, and applications filed thereunder, should be
addressed to the Agency at its office located at:
Rhode Island Department of Health
Division of Occupational and Radiological Health
206 Cannon Building
Three Capitol Hill
Providence, RI 02908-5097
B.2
RECORDKEEPING AND NOTIFICATION
B.2.1
Notification of Asbestos Abatement Projects
(a) A licensed Asbestos Abatement Contractor shall utilize the most current revision of Agency
Form ASB-22 to notify the Agency in writing at least ten (10) working days before beginning
any on-site work at a planned asbestos abatement project. A licensed Asbestos Abatement
Contractor may not submit this notification until the building owner has received notification of
Agency approval for the planned asbestos abatement project. Delivery of the notice by U.S.
Postal Service, commercial delivery service, or hand delivery is acceptable. Electronic methods
of notification (e.g. FAX) can not be used to comply with this requirement.
(b) A licensed Asbestos Contractor or Site Supervisor shall also notify the Agency by telephone
when they begin on-site preparation for an approved asbestos abatement project.
(c) In accordance with the provisions of Section 23-28.4-6.1 of the General Laws of Rhode Island, a
licensed Asbestos Contractor shall also notify the local fire fighting authorities, in writing, prior
to initiating any activity in conjunction with an approved asbestos abatement project.
(d) The written notice required by paragraph (a) above shall be updated as necessary, including
when the amount of asbestos changes by at least twenty (20) percent.
(e) If an Asbestos Abatement Project will begin on a date other than the one contained in the original
notice, notice of the new start date must be provided to the Agency as follows:
(1) When the Asbestos Abatement Project will begin after the date contained in the notice:
(i)
Notify the Agency of the new start date by telephone as soon as possible before the
original start date; and
(ii)
Provide the Agency with a written notice of the new start date as soon as possible
before, and no later than, the original start date.
(2) When the Asbestos Abatement Project will begin on a date earlier than the original start date,
provide the Agency with a written notice of the new start date at least ten (10) working days
before the Asbestos Abatement Project begins.
(3) In no event shall an Asbestos Abatement Project begin on a date other than the date
contained in the written notice of the new start date.
Section B
5
B.2.2
DELETED
B.2.3
Retention of Records
Each licensed Asbestos Contractor shall maintain records of all asbestos abatement projects which it performs
and shall make these records available to the Agency upon request. The Asbestos Contractor shall retain the
records until the Agency authorizes their disposition.
B.2.4
Required Records
The Asbestos Abatement Contractor shall maintain the following information for each asbestos abatement
project at the project site for the duration of the project:
(a) The name, address and license number of each Asbestos Abatement Site Supervisor and Asbestos
Worker utilized on the project.
(b) A complete copy of the approved asbestos abatement plan for the project, including all
amendments.
(c) Starting and completion dates If completion date differs from that originally scheduled, a
statement of reasons for the change must be included.
(d) Documentation of compliance with all applicable regulatory requirements. (e.g., Copies of
workers' medical monitoring and results of respirator fit testing.)
(e) Copies of any correspondence with regulatory agencies concerning the project (e.g. building or
demolition permits, notices of violation, etc).
(f) Receipts and/or manifests indicating the date(s) and amount(s) of ACM removed from the
abatement project site for disposal, as well as the location(s) to which the ACM has been
removed and/or the agent(s) to whom the ACM was transferred.
(g) The methodology and results of all air sampling conducted by the Asbestos Contractor during the
abatement process. The results of all air sampling required by OSHA 29 CFR 1926.58(f) shall be
maintained in accordance with OSHA 29 CFR 1926.58(n).
(h) Documentation of current required annual review training for all Asbestos Abatement Site
Supervisor(s) and Asbestos Abatement Worker(s) utilized on the Asbestos Abatement Project, as
well as a list of other agents working for the Asbestos Abatement Contractor. Copies of current
Agency issued Asbestos Abatement Worker licenses may be maintained in lieu of the required
training documentation.
(i) A log of control of access to the work areas.
(j) A current copy of these regulations.
(k) Documentation of adequacy of compressed air systems/respiratory protection systems. This
documentation must include a list of compatible components. The maximum number of
respirators that may be used with the system and the types of respirators that may be used shall
Section B
6
be specified.
(l) Copies of the procedures for the utilization of the decontamination enclosure system and/or any
other procedures which have been established to prevent contamination of areas outside the work
area.
(m) Copies of procedures to be followed during medical emergencies, including phone numbers of
the nearest hospital and/or rescue squad that will accept individuals with potential asbestos
contamination. A 24-hour Emergency Contact Number for the Asbestos Abatement Contractor
must be posted on site at all times.
(n) Asbestos Abatement Site Supervisor and Asbestos Abatement Worker licenses must be worn or
prominently posted at the project site whenever the licensed individual is being utilized in
conjunction with an Asbestos Abatement Project.
B.3
TRAINING REQUIREMENTS
B.3.1
General Training Requirement
(a) Licensed Asbestos Contractors shall not allow any Asbestos Abatement Worker or Asbestos
Abatement Site Supervisor to participate in asbestos abatement projects until the initial training
requirement contained in Section B.3.2 of these regulations has been satisfied. The criteria for
successful completion of a required training course must include obtaining a passing score on the
final course examination, unless the certified training course has been specifically authorized in
writing by the Agency to use an alternative method of determining successful completion.
(b) Asbestos Abatement Workers and Asbestos Abatement Site Supervisors may not continue to
work beyond the anniversary of their initial training or last annual review course until a current
annual review course has been completed.
(c) Asbestos Contractors shall satisfy the training requirement either by utilizing certified courses
offered by outside agents or by establishing an in-house training program and submitting it for
certification in accordance with the procedures contained in Subpart D.1 of these regulations.
(d) The Asbestos Contractor shall ensure that Asbestos Abatement Workers and Asbestos
Abatement Site Supervisors successfully complete a certified annual review course of at least
eight (8) hours duration (exclusive of lunch and break times) as outlined in Section B.3.4 of these
regulations.
(e) The Asbestos Contractor shall ensure that personnel designated as Asbestos Abatement Site
Supervisor also successfully complete a certified initial training course of at least six (6) hours
duration (exclusive of lunch and break times) as outlined in Paragraph B.3.3(b) of these
regulations.
Section B
7
B.3.2
Certification of Training
Requirements for certification of training courses shall be those contained in Subpart D.1 of these regulations.
B.3.3
Content of Initial Training Courses
(a) The initial training course shall provide, at a minimum, information on the following topics:
(1) The physical characteristics of asbestos including fiber size, aerodynamic characteristics and
physical appearance;
(2) The health hazards of asbestos including, the nature of asbestos related diseases, routes of
exposure, dose response relationships, synergism between cigarette smoking and asbestos
exposure, latency period for disease and health basis for standards;
(3) Asbestos Abatement Worker personal protective equipment including: the classes and
characteristics of respirator types; limitations of respirators; proper selection, inspection,
donning, use, maintenance and storage procedures; methods for field testing of the facepiece-
to-face seal (positive and negative pressure fitting tests); qualitative and quantitative fit
testing procedures; variability between field and laboratory protection factors; factors that
alter respirator fit (e.g. facial hair); the components of a proper respiratory protection
program; selection and use of personal protective clothing; use, storage and handling of
launderable clothing, non- slip footwear, gloves, eye protection and hard hats;
(4) Medical monitoring procedures and requirements included under OSHA 29 CFR 1926.58
and 29 CFR 1910.134, additional recommended procedures and tests, benefits of medical
monitoring and employee access to records;
(5) Air monitoring procedures and requirements included under OSHA 29 CFR 1926.58
including a description of equipment and methods, reasons for air monitoring, types of
samples and current standards with proposed changes;
(6) Additional safety hazards that may be encountered during asbestos abatement activities and
how to deal with them including electrical hazards, heat stress, air contaminants other than
asbestos, fire and explosion hazards, scaffold and ladder hazards, slips, trips and falls,
confined spaces and noise;
(7) Personal hygiene including entry and exit procedures for the work area, use of showers and
prohibition of eating, drinking, smoking and chewing (gum or tobacco) in the work area;
(8) State-of-the-art work practices for asbestos abatement activities including purpose, proper
construction and maintenance of barriers and decontamination enclosure systems, posting of
warning signs, electrical and ventilation system lock-out, proper working techniques for
minimizing fiber release, use of wet methods and surfactants, use of negative pressure
ventilation equipment, use of HEPA vacuums and proper clean-up and disposal procedures.
Work practice requirements as they apply to removal, repair, enclosure and encapsulation
shall be discussed individually; and
(9) The requirements, procedures and standards established by OSHA, EPA and the provisions
of the Act and these regulations.
Section B
8
(b) In addition to the training specified in Paragraph B.3.3(a) above, individuals designated as
Asbestos Abatement Site Supervisors shall also receive at least six (6) hours of additional
training (exclusive of lunch and break times) which shall provide, at a minimum, information on
the following topics:
(1) Legal responsibilities and potential liabilities of various parties including, but not limited to,
contractors licensees, employers, employees, building owners and suppliers;
(2) Insurance and bonding;
(3) Establishing a medical surveillance program in accordance with OSHA 29 CFR 1926.58(m);
(4) Rhode Island Department of Health, EPA, and OSHA recordkeeping requirements;
(5) How to supervise effectively;
(6) Additional emphasis on work practices, including purpose, proper construction and
maintenance of barriers and decontamination systems, posting of warning signs, electrical
and ventilation system lock-out, proper working techniques for minimizing fiber release, use
of wet methods and surfactants, use of negative pressure ventilation equipment, use and
maintenance of HEPA vacuums, proper clean-up and disposal procedures; and
(7) Key elements of contract specifications.
B.3.4
Content of Annual Training Courses
The yearly review course shall consist of at least eight (8) hours of instruction and shall provide, at a
minimum, an adequate review of the topics outlined in Section B.3.3 of these regulations, updated
information on state-of-the-art procedures and equipment and reviews of regulatory changes and
interpretations. Specific topic coverage may be requested by the Agency.
B.4
RESPIRATORY PROTECTION
B.4.1
General Requirement
All license applications from Asbestos Contractors shall include a written respiratory protection program in
accordance with the requirements of OSHA 29 CFR 1910.134(b) and 29 CFR 1926.58(m). This program
shall be posted at all projects requiring asbestos abatement activities over more than a single day.
B.4.2
Selection Requirements
Respirators shall be selected that meet the level of protection requirements contained in OSHA 29 CFR
1926.58(h) and shall be utilized in accordance with OSHA 29 CFR 1910.134.
B.4.3
Fitting of Respirators
(a) Each Asbestos Abatement Worker shall be given an opportunity to try on a variety of respirator
styles and sizes and to select a respirator for comfortable fit.
Section B
9
(b) Each Asbestos Abatement Worker shall be instructed in the performance of positive and negative
pressure fit checks and be able to successfully perform them.
(c) Each Asbestos Abatement Worker shall be fit tested using generally acceptable quantitative fit
testing methods or by qualitative fit testing procedures as detailed in the OSHA Construction
Industry Standard, 29 CFR 1926.58, Appendix C - Qualitative and Quantitative Fit Testing
Procedures, and adequately pass the selected fit test procedure.
(d) Asbestos Abatement Workers shall be provided with the brand name and model number of
respirators that they have been fitted for and are trained to use.
B.4.4
Prohibited Activity
(a) No Asbestos Abatement Worker or agent shall be permitted in the work area without the
respiratory protection required for the level of exposure in the workplace. This requirement shall
be strictly enforced by the Asbestos Contractor.
(b) No personnel with beards, long sideburns or other physical characteristics which interfere with
negative pressure respirator faceplate-to-face seal shall be permitted in the work area when
respiratory protection is required by the level of exposure.
B.5
PROTECTIVE CLOTHING
B.5.1
General Requirement
Each Asbestos Abatement Worker shall be provided with personal protective equipment and clothing in
accordance with OSHA 29 CFR 1926.58(i).
B.6
MEDICAL MONITORING
B.6.1
General Requirement
Asbestos Contractors must ensure that any Asbestos Abatement Worker or agent who may be exposed to
airborne asbestos is medically monitored in accordance with the requirements of OSHA 29 CFR 1926.58(m),
prior to engaging in any asbestos abatement activity. Monitoring shall include, at a minimum, those elements
required by OSHA 29 CFR 1926.58(m)(2)(ii).
B.6.2
Asbestos Abatement Workers must also be given an opportunity to be evaluated by a physician to
determine their capability to safely work while breathing through the added resistance of a respirator.
Examining physicians should be made aware of the nature of respiratory protective hazards and
knowledgeable about the specific types of respirators the Asbestos Abatement Worker shall be
required to wear and the work he will be required to perform. They should also be advised as to
special hazards that may exist in the work place (e.g. high temperatures, toxic contaminants).
B.6.3
Chest X-rays shall be taken by a Registered Radiological Technologist and interpreted in accordance
with OSHA 29 CFR 1926.58, Appendix E - Interpretation and Classification of Chest Roentgen-
grams.
Section B
10
B.6.4
Pulmonary function testing shall be conducted by a NIOSH Certified Pulmonary Technician or other
health professional with training in pulmonary function testing.
B.7
WORKER AIR MONITORING
B.7.1
General Requirement
The Asbestos Contractor must provide representative air monitoring, in accordance with OSHA 29 CFR
1926.58(f), for Asbestos Abatement Workers during asbestos abatement activities. Affected Asbestos
Abatement Workers and agents of the Asbestos Contractor must be notified of the results of air monitoring in
accordance with OSHA 29 CFR 1926.58(f)(6).
B.8
WORK PRACTICE REQUIREMENTS
B.8.1
Applicability
Any Asbestos Abatement Contractor that engages in any Asbestos Abatement Project that involves greater
than ten (10) linear feet (three (3) meters) of pipe covered or coated with asbestos containing material or
twenty five (25) square feet (three (3) square meters) of asbestos containing material used to cover or coat any
surface other than pipe shall comply with the work practices contained in Subpart B.8 of these regulations and
any additional work practice requirements contained in the asbestos abatement plan approved for that project
by the Director of Health. Specific requirements for Category I and Category II Nonfriable ACM that is not
Regulated Asbestos Containing Material (RACM) are contained in Sections B.8.8 through B.8.10 of these
regulations.
B.8.2
General Requirements for Removal, Encapsulation and/or Enclosure of Regulated Asbestos
Containing Material (RACM)
(a) Barriers to isolate contaminated from uncontaminated areas shall be constructed of polyethylene
sheeting attached securely in place.
