200-RICR-20-05-4
200-RICR-20-05-4. Rhode Island School Construction Regulations (version Adoption, 07/11/2007 to 10/10/2018)
RIDE School Construction Regulations (5/24/07)
RIDE 1.00
1.01
Authority, Purpose, and Scope
1.02
Definitions
1.03
Project Categories and Priorities
1.03-1 General Requirements
1.03.2 Existing and New Facilities
1.03-3 Priority of Projects
1.04
School Construction Standards
1.04-1 High Performance School Design
1.04-2 Minority Business Enterprise (MBE)
1.04-3 Miscellaneous Construction Requirements
1.05
Site Standards
1.05-1 Site Ownership
1.05-2 Responsible School Site Selection
1.05-3 Cross District Planning
1.05-4 Consolidation
1.05-5 Community Resources
1.05-6 Smart Growth Planning
1.05-7 Transportation Impact
1.05-8 Storm Water Pollution Prevention
1.05-9 Site and Building Layout
1.06
Space Standards
1.06-1 General Provisions
1.06-2 Space Allowance Guidelines
1.06-3 Space Allowance by Program Activity
1.06-4 Special Education Spaces
1.06-5 Space Allowance Exception
1.07
Cost Standards
1.07-1 Cost Guidelines
1.07-2 Additional Facilities
1.07-3 Ineligible Costs
1.08
Application and Approval Procedures
1.08-1 Necessity of School Construction: Stage 1
1.08-2 Necessity of School Construction: Stage 2
1.09
Design and Review Process
1.09-1 Design Review
1.09-2 Commissioning Agent Services
1.09-3 Architectural, Engineering, and Other Services
1.09-4 Timelines
1.09-5 Construction Bidding Documents
1.09-6 Project Files
1.10
Enforcement of Regulations and Compliance with the Memorandum of Agreement
1.11
Asset Protection and Maintenance of Facilities
1.11-1 Asset Protection Plans and Building Maintenance
1.11-2 Certified Educational Facilities Manager
1
RIDE School Construction Regulations (5/24/07)
1.12
Housing Aid Reimbursement and Incentive
1.12-1 General
1.12-2. Energy and Water Efficiency Incentive
1.13
Program Integrity
1.14
Closing Schools
1.15
Waiver
2
RIDE School Construction Regulations (5/24/07)
RIDE 1.01: AUTHORITY, PURPOSE, AND SCOPE
RIDE 1.00 is promulgated by the Rhode Island Board of Regents for Elementary and Secondary Education
(hereinafter the “Regents”). The Regents were established by R.I.G.L. 16-60-1 and have the authority to develop
and promulgate these regulations pursuant to R.I.G.L. 16-60-4(9) (iv), 16-7-35 through 16-7-47, 16-7-24, 16-7.1-2
(b) (7), and 16-9-4.1. The regulations are intended to govern the process by which the Regents perform their
statutory functions of determining the necessity of school construction, establishing standards for design and
construction of school buildings, approving projects for school housing aid reimbursement, and ensuring that
districts have adequate asset protection plans in place to maintain their school facilities. Proper exercise of this
authority will ensure that approval for school construction will reflect a statewide perspective, establish statewide
uniformity in the quality of school building, and meet the needs of the district. The Regents are also authorized to
issue such supplemental policies, guidelines, guidance documents, and/or administrative procedures that may assist
in the implementation of these regulations. These regulations supercede prior “Information and Instructions” on
Necessity of School Construction. This document does not supercede the Regulations of the Board of Regents on
School Housing Aid (September, 1997).
The Rhode Island Department of Elementary and Secondary Education (hereinafter “RIDE”) has the authority to
implement and administer these regulations on behalf of the Regents, including making recommendations to the
Regents on project approvals, disbursing school housing aid for approved projects, and monitoring compliance with
the conditions of project approval set by the Regents and requirements for asset protection and maintenance of
facilities as set forth in these regulations.
“District” as used throughout these regulations shall refer to school districts, regional school districts, charter
schools, and any other public school entity seeking approval of the necessity of school construction and/or
requesting to fund a portion of the cost of school construction, modernization, or addition projects through
reimbursement from the school housing aid program.
RIDE 1.00 applies to all new school construction and school renovations projects where the total cost exceeds
$500,000. Multi-year capital improvement projects supported by capital reserve funds that exceed $500,000 over
the life of the multi-year cycle must be approved by the Regents and shall be submitted using the approved capital
improvement plan format in Appendix A. Capital improvement projects with projected costs of less than $500,000
are still required to obtain the Commissioner’s approval and shall be submitted using the format found in Appendix
A.
RIDE 1.02: DEFINITIONS
For the purposes of RIDE 1.00, the following terms shall have the meaning set forth, unless the context clearly
requires otherwise:
Applicant means the district and the superintendent or other chief administrative agent of the school district, regional
school district, or charter school.
Application means all documents, forms, letters, statements, certifications, plans, studies, drawings, and other data
and information required to be submitted within the deadlines and in the format prescribed by these regulations. The
Application will include, but not necessarily be limited to, a Design and Educational Program, Educational Facility
Master Plan, Facilities Assessment, Feasibility Study, and Design and Construction Cost Projection; copies of the
school committee and municipal approval; and any other documents, forms, letters, statements, certifications, plans,
studies, drawings, data, or other information as deemed necessary.
Approved Project means a project that has received the Regents’ approval pursuant to these regulations.
Audit means an examination by the Regents and/or its designee of Audit Materials as shall be submitted in a form or
manner prescribed by the Regents to determine compliance with any provision of these regulations.
Audit Materials means all papers, invoices, votes, contracts, agreements, change orders, progress reports, purchase
orders, on-site observation of construction materials and methods, financing information, bonding schedules and
3
RIDE School Construction Regulations (5/24/07)
other documents related to an Approved Project, and any other documents or information that may be requested or
required to determine compliance with these regulations.
Board of Regents for Elementary and Secondary Education (hereinafter the “Regents”) means the public corporation
established by R.I.G.L. 16-60-1, with all of the powers, authorities, and responsibilities accorded to it by the General
Laws of Rhode Island.
Capital Improvement Plan is a long-range plan, typically five years, which identifies capital needs in a district and
provides a funding schedule and timeline for implementation. The capital improvement plan allows for systematic
evaluation of all projects at one time so that a district can anticipate future needs. The capital improvement plan
should not include routine maintenance expenses of the district but should include required upkeep of the facilities,
including but not limited to, roof repairs, heating and ventilation system repairs, or window and door replacement.
Design and Educational Program means a comprehensive numerical and written description of a district’s specific
educational program for a specified number of students over a specified period of time, in a format prescribed by the
Regents. It shall include: an itemization of spaces needed to support the educational program, complete to the degree
that a designer may use it as the basic document from which to create the design of a school facility; the
instructional programs, grade configuration, type of facility, and the spatial relationships for the functions housed at
the facility; the number of students and a list of any specialized classrooms or major support areas, non-instructional
support areas, or external activity spaces; gross and net square footage of any affected existing facility; the overall
security and security measures taken to safeguard the facility and its occupants; the school administrative
organization; and the hours of operation that include the instructional day, extracurricular activities, and any public
access. The Design and Educational Program shall begin with a thorough, in-depth explanation of curriculum goals
and instructional activities that occur within the learning environment of the facility affected by the proposed
project. The Design and Educational Program shall comply with all applicable laws and applicable Regents and
RIDE regulations, including but not limited to, those governing curriculum, basic education program, and length of
school day and year. The Design and Educational Program for the proposed project shall include an itemization of
each functional space and determination of square footage allocations, a calculation of total building square footage,
and establish a realistic construction budget. The Regents will provide districts with annual guidance on what
constitutes a realistic construction budget by annually determining a maximum per square foot cost in accordance
with state, regional, and national construction data.
Educational Program Space Guidelines means the itemized listing (set forth in Section 1.06) of educational spaces
and square footages that comprise a model program for an elementary school, middle school, and high school, or
other grade configurations based upon varying levels of enrollment. The gross square footages are inclusive of all
spaces to be designed in an Approved Project.
Enrollment Projection means a district’s five-year estimate of student population by grade based on local
demographics. It must show increases/decreases from year to year shown in actual numbers or percents and
demonstrate how this data supports the need for the project. When possible, local enrollment projections should be
supported by those from an outside source, such as RIDE or the New England School Development Council
(NESDEC).
Fiscal Year means the year beginning July 1st and ending the following June 30th, unless otherwise determined by
the Regents.
School Housing Aid means funds appropriated by the General Assembly in support of completed school
construction projects to guarantee adequate school housing for all public school children in the state and prevent the
cost of school housing from interfering with the effective operation of the schools. Funds are distributed as
promulgated in R.I.G.L 16-7-35 through 16-7-47.
