250-RICR-150-10-8
250-RICR-150-10-8. Stormwater Management, Design, and Installation Rules (version Adoption, 11/13/2018 to 01/04/2022)
8.1 Purpose
Provide standards for
planning, designing and installing effective stormwater best
management practices (BMPs) to effectively manage the impacts of
stormwater and prevent adverse impacts to water quality, habitat and
flood storage capacity,
8.2 Authority
These rules are promulgated
pursuant to requirements and provisions of R.I. Gen. Laws Chapter
45-61.2, The Smart Development for a Cleaner Bay Act of 2007; Chapter
46-12, Water Pollution; Chapter 46-13.1, Groundwater Protection;
Chapter 42-17.1, Environmental Management; and in accordance with
Chapter 42-35, Administrative Procedures.
8.3 Applicability
A. Stormwater management
required pursuant to state and local programs that reference the
"Rhode Island Stormwater Design and Installation Standards
Manual" shall be in accordance with the standards and
performance criteria in this Part;
B. The stormwater management
standards and performance criteria in this Part do not apply to
single-family lots of record. See the "State of Rhode Island
Stormwater Management Guidance for Individual Single-Family
Residential Lot Development" for recommended procedures to
comply with requirements for stormwater management for development of
single family residential lots of record.
C. In reviewing stormwater
retrofit designs to improve water quality, as compared to existing
conditions, the approving agencies may approve designs that do not
meet the minimum standards or performance criteria herein due to
existing site constraints.
8.4 Incorporated Materials
A. These regulations hereby
adopt and incorporate United States Department of Agriculture Natural
Resources Conservation Service Technical Release No. 55 (2015) by
reference, not including any further editions or amendments thereof
and only to the extent that the provisions therein are not
inconsistent with these regulations.
B. These regulations hereby
adopt and incorporate United States Department of Natural Resources
Conservation Service Technical Release No. 20 (2015) by reference,
not including any further editions or amendments thereof and only to
the extent that the provisions therein are not inconsistent with
these regulations.
C. These regulations hereby
adopt and incorporate ASTM D5126 - 16e1 Standard Guide for Comparison
of Field Methods for Determining Hydraulic Conductivity in Vadose
Zone (2016) by reference, not including any further editions or
amendments thereof and only to the extent that the provisions therein
are not inconsistent with these regulations.
D. These regulations hereby
adopt and incorporate ASTM D3385 - 18 Standard Test Method for
Infiltration Rate of Soils in Field Using Double-Ring Infiltrometer
(2018) by reference, not including any further editions or amendments
thereof and only to the extent that the provisions therein are not
inconsistent with these regulations.
E. These regulations hereby
adopt and incorporate ASTM D5093 - 15e1 Standard Test Method for
Field Measurement of Infiltration Rate Using a Double-Ring
Infiltrometer with Sealed-Inner Ring (2015) by reference, not
including any further editions or amendments thereof and only to the
extent that the provisions therein are not inconsistent with these
regulations.
F. These regulations hereby
adopt and incorporate ASTM D448 - 12 (2017) Standard Classification
for Sizes of Aggregates for Road and Bridge Construction (2017) by
reference, not including any further editions or amendments thereof
and only to the extent that the provisions therein are not
inconsistent with these regulations.
G. These regulations hereby
adopt and incorporate ASTM C33/C33M -18 Standard Specification for
Concrete Aggregates (2018) by reference, not including any further
editions or amendments thereof and only to the extent that the
provisions therein are not inconsistent with these regulations.
8.5 Definitions
A. As used in these rules, the
following terms shall, where the context permits, be construed as
follows:
1. "Approving agency"
means an entity that will enforce or require compliance with the
minimum standards in this Part.
2. "Aquatic bench"
means a 10-15 foot wide bench which is located around the inside
perimeter of a permanent pool and is normally vegetated with aquatic
plants; the goal is to provide pollutant removal and enhance safety
in areas using stormwater ponds.
3. "Aquifer" means a
porous water-bearing formation of permeable rock, sand or gravel
capable of yielding economically significant quantities of
groundwater.
4. "ASTM" means
American Society of Testing Materials.
5. "Baseflow" means
the portion of streamflow that is not due to storm runoff but is the
result of groundwater discharge or discharge from lakes or similar
permanent impoundments of water.
6. "Bioretention"
means a water quality practice that utilizes vegetation and soils to
treat urban stormwater runoff by collecting it in shallow
depressions, before filtering through an engineered bioretention
planting soil media.
7. "BMP" means best
management practice.