(b) All surfaces shall be wet cleaned of dust or debris. Wet cleaning of contaminated items shall be
performed if necessary. All movable objects shall be removed from the work area. All non-
movable objects in the work area shall be covered with 6-mil polyethylene sheeting secured in
place. All openings or penetrations between the work area and uncontaminated areas shall be
sealed, including windows, doorways, elevator openings, corridor entrances, drains, ducts, grills,
grates, diffusers and skylights.
(c) Floor sheeting shall consist of two (2) layers of 6-mil polyethylene sheeting. Floor sheeting shall
extend up sidewalls at least twelve (12) inches and be sized to minimize seams. No seams shall
be located at wall/floor joints.
(d) Wall sheeting shall consist of two (2) layers of 4-mil polyethylene sheeting. It shall be installed
to minimize joints and shall extend beyond wall/floor joint at least twelve (12) inches. No seams
shall be located at wall/wall joints.
(e) A worker decontamination enclosure system, consisting of a clean room, shower room and
equipment room, each separated from each other and from the work area by airlocks and
Section B
11
accessible through doorways protected with two (2) overlapping polyethylene sheets, shall be
provided in accordance with OSHA 29 CFR 1926.58(j). Procedures for the utilization of this
system shall be established which prevent contamination of areas outside the work area.
(f) All HVAC equipment in or passing through the work area shall be shut down and locked out.
All intake and exhaust openings, as well as any seams in system components shall be sealed with
6-mil polyethylene sheeting and/or tape. All system filters shall be replaced at the conclusion of
the abatement and disposed of as asbestos waste. The ventilation system ductwork interiors shall
be decontaminated whenever necessary.
(g) Posting
(1) Warning signs in accordance with OSHA 29 CFR 1926.58(k) shall be displayed at all
approaches to any location where airborne fiber levels can be expected to exceed the Indoor
Non-Occupational Air Exposure Standard established by Section A.3.1 of these regulations.
(2) Warning signs to advise the public of the location(s) within the building where any asbestos
abatement activity is in progress shall be posted at all building entrances and at least one
other conspicuous place per floor. These signs shall be of the same dimensions as the
Warning/Danger signs required in Subparagraph B.8.2(g)(1) of these regulations.
(3) Warning signs in accordance with Section F.3.4 of these regulations shall be posted on
vehicles used to transport Asbestos Containing Waste Materials during loading and
unloading of the waste.
(h) Clean-up procedures using HEPA vacuuming and wet cleaning techniques shall be performed
following abatement. Wet cleaning shall be followed by HEPA vacuuming after surfaces have
been allowed to dry. The sequence of wet cleaning and vacuuming shall be repeated at twenty
four (24) hour intervals until no visible residue is observed in the work area.
(i) Negative pressure ventilation units with HEPA filtration, in sufficient number to provide one (1)
workplace air change every fifteen (15) minutes, shall be operated continuously from the time of
barrier construction through the time acceptable final clearance air-monitoring results are
obtained. These units shall exhaust filtered air to the outside of the building. Filtered air shall
not be exhausted to uncontaminated interior spaces.
(j) All Asbestos Containing Waste Materials shall be adequately wetted before being placed into
containers for disposal.
(k) Asbestos Containing Waste Materials shall be placed in impermeable containers for disposal.
Metal or fiber drums with locking-ring tops shall be used when asbestos waste contains sharp
edged components. Double polyethylene bags of at least 6-mil thickness and which can be
securely sealed may be used for waste. Large components or structural members may be
removed intact and contained in leak-tight wrapping, equivalent to at least two (2) layers of 6-mil
polyethylene sheeting, secured with tape for disposal.
(l) All containers, bags, drums and wrapped components shall be labeled so that labels have the
appearance of or are constructed in accordance with USDOT 49 CFR 172, Subpart E and OSHA
29 CFR 1926.58(k). Each container, bag, drum or wrapped component shall also be labeled or
tagged with the name and license number of the asbestos abatement contractor generating the
Section B
12
waste, as well as the asbestos abatement project number and location at which the waste was
generated.
(m) Storage of asbestos waste containers awaiting transport to an authorized disposal facility shall be
in a secured location to prevent access by unauthorized personnel.
(n) Transport and disposal of asbestos waste shall be in accordance with the provisions of Appendix
D to 40 CFR 763, Subpart E and USDOT 49 CFR 173.1300.
(o) Disposal of Asbestos Containing Waste Materials. All Asbestos Containing Waste Materials
shall be deposited as soon as is practical by the waste generator at:
(1) A waste disposal site operated in accordance with the provisions of 40 CFR 61.154, or
equivalent regulations promulgated by a state or local NESHAP designee; or
(2) An EPA-approved site that converts RACM and Asbestos Containing Waste Materials into
nonasbestos (asbestos-free) material according to the provisions of 40 CFR 61.155.
(p) Access to work areas shall be controlled and posting requirements shall remain in effect until
compliance with the air exposure standard has been verified by procedures outlined below:
(1) Samples shall be collected and analyzed in accordance with the procedures specified by
NIOSH Method 7400 (most current Revision) for asbestos fibers in air or equivalent method;
(2) Air volumes shall be sufficient to accurately determine fiber concentrations to 0.01 fibers/
cubic centimeter of air (f/cc) for fibers greater than five (5) microns in length or 300
nanograms per cubic meter. A minimum air volume of 1000 liters shall be sampled;
(3) Air sampling shall be conducted in representative locations with portable fans circulating air
to simulate actual use conditions;
(4) An acceptable airborne fiber concentration, as established by clearance air monitoring shall
not exceed 0.01 f/cc for fibers greater than five (5) microns in length or 300 nanograms per
cubic meter; and
(5) Air sampling shall be conducted by a representative of the building owner who is not subject
to the control or supervision of the Asbestos Abatement Contractor for the asbestos
abatement plan.
(6) Notwithstanding the requirements contained in Subparagraphs B.8.2(p)(1)-(p)(5) above,
control of access and posting requirements for buildings subject to the AHERA regulations
shall remain in effect until compliance with Subparagraphs C.1.3(a)(5)-(8) of these
regulations has been demonstrated.
B.8.3
Specific Requirements for Removal of Regulated Asbestos Containing Material (RACM)
(a) All RACM shall be adequately wetted prior to removal. In addition, all RACM exposed during
cutting and disjoining operations shall be adequately wet and all RACM shall be kept adequately
wet during stripping operations.
Section B
13
(b) Components shall be removed intact or in large sections whenever possible and carefully lowered
to the floor.
(c) RACM shall be removed in small sections and containerized when adequately wet. At no time
shall material be allowed to accumulate or become dry. Structural components shall be
adequately wetted prior to being contained in leak-tight wrapping for disposal.
(d) Material shall not be dropped or thrown to the floor level. For materials located at heights
greater than fifty (50) feet above the floor, a dust-tight, enclosed chute shall be constructed to
transport removed material to containers on the floor. RACM may be dropped to a raised
scaffold or containerized at elevated levels for disposal. Materials greater than fifteen (15) feet
above the floor shall be dropped onto inclined chutes or scaffolding or containerized at elevated
levels for eventual disposal.
(e) A coating of encapsulating agent shall be applied to any porous surfaces that have been stripped
of RACM to securely seal any residual fibers that may be present. The encapsulating agent
should be chosen so as to be compatible with subsequent coverings.
(f) RACM is not required to be stripped from large facility components such as reactor vessels, large
tanks, and steam generators if the following requirements are met:
(1) The component is removed, transported, stored, disposed of, or reused without disturbing or
damaging the RACM.
(2) The component is encased in a leak-tight wrapping.
(3) The leak-tight wrapping is labeled according to Section F.3.4 of these regulations during all
loading and unloading operations and during storage.
(g) When the temperature at the point of wetting is below 0°C (32°F):
(1) The Asbestos Abatement Contractor need not comply with the wetting provisions of
Paragraphs B.8.3(a) and (c).
(2) The Asbestos Abatement Contractor shall remove facility components containing, coated
with, or covered with RACM as units or in sections to the maximum extend possible.
(3) During periods when wetting operations are suspended due to freezing temperatures, the
Asbestos Abatement Contractor must record the temperature in the area containing the
facility components at the beginning, middle, and end of each workday and keep daily
temperature records available for inspection by the Agency during normal business hours at
the asbestos abatement project site. The Asbestos Abatement Contractor shall retain
temperature records for at least two years.
B.8.4
Specific Requirements for Encapsulation of Regulated Asbestos Containing Material (RACM)
(a) All loose and hanging RACM shall be removed in accordance with Section B.8.3 of these
regulations.
Section B
14
(b) Filler material applied to gaps in existing material shall contain no asbestos, adhere well to the
substrate and provide an adequate base for the encapsulating agent.
(c) Encapsulants shall be applied using only airless spray equipment with nozzle pressure adjustable
between four hundred (400) and fifteen hundred (1500) PSI and in accordance with the
manufacturer's recommendations for a particular encapsulant.
(d) Encapsulated materials shall be specially designated by signs, labels, color coding or some
mechanism to warn individuals who may be required to disturb the material.
(e) Encapsulants shall not be solvent-based or utilize a vehicle consisting of hydrocarbons.
B.8.5
Specific Requirements for Enclosure of Regulated Asbestos Containing Material (RACM)
(a) All areas of RACM shall be adequately wetted with wetting agents if they are to be disturbed
during the installation of hangers, brackets or other portions of the enclosure.
(b) All loose and hanging RACM shall be removed in accordance with Section B.8.3 of these
regulations.
(c) Non-asbestos containing substitutes shall be used to patch thermal insulation and fireproofing
materials when required and where appropriate.
(d) Enclosures for RACM shall be specially designated by signs, labels, color coding or some
mechanism to warn individuals who may be required to disturb or enter the enclosure.
B.8.6
Specific Requirements for Demolition of Structures Containing Asbestos
(a) Any demolition of a structure or portion of a structure which contains structural members,
building materials or structural components composed of or covered by RACM shall be preceded
by a removal of all such materials in accordance with Sections B.8.2 and B.8.3 of these
regulations. Said removal must be completed before any activity begins that would break up,
dislodge, or similarly disturb the material or preclude access to the material for subsequent
removal. Notwithstanding the foregoing, RACM need not be removed before demolition if:
(1) It is Category I nonfriable ACM that is not in poor condition and is not friable; or
(2) It is on a facility component that is encased in concrete or other similarly hard material and is
adequately wet whenever exposed during demolition; or
(3) It was not accessible for testing and was, therefore, not discovered until after demolition
began and, as a result of the demolition, the material cannot be safely removed. If not
removed for safety reasons, the exposed RACM and any asbestos contaminated debris must
be treated as Asbestos Containing Waste Material and adequately wet at all times until
disposed of; or
Section B
15
(4) It is Category II nonfriable ACM and the probability is low that the materials will become
crumbled, pulverized, or reduced to powder during demolition.
(b) For Emergency Asbestos Abatement Projects described in Paragraph A.4.2(c) of these
regulations, adequately wet the portion of the facility that contains RACM during the wrecking
operation.
(c) If a facility is demolished by intentional burning, all RACM, including Category I and Category
II nonfriable ACM, must be removed in accordance with these regulations before burning.
(d) In lieu of the requirements specified in Paragraphs B.8.2(b), (c), (d), and (f) and B.8.3(e) of these
regulations, Asbestos Abatement Contractors engaging in demolition activities shall comply with
the following:
(1) Prior to beginning a demolition project, all doors, windows, floor drains, vents and other
openings to the outside of the building and to areas within the building that do not contain
asbestos materials shall be sealed off with 6-mil polyethylene sheeting and waterproof tape
or equivalent acceptable to the Agency.
(2) If a structure is to be partially demolished, HVAC equipment in the demolition area or
passing through it but servicing areas of the building which will remain, shall be shut down
and locked out and thoroughly sealed with 6-mil polyethylene sheeting and waterproof tape.
(3) If the building owner proposes not to conduct clearance air sampling following asbestos
abatement activities conducted for demolition purposes, the building owner must submit
written justification to the Agency which describes how personnel who must occupy the
building prior to demolition will be protected.
(4) All other requirements of Sections B.8.2 and B.8.3 of these regulations, unless specifically
deleted in Paragraph B.8.6(d) of these regulations, shall apply to demolition abatement
activities.
B.8.7
General Requirements for Use of Glove Bags During Removal and/or Encapsulation of Regulated
Asbestos Containing Material (RACM)
(a) In lieu of the requirements specified in Paragraphs B.8.2 (a), (b), (c), (d), (e), (f), (h) and (i) of
these regulations, Asbestos Abatement Contractors using glove bags during removal and/or
encapsulation of RACM shall comply with the following:
(1) All glovebags must remain stationary during asbestos abatement activities. The use of
moving and/or sliding glove bag techniques are prohibited.
(2) Abatement projects which do not exceed the scope of Spot Repairs, as defined by these
regulations, and which can be contained within one stationary glove bag may be performed
in accordance with the glove bag procedures contained in 29 CFR 1926.58, Appendix G
without the use of additional containment or negative pressure ventilation. The clearance air
monitoring provisions of Paragraph B.8.2(p) of these regulations are waived unless there has
been a breach of the glovebag containment.
Section B
16
(3) All other abatement projects that involve less than two hundred and sixty (260) linear feet
[eighty (80) meters] of pipe covered or coated with RACM or one hundred and sixty (160)
square feet [fifteen (15) square meters] of RACM used to cover or coat any surface other
than pipe shall comply with the following requirements:
(i)
All doors, windows, floor drains, vents and other openings to the outside of he building
and to areas within the building that do not contain asbestos materials shall be sealed
off with 6-mil polyethylene sheeting and waterproof tape or equivalent acceptable to
the Agency.
(ii)
Floor sheeting shall consist of at least one (1) layer of 6-mil polyethylene sheeting.
Floor sheeting shall be placed directly beneath the glove bag and shall extend at least
ten (10) feet in all horizontal directions. If any wall is less than ten (10) feet from the
glove bag, the floor sheeting shall be extended up that wall to at least the height of the
glove bag.
(iii) HVAC equipment in the abatement area or passing through it but servicing other areas
of the building shall be shut down and locked out and thoroughly sealed with 6-mil
polyethylene sheeting and waterproof tape.
(iv) Negative pressure ventilation units with HEPA filtration shall be operated continuously
from the time of barrier construction through the time acceptable final clearance
air-monitoring results are obtained. These units shall exhaust filtered air to the outside
of the building. Filtered air shall not be exhausted to uncontaminated interior spaces.
(v)
Manufacturer's instructions concerning preparation, sealing, utilization and removal of
glovebags must be followed unless the abatement plan and/or these regulations specify
more restrictive requirements.
(vi) A worker decontamination enclosure system must be available immediately adjacent to
the abatement area. A two chamber decontamination system may be used provided
that shower facilities are otherwise available on the project site.