Proposed Project means any project submitted by an Applicant, but not yet approved by the Regents, including
construction of a new school facility, addition to an existing school facility, renovation or refurbishment of an
existing school facility, purchasing and renovating a building as a school facility, and repair or replacement of any
eligible part of a school facility.
4
RIDE School Construction Regulations (5/24/07)
RIDE 1.03: PROJECT CATEGORIES AND PRIORITIES
In order to ensure effective planning, management, and financial sustainability of an approved project, the following
general requirements and standards shall be met in the application for project approval.
1.03-1 General Requirements
General requirements are as follows:
1. Districts must ensure that construction will be completed in a timely, cost-effective manner and that
buildings will be occupied within the timelines established during the approval process The approval of a
project by the Regents and/or the payment of reimbursements by the Regents shall not render the Regents
responsible or liable for the project, or any aspect thereof, except to ensure that the project is in compliance
with these regulations. Districts have sole and exclusive responsibility for all aspects of a proposed and/or
approved project, from its inception, including engaging all necessary and appropriate personnel for design,
construction, and oversight, including a Commissioning Agent (see Section 1.09-2).
2. Approved projects must have a useful life of fifty years for new construction or an addition to an existing
school building.
3. Districts are required to have current capital improvement plans on file at RIDE. Only projects included in
the capital improvement plan will be eligible for approval.
4. A project that results from lack of maintenance or negligence by the district will not be approved.
5. A district is not eligible to be reimbursed for temporary housing costs incurred because adequate project
planning was not performed or local approvals were not obtained in a timely manner.
6. Projects shall be designed to minimize vandalism, and materials and finishes shall be selected to minimize
vandalism.
7. Projects shall provide for equality of educational opportunity without discrimination on account of sex,
race, color, religion, sexual orientation, national origin, or handicap, and all approved projects shall meet
the requirements of the Rhode Island Building Code as it pertains to accessibility and Rhode Island General
Laws pertaining to discrimination. All projects shall comply with all applicable provisions of federal, state,
and local laws relative to the accessibility of programs and facilities to persons with disabilities.
8. Districts shall demonstrate that projects have undergone review in accordance with applicable state law and
regulations and, to the extent applicable to the project, by the Rhode Island’s State Building Commissioner,
Department of Administration, Department of Health, Historical Preservation and Heritage Commission,
Commission for Human Rights, Department of Environmental Management, Governor’s Commission on
Disabilities, Architectural Access Board, and any other department or agency of the state required by law to
review such projects.
9. Projects shall have undergone review in accordance with applicable local or district charters, by-laws,
ordinances, or regulations, including local conservation, fire prevention, water, sewer, or building code
requirements.
10. Districts shall demonstrate that they have identified educational collaborative programs in the school
district not currently housed in public school facilities, and have reviewed any such programs to determine
if students in such programs can be served more efficiently and effectively if the project is approved,
assuming the project is for school use only.
11. Districts must submit an analysis of the impact on the operating budget of implementing the project in such
detail and in the format required by the Regents. The analysis shall include an estimate of the costs of
additional maintenance required of the district, the costs of additional instructional or support staff,
5
RIDE School Construction Regulations (5/24/07)
additional utility costs, the costs of additional transportation, if any, and the estimated revenue, if any, from
the sale or lease of any school facility decommissioned as a result of implementing the project.
12. Districts must provide an analysis of the potential economic and non-economic impact of leveraging cross-
district school capacity and demonstrate that the applicant has considered existing district boundaries,
facilities, and populations and the operating cost impact in determining the need and siting of proposed
projects.
13. Districts shall ensure that all contracts and subcontracts are complied with and are in conformity with all
applicable provisions of federal, state, and local laws and regulations.
14. Districts shall submit an analysis of life cycle costs of all projects including initial capital costs,
maintenance costs, and utility costs and demonstrate how such costs will be reduced over the life of the
building and its systems. Districts shall consider life cycle costs estimates of all feasible energy systems
and technologies, including renewable systems, to identify the system with the lowest life cycle cost
estimate.
1.03.2 Existing and New Facilities
The district shall evaluate and present alternatives to school construction projects including but not limited to new
school construction, rehabilitation of existing schools, additions to existing schools, the use of temporary and mobile
facilities, and the rehabilitation or historic preservation of existing non-school buildings.
Applicants shall consider these alternatives within the context of each district’s comprehensive facilities plan and
specifically address issues of school capacity, educational adequacy, capital needs, and life cycle operating costs.
RIDE will determine the extent to which an applicant demonstrates the necessity for a school construction project
using the following criteria:
•
Construction and operating costs, including those costs not eligible for reimbursement
•
The effect on student populations
•
Educational use and space requirements
•
Proximity to local resources
•
Opportunity for shared facilities
•
The impact on transportation routes and costs
•
Environmental impact
•
Land acquisition and site preparation, including environmental assessments and remediation requirements,
permitting, and zoning requirements
•
The impact on historic resources and community character
•
Adherence to smart growth principles (Refer to Section 1.05-6)
1.03-3 Priority of Projects
In the event the General Assembly or State Budget Office imposes funding limits, the Regents will consider
applications for school construction and renovation projects in accordance with the priorities listed below and in the
order of the priorities listed below:
1. Replacement or renovation of a building which is structurally unsound or otherwise in a condition seriously
jeopardizing the health and safety of school children, where no alternative exists;
2. Elimination of existing severe overcrowding;
3. Prevention of loss of accreditation;
4. Elimination or prevention of severe overcrowding as documented by current enrollment or by enrollment
projections;
5. Creation or alteration of school facilities to provide mandatory instructional programs;
6
RIDE School Construction Regulations (5/24/07)
6. Replacement, renovation, or modernization of any school facility to increase energy conservation and
decrease energy related costs in the facility;
7. Space requirements due to short term enrollment growth for which no reasonable alternative to school
construction exists;
8. Replacement of or addition to obsolete buildings in order to provide a full range of programs consistent
with approved state and local requirements; and
9. Creation or alteration of school facilities to provide supportive services and ensure equitable statewide
access to adequate school facilities.
RIDE 1.04: SCHOOL CONSTRUCTION STANDARDS
1.04-1 High Performance School Design
Projects shall meet all applicable federal, state, local, and regional building code requirements. Projects shall reflect
cost-effective design, material, and finish decisions consistent with good architectural and engineering practice and
high quality construction. Projects shall demonstrate that the current technological needs of students, faculty, and
school staff are met.
Projects shall comply with all requirements set forth in the most recent Northeast Collaborative for High
Performance Schools Protocol (Northeast-CHPS) so that approved projects provide high quality learning
environments, conserve natural resources, consume less energy, are easier to maintain, and provide an enhanced
school facility.
1.04-2 Minority Business Enterprise (MBE)
Minority (MBE) and Women (WBE) Business Enterprises shall mean a small business concern, owned and
controlled by one or more minorities or women certified by the Rhode Island Department of Administration to meet
the definition established by Chapter 37-14.1 of the General Laws of Rhode Island. Disadvantaged Business
Enterprises (DBE) shall mean socially and economically disadvantaged firms which are owned and controlled by
individuals who are citizens of the United States, or legal permanent residents whose social disadvantage must stem
from an individual’s color, national origin, gender, physical handicap, long term residence in an environment
isolated from the mainstream of American society, or other similar cause beyond the control of the individual, and
whose economic disadvantage must stem from an inability to compete in the free enterprise system due to
diminished capital and credit opportunities, as compared to others in the same or similar line of business and/or
competitive market area who are not socially disadvantaged.
Districts are required to demonstrate that ten percent (10%) of the dollar value of the work performed against
contracts for construction exceeding $500,000 shall be performed by MBE, WBE, or DBE where it has been
determined that subcontract opportunities exist, and where certified Minority Business Enterprises are available.
This section of RIDE 1.00 applies to approved projects to the extent that the state law is determined to be applicable
and any future determination that Section 1.04-2 is no longer held to be valid does not affect the enforcement in part
or in whole of these regulations.
1.04-3 Miscellaneous Construction Requirements
1. Applicants are prohibited from utilizing chlorofluorocarbon-based (CFC) refrigerants in any new system
for building heating, ventilating, air conditioning, or refrigeration.
2. All new construction and major reconstruction projects shall meet applicable local ordinances for recycling
space and provide space within the building that is dedicated to the separation, collection, and storage of
materials for recycling, including, at a minimum, paper (white ledger and mixed), cardboard, glass, plastics,
aluminum cans, and metals.
7
RIDE School Construction Regulations (5/24/07)
3. New construction shall be oriented on the site so that natural daylight for classroom spaces is maximized.
4. Windowless classrooms and occupied instructional spaces which do not have operable windows equal to at
least four percent of the floor space shall be air conditioned, excluding gymnasiums, industrials shops,
kitchens, and locker rooms.