8. "Buffer" means a
special type of preserved area along a watercourse or wetland where
development is restricted or prohibited. Buffers protect and
physically separate a resource from development. Buffers also provide
stormwater control flood storage and habitat values.
9. "Catch basin"
means a structure containing a sump placed below grade to conduct
water from a street or other paved surface to the storm sewer.
10. "Catch basin insert"
means a structure, such as a tray, basket, or bag that typically
contains a pollutant removal medium (filter media) and a method for
suspending the structure in the catch basin. They are placed directly
inside of existing catch basins where stormwater flows into the catch
basin and is treated as it passes through the structure.
11. "Channel" means
a natural stream that conveys water; a man-made ditch or swale
excavated for the flow of water.
12. "Channel protection"
or "CPv" means a design criterion which requires 24-hour
detention of the 1-year, post-developed, 24-hour Type III storm event
runoff volume for the control of stream channel erosion.
13. "Channel
stabilization" means erosion prevention and stabilization of
velocity distribution in a channel using jetties, drops, revetments,
structural linings, vegetation and other measures.
14. "Check dams"
means small temporary dams constructed across a swale or drainage
ditch to reduce the velocity of concentrated stormwater flows.
15. "Cistern" means
a container that stores large quantities of rooftop stormwater runoff
and may be located above or below ground. Also see Rain Barrel.
16. "Clay" means
a. A mineral soil separate
consisting of particles less than 0.002 millimeter in equivalent
diameter.
b. A soil texture class.
c. (Engineering) A
fine-grained soil (more than 50% passing the No. 200 sieve) that has
a high plasticity index in relation to the liquid limit. (Unified
Soil Classification System).
17. "Combined sewer
overflows" or "CSOs" means combined sewers collect
both stormwater runoff and sanitary wastewater in a single set of
sewer pipes. When combined sewers do not have enough capacity to
carry all the runoff and wastewater or the receiving water pollution
control plant cannot accept all the combined flow, the combined
wastewater overflows from the collection system into the nearest body
of water, creating a CSO.
18. "Compaction"
means any process by which the soil grains are rearranged to decrease
void space and bring them in closer contact with one another, thereby
increasing the weight of solid material per unit of volume,
increasing the shear and bearing strength and reducing permeability.
19. "Contour" means
a. An imaginary line on the
surface of the earth connecting points of the same elevation.
b. A line drawn on a map
connecting points of the same elevation.
20. "CRMC" means
Rhode Island Coastal Resources Management Council.
21. "Crushed stone"
means gravel-sized particles that pass through a 3-inch sieve and are
retained on the No. 4 sieve, and are angular in shape as produced by
mechanical crushing. Crushed stone must be washed in order to be used
in stormwater BMPs to prevent clogging by fines.
22. "Curve number"
or "CN" means a numerical representation of a given area’s
hydrologic soil group, plant cover, impervious cover, interception
and surface storage derived in accordance with Natural Resources
Conservation Service methods. This number is used to convert rainfall
volume into runoff volume.
23. "Cut" means a
portion of land surface or area from which earth has been removed or
will be removed by excavation; the depth below original ground
surface to excavated surface.
24. "Darcy's law"
means an equation stating that the rate of fluid flow through a
porous medium is proportional to the potential energy gradient within
the fluid. The constant of proportionality is the hydraulic
conductivity, which is a property of both the porous medium and the
fluid moving through the porous medium. Sizing of filtering BMPs and
dry swales is based on this principle.
25. "Deep sump catch
basins" means storm drain inlets that typically include a grate
or curb inlet and at least a four-foot sump to capture trash, debris
and some sediment and oil and grease. Also known as an oil and grease
catch basin.
26. "Deicers" means
materials applied to reduce icing on paved surfaces. These consist of
salts and other formulated materials that lower the melting point of
ice, including sodium chloride, calcium chloride, calcium magnesium
acetate, and blended products consisting of various combinations of
sodium, calcium, magnesium, and chloride, as well as other
constituents.
27. "DEM" means
Rhode Island Department of Environmental Management.
28. "Design points"
or "Points of analyses" means common locations at a site
where pre-development and post-development conditions can be
compared.
29. "Design storm"
means a precipitation event for which the capacity of a best
management practice is sized and designed. Design storms are
expressed in terms of Type III, 24-hour events (i.e., 1-year,
10-year, and 100-year storms).
30. "Detention"
means the temporary storage of storm runoff in a BMP with the goals
of controlling peak discharge rates.
31. "Detention structure"
means a structure constructed for the purpose of temporary storage of
surface runoff and gradual release of stored water at controlled
rates.