(4) All abatement projects that involve more than two hundred and sixty (260) linear feet [eighty
(80) meters] of pipe covered or coated with RACM or one hundred and sixty (160) square
feet [fifteen (15) square meters] of RACM used to cover or coat any surface other than pipe
shall comply with the following requirements:
(i)
All doors, windows, floor drains, vents and other openings to the outside of the
building and to areas within the building that do not contain asbestos materials shall be
sealed off with 6-mil polyethylene sheeting and waterproof tape or equivalent
acceptable to the Agency.
(ii)
Floor sheeting shall consist of at least one (1) layer of 6-mil polyethylene sheeting.
Floor sheeting shall extend up sidewalls at least twelve (12) inches and be sized to
minimize seams. No seams shall be located at wall/floor joints.
(iii) Wall sheeting shall consist of at least one (1) layer of 4-mil polyethylene sheeting. It
shall be installed to minimize joints and shall extend from the wall/ ceiling joint to at
Section B
17
least twelve (12) inches beyond the wall/floor joint. No seams shall be located at
wall/wall joints.
(iv) HVAC equipment in the abatement area or passing through it but servicing other areas
of the building shall be shut down and locked out and thoroughly sealed with 6-mil
polyethylene sheeting and waterproof tape.
(v)
Negative pressure ventilation units with HEPA filtration shall be operated continuously
from the time of barrier construction through the time acceptable final clearance air-
monitoring results are obtained. These units shall exhaust filtered air to the outside of
the building. Filtered air shall not be exhausted to uncontaminated interior spaces.
(vi) Manufacturer's instructions concerning preparation, sealing, utilization and removal of
glovebags must be followed unless the abatement plan and/or these regulations specify
more restrictive requirements.
(vii) A three chamber worker decontamination enclosure system, in accordance with 29
CFR 1926.58(j), must be available immediately adjacent to the abatement area.
(5) All other requirements of Sections B.8.2 and B.8.3 of these regulations, unless specifically
deleted in Paragraph B.8.7(a) of these regulations, shall apply to use of glove bags during
removal and/or encapsulation of asbestos.
(b) Any requests for additional waivers and/or alternative procedures must be submitted for Agency
review and approval in accordance with Subpart B.11 of these regulations.
B.8.8
Specific Requirements for Removal of Category I Nonfriable ACM - Asphalt Roofing Products
(a) All surfaces shall be wet cleaned of dust or debris. All movable objects shall be removed from
the roof area. All openings or penetrations on the roof area and at least one level below the roof
area shall be sealed, including windows, doorways, drains, ducts, grills, grates, diffusers and
skylights.
(b) Floor/ground sheeting shall consist of at least two (2) layers of 6-mil polyethylene sheeting and
shall be utilized as follows:
(1) If the roof is pitched, sheeting shall be applied to the first horizontal surface below the work
area and shall extend from the edge of the building to at least ten (10) feet away from the
building. All material being abated shall be confined to the roof area.
(2) If the roof is flat, sheeting shall extend at least ten (10) feet away from the perimeter of the
work area. When the edge of the roof is less than ten (10) feet from the perimeter of the
work area, sheeting shall be applied in accordance with Paragraph B.8.9(b)(1) such that the
outer edge of the sheeting is at least ten (10) feet from the perimeter of the work area.
(c) All HVAC intake or exhaust vents on the roof area and at least one level below the roof area
shall be shut down and locked out. All intake and exhaust openings, as well as any seams in
system components shall be sealed with 6-mil polyethylene sheeting and/or tape.
Section B
18
(d) A minimum of a two chambered worker decontamination enclosure system shall be provided on
site in accordance with OSHA 29 CFR 1926.58, Appendix G. Procedures for the utilization of
this system shall be established which prevent contamination of areas outside the roof area.
(e) Warning signs shall be posted in accordance with Paragraph B.8.2(g) of these regulations.
(f) Category I Nonfriable ACM shall be removed in small sections and containerized when wet. At
no time shall material be allowed to accumulate or become dry.
(g) Category I Nonfriable ACM shall not be dropped or thrown to the floor/ground level. For roofs
at heights greater than fifty (50) feet above the floor/ground, a dust-tight, enclosed chute shall be
constructed to transport removed Category I Nonfriable ACM to containers on the floor/ground.
Category I Nonfriable ACM may be dropped to a raised scaffold or containerized at elevated
levels for disposal.
(h) All Category I Nonfriable ACM shall be adequately wetted before being placed into containers
for disposal. Disposal shall be in accordance with Paragraphs B.8.2(k) through B.8.2(o) of these
regulations.
(i) A coating of encapsulating agent shall be applied to any porous surfaces that have been stripped
of Category I Nonfriable ACM to securely seal any residual fibers that may be present. The
encapsulating agent should be chosen so as to be compatible with subsequent coverings.
(j) Clean-up procedures using HEPA vacuuming and wet cleaning techniques shall be performed
following abatement.
(k) Personnel air monitoring of Asbestos Abatement Workers, which demonstrates compliance with
the provisions of OSHA 29 CFR 1926.58(f), may be used in lieu of the clearance air sampling
requirements contained in Paragraph B.8.2(p) of these regulations.
B.9
[DELETED]
B.10
WORK PRACTICE REQUIREMENTS - SPOT REPAIRS
B.10.1 Applicability
Individuals performing spot repairs must be certified as a competent person in accordance with Subpart D.2 of
these regulations and shall take reasonable precautions to prevent the release of asbestos fibers to the
environment.
B.10.2 The reasonable precautions required by Section B.10.1 of these regulations shall include, but are not
limited to those outlined in Appendix G to OSHA 29 CFR 1926.58. Specifically:
(a) Barriers constructed shall be adequate to contain asbestos fibers released within the work area.
(b) Procedures shall be established to prevent asbestos contamination in all areas outside the work
area(s).
Section B
19
(c) All asbestos containing material shall be wetted prior to removal and kept wet until
containerized.
(d) HEPA vacuum equipment and wet cleaning techniques shall be used to clean up the work area
following abatement until there is no visible residue.
(e) Asbestos waste shall be packaged in impermeable containers such as polyethylene sheeting, bags
and/or fiber or metal drums and shall be labeled so that labels have the appearance of or are
constructed in accordance with USDOT 49 CFR 172, Subpart E and either OSHA 29 CFR
1926.58(k). Each container, bag, drum or wrapped component shall also be labeled or tagged
with the name and license number of the asbestos abatement contractor generating the waste, as
well as the asbestos abatement project number and location at which the waste was generated.
(f) Transport and disposal of asbestos waste shall be in accordance with the provisions of Appendix
D to 40 CFR 763, Subpart E and USDOT 49 CFR 173.1300.
B.10.3 Documentation
(a) Documentation of all spot repairs must be maintained with the permanent building records. This
documentation shall include, as a minimum, the identity of the competent person performing the
spot repair, the date the spot repair was performed, the specific location that was repaired, the
methods used to perform the spot repair, the quantity of asbestos that was involved in the spot
repair and receipts for the disposal of any asbestos waste. All recordkeeping shall be in
accordance with the requirements of OSHA 29 CFR 1926.58(n).
(b) Exposure monitoring shall be in accordance with the provisions of OSHA 29 CFR 1926.58(f).
B.11
ALTERNATIVE PROCEDURES
The Agency may, on a case-by-case basis, approve an alternative procedure for control of emissions from an
asbestos abatement project provided that the building owner submits the alternative procedure to the Agency
in writing and demonstrates to the satisfaction of the Agency that compliance with the prescribed procedures
is not practical or not feasible or that the proposed alternative procedures provide equivalent control of
asbestos. The Agency, following its review, may approve an alternative procedure if it determines that it will
minimize the emission of asbestos.
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
PART C
ABATEMENT (MANAGEMENT) PLANS AND OWNER RESPONSIBILITIES
JANUARY 1986
AS AMENDED:
AUGUST 1986
OCTOBER 1988
JUNE 1990
FEBRUARY 1992
JUNE 1996(E)
OCTOBER 1996(E)
DECEMBER 1996
Section C
1
PART C
ABATEMENT (MANAGEMENT) PLANS AND OWNER RESPONSIBILITIES
C.1.1
General Requirements
(a) This Part applies to Asbestos Abatement (Management) Plans submitted pursuant to Subpart A.4
of these regulations. All asbestos abatement projects conducted at any facility, with the
exception of spot repairs as defined in these regulations, must be conducted in accordance with
an Asbestos Abatement (Management) Plan which has been submitted by the building owner and
approved by the Agency.
(b) Asbestos Abatement (Management) Plans shall be submitted on forms provided by the Agency.
Said forms shall be signed by the building owner or legally authorized agent. Consultants
retained to prepare Asbestos Abatement (Management) Plans are not authorized to sign these
forms.
(c) An Asbestos Abatement (Management) Plan for any school or school building subject to the
AHERA regulations must be prepared by a consultant certified for the proposed scope of
abatement work in accordance with Subparagraphs D.4.2(b)(5) and/or D.4.2(b)(6) of these
regulations, as appropriate.
(d) An Asbestos Abatement (Management) Plan for any public or private building, other than
schools or school buildings subject to the AHERA regulations, must be prepared by the building
owner, a full time employee of the building owner or an Asbestos Project Designer certified in
accordance with Subparagraph D.4.2(b)(5) of these regulations.
C.1.2
Contents of an Abatement (Management) Plan
(a) An Asbestos Abatement (Management) Plan submitted in accordance with Subpart A.4 of these
regulations must include all the information required by the forms provided by the Agency.
(b) An Asbestos Abatement (Management) Plan must include an interim Operations and
Maintenance Program that will be implemented until the asbestos containing material can be
abated. Furthermore, any Asbestos Abatement (Management) Plan which does not include
complete removal of all asbestos containing material in the area(s) being abated must also
include a long-term Operations and Maintenance Program for the remaining asbestos containing
material.
(c) An Operations and Maintenance Program must address, as a minimum, the following items:
(1) Action(s) to be taken when the monitoring program discovers asbestos containing material in
need of abatement;
(2) Monitoring the physical conditions of the asbestos containing materials in accordance with
Part E of these regulations, including a schedule for monitoring and methods for
documentation of findings;
(3) Educating the building staff and occupants regarding the presence and location of asbestos
containing material;
Section C
2
(4) Procedures for alerting outside service personnel and others to the presence and location of
asbestos containing material, including the Warning Label provisions of 40 CFR 763.95;
(5) Steps to be taken which will minimize the likelihood of asbestos fiber release. (e.g.,
Modification of maintenance activities, spot repairs, etc.); and
(6) Steps to be taken which will minimize the potential of human exposure to asbestos (e.g.,
Limit access to areas known to contain friable asbestos material in deteriorating condition.)
C.1.3
Post Abatement Requirements
(a) Clearance Air Sampling
Clearance air sampling for all buildings subject to the AHERA regulations shall be conducted in
accordance with Subparagraphs C.1.3(a)(5)-(a)(8). Clearance air sampling for all other buildings
shall be conducted in accordance with Subparagraphs C.1.3(a)(1)-(a)(4).
(1) Clearance air sampling shall be conducted and reviewed for compliance with the Indoor
Non-Occupational Air Exposure Standard established by Section A.3.1 of these regulations
prior to dismantling the containment barriers and prior to reoccupancy of the abated area.
(2) Clearance air samples shall be collected by a representative of the building owner in
accordance with the requirements of Section B.8.2(p) of these regulations. This
representative shall be an independent agent who is not subject to the Asbestos Abatement
Contractor's control or supervision. All such clearance air samples shall only be analyzed by
an Asbestos Analytical Service certified for this activity in accordance with Subpart D.3 of
these regulations.
(3) The building owner shall review the results of clearance air sampling prior to dismantling the
containment barriers and prior to reoccupancy of the abated area. If sampling results exceed
the Indoor Non-Occupational Air Exposure Standard established by Section A.3.1 of these
regulations, the area shall be recleaned in accordance with Part B of these regulations and the
clearance air sampling shall be repeated. Cleaning and resampling shall be repeated at no
less than twenty-four (24) hour intervals until the abated area is in compliance with the
Indoor Non-Occupational Air Exposure Standard established by Section A.3.1 of these
regulations.
(4) Within three (3) working days of receipt of clearance air sampling results for an abated area,
the building owner shall notify the Agency either by telephone or in writing of the
completion of the asbestos abatement project and the results of the clearance air sampling.
The building owner shall also submit to the Agency a certified copy of results of all
clearance air sampling conducted in the abatement area and each area adjacent to the
abatement area indicating each area is in compliance with the Indoor Non-Occupational Air
Exposure Standard established by Section A.3.1 of these regulations.
(5) Clearance air sampling shall be conducted in accordance with 40 CFR 763.90(i)(2)-(i)(8) and
reviewed for compliance with the average asbestos concentration established by 40 CFR
763.90(i)(3)-(i)(7) prior to dismantling the containment barriers described in the approved
asbestos abatement plan and prior to reoccupancy of the abated area.
Section C
3
(6) Clearance air samples shall be collected by a representative of the building owner in
accordance with the requirements of 40 CFR 763.90(i)(2). This representative shall be an
independent agent who is not subject to the Asbestos Abatement Contractor's control or
supervision. All such clearance air samples shall only be analyzed by an Asbestos
Analytical Service certified for this activity in accordance with Subpart D.3 of these
regulations. Notwithstanding the preceding, the requirement to use only Agency certified
laboratories for samples analyzed via Transmission Electron Microscopy (TEM) is waived
until such time as the Agency has established requirements for the certification of such
facilities.
(7) The building owner shall review the results of clearance air sampling prior to dismantling the
containment barriers and prior to reoccupancy of the abated area. If sampling results exceed
the average asbestos concentration established by 40 CFR 763. 90(i)(3)-(i)(7), the area shall
be recleaned in accordance with Part B of these regulations and the clearance air sampling
shall be repeated. Cleaning and resampling shall be repeated at no less than twenty-four (24)
hour intervals until the abated area is in compliance with the average asbestos concentration
established by 40 CFR 763.90(i)(3)-(i)(7).
(8) Within three (3) working days of receipt of clearance air sampling results for an abated
area, the building owner shall notify the Agency either by telephone or in writing of the
completion of the asbestos abatement project and the results of the clearance air sampling.
The building owner shall also submit to the Agency a certified copy of results of all
clearance air sampling conducted in the abatement area and each area adjacent to the
abatement area indicating each area is in compliance with the Indoor Non-Occupational Air
Exposure Standard established by Section A.3.1 of these regulations and/or the average
asbestos concentration established by 40 CFR 763.90(i)(3)-(i)(7), as appropriate.
(b) Confirmation of Disposal of Asbestos
For all Asbestos Containing Waste Material transported off the Asbestos Abatement Project Site,
the Asbestos Abatement Contractor shall:
(1) Maintain waste shipment records, using the most current revision of Agency Form ASB-23
to provide the following information:
(i)
The name, address, and telephone number of the Asbestos Abatement Contractor.