5. School facilities shall be designed, constructed, and renovated consistent with state and federal law for
radon, lead, asbestos and other contaminants, and subject to the enforcement of such standards by the
applicable state or federal agency.
6. Concrete floors in all instructional areas, except shops, shall be covered with a resilient floor covering;
7. The storage of pesticides shall be in a locked metal cabinet and vented to the exterior.
8. Spaces in which power tools and machines in shops generate dust shall have dust collecting equipment.
Such equipment shall be either single or multi-use vacuum packs or a central dust collection system.
Installed systems shall comply with National Fire Protection Association (NFPA) Standard 664 “Standards
for the Prevention of Fire and Explosion in Wood Processing and Woodworking Facilities” (1998)
9. Instructional spaces shall comply with the American National Standards Institute standard number
ANSI/IES RP3-00, Guide for Educational Facilities Lighting, (2000) incorporated herein by reference, as
amended and supplemented
RIDE 1.05: SITE STANDARDS
1.05-1 Site Ownership
The applicant shall own the site of an Approved Project or be in the process of acquiring or have a reasonable
expectation of owning the site by the end of the Architectural Feasibility Study (refer to Section 1.08-2).
If the applicant is acquiring a new parcel of land for the project, the applicant shall provide in its Architectural
Feasibility Study to RIDE a completed, signed, and sealed description of the plot plan of the land to be acquired
showing:
•
Topographical and contour lines
•
Adjacent properties indicating current land uses, access roads, deed restrictions, easements, protective
covenants, right of ways, and environmentally sensitive areas such as waterways and wetlands.
•
The acreage and dimensions of the tract proposed for acquisition
•
Anticipated footprint of the proposed school
1.05-2 Responsible School Site Selection
Protecting student health is the most important issue during site selection. These requirements are intended to
eliminate sites containing pollutants known to be hazardous to student and staff health. A variety of factors, from
hazardous materials in the soil to airborne pollutants from nearby sources, will be considered in the site review
process.
1. Project sites must be at sufficient distances from facilities that might reasonably be anticipated to emit
hazardous air emissions or to handle hazardous or acutely hazardous materials, substances, or waste.
Applicants must demonstrate that the health and safety of students and staff are not jeopardized by the
location of the site.
8
RIDE School Construction Regulations (5/24/07)
2. Project sites must have a minimum separation of 500 feet from 50-133kV power-lines, 750 feet from 220-
230kV power-lines, and 1,500 feet from 500-550kV power-lines; and 1,500 feet from railroad tracks,
hazardous pipelines, and major highways.
3. Project sites may not be located in an area with moderate or high radon potential, or in an EPA radon zone,
unless the school building project plan incorporates a radon mitigation strategy.
4. Sites shall be free from noxious pollution or contamination, and shall be selected to avoid flood plain,
wetlands or other environmentally sensitive areas. A new school site must not be located within a one-mile
radius of an active landfill. A landfill, as defined by the RI Department of Environmental Management’s
Hazardous Waste regulations, shall mean a disposal facility or part of a facility where hazardous waste is
placed in or on land and which is not a land treatment facility, a surface impoundment, an injection well, a
waste pile, or a corrective action management unit.
In addition, selected sites shall be sensitive to known and unidentified historic resources, including archaeological
sites.
1.05-3 Cross District Planning
When choosing a site for school construction projects, applicants shall consider cross districting issues and
possibilities in order to more efficiently and fairly serve the community and student population. Districts will be
required to document that this was done as part of the school construction application (refer to Section 1.08-1).
1.05-4 Consolidation
Applicants must submit an analysis of the option of school consolidation and school district consolidation. This
applicant shall provide this analysis in its Architectural Feasibility Study (refer to Section 1.08-2). Documentation
shall include:
1. Current school capacity and enrollment by school and grade and anticipated five year district growth by
grade and school;
2. A map of the district showing the location of the site or sites under consideration and the location of
existing school buildings in the district;
3. The attendance area to be served by the proposed school and the number of school-age children who reside
within the attendance area and future demographic projections for the district and attendance area;
4. A map of the nearest adjacent district(s) showing their buildings and attendance areas;
5. Other potential non-school buildings evaluated for conversion, include information on age, location, size,
nearby community services and buildings, cost, and needed modernization;
6. Information regarding any school buildings abandoned by the district or converted to other use by the
community in the last ten years including a map of their location in the district;
7. A comparative analysis of the potential impact of building sites on student transportation and local traffic
conditions including traffic impact, public transportation opportunities, times of transit by school
transportation, and cost of any changes that would be required to roads or the transportation system; and
8. Documentation must also be provided demonstrating that a licensed professional engineer has examined
soil conditions for structural integrity and drainage in order to determine the suitability or lack thereof of
possible sites and identified the existence of soil conditions which may increase site development costs.
9
RIDE School Construction Regulations (5/24/07)
1.05-5 Community Resources
R.I.G.L. 16-7-41.1 restricts payment of school housing aid for school facilities which are under the care and control
of the school committee and located on school property. Facilities with combined school and municipal uses or
facilities that are operated jointly with any other profit or non-profit entity also do not qualify for reimbursement.
Nonetheless, it is often necessary to site schools near other existing community resources in order to provide a
comprehensive educational program. This is especially true of small and urban districts where land is at a premium.
In this context, the site selected shall be chosen to meet the educational needs of the students who will be housed in
the building, maximize the use of any available community resources, and minimize any possible adverse
educational, social, environmental, or economic impact upon the community.
Consideration should be given to locating facilities in areas that are already served by existing or planned water,
sewer, and other public infrastructure. When possible, the site selected should be in close proximity to other
community resources such as libraries, museums, parks, natural resources, nature study areas, community centers,
and businesses, so as to enhance the Design and Educational Program.
Sites should be located to efficiently and safely serve intended school populations and provide sufficient space for
needed parking, bus turnarounds, delivery areas, required setbacks, and planned aesthetics.
1.05-6 Smart Growth Planning
The site shall incorporate “smart growth” concepts where feasible with relation to educational facilities and the
impact of suburban sprawl in developing and planning for new construction. Smart growth schools involve the
community in school facility planning, make use of existing resources, such as historic school buildings, are located
within neighborhoods and fit into the scale and design of the neighborhood, and are usually small in size. The
National Trust for Historic Preservation’s publication Historic Neighborhood Schools in the Age of Sprawl: Why
Johnny Can’t Walk to School made recommendations as to how districts could avoid suburban sprawl.
1.05-7 Transportation Impact
Whenever possible, sites shall be located close to public transportation. In order to reduce automobile-related
pollution and conserve energy, designs shall incorporate the use of public transportation and carpooling by
minimizing parking, creating bike facilities, providing safe walking/biking access, and other appropriate design
elements.
Additionally, applicants shall consider the proximity of other services in the community, such as supermarkets,
commercial office buildings, grocery stores, day cares, cleaners, fitness centers, hair care, hardware, laundry,
medical/dental services, senior care facilities, public parks, pharmacies, post offices, banks, libraries, and
community centers.
1.05-8 Storm Water Pollution Prevention
The district must submit a Storm Water Pollution Prevention plan addressing erosion and sediment control that
complies with the National Pollution Discharge Elimination System Construction General Permit issued by the U.S.
Environmental Protection Agency. Exception: If land disturbance is less than 100,000 square feet for the entire
project as a whole, then the project is exempt from this prerequisite. However, all projects involving the protection
of wetlands must meet this requirement.
1.05-9 Site and Building Layout
All proposed projects must:
1. Orient the building(s) to take advantage of maximum natural day lighting and plot shadow patterns from
surrounding buildings and place buildings to optimize solar gain (for urban-infill sites).
10
RIDE School Construction Regulations (5/24/07)
2. Consider prevailing winds when determining the site and building layout. For example, consider how the
shape of the building itself can create wind-sheltered spaces and consider prevailing winds when designing
parking lots and driveways to help blow exhaust fumes away from the school.
3. Maximize use of existing land formations and vegetation to provide shelter from extreme weather or to
deflect unwanted noise.
4. Plant or protect existing deciduous trees to block summer sun and allow winter solar gain. Plant or protect
existing coniferous trees to block winter wind.
5. Minimize importation of non-native soils and exportation of native soils. Optimize Cut & Fill (ideally 1:1)
during clearing and excavation.
6. Create physical connections to existing bike paths, natural features, or adjacent buildings and
neighborhoods.
7. Design parking lots and driveways to limit student proximity to bus emissions. Design bus loading and
unloading areas such that buses need not be lined up head to tail. Do not design bus loading and unloading
areas such that bus exhaust is in proximity to any of the school’s air intake vents.