32. "Disposal site"
means a structure, well, pit, pond, lagoon, impoundment, ditch,
landfill or other place or area, excluding ambient air or surface
water, where uncontrolled oil or hazardous material has come to be
located as a result of any spilling, leaking, pouring, ponding,
emitting, emptying, discharging, injecting, escaping, leaching,
dumping, discarding or otherwise disposing of such oil or hazardous
material. Disposal sites are designated as LUHPPLs.
33. "Disturbed area"
means an area in which the natural vegetative soil cover has been
removed or altered and, therefore, is susceptible to erosion.
34. "Diversion"
means a channel with a supporting ridge on the lower side constructed
across the slope to divert water from areas where it is in excess to
sites where it can be used or disposed of safely. Diversions differ
from terraces in that they are individually designed.
35. "Downstream analysis"
means calculation of peak flows, velocities, and hydraulic effects at
critical downstream locations to ensure that proposed projects do not
increase post-development peak flows and velocities at these
locations.
36. "Drainage" means
the removal of excess surface water or ground water from land by
means of surface or subsurface drains.
37. "Drainage area"
or "watershed" means all land and water area from which
runoff may run to a common (design) point.
38. "Dry extended
detention pond" or "dry pond" or "detention
basin" means a stormwater basin designed to capture, temporarily
hold, and gradually release a volume of stormwater runoff to
attenuate and delay stormwater runoff peaks. Dry extended detention
ponds provide water quantity control (peak flow control and stream
channel protection) as opposed to water quality control.
39. "Dry swale"
means an open drainage channel explicitly designed to detain and
promote the filtration of stormwater runoff through an underlying
fabricated soil media.
40. "Dry well" means
small excavated pits or trenches filled with aggregate that receive
clean stormwater runoff primarily from building rooftops. Dry wells
function as infiltration systems to reduce the quantity of runoff
from a site. The use of dry wells is applicable for small drainage
areas with low sediment or pollutant loadings and where soils are
sufficiently permeable to allow reasonable rates of infiltration.
41. "Emergency spillway"
means an open and/or closed channel designed to safely discharge
stormwater flows in excess of the principal spillway capacity.
42. "Erosion" means
a. The wearing away of the
land surface by running water, wind, ice, or other geological agents,
including such processes as gravitational creep.
b. Detachment and movement of
soil or rock fragments by water, wind, ice or gravity. The following
terms are used to describe different types of water erosion:
(1) Accelerated erosion -
Erosion much more rapid than normal, natural or geologic erosion,
primarily as a result of the influence of the activities of man or,
in some cases, of other animals or natural catastrophes that expose
base surfaces.
(2) Gully erosion - The
erosion process whereby water accumulates in narrow channels and,
over short periods, removes the soil from this narrow area to
considerable depths, ranging from 1 or 2 feet to as much as 75 to 100
feet.
(3) Rill erosion - An erosion
process in which numerous small channels only several inches deep are
formed.
(4) Sheet erosion - The
spattering of small soil particles caused by the impact of raindrops
on wet soils. The loosened and spattered particles may or may not
subsequently be removed by surface runoff.
43. "Erosive velocities"
means velocities of water that are high enough to wear away the land
surface. Exposed soil will generally erode faster than stabilized
soils. Erosive velocities will vary according to the soil type,
slope, structural, or vegetative stabilization used to protect the
soil.
44. "Exfilter" means
a conventional stormwater filter without an underdrain system. The
filtered volume ultimately infiltrates into the underlying soils.
45. "Extended detention"
or "ED" means a stormwater design feature that provides for
the gradual release of a volume of water over a 24- to 48-hour
interval in order to increase settling of urban pollutants and
protect downstream channels from frequent storm events.
46. "Filter strip"
means a strip of permanent vegetation to treat sheet flow from
adjacent impervious areas by causing deposition of transported
material, thereby reducing sediment flow.
47. "Filtering practices"
means practices that capture and store stormwater runoff and pass it
through a filtering media such as sand, organic material, or the
native soil for pollutant removal. Stormwater filters are primarily
water quality control devices designed to remove particulate
pollutants and, to a lesser degree, bacteria and nutrients.
Filtering systems include sand filters, organic filters,
bioretention, and tree filters.
48. "Floodplain"
means areas adjacent to a stream or river that are subject to
flooding or inundation during a storm event that occurs, on average,
once every 100 years (or has a likelihood of occurrence of 1/100 in
any given year).