(ii)
The approximate quantity in cubic yards (cubic meters).
(iii) The name and telephone number of the disposal site operator.
(iv) The name and physical site location of the disposal site.
(v)
The date transported.
(vi) The name, address, and telephone number of the transporter(s).
(vii) A certification that the contents of this consignment are fully and adequately described
by proper shipping name and are classified, packed, marked, and labeled, and are in all
Section C
4
respects in proper condition for transport by highway according to applicable
international and government regulations.
(2) Provide a properly completed copy of Agency Form ASB-23 to the disposal site owners or
operators at the same time as the Asbestos Containing Waste Material is delivered to the
waste disposal site.
(3) Provide the building owner with the original (white) copy of Agency Form ASB-23 signed
by the owner or operator of the designated disposal site. Said original copy shall be
transmitted to the Agency by the building owner within five (5) working days of receipt.
(4) For waste shipments where a copy of the waste shipment record, signed by the owner or
operator of the designated disposal site, is not received by the Asbestos Abatement
Contractor within thirty-five (35) days of the date the waste was accepted by the initial
transporter [i.e. the date the waste left the abatement project site], contact the transporter
and/or the owner or operator of the designated disposal site to determine the status of the
waste shipment.
(5) Report in writing to the Agency if a copy of the waste shipment record, signed by the owner
or operator of the designated waste disposal site, is not received by the Asbestos Abatement
Contractor within forty-five (45) days of the day the waste was accepted by the initial
transporter. Include in the report the following information:
(i)
A copy of the waste shipment record for which a confirmation of delivery was not
received; and
(ii)
A cover letter signed by the Asbestos Abatement Contractor explaining the efforts
taken to locate the asbestos waste shipment and the results of those efforts.
(6) Retain a copy of all waste shipment records, including a copy of the waste shipment record
signed by the owner or operator of the designated waste disposal site, for at least two (2)
years.
C.1.4
Revocation of Agency Approval for an Asbestos Abatement (Management) Plan
(a) The Agency may revoke any Asbestos Abatement (Management) Plan approval issued pursuant
to these regulations in the event that the granting of said approval was based upon statements
which prove to be false or based on misrepresentation of fact.
(b) Any aggrieved party shall have the right to a hearing on any such revocation. Said request for a
hearing shall be in writing and shall be made within ten (10) of notification of said revocation.
C.1.5
Expiration of Agency Approval for an Asbestos Abatement (Management) Plan
(a) An Asbestos Abatement (Management) Plan approval issued by the Agency pursuant to these
regulations shall become invalid unless the work authorized by said approval shall have been
commenced within six (6) months after its issuance and been completed within twelve (12)
months after its issuance.
(b) The six (6) month limit provided for by Paragraph C.1.5(a) of these regulations may be extended,
Section C
5
for cause, up to an additional ninety (90) days. Written justification for such an extension must
be submitted for Agency review prior to the approval expiration date. All Agency approvals for
such an extension must be in writing.
(c) The six (6) month limit provided for by Paragraph C.1.5(a) of these regulations shall not apply to
any suspension or abandonment of an Agency approved abatement project when the suspension
or abandonment is due to a court order prohibiting such work as authorized by said approval.
C.1.6
Asbestos Abatement (Management) Plan Fees
(a) The application fee must accompany the Asbestos Abatement (Management) Plan and shall be in
the form of a check made payable to General Treasurer, State of Rhode Island. This fee is non-
refundable and will not be returned if the Asbestos Abatement (Management) Plan is denied or
otherwise not approved by the Agency. The application fee also includes the inspection fee,
authorized by Section 23-24.5-7(d) of the General Laws, for any inspections of said Asbestos
Abatement Project which are deemed necessary by the Agency.
(b) The application fee is based on the number of NESHAP units of ACM involved in the abatement
project. One (1) NESHAP unit equals two hundred and sixty (260) linear feet [eighty (80)
meters] of ACM or one hundred and sixty (160) square feet [fifteen (15) square meters] of ACM
or thirty five (35) cubic feet [one (1) cubic meter] of ACM off facility components where the
length or area could not be measured previously. If any combination of linear, square or cubic
feet is involved, the sum of the fractions must be used to determine the actual number of
NESHAP units involved in the asbestos abatement project. The application fees are as set forth
in the Rules and Regulations Pertaining to the Fee Structure for Licensing, Laboratory and
Administrative Services Provided by the Department of Health.
(c) Any amendments to the Asbestos Abatement (Management) Plan which increase the scope of
work into a higher fee category will be reassessed. The difference in the two fees shall be
submitted to the Agency in the form of a check made payable to General Treasurer, State of
Rhode Island.
(d) Any amendments to the Asbestos Abatement (Management) Plan which request additional
waivers and/or variances under the provisions of Subpart B.11 of the regulations will be assessed
a flat fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health. Said fee shall be
submitted to the Agency in the form of a check made payable to General Treasurer, State of
Rhode Island. However, said fee will be waived if the amendment(s) to the Asbestos Abatement
(Management) Plan also include a request for an increase in the scope of work which would
result in the fee difference in accordance with Paragraph C.1.6(c) of these regulations being
assessed.
(e) All other amendments to the Asbestos Abatement (Management) Plan, including those involving
only minor changes that can receive Agency approval over the telephone, will not be charged a
fee.
(f) Waiver and/or exemption of Asbestos Abatement (Management) Plan Fees:
The application fee shall be waived for any Asbestos Abatement (Management) Plan which is
eligible for loans or grants in accordance with the provisions of Section 23-24.5-19 of the Act
and/or any rules or regulations promulgated by the Rhode Island Department of Administration
Section C
6
pursuant to the authority conferred by Section 23024.5-19 of the Act. State agencies shall be
exempt from application fees associated with the submittal of Asbestos Abatement
(Management) Plans.
C.1.7
Recordkeeping Requirements for AHERA Management Plans
All records required by 40 CFR 763.94 for school buildings subject to the AHERA regulations shall be
maintained in a centralized location in the administrative office of both the school building and the Local
Education Agency (LEA) and shall be considered a part of the AHERA management plan(s) for all such
buildings. These records shall be maintained until their disposal is specifically authorized in writing by the
Agency unless a shorter retention period is specifically authorized by 40 CFR 763.94 for that type of record.
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
PART D
CERTIFICATION OF TRAINING COURSES, COMPETENT PERSONS,
ANALYTICAL SERVICES AND CONSULTANTS
JANUARY 1986
AS AMENDED:
AUGUST 1986
OCTOBER 1988
JUNE 1990
FEBRUARY 1992
SEPTEMBER 2007
Section D
1
PART D
CERTIFICATION OF TRAINING COURSES, COMPETENT PERSONS,
ANALYTICAL SERVICES AND CONSULTANTS
D.1
CERTIFICATION OF ASBESTOS ABATEMENT TRAINING COURSES
D.1.1 General Requirement
(a) Training courses offered and conducted for the purpose of meeting the training requirements of
these regulations must be certified in accordance with this Subpart. Applicants, in order to obtain
certification for a training course, must submit an application which demonstrates compliance
with the requirements of this Subpart.
(b) Notwithstanding the requirements of Paragraph D.1.1(a), initial or annual review training courses
for Asbestos Inspectors, Asbestos Project Designers or Asbestos Management Planners that are
currently certified by other jurisdictions in accordance with the EPA Model Accreditation
Program will be considered as having been certified in accordance with this Subpart.
(c) The criteria for successful completion of a required training course must include obtaining a
passing score on the final course examination, unless the certified training course has been
specifically authorized in writing by the Agency to use an alternative method of determining
successful completion.
D.1.2 Application for Certification of Training Courses
An applicant for certification of any asbestos abatement training course shall submit the following
information for Agency review at least forty five (45) days prior to the first scheduled course date:
(a) The name and address of the person(s), consulting firm, union, trade association, governmental
agency, educational institution or other entity which proposes to conduct the training course,
background information about the course sponsors, the name of the responsible individual and
his/her telephone number.
(b) The type of course(s) for which certification is being requested.
(c) A detailed outline of the course curriculum including the amount of time allotted to each topic,
the name and training/qualifications of the individual(s) responsible for developing the
instruction program for each topic and the name of the instructor(s) for each topic.
(d) A description of the teaching methods to be used to present each topic including, where
appropriate, lectures, discussions, demonstrations and audio-visual materials. When applicable,
include the name, producer and date of production of audio-visual materials to be used.
(e) Copies of written materials to be distributed. All materials submitted in conjunction with the
application shall be typewritten or machine printed.
(f) Evidence demonstrating that the applicant has employed or contracted as instructors, either on a
full time or temporary basis, a sufficient number of persons (a minimum of two) who meet the
training and experience criteria contained in Section D.1.3 of these regulations. Resumes
describing special training and education and/or prior experience may be submitted for the
Section D
2
purpose of providing this evidence.
(g) A list of the types, brand names and quantities of respirators to be used to demonstrate and fit test
or flow test respirators.
(h) A description of the type and quantity of protective clothing to be used during practice exercises
and demonstrations.
(i) A description of the materials to be used for hands-on practice exercises and demonstrations,
including hand tools, ladders, plastic sheeting and other barrier construction supplies, negative air
filtration units, water spray devices and decontamination facilities.
(j) A detailed description of the site of the training course including address where demonstrations
and hands-on practice exercises will be conducted.
(k) Any restrictions on attendance (language, degree of literacy required, union or group
association, etc.).
(1) Oral final examinations are not permitted unless specifically requested by the applicant and
authorized in writing by the Agency. The applicant must specifically identify the
circumstances under which an oral final examination will be used. If oral final examinations
are to be given in a language other than English, the applicant must outline the procedure
used to ensure the integrity of the examination process.
(2) Only Initial and Annual Review courses for Asbestos Abatement Workers and Competent
Persons may be presented in a foreign language. Where such foreign language courses are
offered, the applicant must translate all of the course materials into the foreign language and
submit them to the Agency. The applicant must certify to the Agency that the translations
have been adequately checked for accuracy and provide the qualifications of the person(s)
making the translation.
(3) Written final examinations must be administered in the same language in which the other
course materials were presented.
(4) Agency approval of an English language Asbestos Abatement Worker Initial or Annual
Review course does not constitute approval to offer that course in any other language. Each
foreign language version of an Asbestos Abatement Worker Initial or Annual Review course
must receive specific Agency approval. Agency approval to present Asbestos Abatement
Worker Initial or Annual Review courses in a foreign language must be issued prior to its
initial offering and will not be retroactive.
(l) Instructor to student ratio for the hands-on practice exercises and demonstrations. Written
justification must be submitted for student to instructor ratios greater than ten to one (10:1).
(m) Copies of typical final examination questions/answers, including the typical number and
distribution of questions among the various subject areas, as well as the minimum grade which
must be obtained for a trainee to successfully complete the course. Final examinations for
Asbestos Inspector, Management Planner and Asbestos Abatement Worker training courses must
consist of at least fifty (50) multiple choice questions. Final examinations for Abatement Project
Designer and Asbestos Abatement Contractor/Site Supervisor training courses must consist of at
Section D
3
least one-hundred (100) multiple choice questions. Final examinations for all Annual Review
and Competent Person training courses, as well as any other Agency approved training course
containing up to fourteen (14) instructional hours, must consist of at least fifteen to twenty-five
(15-25) multiple choice questions, depending on the length of the training course. The minimum
passing grade must be at least seventy percent (70%).
(n) The Agency shall be immediately notified in writing of any significant changes in any
information submitted by the applicant. These changes may not be implemented until they have
been approved by the Agency.
(o) Appropriate course content and duration, as defined by Section D.1.8 of these regulations.
(p) The mechanism(s) that the applicant will use to ensure that all prospective students have
successfully completed the appropriate initial training course(s) before being allowed to enroll in
the respective annual review course(s), and that all prospective students have successfully
completed any prerequisites for an initial training course (e.g., Inspector is required for
Management Planner).
D.1.3 Criteria for Instructors
To be eligible for certification of any training course, two (2) or more course instructors shall be employed. A
sufficient number of instructors shall be hired to ensure that all of the education and experience criteria for
instructors set forth below are met:
(a) An instructor shall have experience in both the design, field performance and evaluation of air
monitoring programs and the design and implementation of respiratory protection programs.
(b) To qualify to teach the sections of the course concerning the health effects of asbestos, a
qualified health professional shall be employed.
(c) To qualify to teach the sections of the course covering the hands-on practice sessions, an
instructor shall be employed with experience as an asbestos abatement contractor or experience
as an on-site foreman or supervisor of asbestos abatement workers. This person shall have had
direct experience in all phases of asbestos abatement work including work area preparation,
construction of barriers, the use of personal protective equipment, engineering controls, work
practices, clean-up, disposal and decontamination.
(d) An instructor shall have experience in designing, implementing and evaluating either employee
educational programs in occupational health and safety or vocational educational programs.
D.1.4 Recordkeeping Requirements
The training entity shall maintain documentation of each certified course offered which shall include as a
minimum: type of course, date(s) and location(s) of course, class roster and results of any final examination/
evaluation, as well as the unique certificate number, for each student enrolled. The training entity shall retain
all required records for a period of at least ten (10) years and shall make this information available to the
Agency upon request.
D.1.5 Suspension or Revocation of Certification
Section D
4
The Agency may suspend or revoke any certification issued under this Subpart for:
(a) Submitting false information on an application;
(b) Failure to comply with these regulations;
(c) Incompetence; or
(d) Any good cause within the meaning and purpose of these regulations or the Act.
D.1.6 Asbestos Training Course Fees and Issuance/Renewal of Certificates
(a) An application fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health must
accompany the application and shall be in the form of a check made payable to General
Treasurer, State of Rhode Island. This fee is non-refundable and will not be returned if the
application is denied or otherwise not approved by the Agency.
(b) Pursuant to the provisions of Section 23-24.5-14(c) of the General Laws of Rhode Island, 1956,
as amended, the Agency shall grant a certificate to an Asbestos Training Course which meets the
certification requirements set forth in these regulations, and upon submission of the certification
fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health. Said certificate
shall expire two (2) years from the date of issuance unless sooner suspended or revoked. Said
certificate may be renewed every two (2) years in accordance with the provisions of Section
D.1.7 of these regulations and upon payment of the renewal application fee and the appropriate
certification fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health.
(c) The certification fees are as set forth in the Rules and Regulations Pertaining to the Fee
Structure for Licensing, Laboratory and Administrative Services Provided by the Department of
Health.