8. Site the building to maximize opportunities for on-site renewable energy generation. For example, preserve
or ensure availability of space for wood chip storage facilities for biomass heating, wind turbines (if wind
resources are adequate), or other renewable energy sources.
9. Facilitate use of public transportation by locating the school within a one-mile radius of a public bus route.
RIDE 1.06: SPACE STANDARDS
1.06-1 General Provisions
School facilities shall afford space for general instruction, specialized instruction, administration and student
services, the adequacy of which shall be pursuant to the requirements of this section. In addition, school facilities
shall afford accommodations for approved vocational and special education programs. General design and
construction space requirements are as follows:
1.
Instructional rooms with windows shall have no exterior obstructing wall within 20 feet of the major
window wall;
2.
The minimum dimension of any instructional space or specialized instructional space shall be 10
square feet of floor area;
3.
Ceiling heights reported in the design and construction plans shall meet the following requirements:
ƒ
The ceiling height of an academic classroom or other instructional space containing more than 300
square feet in area shall average nine feet six inches (9’-6”), and no part of the ceiling or other
obstruction shall be lower than eight (8) feet;
ƒ
Instructional spaces of less than 300 square feet and areas of larger spaces devoted to clothing
alcoves, storage or work space shall have a minimum ceiling height of eight feet;
ƒ
Large group spaces shall have minimum ceiling heights as follows:
¾ Gymnasium --22 feet
¾ Music Room (Vocal or Instrumental)-- 12 feet, The minimum height from overall highest
riser to ceiling shall be eight feet
¾ Cafeteria --12 feet
¾ Industrial Arts and Vocational Shop--12 feet
¾ Library/Media Center --91/2 feet;
11
RIDE School Construction Regulations (5/24/07)
ƒ
Corridors and all other administrative spaces shall have a minimum ceiling height of eight (8) feet;
and
4.
A health unit shall be provided and shall include a nurse’s area, a waiting area, an examination area, a
rest area with privacy, drinking water and toilet facilities sized and arranged so that physically disabled
persons requiring assistance will be able to receive such aid.
1.06-2 Space Allowance Guidelines
All projects must meet Educational Program Space Guidelines that provide the basis for gross square foot per pupil
allowances. The standards and any associated guidelines provide by RIDE shall define prototype school design and
space recommendations for each specified program activity eligible for housing aid. Projects that exceed gross
square foot per student allocations will be reimbursed only up to the limits provided herein. These standards are
reflective of realistic, future-oriented, and contemporary educational program goals and are based on the summation
of square foot allocations for each itemized educational space.
Table 1: Gross Square Feet (GSF) per Student - Elementary Schools
Projected Enrollment
GSF per Student
Projected Enrollment
GSF per Student
Less than 300
180
450-459
163
300-309
180
460-469
161
310-319
179
470-479
160
320-329
178
480-489
159
330-339
177
490-499
158
340-349
175
500-509
157
350-359
174
510-519
156
360-369
173
520-529
154
370-379
172
530-539
153
380-389
171
540-549
152
390-399
170
550-559
151
400-409
168
560-569
150
410-419
167
570-579
149
420-429
166
580-589
147
430-439
165
590-599
146
440-449
164
600 and greater
145
Table 2: Gross Square Feet per Student – Middle and Junior High Schools
Projected Enrollment
GSF per Student
Projected Enrollment
GSF per Student
Less than 400
190
580-589
175
400-409
190
590-599
174
410-419
189
600-609
173
420-429
188
610-619
172
430-439
187
620-629
171
440-449
187
630-639
170
450-459
186
640-649
169
460-469
185
650-659
169
470-479
184
660-669
168
480-489
183
670-679
167
490-499
182
680-689
166
500-509
181
690-699
165
510-519
181
700-709
164
520-529
180
710-719
163
530-539
179
720-729
163
540-549
178
730-739
162
550-559
177
740-749
161
560-569
176
750 and greater
160
570-579
175
12
RIDE School Construction Regulations (5/24/07)
Table 3: Gross Square Feet per Student – Academic High Schools
Projected Enrollment
GSF per Student
Projected Enrollment
GSF per Student
Less than 600
205
800-809
195
600-609
205
810-819
195
610-619
205
820-829
194
620-629
204
830-839
194
630-639
204
840-849
193
640-649
203
850-859
193
650-659
203
860-869
192
660-669
202
870-879
192
670-679
202
880-889
191
680-689
201
890-899
191
690-699
201
900-909
190
700-709
200
910-919
190
710-719
200
920-929
189
720-729
199
930-939
189
730-739
199
940-949
188
740-749
198
950-959
188
750-759
198
960-969
187
760-769
197
970-979
187
770-779
197
980-989
186
780-789
196
990-999
186
790-799
196
1000 and greater
185
Vocational Technical Schools and the Vocational Education space components of comprehensive high schools shall
not exceed 225 gross square feet per pupil and any additional programmatic requirements may be considered on a
case by case basis.
1.06-3 Space Allowance by Program Activity
The following space allowance guidelines shall be used to plan new educational facilities. Square footage designed
above these criteria is ineligible for reimbursement funding.
ELEMENTARY SCHOOLS
Type of Space
300 Students
600 Students
Pre-Kindergarten & Kindergarten (including toilet)
1200 square feet each
1200 square feet each
Core Classrooms
950 square feet each
950 square feet each
Art (including storage and workroom)
1150 square feet
2300 square feet
Music (including practice and ensemble)
1350 square feet
2700 square feet
Special Education:
Self-contained classroom (including toilet)
Small Group/Resource Room
950 square feet
500 square feet
950 square feet
500 square feet
Media Center/Library
2020 square feet
3310 square feet
Gymnasium (including storage and office)
6300 square feet
6300 square feet
Food Prep/Kitchen
1600 square feet
1900 square feet
Cafeteria
15 square feet per student
accommodating ½ planned
enrollment
15 square feet per student
accommodating ½
planned enrollment
Stage
1000 square feet
1000 square feet
Chair/Table Equipment Storage
200 square feet
300 square feet
Staff Lunch Room
200 square feet
300 square feet
General Office
1500 square feet
1600 square feet
Nurse/Health
510 square feet
510 square feet
Guidance
185 square feet
185 square feet
Teachers Workroom/Lounge (including toilet)
300 square feet
450 square feet
Custodian/Maintenance
1500 square feet
1600 square feet
General Storage (Books)
400 square feet
600 square feet
13
RIDE School Construction Regulations (5/24/07)
JUNIOR HIGH/MIDDLE SCHOOLS
Type of Space
400 Students
750 Students
Core Classrooms
950 square feet each
950 square feet each
Science
1200 square feet each
1200 square feet each
Art (including storage and workroom)
1350 square feet
2550 square feet
Music (including practice and ensemble)
1700 square feet
1700 square feet
Tech Classroom (e.g. drafting, business)
1200 square feet
2400 square feet
Tech Shop (e.g. consumer, wood)
2000 square feet
4000 square feet
Special Education:
Self-contained classroom (including toilet)
Small Group/Resource Room
950 square feet
500 square feet
950 square feet
500 square feet
Media Center/Library
2680 square feet
4700 square feet
Gymnasium (including storage and office)
6150 square feet
6150 square feet
Food Prep/Kitchen
1700 square feet
2050 square feet
Cafeteria
15 square feet accommodating
2/3 planned enrollment
15 square feet
accommodating 2/3 planned
enrollment
Stage
1600 square feet
1600 square feet
Chair/Table Equipment Storage
200 square feet
300 square feet
Staff Lunch Room
200 square feet
300 square feet
General Office
1920 square feet
2170 square feet
Nurse’s Office/Health
510 square feet
510 square feet
Guidance
450 square feet
750 square feet
Teachers Workroom/Lounge (including toilet)
300 square feet
450 square feet
Custodian/Maintenance
1375 square feet
1400 square feet
General Storage (Books)
400 square feet
600 square feet
HIGH SCHOOLS
Type of Space
600 Students
1000 Students
Core Classrooms
950 square feet each
950 square feet each
Science
1200 square feet each
1200 square feet each
Art (including storage and workroom)
1350 square feet
2700 square feet
Music (including practice and ensemble)
2125 square feet
2275 square feet
Tech Classroom (e.g. drafting, business)
2400 square feet
4800 square feet
Tech Shop (e.g. consumer, wood)
4000 square feet
8000 square feet
Special Education:
Self-contained classroom (including toilet)
Small Group/Resource Room
950 square feet
500 square feet
950 square feet
500 square feet
Media Center/Library
3650 square feet
6150 square feet
Gymnasium (including storage and office)
10000 square feet
10000 square feet
Ancillary PE Space (including PE alternatives, storage,
lockers, offices, and locker rooms)
7000 square feet
10300 square feet
Food Prep/Kitchen
1900 square feet
2300 square feet
Cafeteria
15 square feet per student
accommodating 1/3 planned
enrollment
15 square feet per student
accommodating 1/3 planned
enrollment
Auditorium
2/3 enrollment at 10 square feet
per student (750 seats
maximum)
2/3 enrollment at 10 square
feet per student (750 seats
maximum)
Stage Auditorium Storage, dressing rooms, controls
2800 square feet
2800 square feet
Staff Lunch Room
400 square feet
500 square feet
General Office
2020 square feet
2270 square feet
Nurse’s Office/Health
710 square feet
910 square feet
Guidance
1050 square feet
1500 square feet
Teachers Workroom/Lounge (including toilet)
300 square feet
450 square feet
Custodian/Maintenance
1475 square feet
1575 square feet
General Storage (Books)
400 square feet
600 square feet
14
RIDE School Construction Regulations (5/24/07)
1.06-4 Special Education Spaces
Spaces for special education classes/programs may receive special consideration for additional space at the
discretion of RIDE, if the district documents and certifies a greater need in the Design and Educational Program.