49. "Flow splitter"
means an engineered, hydraulic structure designed to divert a
percentage of storm flow to a BMP located out of the primary channel,
or to direct stormwater to a parallel pipe system, or to bypass a
portion of baseflow around a BMP.
50. "Forebay" means
a storage space located near a stormwater BMP inlet that serves to
trap incoming coarse sediments before they accumulate in the main
treatment area.
51. "Grade" means
a. The slope of a road,
channel or natural ground.
b. The finished surface of a
canal bed, roadbed, top of embankment, or bottom of excavation; any
surface prepared for the support of construction, like paving or
laying a conduit.
c. To finish the surface of a
canal bed, roadbed, top of embankment or bottom of excavation.
52. "Grass channels"
means traditional vegetated open channels, typically trapezoidal,
triangular, or parabolic in shape, whose primary function is to
provide non-erosive conveyance, typically up to the 10-year frequency
design flow. They provide limited pollutant removal through
filtration by grass or other vegetation, sedimentation, biological
activity in the grass/soil media, as well as limited infiltration if
underlying soils are pervious.
53. "Gravel" means
a. “Pea” gravel is
an aggregate consisting of mixed sizes of 1/4-inch to 3/4-inch
particles that normally occur in or near old streambeds and have been
worn smooth by the action of water. Pea gravel is often used as a
filter layer in stormwater BMPs.
b. According to the Unified
Soil Classification System, gravel is a soil having particle sizes
that pass through a 3-inch sieve and are retained on the No. 4 sieve;
may be angular in shape as produced by mechanical crushing. Also
referred to as “crushed stone.” Crushed stone can be used
as a media for stormwater best management practices.
c. Type of impervious surface
when used for road, driveway, or parking surfaces.
54. "Gravel WVTS"
means a wet vegetated treatment system that maintains a saturated
gravel bed and provides treatment by stormwater movement through the
gravel bed and plant/soil treatment processes.
55. "Green roofs"
means multilayered, constructed roof systems consisting of a
vegetative layer, media, a geotextile layer, and a synthetic drain
layer installed on building rooftops. Rainwater is either intercepted
by vegetation and evaporated to the atmosphere or retained in the
substrate before being returned to the atmosphere through
transpiration and evaporation.
56. "Ground cover"
means plants that are low growing and provide a thick growth that
protects the soil as well as providing some beautification of the
area occupied.
57. "Groundwater
recharge" means the process by which water that seeps into the
ground, eventually replenishing groundwater aquifers and surface
waters such as lakes, streams, and the oceans. This process helps
maintain water flow in streams and wetlands and preserves water table
levels that support drinking water supplies.
58. "Groundwater recharge
volume" or "Rev" means the post-development design
recharge volume (on a storm event basis) required to minimize the
loss of annual pre-development groundwater recharge. The Rev is
determined as a function of annual pre-development recharge for
site-specific soils or surficial materials, average annual rainfall
volume, and amount of impervious cover on a site.
59. "Gully" means a
channel or miniature valley cut by concentrated runoff through which
water commonly flows only during and immediately after heavy rains.
The distinction between gully and rill is one of depth. A gully is
sufficiently deep that it would not be obliterated by normal tillage
operations, whereas a rill is of lesser depth and would be smoothed
by ordinary farm tillage.
60. "Hazard
classification" for dams means a rating for a dam that relates
to the probable consequences of failure or misoperation of the dam,
which is a determination made by the DEM Director based on an
assessment of loss of human life, damages to properties or structures
located downstream of the reservoir, or loss of use as a drinking
water supply. A higher hazard dam does not imply that it is more
likely to fail or be misoperated than a lower hazard dam.
61. "Head" or
"Hydraulics" means
a. The height of water above
any plane of reference.
b. The energy, either kinetic
or potential, possessed by each unit weight of a liquid expressed as
the vertical height through which a unit weight would have to fall to
release the average energy possessed. Used in various terms such as
pressure head, velocity head, and head loss.
62. "Herbaceous
perennial" means a plant whose stems die back to the ground each
year.
63. "Hydrodynamic
separators" means a group of stormwater treatment technologies
designed to remove large particle total suspended solids and large
oil droplets, consisting primarily of cylindrical-shaped devices that
are designed to fit in or adjacent to existing stormwater drainage
systems. The most common mechanism used in these devices is
vortex-enhanced sedimentation, where stormwater enters as tangential
inlet flow into the side of the cylindrical structure. As the
stormwater spirals through the chamber, the swirling motion causes
the sediments to settle by gravity, removing them from the
stormwater.
64. "Hydrograph"
means a graph showing variation in depth or discharge of a stream of
water over a period of time.