(d) All amendments which request modification of course content and/or require evaluation of
additional training facilities will be assessed a fee as set forth in the Rules and Regulations
Pertaining to the Fee Structure for Licensing, Laboratory and Administrative Services Provided
by the Department of Health. Said fee shall be submitted to the Agency in the form of a check
made payable to General Treasurer, State of Rhode Island.
(e) All other amendments to Asbestos Training Courses will not be charged a fee.
(f) Waiver of Asbestos Training Course Fees. The application and certification fees shall be waived
for any Asbestos Training Course which is conducted by a Rhode Island state college or
university and/or any agency of the State of Rhode Island or its political subdivisions.
D.1.7 Renewal of Certification
(a) Requests for renewal of certifications issued under this Subpart must contain all the information
requested by Section D.1.2 of these regulations without reference to any previously submitted
material.
Section D
5
(b) In any case in which the responsible individual of a training course with complete certification,
not less than 30 days prior to expiration of its existing complete certification, has filed an
application in proper form for renewal, such existing complete certification shall not expire until
final action on the application has been taken by the Agency.
D.1.8 Certified Training Courses - Types, Content and Duration
(a) The initial training course for all Asbestos Abatement Workers and Site Supervisors shall
conform to the content specified by Paragraph B.3.3(a) of these regulations, shall consist of at
least thirty two (32) hours over a period of at least four (4) days. The course shall also provide
each participant with a minimum of six (6) hours conducting practice exercises which
demonstrate that the participant can:
(1) Properly perform all aspects of asbestos abatement work; and
(2) Prevent unnecessary asbestos exposure to the general public and co-workers by properly
constructing and maintaining temporary plastic barriers, by properly using respiratory
protection, protective clothing and other protective equipment, and by using proper work
area clean-up, decontamination and waste disposal techniques.
(b) The additional training for all Asbestos Abatement Site Supervisors shall conform to the content
specified by Paragraph B.3.3(b) of these regulations and shall consist of at least six (6) hours of
instruction.
(c) The annual review course for all Asbestos Abatement Workers and Site Supervisors shall consist
of the one (1) day (at least eight (8) hours of instruction) training course specified by Section
B.3.4 of these regulation.
(d) The initial training course for Competent Persons required by Section D.2.1 of these regulations
shall consist of at least fourteen (14) hours of instruction and must contain the material required
by Paragraph D.2.2(a) of these regulations.
(e) The initial training for all individuals providing Asbestos Inspection Services shall consist of a
three (3) day (twenty four (24) hours in duration) training course. Lectures, demonstrations and
field exercise(s) shall provide, at a minimum, all of the information required for initial training of
Inspectors by the EPA Model Contractor Accreditation Plan (52 FR 15875-15882, 30 April
1987) or as subsequently amended by the EPA. The initial training course must also include
specific training in the asbestos assessment protocol contained in Part E of these regulations.
(f) The annual review course for all individuals providing Asbestos Inspection Services shall consist
of the one-half (1/2) day (at least three (3) hours of instruction) training course which shall
provide, at a minimum, an adequate review of the topics specified by Paragraph D.1.8(e) of these
regulations, updated information on state-of-the-art procedures and equipment, and reviews of
regulatory changes and interpretations. Specific topic coverage may be requested by the Agency.
(g) The initial training for all individuals providing Asbestos Project Designer Services shall consist
of a three (3) day (twenty four (24) hours in duration) training course. Lectures, demonstrations
and field trip(s) shall provide, at a minimum, all of the material required for initial training of
Abatement Project Designers by the EPA Model Contractor Accreditation Plan (52 FR 15875-
15882, 30 April 1987) or as subsequently amended by the EPA. The thirty eight (38) hour
Section D
6
Asbestos Abatement Worker/Site Supervisor training course(s) specified by Paragraphs B.3.3(a)
and B.3.3(b) of these regulations may also be used to fulfill this requirement if a module on "key
elements of contract specifications" is included in the course(s).
(h) The annual review course for all individuals providing Asbestos Project Designer Services shall
consist of the one (1) day (at least six (6) hours of instruction) training course which shall
provide, at a minimum, an adequate review of the topics specified by Paragraph D.1.8(g) of these
regulations, updated information on state-of-the-art procedures and equipment, and reviews of
regulatory changes and interpretations. Specific topic coverage may be requested by the Agency.
(i) The initial training for all individuals providing Asbestos Management Planner Services shall
consist of both the three (3) day (twenty four (24) hours in duration) training course for Asbestos
Inspectors specified by Paragraph D.1.8(e) of these regulations and an additional two (2) day
(sixteen (16) hours in duration) training course specifically for Asbestos Management Planners.
This additional training course shall consist of lectures, demonstrations and field trip(s) and shall
provide, at a minimum, all of the material required for initial training of Asbestos Management
Planners by the EPA Model Contractor Accreditation Plan (52 FR 15875-15882, 30 April 1987)
or as subsequently amended by the EPA.
(j) The annual review for all individuals providing Asbestos Management Planner Services shall
consist of both the one-half (1/2) day (at least three (3) hours of instruction) training course for
Asbestos Inspectors specified by Paragraph D.1.8(e) of these regulations and an additional one-
half (1/2) day (at least three (3) hours of instruction) training course specifically for Asbestos
Management Planners. This additional training course shall provide, at a minimum, an adequate
review of the topics specified by Paragraph D.1.8(i) of these regulations, updated information on
state-of-the-art procedures and equipment, and reviews of regulatory changes and interpretations.
Specific topic coverage may be requested by the Agency.
(k) The annual review course for Competent Persons required by Paragraph D.2.5(a) of these
regulations shall consist of at least eight (8) hours of instruction and must contain the material
required by paragraph D.2.2(b) of these regulations. Any annual review course that proposes to
include the proficiency test provided for by Paragraph D.2.2(c) of these regulations must also
submit a detailed description of how said proficiency test will be administered. This description
shall include, as a minimum, the skills that will be evaluated, the types of evaluations that will be
conducted, the name(s) and qualifications of the instructor(s) that will conduct the evaluation, the
degree of proficiency that will be necessary to pass this evaluation, and additional training that
will be required before a trainee can be retested after failing any portion of the evaluation.
D.2
CERTIFICATION OF COMPETENT PERSONS
D.2.1 General Requirement
(a) Any designated public employee, designated public maintenance person, maintenance worker in
the private sector, teacher and/or parent representative who desires to be certified as competent in
the basic aspects of asbestos inspections and abatement process evaluations, as defined by the
Act, or to perform spot repairs within the jurisdiction of the applicant's agency, municipality or
building(s) must file an application with the Agency which includes evidence of successful
completion of a certified training course of at least fourteen (14) hours duration (exclusive of
lunch and break times) as outlined in Section D.2.2 of these regulations.
Section D
7
(b) Maintenance personnel in the private sector, including but not limited to plumbers, electricians
and oil burner repairmen, who perform asbestos abatement activities that are subject to these
regulations in conjunction with their primary profession must be certified as a Competent Person-
Spot Repair in accordance with Paragraph D.2.1(a) of these regulations.
D.2.2 Content of Competent Person Training Courses
(a) The initial training course for Competent Person shall consists of at least fourteen (14) hours of
instruction and shall provide, at a minimum, information on the following topics:
(1) The training for maintenance and custodial employees required by 40 CFR 763.92(a)(1) and
(a)(2);
(2) The requirements, procedures and standards established by these regulations, particularly
those sections dealing with spot repairs (Subpart B.10) and the inspection and evaluation
criteria for asbestos in public buildings (Part E); and
(3) At least four (4) hours of hands-on instruction in state-of-the-art spot repair techniques.
(b) The yearly review course shall consist of at least eight (8) hours of instruction and shall provide,
at a minimum, information on the following topics:
(1) An adequate review of the topics outlined in Paragraph D.2.2(a) of these regulations;
(2) Updated information on state-of-the-art procedures and equipment;
(3) Reviews of regulatory changes and interpretations;
(4) Specific topic coverage as requested by the Agency; and
(5) At least four (4) hours of hands-on instruction in state-of-the-art spot repair techniques.
(c) Notwithstanding the requirements of Subparagraph D.2.2(b)(5) above, certified annual review
courses may include a mechanism for trainees to demonstrate proficiency in the hands-on portion
of said course, in lieu of repeating the four (4) hours of hands-on instruction.
D.2.3 Suspension or Revocation of Competent Person Certification and/or Imposition of Civil Penalties
(a) The Agency may suspend or revoke any Competent Person certification issued under this
Subpart for:
(1) Failure to maintain appropriate proficiency in the required areas.
(2) Incompetence and/or negligence.
(3) Submitting false information on an application.
(4) Failure to comply with these regulations; or
(5) Any good cause within the meaning and purpose of these regulations or the Act.
Section D
8
(b) Civil Penalties
Any person certified only for spot repairs who undertakes any asbestos abatement project larger
than the size limits for a Spot Repair as defined by these regulations or who does not follow the
work practices for Spot Repairs contained in Section B.10.2 of these regulations shall be subject
to a fine of no more than five hundred dollars ($500) per violation. This provision shall also be
applicable to the employers of said persons.
D.2.4 Expiration of Certification
(a) Unless sooner revoked or suspended by the Agency in accordance with the provisions of Section
D.2.3 of these regulations, certification as a Competent Person shall expire one (1) year from the
date of the issuance of the certification.
(b) Notwithstanding the requirements of Paragraph D.2.4(a) above, Competent Person certifications
issued prior to 1 August 1990 shall expire on the date indicated on said certification. However,
individuals holding said Competent Person certifications are subject to the annual review
requirements contained in Paragraph D.2.2(b) of these regulations.
D.2.5 Renewal of Certification
(a) Requests for renewal of certifications issued under this Subpart must contain evidence that the
applicant has successfully completed a certified annual review course, as described in Paragraph
D.2.2(b) of these regulations.
(b) In any case in which a Competent Person, not less than 30 days prior to expiration of its existing
certification, has filed an application in proper form for renewal, such existing certification shall
not expire until final action on the application has been taken by the Agency.
D.3
CERTIFICATION OF ASBESTOS ANALYTICAL SERVICES
D.3.1 General Requirement
Asbestos analytical services offered for the purpose of meeting the requirements of these regulations must be
certified in accordance with this Subpart. Applicants, in order to obtain certification for asbestos analytical
services, must submit an application which demonstrates compliance with the requirements of this Subpart.
D.3.2 Application for Certification of Asbestos Analytical Services
(a) An applicant for certification of any asbestos analytical service shall submit the following
information for Agency review:
(1) The name, address and phone number of the facility and person in charge;
(2) The names, duties and dates of employment of the personnel who will be performing and/ or
certifying the asbestos analysis;
(3) The type(s) of asbestos analysis for which the person is requesting certification;
(4) For analysis of air samples: Evidence that the National Institute for Occupational Safety and
Health has rated the applicant's laboratory facility as "Proficient (P)" in the Proficiency
Section D
9
Analytical Testing (PAT) program's most recent round for asbestos evaluation.
(5) For analysis of bulk asbestos samples: Evidence that the applicant's laboratory facility is
currently accredited for Polarized Light Microscopy (PLM) in the Asbestos Fiber Analysis
Program administered by the National Voluntary Laboratory Accreditation Program
(NVLAP) of the National Institute of Standards and Technology (NIST).
(6) Evidence that any analyst who is proposed to certify results of asbestos analysis conducted
by Phase Contrast Microscopy (PCM) and/or Polarized Light Microscopy (PLM) has
successfully completed:
(i)
A formal course in PCM and/or PLM analysis of asbestos which is acceptable to the
Agency and conducted by a center recognized for training personnel to perform PCM
and/or PLM analysis of asbestos; or
(ii)
An in-house training program, acceptable to the Agency, under the supervision of an
individual who meets the requirements of paragraph (i) above.
(7) A copy of the quality control procedures for asbestos analysis established by the applicant's
laboratory. If the document is lengthy, a summary of the essential elements may be
submitted.
(8) For analysis of asbestos samples by Transmission Electron Microscopy (TEM): Evidence
that the applicant's laboratory facility is currently accredited for TEM in the Asbestos Fiber
Analysis Program administered by the National Voluntary Laboratory Accreditation
Program (NVLAP) of the National Institute of Standards and Technology (NIST).
(9) Evidence that any analyst who is proposed to certify results of asbestos analysis conducted
by Transmission Electron Microscopy (TEM) has successfully completed:
(i)
A formal course in TEM analysis of asbestos which is acceptable to the Agency and
conducted by a center recognized for training personnel to perform TEM analysis of
asbestos; or
(ii)
An in-house training program, acceptable to the Agency, under the supervision of an
individual who meets the requirements of paragraph (i) above.
(b) In addition to the requirements contained in D.3.2(a), the person shall also submit:
(1) Evidence of licensure as an analytical laboratory by the Rhode Island Department of Health-
Division of Laboratories or, for facilities located outside of Rhode Island, evidence of
licensure/certification by an equivalent state, county or municipal agency if said jurisdiction
requires licensure/certification; and
(2) Evidence that the facility has previous experience in successful asbestos analysis utilizing
NIOSH Method 7400 (most current Revision), the EPA Interim Method for the
Determination of Asbestos in Bulk Insulation Samples or alternative methods acceptable to
the Agency.
(3) Evidence that the facility has previous experience in successful asbestos analysis utilizing the
Section D
10
method contained in Appendix A to 40 CFR 763, Subpart A, or alternative methods
acceptable to the Agency. [Applicable only to facilities requesting certification for
Transmission Electron Microscopy (TEM).]
D.3.3 Suspension or Revocation of Laboratory Certification
The Agency may suspend or revoke any laboratory certification issued under this Subpart for:
(a) Failure to maintain proficiency and/or accreditation in the required proficiency testing programs
outlined in Subparagraphs D.3.2(a)(4), D.3.2(a)(5) and/or D.3.2(a)(8) of the regulations.
(b) Submitting false information on an application.
(c) Failure to comply with these regulations.
(d) Any good cause within the meaning and purpose of these regulations or the Act; or
(e) Failure to actually perform asbestos analysis in accordance with prevailing methods of practice.
D.3.4 Asbestos Analytical Services Fees and Issuance/Renewal of Certificates
(a) An application fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health must
accompany the application and shall be in the form of a check made payable to General
Treasurer, State of Rhode Island. This fee is non-refundable and will not be returned if the
application is denied or otherwise not approved by the Agency.
(b) Pursuant to the provisions of Section 23-24.5-14(c) of the General Laws of Rhode Island, 1956,
as amended, the Agency shall grant a certificate to an Asbestos Analytical Service which meets
the certification requirements set forth in these regulations, and upon submission of the
certification fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health. All
prospective analysts that meet Agency training requirements will be included on this
certification. Said certificate shall expire one (1) year from the date of issuance unless sooner
suspended or revoked. Said certificate may be renewed each year in accordance with the
provisions of Section D.3.5 of these regulations and upon payment of the renewal application and
certification fees as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health.