The gross square feet per student defined herein includes an assumption that 8% of the total planned enrollment will
be enrolled in self-contained special education programs.
The Regents shall approve requests for additional space eligible for housing aid reimbursement if the district
demonstrates that:
1. School facility needs related to the required programs cannot be addressed within the existing facilities and
that all other spaces are consistent with the space allowance guidelines;
2. Such spaces are necessary to comply with federal or state laws concerning educating students with
disabilities to the greatest extent possible in the same building or classes with their non-disabled peers and
the additional or inconsistent spaces will:
a)
Allow for the return of students with disabilities from out of district facilities;
b)
Permit the retention of students with disabilities who would otherwise be placed in out of
district facilities;
c)
Provide space for regional programs in a host school building that houses both disabled and
non-disabled students; or
d)
Provide space for the coordination of regional programs by a county special services district,
educational services commission, jointure commission or other agency authorized by law to
provide regional special education services, in a School facility that houses both disabled and
non- disabled students
1.06-5 Space Allowance Exception
The applicant may make reasonable departures from the guidelines shown above only with a prior written
determination of the Regents that special circumstances exist and that such departures are consistent with the intent
of RIDE 1.00 to provide adequate, safe, cost-effective, and programmatically sound school facilities.
RIDE 1.07: COST STANDARDS
1.07-1 Cost Guidelines
Districts shall include in their application a complete and detailed breakdown of the estimated costs associated with
the project, prepared by a professional construction cost estimator. Cost estimates should be in the format provided
in the annual guidance. This format will be an elemental classification framework developed through industry and
government consensus. Construction cost estimates must be carried forward to the proposed bid date and include
project management and design fees. Project information collected by RIDE will be stored in a database to provide
a means for preparing annual cost guidance.
Project management and design fees, as a percentage of total construction costs, shall not exceed 20% of the general
construction costs. Where projects mix new and retrofit construction, costs shall be clearly separated for new
construction, new additions, gut rehabilitation, and space modernization.
1.07-2 Additional Facilities
The provisions of this section shall not be deemed to preclude an applicant from including in an Approved Project,
in addition to the Design and Educational Program as approved by the Regents, such additional facilities as said
district might desire. Any and all costs related to said additional facilities, including but not limited to, the design,
construction and implementation of said additional facilities, shall be the sole responsibility of the eligible district.
15
RIDE School Construction Regulations (5/24/07)
1.07-3 Ineligible Costs
The cost of project elements that exceed or diverge from the project scope of an approved project, including items
noted below, are categorically ineligible to receive school housing aid. School housing aid is not paid on
furnishings, fittings, and equipment unless the project involves new construction.
Categorically ineligible costs shall include, but not be limited to:
1. Any costs for an Approved Project in excess of the final approved amount for Housing Aid.
2. Financing costs incurred by an Applicant if the bond is not issued through the Rhode Island Health, Education,
and Building Corporation (RIHEBC).
3. The cost of legal services.
4. The provision of any direct or indirect municipal services shall be ineligible costs, except the provision of
public safety services as required by law, or services which RIDE determines are necessary for the completion
of the project.
5. All costs associated with the operation and routine maintenance of a school facility.
6. Costs associated with site remediation costs, unless a district demonstrates that there are no available sites that
do not require remediation or that it is less costly to remediate the selected site rather than purchase other
property. In addition, the district will have to document its efforts to obtain other sources of public and private
funds to assist with the remediation of the site. The Regents expect that municipalities will secure federal
funding or judgments against those responsible for the contamination.
7. Any costs determined to be ineligible by the Regents during the course of the enforcement of the regulations
and compliance with the memorandum of agreement process. The Regents reserve the right to disallow any
costs associated with any change order that deviates from the scope of the project.
8. Other ineligible costs: swimming pools, skating rinks, field houses, district administrative office space that is
not incorporated into a school building, indoor tennis courts, and outdoor field surface materials on existing
fields. In addition, districts building new or an addition to existing elementary schools will be reimbursed only
for a multi-purpose room for auditorium and cafeteria purposes. Furthermore, athletic facilities requests will be
considered only if the district demonstrates that the facility will be used predominantly by the school
population. This demonstration shall include an analysis of needed physical education and sports activities
based on the student population to be served by the proposed new facility. The district shall also include an
inventory of community athletic/recreation facilities to ensure that school housing aid is not being paid for
community resources.
RIDE 1.08: APPLICATION AND APPROVAL PROCEDURES
The process and requirements of the revised Necessity of Construction approval process allow the Regents to:
•
better project and allocate school housing aid;
•
give school districts adequate planning time prior to a final bond-approval commitment; and
•
provide greater accountability over individual school district project costs and content through a structured
review process.
The Necessity of School Construction approval process is a two-stage process as outlined below. Stage 1 of the
process requires districts to include a statement of interest, project justification, facilities analysis, district asset
protection plan, capital improvement plan, and community demographics. Upon the preliminary determination by
RIDE that the project meets the criteria for the Stage 1 of the necessity of school construction process, the
16
RIDE School Construction Regulations (5/24/07)
application proceeds to Stage 2. Stage 2 of the process requires districts to complete a feasibility study, cost
projections, design plans, and site work.
1.08-1 Necessity of School Construction: Stage 1
The project approval process begins with informing RIDE of the district’s intent to modernize, modernize and build
an addition, or construct a new school building. The intent is confirmed once the Necessity of School Construction
Application packet has been completed by the district, submitted to RIDE, and accepted by RIDE in writing. The
Stage 1 Necessity of School Construction Application shall include the following:
1) Statement of Interest/Project Justification
Districts must submit a letter from the School Committee to RIDE signed by the Superintendent, School Committee
Chair, and a representative of the municipality in which the district is located (Town Council, Mayor, etc.)
indicating the intent of the district to request school housing aid funds and clearly justifying why the proposed
project is necessary.
When submitting a Statement of Interest, the district must clearly demonstrate why the project is deemed necessary
to the district’s educational mission and the building deficiencies that this project will remediate such as: not
meeting student enrollment needs, class size above appropriate limits, reduced ability or inability to offer ancillary
services, and/or learning environments and classroom sizes that are inadequate for student learning or student
programs.
The district must indicate whether the building will be a major renovation of a current building, a major renovation
with an addition, or construction of a new building. In the case of new construction, the district must clearly
demonstrate why new construction is necessary as opposed to renovating existing facilities. With renovation
projects, the Facility Analysis must clearly indicate that the condition of the affected facility is poor. The
application, through the Facility Analysis, should note the reason for the renovations, such as the need to rectify
building code compliance issues, safety and/or health concerns, or security issues. When renovations to or closing
of an historic building are proposed, the justification should identify historic tax credits or other potential costs if the
building were put to commercial use.
The district must indicate how the current condition of existing facilities has been addressed through the Asset
Protection plan below and link this information to the need for new construction or a major renovation project.
If the district is applying for High Performance Green School Status and the additional 2-4% reimbursement for
energy efficiency pursuant to Section 1-12.2, this must be stated in the Necessity of Construction Application.
2) School Building Committee members
The district must submit names and backgrounds of the members of the school building committee that shall be
formed in accordance with the provisions of the district’s local charter and/or by-laws.
The school building committee must, at a minimum consist of eight people, including the superintendent of schools,
at least one member of the school committee, the local official responsible for building maintenance, a
representative of the office or body authorized by law to construct school buildings in the municipality, the school
principal from the subject school, a member who has knowledge of the educational mission and function of the
facility, a local budget official or member of the local finance committee, and at least one member of the community
with architectural, engineering and/or construction experience to provide input relative to the effect of the project on
the community and to examine building design and construction plans for reasonableness.