65. "Hydrologic cycle"
means the distribution and movement of water between the earth’s
atmosphere, land, and water bodies.
66. "Hydrologic soil
group" or "HSG" means a Natural Resource Conservation
Service classification system in which soils are categorized into
four runoff potential groups. The groups range from A soils, with
high permeability and little runoff production, to D soils, which
have low permeability rates and produce much more runoff.
67. "Illicit discharges"
means unpermitted discharges to waters of the state that do not
consist entirely of stormwater or uncontaminated groundwater except
certain discharges identified in the RIPDES Phase II Stormwater
General Permit.
68. "Impaired waters"
means those waterbodies not meeting water quality standards. Pursuant
to Section 303(d) of the federal Clean Water Act, 33 U.S.C. §
1313 (2018), each state prepares a list of impaired waters (known as
the 303(d) list) which is presented in the state's Integrated Water
Report as Category 5 waters. Those impaired waters for which a TMDL
has been approved by US EPA and is not otherwise impaired, are listed
in Category 4A.
69. "Impervious cover"
or "I" means those surfaces that cannot effectively
infiltrate rainfall consisting of surfaces such as building rooftops,
pavement, sidewalks, driveways, compacted gravel.
70. "Infill" means a
development site that meets all of the following: the site is
currently predominately pervious (less than 10,000 square feet of
existing impervious cover); it is surrounded (on at least 3 sides) by
existing development (not including roadways); the site is served by
a network of existing infrastructure and does not require the
extension of utility lines or new public road construction to serve
the property; and the site is 1 acre or less where the existing land
use is commercial, industrial, institutional, governmental,
recreational, or multifamily residential.
71. "Infiltration
practices" means stormwater treatment practices designed to
capture stormwater runoff and infiltrate it into the ground over a
period of days.
72. "Infiltration rate"
means the rate at which stormwater percolates into the subsoil
measured in inches per hour.
73. "Land use with higher
potential pollutant load" or "LUHPPL" means area where
the land use has the potential to generate highly contaminated
runoff, with concentrations of pollutants in excess of those
typically found in stormwater.
74. "Landfill" means
a facility or part of a facility established in accordance with a
valid site assignment for the disposal of solid waste into or on
land. Landfills are designated as LUHPPLs.
75. "Level spreader"
means a device for distributing stormwater uniformly over the ground
surface as sheet flow to prevent concentrated, erosive flows and
promote infiltration.
76. "Limit of
disturbance" means a line delineating the boundary of the area
to be disturbed during a development or redevelopment project. Area
outside this boundary shall not be touched.
77. "Low impact
development" or "LID" means a site planning and design
strategy intended to maintain or replicate predevelopment hydrology
through the use of site planning, source control, and small-scale
practices integrated throughout the site to prevent, infiltrate and
manage runoff as close to its source as possible.
78. "Maximum extent
practicable" means to show that a proposed development has met a
standard to the maximum extent practicable, the applicant must
demonstrate the following:
a. All reasonable efforts have
been made to meet the standard in accordance with current local,
state, and federal regulations,
b. A complete evaluation of
all possible management measures has been performed, and
c. If full compliance cannot
be achieved, the highest practicable level of management is being
implemented.
79. "Mulch" means a
natural or artificial protective layer of suitable materials, usually
of organic matter such as wood chips, leaves, straw, or peat, placed
around plants that aids in soil stabilization, soil moisture
conservation, prevention of freezing, and control of weeds. In
addition, mulches serve as soil amendments upon decomposition (for
organic mulches).
80. "Native plants"
means plants that are adapted to the local soil and rainfall
conditions and that require minimal watering, fertilizer, and
pesticide application.
81. "Non-structural
controls" means pollution control techniques, such as management
actions and behavior modification that do not involve the
construction or installation of devices.
82. "Off-line" means
a stormwater management system designed to manage small storm events
by diverting a percentage of stormwater flow away from the storm
drainage system. Flow from large storm events will bypass this
stormwater management system.
83. "Oil separators"
or "Particle separators" means a device consisting of 1 or
more chambers designed to remove trash and debris and to promote
sedimentation of coarse materials and separation of free oil (as
opposed to emulsified or dissolved oil) from stormwater runoff.
Oil/particle separators are typically designed as off-line systems
for pretreatment of runoff from small impervious areas, and therefore
provide minimal attenuation of flow. Also called oil/grit separators,
water quality inlets, and oil/water separators.
84. "On-line" means
a stormwater management system designed to manage stormwater in its
original drainage channel or pipe network such that all stormwater
flow will be directed to and through the stormwater management
system.