(c) All amendments which request inclusion of (an) additional certifying analyst(s) will be assessed
a fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health.
Said fee shall be submitted to the Agency in the form of a check made payable to General
Treasurer, State of Rhode Island.
(d) Fees for Transmission Electron Microscopy (TEM) Facilities. Facilities requesting only
certification for asbestos analysis by Transmission Electron Microscopy (TEM) shall submit the
fee specified in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health.
Facilities requesting certification for asbestos analysis by TEM in addition to Phase Contrast
Section D
11
Microscopy (PCM) and/or Polarized Light Microscopy (PLM) shall be required to submit the fee
specified in the Rules and Regulations Pertaining to the Fee Structure for Licensing, Laboratory
and Administrative Services Provided by the Department of Health and an additional
initial/renewal certification fee as set forth in the Rules and Regulations Pertaining to the Fee
Structure for Licensing, Laboratory and Administrative Services Provided by the Department of
Health. Said fee shall be submitted to the Agency in the form of a check made payable to
General Treasurer, State of Rhode Island.
(e) All other amendments to Asbestos Analytical Service certificates will not be charged a fee.
D.3.5 Renewal of Certification
(a) Requests for renewal of certifications issued under this Subpart must contain all the information
requested by Section D.3.2 of these regulations without reference to any previously submitted
material.
(b) In any case in which a laboratory, not less than 30 days prior to expiration of its existing
certification, has filed an application in proper form for renewal, such existing certification shall
not expire until final action on the application has been taken by the Agency.
D.4
CERTIFICATION OF CONSULTANTS
D.4.1 General Requirement
Asbestos consultant services offered for the purpose of meeting the requirements of these regulations must be
certified in accordance with this Subpart. Applicants, in order to obtain certification for asbestos consultant
services, must submit an application which demonstrates compliance with the requirements of this Subpart.
D.4.2 Certification of Consultants
(a) Any individual requesting certification as an asbestos consultant must submit a completed
application to the Agency on forms provided by the Agency. The application shall include all
information required by the Act, these regulations, as well as by the form and accompanying
instructions. The appropriate fee(s) required in the Rules and Regulations Pertaining to the Fee
Structure for Licensing, Laboratory and Administrative Services Provided by the Department of
Health must also be submitted with the application.
(b) In addition to the requirements contained in D.4.2(a), the individual shall also submit evidence of
competence in the activity being requested. The following are minimum criteria for establishing
competence in the various activities:
(1) Industrial Hygiene Services. On and after 1 November 1988 the categories of Industrial
Hygiene consultants will no longer be recognized.
(2) Asbestos Abatement Planning. Asbestos Abatement Planning Services Certifications were
no longer recognized as of 1 January 1989.
(3) Inspection Service. Inspection Services (Hazard Assessment) Certifications were no longer
recognized as of 1 January 1989.
Section D
12
(4) Asbestos Inspection Services. Successful completion of an Agency certified training course
covering state-of-the-art techniques in Asbestos Inspection specified by Paragraph D.1.8(e)
of these regulations.
(5) Asbestos Project Designer Services. Successful completion of an Agency certified training
course covering state-of-the-art techniques in Asbestos Project Design specified by
Paragraph D.1.8(g) of these regulations.
(6) Asbestos Management Planner Services. Successful completion of an Agency certified
training course covering state-of-the-art techniques in Asbestos Management Planning
specified by Paragraph D.1.8(i) of these regulations.
D.4.3 Suspension or Revocation of Consultant Certification
The Agency may suspend or revoke any consultant certification issued under this Subpart for:
(a) Failure to maintain appropriate proficiency in the required areas, including failure to
successfully complete the annual training requirement specified by Section D.4.7 of these
regulations.
(b) Incompetence and/or negligence.
(c) Submitting false information on an application.
(d) Failure to discharge activities in accordance with statutory and regulatory provisions contained in
these regulations.
(e) Failure to discharge activities in a manner consistent with prevailing standards of practice; or
(f) Any good cause within the meaning and purpose of these regulations or the Act.
D.4.4 Asbestos Consultant Fees and Issuance/Renewal of Certificates
(a) Pursuant to the provisions of Section 23-24.5-14(c) of the General Laws of Rhode Island, 1956,
as amended, the Agency shall grant a certificate to an Asbestos Consultant who meets the
certification requirements set forth in these regulations, and upon submission of the certification
fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for Licensing,
Laboratory and Administrative Services Provided by the Department of Health for the first
category certified and the fee set forth in the Rules and Regulations Pertaining to the Fee
Structure for Licensing, Laboratory and Administrative Services Provided by the Department of
Health for each additional category certified at the time of original application, made payable by
check to the General Treasurer, State of Rhode Island. Said certificate shall expire one (1) year
from the date of issuance unless sooner suspended or revoked. Said certificate may be renewed
each year in accordance with the provisions of Section D.4.5 of these regulations, upon
documentation of compliance with the requirements of Section D.4.7 of these regulations, and
upon payment of the renewal certification fees as set forth in the Rules and Regulations
Pertaining to the Fee Structure for Licensing, Laboratory and Administrative Services Provided
by the Department of Health for the first category certified and the fee set forth in the Rules and
Regulations Pertaining to the Fee Structure for Licensing, Laboratory and Administrative
Services Provided by the Department of Health for each additional category certified at the time
of renewal, made payable by check to the General Treasurer, State of Rhode Island.
Section D
13
(b) All amendments which contain a request for (an) additional Asbestos Consultant service(s) will
be assessed a fee as set forth in the Rules and Regulations Pertaining to the Fee Structure for
Licensing, Laboratory and Administrative Services Provided by the Department of Health for the
first additional category certified and the fee set forth in the Rules and Regulations Pertaining to
the Fee Structure for Licensing, Laboratory and Administrative Services Provided by the
Department of Health for each subsequent category certified at the time of each amendment
request. Said fee shall be submitted to the Agency in the form of a check made payable to
General Treasurer, State of Rhode Island. Amendment fees will not be prorated for a period of
time less than the full term of a certificate and amended Asbestos Consultant certificates will
only be issued for the balance of the one (1) year term of the original certificate.
(c) Waiver of Asbestos Consultant Fees. Full time employees of a Local Education Agency (LEA)
that maintain Asbestos Inspector or Asbestos Management Planner certificates solely because of
requirements contained in the AHERA regulations may receive a waiver of application and
certification fees under the following conditions:
(1) Each LEA will be limited to three (3) fee waivers for Asbestos Management Planner or
Asbestos Inspector certificates during any twelve (12) consecutive month period. A
application for certification as both an Asbestos Inspector and Asbestos Management Planner
shall be considered as two (2) fee waivers.
(2) The applicant's initial or renewal application must be accompanied by a written statement
from the LEA Superintendent (or equivalent official) that said applicant's assigned duties
require possession of the specified certificate(s).
(3) The certificate(s) will limit authorized activities to those buildings owned by, or under the
direct control of, the LEA, and will terminate before the stated expiration date if the
certificate holder is no longer a full time employee of the LEA.
(d) All other amendments to Asbestos Consultant certificates will not be charged a fee.
D.4.5 Renewal of Certification
(a) Requests for renewal of certifications issued under this Subpart must contain all the information
requested by Section D.4.2 of these regulations without reference to any previously submitted
material. All applications for renewal of certification must also include documentation of
compliance with the provisions of Section D.4.7 of these regulations regarding successful
completion of required annual review training.
(b) In any case in which a consultant, not less than 30 days prior to expiration of its existing
certification, has filed an application in proper form for renewal, such existing certification shall
not expire until final action on the application has been taken by the Agency.
D.4.6 Assessment Criteria
Inspection Services certified under this Subpart shall use the assessment criteria established by Part E of these
regulations unless the Service is authorized by the Agency, in writing, to utilize other assessment criteria.
D.4.7 Annual Training Requirement
Section D
14
Consultants certified in accordance with this Subpart must successfully complete the annual training
requirements specified below:
(a) An individual certified for Asbestos Inspection Services must successfully complete the certified
annual review course specified by Paragraph D.1.8(f) of these regulations.
(b) An individual certified for Abatement Project Designer Services must successfully complete the
certified annual review course required by Paragraph D.1.8(h) of these regulations. The Site
Supervisor annual review course, described in Section B.3.4 of these regulations, can not be used
to fulfill this requirement.
(c) An individual certified for Asbestos Management Planner Services must successfully complete
the certified annual review course required by Paragraph D.1.8(j) of these regulations.
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
PART E
HAZARD ASSESSMENT CRITERIA
JANUARY 1986
AS AMENDED:
AUGUST 1986
OCTOBER 1988
JUNE 1990
Section E
1
PART E
HAZARD ASSESSMENT CRITERIA
E.1
INSPECTION OF BUILDINGS
E.1.1
General Requirement
Inspections of buildings for the purpose of making the following determinations shall be conducted in
accordance with the requirements contained in this Part of these regulations: the asbestos content of materials;
conducting information surveys for asbestos containing materials.
E.1.2
Establishing the Asbestos Content of Materials
Bulk sampling of materials suspected of containing asbestos shall be conducted in accordance with the
procedures contained in Appendix A to this Part. Analysis of bulk samples shall be performed by a
laboratory certified in accordance with Subpart D.3 of these regulations.
E.1.3
Conducting Information Surveys for Asbestos Containing Materials
Asbestos inspections for schools subject to the AHERA regulations shall be in accordance with 40 CFR
763.85 and 763.86. In all other cases, information to be collected for the evaluation of asbestos hazards in
buildings shall be in accordance with the format contained in Appendix C to this Part.
E.1.4
Determining the Degree of Hazard Posed by Asbestos Containing Materials
(a) The degree of hazard posed by asbestos containing materials in school buildings subject to the
AHERA regulations shall be evaluated in accordance with 40 CFR 763.88. In all other cases, the
degree of hazard posed by asbestos containing materials in buildings shall be evaluated using the
algorithm contained in Appendix B to this Part.
(b) Not withstanding the requirements of Section E.1.3 and Paragraph E.1.4(a) of these regulations,
assessments of schools shall also be conducted in accordance with Appendices B and C to this
Part for the purpose of determining eligibility for funding in accordance with Section 23-24.5-19
of the Act and regulations adopted thereunder.
E.2
DEVELOPMENT OF ASBESTOS ABATEMENT REMEDIES
E.2.1
General Requirement
(a) Areas of buildings receiving a score greater than zero from the hazard assessment conducted in
accordance with Section E.1.4 of these regulations will require some type of asbestos abatement
(management) plan. This asbestos abatement plan must be developed by the building owner in
accordance with Part C of these regulations and submitted for Agency review.
(b) Decisions regarding the abatement remedies that may be proposed to the Agency as part of an
asbestos abatement plan are the responsibility of the building owner. These strategies may range
from simple operations and maintenance plans to complete removal. The remedies proposed in
Section E
2
the asbestos abatement plan will be governed by the nature and extent of the hazards that have
been identified, as reflected by the numerical score determined in accordance with Section E.1.4
of these regulations. The acceptability of proposed abatement remedies will be reviewed by the
Agency during the plan approval process in accordance with Part C of these regulations.
E.3
REINSPECTION OF SCHOOLS AND SCHOOL BUILDINGS
E.3.1
General Requirement
All schools and school buildings, as defined by the AHERA regulations, must have all friable and nonfriable
known or assumed ACM reinspected at least once every three (3) years in accordance with 40 CFR 763.85(b).
Section E
3
APPENDIX A
SAMPLING AND ANALYSIS CRITERIA
BULK SAMPLING PROTOCOL FOR HAZARD ASSESSMENT
1. Number of Samples
Samples of suspect asbestos containing materials must be taken for laboratory analysis. The number of
samples to be taken is dependent upon the type of material to be sampled.
(a) Friable or Potentially Friable Surfacing Material
A consultant certified for Asbestos Inspection Services in accordance with Subparagraph D.4.2(b)(5) of
these regulations or a Competent Person certified in accordance with Subpart D.2 of these regulations
shall collect bulk samples, in a statistically random manner that is representative of each homogeneous
area, as follows:
(1) At least three (3) bulk samples from each homogeneous area that is one thousand (1000) square feet
or less, except as provided in Subparagraphs (4) and (5) of this Section.
(2) At least five (5) bulk samples from each homogeneous area that is greater than one thousand (1000)
square feet but less than five thousand (5000) square feet, except as provided in Subparagraphs (4)
and (5) of this Section.
(3) At least seven (7) bulk samples from each homogeneous area that is greater than five thousand (5000)
square feet, except as provided in Subparagraphs (4) and (5) of this Section.
(4) A homogeneous area shall be determined to contain ACM based on a finding that the results of at
least one (1) sample collected from that area shows that asbestos is present in an amount greater than
one percent (1%).
(5) A homogeneous area is considered not to contain ACM only if the results of all samples required to
be collected from that area show asbestos in amounts of one percent (1%) or less.
(b) Thermal System Insulation.
A consultant certified for Asbestos Inspection Services in accordance with Subparagraph D.4.2(b)(5) of
these regulations or a Competent Person certified in accordance with Subpart D.2 of these regulations
shall collect bulk samples, in a statistically random manner that is representative of each homogeneous
area, as follows:
(1) At least three (3) bulk samples from each homogeneous area that is damaged, except as provided in
Subparagraphs (1)(a)(4) and (1)(a)(5) of this Appendix.
(2) At least one (1) bulk sample from each homogeneous area of patched thermal system insulation if the
patched section is less than six (6) linear or square feet, except as provided in Subparagraphs (1)(a)(4)
and (1)(a)(5) of this Appendix.
(3) In a manner sufficient to determine whether the material is ACM or not ACM, collect bulk samples
from each insulated mechanical system where cement is used on tees, elbows or valves, except as
provided in Subparagraphs (1)(a)(4) and (5) of this Appendix.
Section E
4
(c) Miscellaneous and Non-Friable Material
A consultant certified for Asbestos Inspection Services in accordance with Subparagraph D.4.2(b)(5) of
these regulations or a Competent Person certified in accordance with Subpart D.2 of these regulations
shall collect bulk samples from each homogeneous area in a manner sufficient to determine whether the
material is ACM or not ACM, except as provided in Subparagraphs (1)(a)(4) and (1)(a)(5) of this
Appendix.
(d) Homogeneous Areas Assumed to Contain ACM
Notwithstanding the requirements of Paragraphs (1)(a), (1)(b) and (1)(c) above, any homogeneous area
that is assumed to be ACM in accordance with 40 CFR 763.85(a)(4)(iii) and (iv) does not have to be
sampled as long as the remaining elements of the assessment required by 40 CFR 763.85(a)(4)(v) and/or
Subpart E of these regulations are completed.