3) District Asset Protection Plan
The district must submit the district’s Asset Protection Plans for the three years prior to the Application
documenting spending on preventive maintenance, renovation, and adaptation of the building to be modernized or
17
RIDE School Construction Regulations (5/24/07)
replaced with notes explaining actions taken by the district to ensure protection of its physical assets. Particular
attention must be given to projects receiving Housing Aid reimbursement in previous years.
A review of a district’s past investment in maintenance and ongoing maintenance activities will indicate to the
Regents whether the district has effectively maintained existing buildings in accordance with its asset protection
plans, such that approval of the proposed project by the Regents is justified.
4) Capital Improvement Plan
The district must submit the municipality or district’s most recently submitted Capital Improvement Plan showing
how the proposed building modernization or construction project has been anticipated in district planning or a
written explanation of the reason that the project has been moved up in the planning sequence or added to the Plan.
If the district does not have a current five-year Capital Improvement Plan on file with RIDE, the district must
complete and submit such Plan. Districts submitting new plans or amendments to existing plans will be notified in
writing if the Commissioner of Education accepted the plan prior to Stage 2 of the approval process
5) Facility Analysis of Existing Buildings
A facility analysis must be submitted. The Facility Analysis should list any deficiencies in the district’s existing
buildings. The Facility Analysis must be conducted by a licensed engineer and must include:
•
Inspection and analysis of the building envelope (roof, walls, glazing, foundation, floor/slab)
•
Inspection and analysis of the structural elements of the facility
•
Inspection and analysis of all mechanical systems, including condition, age, energy efficiency, levels of
ventilation, and compliance with American Society of Heating, Refrigerating, and Air Conditioning
Engineers (ASHRAE) standards
•
Inspection and analysis of the lighting system, including condition, age, energy efficiency and lighting
levels
•
Inspection and analysis of all controls including lighting controls and sensors, energy management systems,
emergency shutoffs
•
Inspection and analysis of all fire, safety and security systems including emergency plans
•
Analysis of the energy use (electric and heating and/or cooling) of the facility for at least the last two years,
a survey of the facility systems, and recommendations for improving energy efficiency. The use of Energy
Star Portfolio Manager or ComCheck software systems to benchmark the facility against other buildings or
the Rhode Island Building Energy Code is highly encouraged.
6) District and Community Demographics
Districts must submit enrollment projections for the next five years for each grade with a brief analysis
(increases/decreases from year to year shown in actual numbers or percents) of how the data supports the need for
the project. When possible, local enrollment projections should be supported by those from an outside source, such
as RIDE or the New England School Development Council (NESDEC).
The district must submit community data including actual and projected population, housing statistics, birth rates, or
immigration estimates, and an analysis of how the data supports the need for the project.
7) Cross Districting
Districts must provide an analysis for the potential economic and non-economic impact of cross-districting, which
shall demonstrate that the district has considered district boundaries, other existing facilities, and population trends
in determining the need and site of proposed projects.
18
RIDE School Construction Regulations (5/24/07)
8) Approval of Funding for Architectural Feasibility Study
The district must submit an agreement to fund an Architectural Feasibility Study, to include initial energy modeling
of energy efficiency or renewable energy technologies, signed by the school district authority or municipal authority.
No application will be considered unless there has been an approval by the authority that authorizes funding of an
Architectural Feasibility Study.
The Stage 1 application is reviewed by RIDE and either approved, returned to the district for further information, or
disapproved.
Plan Review options:
•
Approval: RIDE approves the Application and schedules and conducts a conference with the School
Building Committee and RIDE at which questions about the Application may be asked and answered and
the school construction regulations and feasibility study requirements are discussed. If a project is
approved, a written timeline will be established for how the project will proceed.
•
Further information needed: RIDE returns the Application with requests to provide timely answers to
questions, clarification of prescribed issues or request supplemental information. This step may also
include a Plan Review where the concerns are addressed at the scheduled conference.
•
Disapproval: RIDE returns the Application and notes the reasons for disapproval. The district may request
a meeting with RIDE to review the Application and the decision.
Once RIDE has approved the Stage 1 Necessity Application, the district has one year in which to complete Stage 2
of the application. This is the critical step in project design since Stage 2 will include the projected total cost of
construction of the project as well as the rationale for the project to be presented to voters, if a bond issue is
required. If districts do not submit Stage 2 within one year of the preliminary approval, the approval will expire and
districts will have to start at Stage 1 again.
1.08-2 Necessity of School Construction: Stage 2
The following Stage 2 Necessity of School Construction items are submitted within one year of the preliminary
approval and must include the following:
1) Architectural Feasibility Study
The Architectural Feasibility Study must include the following items:
•
Design and Educational Program as defined in Section 1.02
•
The site selected in the case of new construction along with a comparison of the costs and feasibility of
modernization/addition and new construction.
•
Cost comparison between this project and other alternatives reviewed. If the project involves new
construction, the cost analysis must show clearly and fully that the proposed new construction is the best
available alternative to meet the projected need based upon educational programs to be housed, total cost
effectiveness (including life cycle cost analysis using twenty years as the lifetime), and the public interest.
A consideration of indirect costs associated with the project, such as new sewers, roads, transportation or
utilities, must be included. If there are surplus buildings, include benefits or costs to the public, such as re-
sale value or demolition costs. If the project includes the renovation of an existing building, the Facility
Analysis must clearly demonstrate that the building is structurally sound or can be made so reasonably.
•
Documentation of compliance with Site Standards as referenced in these regulations and the Northeast-
CHPS.
•
Consideration of school district or school facility consolidation pursuant to Section 1.05-4
•
Analysis of historic implications and comments from the RI Historical Preservation and Heritage
Commission, if applicable.
•
Traffic/Transportation Impact Plan pursuant to Section 1.05-7
•
Preliminary energy analysis or modeling [reference Northeast-CHPS]
•
Feasibility of using renewable energy technologies [reference Northeast-CHPS]
19
RIDE School Construction Regulations (5/24/07)
2) Architect’s Design Plans
District must submit three sets of architect’s schematic design plans to RIDE for Plan Review.
3) Design and Construction Cost Projection
Cost projections must consider the effects of initial capital costs versus maintenance costs over the life of the
building with the goal of reducing operation and maintenance costs. Districts must demonstrate the incorporation of
life cycle cost analysis in the selection of mechanical systems, equipment, and materials.
The projection shall include a detailed breakdown of the costs associated with this project. This cost analysis should
include not only the estimated costs of construction escalated for inflation at the anticipated bid date but also the
project management and design fees. Refer to Section 1.07-1. Project management and design fees as a percentage
of total construction costs shall not exceed 20% of the general construction costs, as determined by RIDE.
Basic architectural services shall consist of the following phases, schematic design, design development,
construction documents, bidding, and construction administration and include the following: architectural drawings,
mechanical, electrical, plumbing, fire protection, structural, site development, basic environmental permitting,
graphics, lighting design, acoustics, data and communication, educational consultants, any specialty consultants for
laboratory, library/media center and kitchen space, code consultants, accessibility, and other services established by
RIDE. Additional architectural services may include: geotechnical consultants, asbestos consulting, wetlands
flagging, and other additional services as determined by RIDE.
Cost projections must be broken down between new space (i.e. addition) and space improvements (i.e. renovation).
If a district is building an addition onto a school as well as conducting major renovations, the soft costs shall be pro
rated between the two aspects of the project. By separating the costs, RIDE is able to compare the cost of the new
construction versus renovation. RIDE provides cost guidelines as prescribed in Section 1.07-1. The cost
comparison should also include an evaluation of the potential for the use of historic tax credits for historic buildings
that are being reused or surplused.
4) Financing plan
Districts must consider the impact on the operating budget of implementing the project in such detail and format as
required by the Regents, including but not limited to, an estimate of the costs of additional maintenance required of
the district, the costs of additional instructional or support staff, additional utility costs, the costs of additional
transportation, if any, and the estimated revenue, if any, from the sale or lease of any school facility
decommissioned as a result of implementing the project.
5) Site Purchase Plan (if required)
Districts must detail information about the location, cost, and acquisition plan for any new site. The site must meet
all site standards included in these regulations. The district has sole responsibility for identifying and acquiring
control of the site.
6) Local Support, Approval by the Regents, and Memorandum of Agreement
Districts must submit documentation of community support for the project, including City/Town Council and
School Committee approvals. Please include a timeline for when the project will be submitted to voters for
approval, if applicable.