85. "Open channels"
or "Swales" or "Grass channels" means systems
that are used for the conveyance, retention, infiltration and
filtration of stormwater runoff.
86. "Outfall" means
the point where water flows from a conduit, stream, or drain.
87. "Outlet" means
the point at which water discharges from stormwater practices such as
pipes or channels.
88. "Outlet control
structure" means a hydraulic structure placed at the outlet of a
channel, spillway, pond, etc., for the purpose of dissipating energy,
providing a transition to the channel or pipe downstream, while
achieving the discharge rates for specified designs.
89. "OWTS" means
onsite wastewater treatment system.
90. "Peak discharge rate"
means the maximum instantaneous rate of flow during a storm, usually
in reference to a specific design storm event.
91. "Peak flow control"
means criteria intended to address increases in the frequency and
magnitude of a range of potential flood conditions resulting from
development and include stream channel protection, conveyance
protection, peak runoff attenuation, and emergency outlet sizing.
92. "Performance
monitoring" means collection of data on the effectiveness of
individual stormwater treatment practices.
93. "Permanent pool"
or "Wet pool" means an area of a stormwater management
practice that has a fixed water surface elevation due to a
manipulation of the outlet structure.
94. "Permeability"
means the rate of water movement through the soil column under
saturated conditions.
95. "Permeable paving
materials" means materials that are alternatives to conventional
pavement surfaces and are designed to increase infiltration and
reduce stormwater runoff and pollutant loads. Alternative materials
include porous asphalt, pervious concrete, and various pavers and
open-celled grids.
96. "Piping" means
removal of soil material through subsurface flow channels or “pipes”
developed by seepage water.
97. "Plugs" means
pieces of vegetation, usually cut with a round tube, which can be
used to propagate the plant by vegetative means.
98. "Point source"
means any discernible, confined and discrete conveyance, including
but not limited to, any pipe, ditch, channel, tunnel, conduit, well,
discrete fissure, container, rolling stock, concentrated animal
feeding operation, landfill leachate collection system, vessel or
other floating craft from which pollutants are or may be discharged.
99. "Pondscaping"
means plantings around stormwater ponds that emphasize native
vegetative species to meet specific design intentions. Species are
selected for up to six zones in the basin and its surrounding
setback, based on their ability to tolerate inundation and/ or soil
saturation.
100. "Pretreatment"
means techniques employed in stormwater BMPs to provide storage or
filtering to help trap coarse materials before they enter the system.
101. "Principal spillway"
means an open and/or closed channel designed to allow a normal range
of stormwater flows to discharge from an impoundment.
102. "Qualifying pervious
area" or "QPA" means the generally flat, natural or
landscaped vegetated areas that are fully stabilized and where
discharge from impervious areas may be directed via sheet flow in
order to obtain a Stormwater Credit.
103. "QA" means
quality assurance.
104. "QAP" means
quality assurance plan.
105. "QC" means
quality control.
106. "Rational equation"
means an empirical equation acceptable for estimating peak flow rates
for small urbanized drainage areas with short times of concentration,
but not for estimating runoff volume. The Rational Equation is Q=CiA;
where Q = peak discharge, C = rational Method runoff coefficient, i
= rainfall intensity (inches/hour); and A = drainage area (acres).
107. "Redevelopment"
means any construction, alteration, or improvement that disturbs a
total of 10,000 square feet or more of existing impervious area where
the existing land use is commercial, industrial, institutional,
governmental, recreational, or multifamily residential.
108. "Responsible
authority" means authority responsible for long-term maintenance
of stormwater BMPs.
109. "Retention"
means the amount of precipitation on a drainage area that does not
escape as runoff. It is the difference between total precipitation
and total runoff.
110. "Right of way"
or "ROW" means right of passage, as over another’s
property. A route that is lawful to use. A strip of land acquired for
transport or utility construction.
111. "RIPDES" means
Rhode Island Pollutant Discharge Elimination System.
112. "Riser" means a
type of outlet control structure that consists of a vertical pipe
that extends from the bottom of a pond BMP and houses the control
devices (weirs/orifices) to achieve the discharge rates for specified
designs.
113. "Runoff" means
the water from rain, snowmelt, or irrigation that flows over the land
surface and is not absorbed into the ground, instead flowing into
surface waters or land depressions.
114. "Safety bench"
means a flat area above the permanent pool and surrounding a
stormwater basin designed to provide a separation from the basin pool
and adjacent slopes.