2. Sampling Procedures
(a) Materials
* Clean, dry small jar (35 mm film canister or small, wide-mouthed glass jar) with screw-on lid
* Knife (optional)
* Core borer (optional)
* Half-face cartridge respirator with two screw-in canisters; NIOSH approval number TC-23C-153
(Mine Safety Appliance chemical cartridge: approved for organic volatiles, chlorine, sulfur dioxide and
hydrogen chloride; with dust, fume, mist (high efficiency) filter.
(b) Sampling Methods
* The material should be sampled when the area is not in use.
* Only those persons needed for sampling should be present.
* The sampler should wear an approved respirator.
* The material to be sampled should be lightly misted with water to minimize fiber release.
* Gently twist the open end of the container into the material, penetrating the depth of the material until
material falls into the container. Use a knife or core borer to take the sample of cementitious materials
and then empty the material into the container.
* Close the container tightly and wipe off the exterior with a damp cloth. Tape the lid to prevent
accidental opening during shipment or handling.
* Label the sample container with a unique identification number, the name of the building, initials of the
person who sampled, and the date of sample collection.
* Make a record of each sample by noting the date the sample was taken, location of material sampled
(including room or area), and the sample ID number.
* Wet mop or wipe-up with a wet cloth any material which may have fallen on the floor.
* Spray the area sampled with a clear shellac, varnish or similar material to minimize the potential for
fiber release.
* Clean the knife or core borer, if used, with water.
* Submit samples to a laboratory certified by the Agency to analyze asbestos.
* Request that results be reported as type and percent asbestos by a method capable of determining
asbestos content with a minimum detection level of 1% by weight.
Section E
5
Section E
6
APPENDIX B
EVALUATION & RATING OF ASBESTOS HAZARDS IN BUILDINGS
FACTOR
RANGE OR EXTENT
SCORE
1. Material Condition
Deterioration/Damage
None
Moderate/Small Area (See Notes 1 & 3)
Moderate/Large Area (See Notes 1 & 4)
Severe/Small Area (See Notes 2 & 3)
Severe/Large Area (See Notes 2 & 4)
0
2
3
4
5
MATERIAL CONDITION RATING:
2. Water Damage
(Including Steam)
None
Damage over Small Area or No Damage but with flat
roof immediately overhead (See Note 3)
Damage over Small Area with flat roof immediately
overhead or Damage to Large Area regardless of roof
type (See Notes 3 and 4)
0
1
2
WATER DAMAGE RATING:
Note 1: Moderate-Any uncovered pipe and/or
delamination, crack, etc in a surface that is basically
intact.
Note 2: Severe-Obvious deterioration or physical
separation that is not easily repaired.
Note 3: Small Area-Any area less than or equal to 10
linear feet (pipes) or 25 square feet (surfaces other
than pipes).
Note 4: Large Area-Any area greater than 10 linear feet
(pipes) or 25 square feet (surfaces other than pipes).
3. Exposed Surface Area
Not Exposed (i.e.: Located above suspended ceiling
and/or not visible without removing panels or ceiling
sections)
10% or less of the material is exposed
10%-100% of the material is exposed
0
1
4
EXPOSED SURFACE AREA RATING:
Section E
7
FACTOR
RANGE OR EXTENT
SCORE
4. Accessibility
Not Accessible
Low (Access requires removal of temporary barrier such as
drop-ceiling)
Low-Moderate (Accessible only with devices or equipment
not common to area)
Moderate (accessible only with devices or equipment
common to area)
High (Accessible with no additional devices or equipment)
0
1
2
3
4
ACCESSIBILITY RATING:
5. Activity and
Movement
None or Low (Sedentary activities only)
Moderate (Ordinary movement - more walking than sitting)
High (Elevated level of physical activity such as running,
jumping or manual labor)
0
1
2
ACTIVITY AND MOVEMENT RATING:
6. Air Plenum or
Direct Air Stream
None
Present
0
1
AIR PLENUM OR DIRECT AIR STREAM
RATING:
7. Friability
Not Friable
Potentially Friable (Difficult but possible to damage by hand
and/or material than has been properly encapsulated or
enclosed)
Moderately Friable (Fairly easy to dislodge and crush)
Highly Friable (Fluffy, spongy or flaking and/or pieces
hanging and/or falls apart when touched)
0.1
1
2
3
FRIABILITY RATING:
8. Asbestos Content
Trace to <1%
1% to 50%
50% to 100%
0
2
3
ASBESTOS CONTENT RATING:
Section E
8
FACTOR
RANGE OR EXTENT
SCORE
9. Occupancy & Use
Low Priority Buildings
Low Priority Areas
Restricted Use Areas
High Priority Areas of Intermediate Priority Buildings
High Priority Areas of High Priority Buildings
0
0
0
8
12
OCCUPANCY & USE RATING:
TOTAL HAZARD = ([SUM of Factors 1-6] x [Factor #7] x [Factor #8]) + [Factor 9]
TOTAL HAZARD = ( x x ) + ( ) =
Comments:
Section E
9
APPENDIX C
WALK-THROUGH SURVEY FOR INFORMATION ON
ASBESTOS HAZARDS IN BUILDINGS
PARAMETER
DESCRIPTION--Indicate all that apply
1. Primary Use of this Area
A-Auditorium B-Boiler/Mech. C-Corridor
D-Storage E-Classroom F-Food Service
G-Gymnasium H-Lavatory I-Inaccessible J-Office
K-Lounge Z-Other
2. Persons with Access to
this area
1-General Public 2-All Employees 3-Children
4-Maintenance Employees Only 5-Patients
6-1 & 2 7-1 & 3 8-2 & 3 9-1, 2 & 3 0-Other
3. Asbestos Location
1-Ceiling 2-Walls 3-Exposed Pipes
4-Pipes Above Suspended Ceiling 9-Other
4. Type of Asbestos
1-Trowelled On 2-Sprayed On 3-Transite in this Area
4-Boiler Lagging 5-Steam Pipe 6-Water Tank 7-Water Pipe
8-Air Duct 9-Other
5. Total Asbestos in this
area
Linear Feet (Pipes Only)
Square Feet (All Other Surfaces)
6. % of Total Asbestos in
area that is exposed**
0-None 1-Less Than 10% 4-10%-100%
7. Description of Damage
0-None 1-Water Damage 2-Impact Damage
3-Loose 4-Incomplete Repair
5-Open Ends 6-Delamination 7-Dust/Debris
8-Cracks 9-Other
8. Degree of Damage
0-None 1-Moderate 2-Severe
9. Total Asbestos Damaged
in this Area
Linear Feet (Pipes Only)
Square Feet (All Other Surfaces)
10. Accessibility of the
Asbestos in this Area **
0-Not Accessible 1-Access by removal of barrier
2-Access with Equipment NOT Common to Area
3-Access with Equipment Common to Area
4-Easy Access
Section E
10
PARAMETER
DESCRIPTION--Indicate all that apply
11. Friability of Asbestos
this Area **
0.1-Not Friable 1-Potentially Friable
2-Moderately Friable 3-Highly Friable
12. Typical Occupancy of
this Area
0-None 1-Low 2-Moderate 3-High
Average Person-hours/Week in this Area:
13. Typical Activity in this
Area**
0-Sedentary 1-Ordinary Movement
2-Elevated Physical Activity and/or Manual Labor
14. Air plenum or direct
air stream in this
area?**
0-No 1-Yes
15. Is air removed from
this area supplied to
other areas?
( ) No ( ) Yes
If Yes, indicate number and use of other rooms involved:
16. Ceiling Type
1-Concrete 2-Plaster 3-Concrete Joists/Beams 4-Tile
5-Suspended Lay-in Panels 6-Corrugated Steel
7-Metal Deck/Steel Beam/Bar Joist
8-Suspended Metal Lath 9-Other
17. Ceiling Shape
1-Flat 2-Dome 3-Folded Plate
4-Barrel 5-Reinforced Squares
9-Other
18. Ceiling Height (Feet):
19. Lighting Type
1-Surface Mounted 2-Suspended
3-Recessed 9-Other
20. # of Light Fixtures:
21. Floor Type
1-Concrete 2-Tile/Linoleum 3-Wood
4-Carpet 5-Soil 9-Other
22. COMMENTS:
NOTE: Parameters indicated by ** are directly transferred to FORM ASB-2 when calculating the overall asbestos
hazard rating of this sub-area.
RULES AND REGULATIONS FOR ASBESTOS CONTROL
[R23-24.5-ASB]
PART F
NESHAP REQUIREMENTS
FEBRUARY 1992
Section F
1
PART F
NESHAP REQUIREMENTS
F.1
GENERAL PROVISIONS
F.1.1
Authority
This part is promulgated pursuant to authority delegated to the Agency by the U.S. Environmental Protection
Agency under the provisions of 40 CFR 61.157(b).
F.1.2
Implementation
Implementation of this part will be suspended until such time as formal delegation of Asbestos NESHAP
authority has been conveyed to the Agency by the U.S. Environmental Protection Agency.
F.1.3
Applicability and Scope
This part is only applicable to federal facilities and such other persons subject to the asbestos NESHAP
requirements promulgated in 40 CFR 61, Subpart M who are not otherwise subject to these regulations. The
definitions contained in Subpart A.1 of these regulations are also applicable to this part, to the extent that they
pertain to regulations contained in this part.
F.2
STANDARD FOR DEMOLITION AND RENOVATION
F.2.1
Applicability
Prior to the commencement of any demolition or renovation, the owner or operator of a demolition or
renovation activity shall thoroughly inspect the affected facility or part of the facility where the demolition or
renovation operation will occur for the presence of asbestos, including Category I and Category II nonfriable
ACM. The requirements of Sections F.2.2 and F.2.3 of these regulations apply to each operator and owner of
a demolition or renovation activity, including the removal of RACM, as follows:
(a) In a facility being demolished, all the requirements of Sections F.2.2 and F.2.3 apply, except as
provided in Paragraph F.2.1(c) below, if the combined amount of RACM is:
(1) At least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square
feet) on other facility components; or
(2) At least 1 cubic meter (35 cubic feet) off facility components where the length or area could
not be measured previously.
(b) In a facility being demolished, only the notification requirements of Paragraphs F.2.2(a), (b),
(c)(1), (c)(4), (d)(1) through (d)(7), (d)(9) and (d)(16) apply if the combined amount of RACM
is:
(1) Less than 80 linear meters (260 linear feet) on pipes and less than 15 square meters (160
square feet) on other facility components; and
(2) Less than 1 cubic meter (35 cubic feet) off facility components where the length or area
could not be measured previously or there is no asbestos.
(c) If the facility is being demolished under an order of a State or local government agency, issued
because the facility is structurally unsound and in danger of imminent collapse, only the
Section F
2
requirements of Paragraphs F.2.2(a), (b), (c)(3), (d) [except (d)(8)], (e), and F.2.3(d) through
F.2.3(i) apply.
(d) In a facility being renovated, including any individual nonscheduled renovation operation, all the
requirements of Sections F.2.2 and F.2.3 apply if the combined amount of RACM to be stripped,
removed, dislodged, cut, drilled, or similarly disturbed is:
(1) At least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square
feet) on other facility components; or
(2) At least 1 cubic meter (35 cubic feet) off facility components where the length or area could
not be measured previously.
(3) To determine whether Paragraph F.2.1(d) applies to planned renovation operations involving
individual nonscheduled operations, predict the combined additive amount of RACM to be
removed or stripped during a calendar year of January 1 through December 31.
(4) To determine whether Paragraph F.2.1(d) applies to emergency renovation operations,
estimate the combined amount of RACM to be removed or stripped as a result of the sudden,
unexpected event that necessitated the renovation.
(e) Owners or operators of demolition operations are exempt from the requirements of 40 CFR
61.05(a), 61.07 and 61.09.
F.2.2
Notification Requirements
Each owner or operator of a demolition or renovation activity to which this section applies shall:
(a) Provide the Agency with written notice of intention to demolish or renovate. Delivery of the
notice by U.S. Postal Service, commercial delivery service, or hand delivery is acceptable.
(b) Update notice, as necessary, including when the amount of asbestos changes by at least 20
percent.
(c) Postmark or deliver the notice as follows:
(1) If the operation is described in Paragraphs F.2.1(a) and (d) [except (d)(3) and
(d)(4)],notification is required at least 10 working days before asbestos striping or removal
work, or any other activity [e.g. site preparation] that would break up, dislodge or similarly
disturb asbestos material, begins. If the operation is as described in Paragraph F.2.1(b),
notification is required 10 working days before demolition begins.
(2) For renovations described in Paragraph F.2.1(d)(3), notification is required at least 10
working days before the end of a calendar year preceding the year for which notice is being
given.
(3) If the operation is a demolition ordered according to Paragraph F.2.1(c), or a renovation
described in Paragraph F.2.1(d)(4), notification is required as early as possible before, but
not later than, the following working day.
Section F
3
(4) If asbestos stripping or removal work in a demolition or renovation operation described in
Paragraphs F.2.1(a) and (d) [except (d)(3) and (d)(4)], or a demolition described in Paragraph
F.2.1(b), will begin on a date other than the one contained in the original notice, notice of the
new start date must be provided to the Agency as follows:
(i)
When the asbestos stripping or removal operation or demolition operation covered by
this paragraph will begin after the date contained in the notice:
(a) Notify the Agency of the new start date by telephone as soon as possible before the
original start date; and
(b) Provide the Agency with a written notice of the new start date as soon as possible
before, and no later than, the original start date. Delivery of the updated notice by
U.S. Postal Service, commercial delivery service, or hand delivery is acceptable.
(ii)
When the asbestos stripping or removal operation or demolition operation covered by
this paragraph will begin on a date earlier than the original start date:
(a) Provide the Agency with a written notice of the new start date at least 10 working
days before asbestos stripping or removal work begins.
(b) For demolitions covered by Paragraph F.2.1(b), provide the Agency with a written
notice of the new start date at least 10 working days before commencement of
demolition. Delivery of updated notice by U.S. Postal Service, commercial
delivery service, or hand delivery is acceptable.
(iii) In no event shall an operation covered by this subpart begin on a date other than the
date contained in the written notice of the new start date.
(d) The most current revision of Agency Form ASB-22 shall be used to submit the following
information:
(1) An indication of whether the notice is the original or a revised notification.
(2) Name, address and telephone number of both the facility owner and operator and the
asbestos removal contractor owner or operator.
(3) Type of operation: demolition or renovation.
(4) Description of the facility or affected part of the facility including the size [square meters/
square feet and number of floors], age, and present and prior use of the facility.
(5) Procedure, including analytical methods, employed to detect the presence of RACM and
Category I and Category II nonfriable ACM.