Upon receipt of the Stage 2 Application, RIDE conducts a project feasibility review followed by a Plan Review
meeting with the school building committee, design team, commissioning agent (see Section 1.09-2), and other
applicable parties. After the Plan Review, if the application has received preliminary approval by RIDE, the project
will be sent to the Regents for final approval. If the project is approved, a Memorandum of Agreement will be
entered into with the district that sets forth the dollar authorization for the project (budget agreement), the scope of
20
RIDE School Construction Regulations (5/24/07)
the project, and any contingencies that the district must comply with. Districts will be required to agree to any
contingencies noted in the Memorandum of Agreement. A standing contingency is that districts will be expected to
warn and conduct the vote for public approval for funding within six months of the Regents approval. If the voters
do not approve the project within that time frame, the approval will expire and districts will have to start at Stage 1
again. The district will submit a signed copy of the Memorandum of Agreement to RIDE within 10 days of receipt.
The Superintendent, or other chief administrative officer of the district, as well as all members of the School
Committee must sign the agreement.
Finally, there will be ongoing design document review and approval process by RIDE that occurs, at a minimum, at
the following three stages of project implementation (see Section 1.10):
•
Completion of Schematic Design
•
Completion of Design Development
•
60% completion of Construction documents
RIDE 1.09: DESIGN AND REVIEW PROCESS
1.09-1 Design Review
RIDE will conduct an architectural and technical peer review of each Approved Project at the completion of
schematic design, design development, and construction document phases, or at such other times determined by
RIDE. Such a review will ensure that the designs comply with the approved Design and Educational Program
approved by the Regents and these regulations. In the event that the school project involves historic buildings or
districts, the RI Historical Preservation and Heritage Commission may require an ongoing review through
construction.
Districts are responsible for submitting all required documentation to RIDE upon completion of each design phase
and attending Plan Review meetings as scheduled by RIDE. At the Plan Review meetings, the design team and
building committee are expected to answer all questions posed by RIDE and, upon successful conclusion of the
review, may move to the next phase of design.
Listed below is the required documentation for each phase of the design process:
Schematic Design:
The purpose of the documentation submitted during the Schematic Design is to document the continuing
development of the school construction project and its major components and to project a project budget. The
documentation should also demonstrate compliance with the Northeast-CHPS.
Site plan and Landscape plan @ 1/16” = 1’-0”
Floor plans @ 1/16” = 1’-0” showing all partitions and door swings
Color Rendering
Exterior elevations @ 1/16” = 1’-0”
Typical building wall sections
Single line engineering diagrams
Outline specifications
City Planning Board submission
Civil engineering drawings (scale as required)
Confirm Project schedule
Site engineering calculations
Construction Cost Estimates
Project Report
LEED™ Checklist Form
Project Review Meeting
Educational Specifications and Schematic submission to DOE
21
RIDE School Construction Regulations (5/24/07)
Design Development and Construction Documents:
Design Development is intended to further develop the school facilities project design with greater detail.
Construction drawings for all trades that show the scope of work for the Project as defined in the detailed
deliverables description
Specifications with general conditions and all technical sections
Construction Cost Estimate
Legal/regulatory approvals completed as required
Confirm Project schedule
Project Report
LEED™ Checklist Form
Project Review Meeting
The cost of project elements that exceed or diverge from approved project scope may be declared ineligible for
school housing aid reimbursement. The district may retain such elements only by accepting sole financial
responsibility for non-conforming elements in writing in a format prescribed by RIDE, prior to inclusion of such
elements in any designs.
1.09-2 Commissioning Agent Services
The district shall procure the services of an independent engineering Commissioning Agent. Commissioning is the
process of ensuring that systems are designed, installed, functionally tested, and capable of being operated and
maintained to perform in conformity with the design intent of a project. The Commissioning Agent must be secured
prior to the design phase of the project. The Commissioning Agent must be independent, and be procured separately
from the contract for the district’s construction services. The Commissioning Agent will be responsible, in part, for
the local reporting required to implement state enforcement of the regulations for the project during the design,
construction, and operational acceptance process to ensure compliance with the regulations during integrated design.
During schematic design and design development, the Commissioning Agent will verify that all standards have been
met through meetings with the design team and review of plans submitted by the design team. The Commissioning
Agent will continue to monitor compliance with these regulations through the development of construction
documents and through the construction process to ensure that all building systems, mechanical and lighting
equipment, and all specifications are in compliance with regulations, included in and consistent with all plans,
construction documents, and cost estimates. The Commissioning Agent will submit reports certifying compliance
with all standards and regulations to RIDE and the district representative. The Commissioning Agent should work
closely with the district’s project manager, also referred to as clerk of the works.
The Commissioning Agent must:
•
Bring the owner’s needs and project requirements to the forefront at each phase of the project to ensure that
the finished project will meet expectations;
•
Improve the building’s overall performance by optimizing energy-efficient design features and directly
addressing issues like equipment performance testing and system integration; and
•
Verify that building staff members are well-trained and possess the documentation they need to operate and
maintain the building’s systems and equipment after turnover.
1. 09-3 Architectural, Engineering, and Other Services
Architectural, engineering, project management, construction management, financial, and other professional services
shall be procured by the districts for all projects.
The Facility Analysis must include an analysis of the energy use (electric and heating and/or cooling) of the facility
for at least the last two years, a survey of the facility systems, and recommendations for improving energy
efficiency. The use of Energy Star Portfolio Manager or ComCheck software systems to benchmark the facility
against other buildings or the Rhode Island Building Energy Code is highly encouraged.
22
RIDE School Construction Regulations (5/24/07)
1.09-4 Timelines
The district must meet the timelines established in the Memorandum of Agreement. If the district does not meet
said timelines, RIDE reserves the right to rescind project approval and the district may reapply for the Project in a
subsequent fiscal year.
1.09-5 Construction Bidding Documents
The district shall maintain bidding information and tabulation sheets and shall provide them and any other
documentation upon request by RIDE.
1.09-6 Project Files
The district shall maintain a project file that shall include, but not be limited to, the following documents:
1. All documents related to the project approval process, including project siting, land acquisition, real estate
documents (deeds, leases, title report including searches for easements, mortgages, judgments, liens, unpaid
taxes, water and sewer, or property description by metes and bounds) surveys, school board resolutions,
referendum ballot questions or municipal debt ordinances, and all public notices.
2. All documents related to the financing of the project including:
a.
Selection and payment of professionals, such as bond counsel and other attorneys, underwriters,
financial and investment advisors, trustees, official printers, and bond insurers;
b. Structuring of the financing, such as the method(s) of borrowing considered, complete financing
estimates and cash flows, all number runs including escrow sufficiency, if applicable, and yield
calculations, the rationale for the plan of financing (resulting in the issuance of obligations under terms
most advantageous to the district), long-range plans or models, computerized models, private uses, and
costs of issuance; and
c.
Issues of debt, such as general, series and supplemental bond resolutions, trust indentures, trust
agreement, preliminary official statement, all disclosure materials, Official Notice of Sale or Purchase
Contract, arbitrage certificate, tax regulatory agreement, IRS Form 8083, as appropriate, Disclosure
Agreement, and TEFRA Notice, if applicable
3. All documents related to the bidding process, evaluation of bids, award, and execution of contracts, the
specifications, request for proposal (“RFP”) or other invitations to bidders, the advertisements or public notices
of the opportunity to bid, logs of the bids received and the bids opened, bid evaluation worksheets, notices of
contract award, and the executed construction contract documents;
4. All documents related to the construction of school facilities, including the documents required to be kept by the
construction contract documents, specifications, change orders, alternate submissions, approvals or rejections,
unit prices, product data, time of performance schedules, construction photographs, quality control management
reports, value engineering information, up-to-date project accounting system, intermediate and final audits, “as
builts” or other drawings documenting the actual facilities built and fixtures installed, close-out documentation
on forms provided by RIDE, related correspondence, vouchers, and certifications;
5. All payroll certifications filed with the district by all contractors and subcontractors; and
6. All documents a district is legally required to make, maintain, or keep on file as part of a construction project.
The documents above shall be maintained in a readily accessible place for review and inspection by the RIDE and
any other related agencies for the duration of the school facilities project and three years thereafter or, if litigation
concerning any aspect of the school facilities project is instituted, until completion of all litigation, whichever is
later.
23
RIDE School Construction Regulations (5/24/07)
RIDE 1.10: Enforcement of Regulations and Compliance with the Memorandum of Agreement
During design, RIDE will review schematic design and design development documents as indicated in Section 1.08-
2. During construction, RIDE may visit the construction site to determine that the project is being built as approved.
RIDE will review periodic construction progress reports. RIDE will review construction documents at the 60%
completion stage and review change orders exceeding 10% of the original approval to determine that the project is
proceeding as approved and in compliance with these regulations. The cost of change orders, which result in
elements that diverge from or exceed the provisions of the Design and Educational Program and/or the
Memorandum of Agreement, may be deemed ineligible for reimbursement. RIDE may inspect the completed
facility, in operation, to ensure the project has been completed and is operating consistent with project approval by
the Regents and pursuant to the terms of the Memorandum of Agreement. RIDE or its representative reserves the
right to conduct an Audit, as defined in Section 1.02. Audit Materials, as defined in Section 1.02, shall be provided
as requested.