115. "Sand" means
a. (Agronomy) A soil particle
between 0.05 and 2.0 millimeters in diameter.
b. A soil textural class.
c. (Engineering) According to
the Unified Soil Classification System, a soil particle larger than
the No. 200 sieve (0.074mm) and passing the No. 4 sieve
(approximately 1/4 inch).
116. "SARA 312 generator"
means a facility that is required by the Emergency Planning and
Community Right to Know Act, 42 U.S.C § 116 also known as Title
III of the Superfund Amendments and Reauthorization Act of 1989 (SARA
Title III), to submit an inventory of the location of hazardous
chemicals which are located at the site. SARA 312 generators are
designated as LUHPPLs.
117. "Seasonal high
groundwater table" or "SHGT" means the elevation of
the groundwater table during that time of the year at which it is
highest as determined by direct observation or by interpretation of
hydromorphic features in the soil profile.
118. "Sediment"
means solid material, both mineral and organic, that is in
suspension, is being transported, or has been moved from its site of
origin by air, water, gravity, or ice and has come to rest on the
earth’s surface either above or below sea level.
119. "Sediment chamber"
or "forebay" means an underground chamber or surface
impoundment designed to remove sediment and/or floatables prior to a
primary or other secondary stormwater treatment practice.
120. "Seepage" means
a. Water escaping through or
emerging from the ground.
b. The process by which water
percolates through the soil.
121. "SESC" means
soil erosion and sediment control.
122. "Setbacks"
means the minimum distance requirements for location of a structural
BMP in relation to roads, wells, septic fields, and other structures.
Also, the area immediately surrounding a best management practice
that provides a separation barrier to adjacent development and acts
as filter to remove pollutants and provide infiltration of stormwater
prior to reaching the BMP.
123. "Shallow WVTS"
means a wet vegetated treatment system that consists of aquatic
vegetation within a permanent pool ranging in depth from 6” to
18” during normal conditions that is equivalent to the entire
WQv and provides treatment via settling and plant/soil treatment
processes.
124. "Sheet flow"
means water, usually storm runoff, flowing in a thin layer over the
ground surface.
125. "Side slopes"
means the slope of the sides of a channel, dam or embankment. It is
customary to name the horizontal distance first, as 1.5 to 1, or
frequently, 1 ½: 1, meaning a horizontal distance of 1.5 feet
to 1 foot vertical.
126. "Silt" means
a. (Agronomy) A soil separate
consisting of particles between 0.05 and 0.002 millimeter in
equivalent diameter.
b. A soil textural class.
c. (Engineering) According to
the Unified Soil Classification System a fine-grained soil (more than
50% passing the No. 200 sieve) that has a low plasticity index in
relation to the liquid limit.
127. "Site" means 1
or more lots, tracts, or parcels of land to be developed or
redeveloped for a complex of uses, units or structures, including but
not limited to commercial, residential, institutional, governmental,
recreational, open space, and/or mixed uses. When calculating site
size, jurisdictional wetland areas defined by DEM or CRMC regulations
and undeveloped lands protected by conservation easements should be
subtracted from the total site area.
128. "Site planning and
design strategies" means techniques of planning, engineering,
and landscape design that maintain predevelopment hydrologic
functions and pollutant removal mechanisms to the extent practical.
129. "Soil test"
means a chemical analysis of soil to determine needs for fertilizers
or amendments for species of plant being grown.
130. "Source control"
means practices to limit the generation of stormwater pollutants at
their source.
131. "Stabilization"
means providing adequate measures, vegetative and/or structural, that
will prevent erosion from occurring.
132. "Stormwater"
means water consisting of precipitation runoff or snowmelt.
133. "Stormwater basin"
means a land depression or impoundment created for the detention or
retention of stormwater runoff.
134. "Stormwater filter"
means a stormwater treatment method that utilizes an artificial media
to filter out pollutants entrained in urban runoff.
135. "Stormwater
management plan" means a plan describing the proposed methods
and measures to prevent or minimize water quality and quantity
impacts associated with a development project both during and after
construction. It identifies selected LID source controls and
treatment practices to address those potential impacts, the
engineering design of the treatment practices, and maintenance
requirements for proper performance of the selected practices.
136. "Stormwater
pollution prevention plan" or "SWPPP" means a plan
that identifies potential sources of pollution and outlines specific
management activities designed to minimize the introduction of
pollutants into stormwater.
137. "Stormwater
retrofits" means modifications to existing development to
incorporate source controls and structural stormwater treatment
practices to remedy problems associated with and improve water
quality mitigation functions of older, poorly designed, or poorly
maintained stormwater management systems.