(6) Estimate of the approximate amount of RACM to be removed from the facility in terms of
length of pipe in linear meters (linear feet), surface area in square meters (square feet) on
other facility components, or volume in cubic meters (cubic feet) if off the facility
components. Also, estimate the approximate amount of Category I and Category II
nonfriable ACM in the affected part of the facility that will not be removed before
Section F
4
demolition.
(7) Location and street address [including building number or name and floor or room number, if
appropriate], city, county, and state, of the facility being demolished or renovated.
(8) Scheduled starting and completion dates of a demolition or renovation activity involving
asbestos removal work or any other activity [e.g. site preparation] that would break up,
dislodge, or similarly disturb asbestos material. Planned renovation operations involving
individual nonscheduled operations shall only include the beginning and ending dates of the
report period, as described in Paragraph F.2.1(d)(3).
(9) Scheduled starting and completion dates of demolition or renovation.
(10) Description of planned demolition or renovation work to be performed and method(s) to be
employed, including demolition or renovation techniques to be used and descriptions of
affected facility components.
(11) Description of work practices and engineering controls to be used to comply with the
requirements of this Subpart, including asbestos removal and waste handling emission
control procedures.
(12) Name and location of the waste disposal site where the Asbestos Containing Waste Material
will be deposited.
(13) A certification that at least one person trained as required by Paragraph F.2.3(h) will
supervise the stripping and removal described by this notification. This requirement shall
become effective 20 November 1991.
(14) For facilities described in Paragraph F.2.1(c), the name, title, and authority of the State or
local government representative who has ordered the demolition, the date that the order was
issued, and the date on which the demolition was ordered to begin. A copy of the order shall
be attached to the notification.
(15) For emergency renovations described in Paragraph F.2.1(d)(4), the date and hour that the
emergency occurred, a description of the sudden, unexpected event, and an explanation of
how the event caused an unsafe condition or would cause equipment damage or an
unreasonable financial burden.
(16) Description of procedures to be followed in the event that unexpected RACM is found or
Category II nonfriable ACM becomes crumbled, pulverized, or reduced to powder.
(17) Name, address and telephone number of waste transporter.
F.2.3
Procedures for Asbestos Emission Control
Each owner or operator of a demolition or renovation activity to whom this part applies, according to Section
F.2.1 of these regulations, shall comply with the following procedures:
(a) Remove all RACM from a facility being demolished or renovated before any activity begins that
would break up, dislodge, or similarly disturb the material or preclude access to the material for
subsequent removal. RACM need not be removed before demolition if:
Section F
5
(1) It is Category I nonfriable ACM that is not in poor condition and is not friable.
(2) It is on a facility component that is encased in concrete or other similarly hard material and is
adequately wet whenever exposed during demolition; or
(3) It was not accessible for testing and was, therefore, not discovered until after demolition
began and, as a result of the demolition, the material cannot be safely removed. If not
removed for safety reasons, the exposed RACM and any asbestos contaminated debris must
be treated as Asbestos Containing Waste Material and adequately wet at all times until
disposed of.
(4) They are Category II nonfriable ACM and the probability is low that the materials will
become crumbled, pulverized, or reduced to powder during demolition.
(b) When a facility component that contains, is covered with, or is coated with RACM is being taken
out of the facility as a unit or in sections:
(1) Adequately wet all RACM exposed during cutting and disjoining operations; and
(2) Carefully lower each unit or section to the floor and to ground level, not dropping, throwing,
sliding, or otherwise damaging or disturbing the RACM.
(c) When RACM is stripped from a facility component while it remains in place in the facility,
adequately wet the RACM during the stripping operation.
(1) In renovation operations, wetting is not required if:
(i)
The owner or operator has obtained prior written approval from the Agency based on a
written application that wetting to comply with this paragraph would unavoidably
damage equipment or present a safety hazard; and
(ii)
The owner or operator uses one or more of the following emission control methods:
(a) A local exhaust ventilation and collection system designed and operated to capture
the particulate asbestos material produced by the stripping and removal of the
asbestos materials. The system must exhibit no visible emissions to the outside
air, or be designed and operated to utilize either a HEPA filter that is certified to be
at least 99.97 percent efficient for 0.3 micron particles or another method approved
by the Administrator of the U.S. Environmental Protection Agency in accordance
with 40 CFR 61.152(b)(3).
(b) A glovebag system designed and operated to contain the particulate asbestos
material produced by the stripping of the asbestos materials.
(c) Leak-tight wrapping to contain all RACM prior to dismantlement.
(2) In renovation operations where wetting would result in equipment damage or a safety hazard,
and the methods allowed in Paragraph F.2.3(c)(1) cannot be used, another method may be
used after obtaining written approval from the Agency based upon a determination that it is
Section F
6
equivalent to wetting in controlling emissions or to the methods allowed in Paragraph
F.2.3(c)(1).
(3) A copy of the Agency's written approval shall be kept at the worksite and made available for
inspection.
(d) After a facility component covered with, coated with, or containing RACM has been taken out of
the facility as a unit or in sections pursuant to Paragraph F.2.3(b), it shall be stripped or contained
in leak-tight wrapping, except as described in Paragraph F.2.3(e). If stripped, either:
(1) Adequately wet the RACM during stripping; or
(2) Use a local exhaust ventilation and collection system designed and operated to capture the
particulate asbestos material produced by the stripping. The system must exhibit no visible
emissions to the outside air, or be designed and operated to utilize either a HEPA filter that is
certified to be at least 99.97 percent efficient for 0.3 micron particles or another method
approved by the Administrator of the U.S. Environmental Protection Agency in accordance
with 40 CFR 61.152(b)(3).
(e) Beams must be handled in accordance with Paragraphs F.2.3(b), (c), and (d) above. RACM is
not required to be stripped from large facility components such as reactor vessels, large tanks,
and steam generators if the following requirements are met:
(1) The component is removed, transported, stored, disposed of, or reused without disturbing or
damaging the RACM.
(2) The component is encased in a leak-tight wrapping.
(3) The leak-tight wrapping is labeled according to Section F.3.4 of these regulations during all
loading and unloading operations and during storage.
(f) For all RACM, including material that has been removed or stripped:
(1) Adequately wet the material and ensure that it remains wet until collected and contained or
treated in accordance with Subpart F.3 of these regulations; and
(2) Carefully lower the material to the ground and floor, not dropping, throwing, sliding, or
otherwise damaging or disturbing the material.
(3) Transport the material to the ground via leak-tight chutes or containers if it has been removed
or stripped more than 50 feet above ground level and was not removed as units or in sections.
(4) RACM contained in leak-tight wrapping that has been removed in accordance with
Paragraphs F.2.3(d) and F.2.3(c)(1)(ii)(c) need not be wetted.
(g) When the temperature at the point of wetting is below 0°C (32°F):
(1) The owner or operator need not comply with Paragraphs F.2.3(b)(1) and the wetting
provisions of Paragraph F.2.3(c).
Section F
7
(2) The owner or operator shall remove facility components containing, coated with, or covered
with RACM as units or in sections to the maximum extend possible.
(3) During periods when wetting operations are suspended due to freezing temperatures, the
owner or operator must record the temperature in the area containing the facility components
at the beginning, middle, and end of each workday and keep daily temperature records
available for inspection by the Agency during normal business hours at the demolition or
renovation site. The owner or operator shall retain temperature records for at least two years.
(h) Effective 20 November 1991, no RACM shall be stripped, removed, or otherwise handled or
disturbed at a facility regulated by this section unless at least one on-site representative, such as a
foreman or management level person or other authorized representative, trained in the provisions
of these regulations and the methods for complying with them, is present. Every 2 years, the
trained on-site individual shall receive refresher training in the provisions of this regulation. The
required training shall include as a minimum: applicability; notifications; material identification;
control procedures for removals including, at least, wetting, local exhaust ventilation, negative
pressure enclosures, glovebag procedures and High Efficiency Particulate Air (HEPA) filters;
waste disposal work practices; reporting and recordkeeping; and asbestos hazards and worker
protection. Evidence that the required training has been completed shall be posted and made
available for inspection by the Agency at the demolition or renovation site.
(i) For facilities described in Paragraph F.2.1(c), adequately wet the portion of the facility that
contains RACM during the wrecking operation.
(j) If a facility is demolished by intentional burning, all RACM including Category I and Category
II nonfriable ACM must be removed in accordance with these regulations before burning.
F.3
STANDARDS FOR WASTE DISPOSAL FOR DEMOLITION AND RENOVATION
OPERATIONS
F.3.1
Applicability and Scope
Each owner or operator of a demolition or renovation activity subject to Subpart F.2 of these regulations shall
also comply with the provisions of this subpart.
F.3.2
Visible Emissions
Discharge no visible emissions to the outside air during the collection, processing (including incineration),
packaging, or transporting of any Asbestos Containing Waste Material, or use one of the following emission
control and waste treatment methods:
(a) Process Asbestos Containing Waste Material for disposal as follows:
(1) Adequately wet Asbestos Containing Waste Materials; and
(2) Discharge no visible emissions to the outside air from collection, mixing, wetting, and
handling operations. Alternatively, either a HEPA filter that is certified to be at least 99.97
percent efficient for 0.3 micron particles or another method approved by the Administrator of
the U.S. Environmental Protection Agency in accordance with 40 CFR 61.152(b)(3) shall be
used to clean emissions containing particulate asbestos material before they escape to, or are
Section F
8
vented to, the outside air; and
(3) After wetting, seal all Asbestos Containing Waste Material in leak-tight containers while
wet. Alternatively, materials that will not fit into containers without additional breaking
shall be put into leak-tight wrapping; and
(4) Label the containers or wrapped materials using warning labels specified by Paragraph
B.8.2(l) of these regulations. The labels shall be printed in letters of sufficient size and
contrast so as to be readily visible and legible.
(5) For Asbestos Containing Waste Material to be transported off the facility site, label
containers or wrapped materials with the name of the waste generator and the location at
which the waste was generated.
(b) Process Asbestos Containing Waste Material into nonfriable forms as follows:
(1) Form all Asbestos Containing Waste Material into nonfriable pellets or other shapes;
(2) Discharge no visible emissions to the outside air from collection and processing operations.
Alternatively, either a HEPA filter that is certified to be at least 99.97 percent efficient for
0.3 micron particles or another method approved by the Administrator of the U.S.
Environmental Protection Agency in accordance with 40 CFR 61.152(b)(3) shall be used to
clean emissions containing particulate asbestos material before they escape to, or are vented
to, the outside air.
(c) For facilities demolished where the RACM is not removed prior to demolition according to
F.2.3(a)(1) through (a)(4), or for facilities demolished according to F.2.3(i), adequately wet
Asbestos Containing Waste Material at all times after demolition and keep wet during handling
and loading for transport to a disposal site. Asbestos containing waste materials covered by this
paragraph do not have to be sealed in leak-tight containers and wrapping but may be transported
and disposed of in bulk.
(d) Use an alternative emission control and waste treatment method that has received prior approval
from the Administrator of the U.S. Environmental Protection Agency in accordance with the
procedure described in 40 CFR 61.149(c)(2).
(e) As applied to demolition and renovation, the requirements of Section F.3.2 do not apply to
Category I nonfriable ACM waste and Category II nonfriable ACM waste that did not become
crumbled, pulverized, or reduced to powder.
F.3.3
Disposal of Asbestos Containing Waste Material
All Asbestos Containing Waste Material shall be deposited as soon as is practical by the waste generator at:
(a) A waste disposal site operated in accordance with the provisions of 40 CFR 61.154, or equivalent
regulations promulgated by a state or local NESHAP designee; or
(b) An EPA-approved site that converts RACM and Asbestos Containing Waste Material into
nonasbestos (asbestos-free) material according to the provisions of 40 CFR 61.155.
(c) The requirements of Section F.3.3 of these regulations do not apply to Category I nonfriable
Section F
9
ACM that is not RACM.
F.3.4
Placarding
Vehicles used to transport Asbestos Containing Waste Material shall be placarded during the loading and
unloading of the waste so that the signs are visible. The signs must:
(a) Be displayed in such a manner and location that a person can easily read the legend.
(b) Conform to the requirements for 51 cm X 36 cm (20 inch X 14 inch) upright format signs
specified in OSHA 29 CFR 1910.145(d)(4).
(c) Display the following legend in the lower panel with letter sizes and styles of a visibility at least
equal to that specified below:
Legend
DANGER
ASBESTOS DUST HAZARD
CANCER AND LUNG DISEASE HAZARD
Authorized Personnel Only
Notation
2.5 cm (1 inch) Sans Serif, Gothic or Block
2.5 cm (1 inch) Sans Serif, Gothic or Block
1.9 cm (3/4 inch) Sans Serif, Gothic or Block
14 Point Gothic
Spacing between any two lines must be at least equal to the height of the upper of the two lines.
F.3.5
For all Asbestos Containing Waste Material transported off the facility site:
(a) Maintain waste shipment records, using the most current revision of Agency Form ASB-23 to
provide the following information:
(1) The name, address, and telephone number of the waste generator.
(2) The approximate quantity in cubic meters (cubic yards).
(3) The name and telephone number of the disposal site operator.
(4) The name and physical site location of the disposal site.
(5) The date transported.
(6) The name, address, and telephone number of the transporter(s).
(7) A certification that the contents of this consignment are fully and adequately described by
proper shipping name and are classified, packed, marked, and labeled, and are in all respects
in proper condition for transport by highway according to applicable international and
Section F
10
government regulations.
(b) Provide a copy of the waste shipment record, described in Paragraph F.3.5(a), to the disposal site
owners or operators at the same time as the Asbestos Containing Waste Material is delivered to
the waste disposal site.
(c) For waste shipments where a copy of the waste shipment record, signed by the owner or operator
of the designated disposal site, is not received by the waste generator within 35 days of the date
the waste was accepted by the initial transporter, contact the transporter and/or the owner or
operator of the designated disposal site to determine the status of the waste shipment.
(d) Report in writing to the Agency if a copy of the waste shipment record, signed by the owner or
operator of the designated waste disposal site, is not received by the waste generator within 45
days of the day the waste was accepted by the initial transporter. Include in the report the
following information:
(1) A copy of the waste shipment record for which a confirmation of delivery was not received;
and
(2) A cover letter signed by the waste generator explaining the efforts taken to locate the
asbestos waste shipment and the results of those efforts.
(e) Retain a copy of all waste shipment records, including a copy of the waste shipment record
signed by the owner or operator of the designated waste disposal site, for at least 2 years.
F.3.6
Recordkeeping
The owner or operator of a demolition or renovation activity subject to Part F of these regulations shall
furnish upon request, and make available for inspection by the Agency, all records required under this
subpart.