In order to determine the eligible costs of an Approved Project, districts will submit fiscal records to RIDE as
prescribed by the Regents to ensure that only eligible costs are included in the school housing aid reimbursement.
Districts shall cooperate with RIDE or its designee, if any, in the conduct of a fiscal review. Such cooperation shall
include, but not be limited to, scheduling, provision of adequate work space, requests for documents, access to
personnel with knowledge of the Approved Project, access to Approved Project-related materials stored
electronically, or any other requirement for the thorough and expeditious conduct of the review.
Except as provided herein, the cost of an audit shall be borne by RIDE. If RIDE determines that the district has not
reasonably cooperated in the conduct of a review, is responsible for any delay in the review, or is determined to be
making frivolous or non-meritorious appeals, RIDE may, in its sole discretion, deduct all or a portion of the cost of
conducting the fiscal review from the district’s school housing aid reimbursement.
Applicants shall maintain all records related to an Application and an Approved Project pursuant to the requirements
established in Section 1.09.
RIDE 1.11: ASSET PROTECTION AND MAINTENANCE OF FACILITIES
1.11-1 Asset Protection Plans and Building Maintenance
Each school district shall develop, implement, and maintain a comprehensive asset protection plan for every school
building, not just buildings for which school housing aid is sought or received. The plan must include a full analysis
of the building’s current condition, the need for repairs if any, the costs associated with the repairs, and the nature
and cost of annual maintenance for each building. The asset protection plan must be submitted to RIDE annually
and will be reviewed by a certified licensed professional to determine that the plan is adequate. The plans must
address regularly scheduled preventive maintenance to prevent premature failure and to maximize the useful life of a
facility. If the plan submitted by the district is determined to be inadequate, districts will be notified by RIDE and
required to submit a revised plan within thirty (30) days. Districts must submit annual updates to these plans to
RIDE that list all maintenance performed and expenditures pursuant to the plan for the previous year.
The asset protection plan and annual expenditures pursuant thereto must meet the following minimum requirements:
a.
All facilities and structures shall be maintained in a safe, sound, and energy efficient condition. All service
equipment, means of egress, devices, and safeguards which are required by the state building code in a
building or structure, when erected, altered, or repaired, shall be maintained in good working order;
b. For each facility, the plan shall itemize anticipated annual expenditures for required maintenance;
c.
Capital maintenance expenditures shall be itemized and be consistent with the district’s approval capital
improvement plan; and
24
RIDE School Construction Regulations (5/24/07)
d. The plan shall itemize costs for the replacement of all approved temporary facilities in the district with
permanent structures.
Commencing on July 1, 2010, RIDE will not approve a school construction application for a district that does not
have a budget for that fiscal year which provides for full funding of its asset protection plan. Also commencing on
July 1, 2010, RIDE will not approve a school construction application for any district that has not spent at least fifty
percent (50%) of its asset protection budget pursuant to its asset protection plan in each of the previous three years
prior to application.
If a district receiving school housing aid fails to maintain compliance with the asset protection requirements of these
regulations or any guidelines, policies or procedures established by the Regents, the district may be prohibited from
receiving school housing aid for at least one year and prior to reinstatement of school housing aid payments shall be
subject to a review by RIDE to determine that the district is in compliance with these regulations.
1.11-2 Certified Educational Facilities Manager
(a) No person shall be employed by a district to supervise buildings and grounds unless the candidate meets one of
the following criteria:
ƒ
Has completed a minimum of two years experience in the field of buildings and grounds supervision.
Or
ƒ
Has been certified an educational facilities manager through an industry accepted certification offered at a
regionally accredited institution of higher education or an approved postsecondary institution located
within or outside Rhode Island.
Or
ƒ
Has a college degree in a field related to facilities management.
(b) When a vacancy occurs in a position in which the duties of a supervisor of buildings and grounds are performed,
the district may select, for a period not to exceed six months from the date of the vacancy, a person who does not
meet the requirements noted above to perform on an interim basis the duties of a supervisor of buildings and
grounds.
RIDE 1.12: HOUSING AID REIMBURSEMENT AND INCENTIVE
1.12-1 General
RIDE shall annually award school housing aid within the amounts and at such times as authorized by R.I.G.L. 16-7-
35 through 16-7-47. State funding shall be awarded to completed projects according to statutes and regulations
governing school housing aid. No payment of school housing aid for an Approved Project shall be made before the
completion of the project and submission of the forms as prescribed by the Regents. School housing aid will be paid
on interest only for bonds issued through the RIHEBC.
1.12-2 Energy and Water Efficiency Incentive
Additional reimbursement funds are available to approved new construction projects that demonstrate energy and
water efficiency cost reduction beyond the minimum school construction threshold requirements as defined in the
Northeast-CHPS.
Districts are eligible for 2% additional reimbursement funds for projects that achieve energy efficiency 30% above
the RI Building Energy Code; 3% additional reimbursement for energy efficiency 40% above the RI Building
Energy Code; and 4% additional reimbursement for energy efficiency 50% above the RI Building Energy Code.
25
RIDE School Construction Regulati
26
ons (5/24/07)
Compliance with increased energy efficiency levels is demonstrated through submission of results of energy
modeling and analysis reports during the Necessity for School Construction application process as prescribed in
Section 1.08 and Plan Review upon completion of schematic design, design development, and construction
documents as outlined in these regulations. The submission must be reviewed and certified by a licensed
professional engineer and approved by RIDE.
Energy efficiency performance must be documented each year through the submission of yearly reports that include:
monthly utility bills, summary of energy consumption for the previous year, and energy consumption compared to
the baseline design. The district may submit benchmark energy software programs (such as ENERGY STAR
Portfolio Manager) to demonstrate compliance.
Buildings that are not able to maintain energy efficiency over time must meet with RIDE officials to review the
materials and explain any discrepancies. Should non-compliance persist, RIDE may reduce any further
reimbursement by the percent of the incentive.
RIDE 1.13: PROGRAM INTEGRITY
Where RIDE determines that false or intentionally misleading information or documentation was submitted by an
applicant in support of any effort to obtain acceptance of an application, approval for a Project, reconsideration of an
appeal, granting of waiver or any other action or forbearance by RIDE, or a district commits any other act affecting
the integrity of the Program, RIDE may permanently revoke any and all payments due to a district, RIDE may take
steps to recover any previous payments made to a district and/or said district shall be prohibited from receiving
school housing aid for a period of time to be determined by RIDE.
RIDE 1.14: CLOSING SCHOOLS
A district must notify RIDE in writing six months prior to the sale, lease, demolition, or other removal from service
of any school facility in the district’s jurisdiction. The notification must include the district’s plan for
accommodating any displaced school programs or services and a plan for accommodating district students within
remaining school buildings as a result of this sale, lease or removal from service.
Where a building that has received school construction payments from RIDE for a building that has not remained in
service for 50 years, RIDE may recapture at its discretion a portion of the housing aid reimbursement.
In the event of a proposed closure, a district shall inform neighboring districts of the proposed action in the event
that the second district may wish to acquire the building for its own use.
RIDE 1.15: WAIVER
Any request for a waiver of any provision of these regulations shall be governed by the “Protocol for Granting
Variances to Regulations of the Board of Regents or Regulations of the Commissioner” (May, 1993)
RIDE Proposed School Construction Regulations (3/9/07) DRAFT
APPENDIX A
Sample Capital Improvement Plan
District: ABC
Description
FY 2008
FY 2009
FY 2010
FY 2011
FY 2012
Total
Replace HVAC system at XYZ Elementary School
250,000
250,000
500,000
Upgrade wiring at High School for new technology
50,000
50,000
Repave Middle School parking lot
100,000
100,000
Replace roof at ABC Elementary School
250,000
250,000
500,000
Repair tile flooring district-wide
10,000
10,000
10,000
10,000
10,000
50,000
Paint classrooms district-wide
25,000
25,000
25,000
25,000
25,000
125,000
Total Request
285,000
285,000
85,000
385,000
285,000
1,325,000
Five Year Capital Improvement Plan
Some items that will not be reimbursed: lockers; window screens, curtains, or blinds; equipment (e.g. computer monitors,
hardware, and software; air compressor; individual air conditioning units; floor washing machines; television/media equipment;
vehicles; auditorium stage curtains; or maintenance related items (e.g. air duct cleaning; oil burner maintenance; or graffiti
removal).
This list is not comprehensive but gives districts an idea of the types of items that do not qualify for Housing Aid. If you have
any questions regarding the eligibility of an item, please contact the State Aid Specialist.
27