138. "Stormwater
treatment train" means stormwater treatment practices, as well
as site planning techniques and source controls, combined in series
to enhance pollutant removal or achieve multiple stormwater
objectives.
139. "Stream buffers"
means zones of variable width that are located along both sides of a
stream and are designed to provide a protective natural area along a
stream corridor.
140. "Stream order"
means the relative size of a stream based on Strahler’s (1957)
method. Streams with no tributaries are first-order streams,
represented as the start of a solid line on a 1:24,000 USGS
Quadrangle Sheet. A second-order stream is formed at the confluence
of two first-order streams. However, if a first-order stream joins a
second-order stream, it remains a second-order stream; it is not
until a second-order stream combines with another second-order stream
that it becomes a third-order stream, and so on. Peak flow controls
(CPv and Qp) are waived for discharges to fourth-order and larger
streams.
141. "Street sweeper"
means equipment that removes particulate debris from roadways and
parking lots. Includes mechanical broom sweepers, vacuum sweepers,
regenerative air sweepers, and dry vacuum sweepers.
142. "Structural BMPs"
means devices that are constructed to manage stormwater runoff.
143. "Subgrade"
means the soil prepared and compacted to support a structure or a
pavement system.
144. "Subwatershed"
means the area draining to the point of confluence between two
first-order tributaries.
145. "Technical Release
No. 55" or "TR-55" means a watershed hydrology model
developed by the US Soil Conservation Service (now US Natural
Resources Conservation Service) used to calculate runoff volumes and
provide a simplified routing for storm events through ponds.
146. "Time of
concentration" means time required for water to flow from the
most remote point of a drainage area, in a hydraulic sense, to the
point of analysis.
147. "Toe of slope"
means where the slope stops or levels out. Bottom of the slope.
148. "Token spillways"
or "emergency spillways" means spillways that are placed
above the water elevation of the largest managed storm and are
required if not already provided as part of the conveyance of the
100-year storm event.
149. "Topsoil" means
fertile or desirable soil material used to top dress road banks,
subsoils, parent material, etc.
150. "Total maximum daily
load" or "TMDL" means a calculation of the maximum
amount of a pollutant that a water body can receive and still meet
water quality standards, and an allocation of that amount to the
pollutant's sources, including a margin of safety.
151. "Total nitrogen"
or "TN" means the sum of total Kjeldahl nitrogen, nitrate,
and nitrite. Nitrogen is typically the growth-limiting nutrient in
estuarine and marine systems.
152. "Total phosphorus"
or "TP" means sum of orthophosphate, metaphosphate (or
polyphosphate) and organically bound phosphate. Phosphorus is
typically the growth-limiting nutrient in freshwater systems.
153. "Total suspended
solids" or "TSS" means the total amount of soils
particulate matter that is suspended in the water column.
154. "Trash rack"
means a grill, grate, or other device at the intake of a channel,
pipe, drain or spillway for the purpose of preventing oversized
debris from entering the structure and clogging the outlet
weir/orifice.
155. "Tree filter"
means a small bioretention practice that may be contained in a
concrete vault with an underdrain connecting to the storm drain
system, or may have an open base for infiltration into the underlying
soils.
156. "Underground
detention facilities" means vaults, pipes, tanks, and other
subsurface structures designed to temporarily store stormwater runoff
for water quantity control and to drain completely between runoff
events. They are intended to control peak flows, limit downstream
flooding, and provide some channel protection.
157. "Underground
infiltration systems" means structures designed to capture,
temporarily store, and infiltrate the water quality volume over
several days, including premanufactured pipes, vaults, and modular
structures. Used as alternatives to infiltration trenches and basins
for space-limited sites and stormwater retrofit applications.
158. "Urban stormwater
runoff" means stormwater runoff from developed areas.
159. "Velocity head"
means the head due to the velocity of a moving fluid, equal to the
square of the mean velocity divided by twice the acceleration due to
gravity (32.16 feet per second per second).
160. "Water balance"
means an equation describing the input, output, and storage of water
in a watershed or other hydrologic system.
161. "Water quality flow"
or "WQf" means the peak flow rate associated with the water
quality design storm or WQv.
162. "Water quality
swales" means vegetated open channels designed to treat and
attenuate the water quality volume and convey excess stormwater
runoff. Dry swales are primarily designed to receive drainage from
small impervious areas and rural roads. Wet swales are primarily used
for highway runoff, small parking lots, rooftops, and pervious areas.
163. "Water quality
volume" or "WQv" means the storage needed to capture
and treat 90% of the average annual stormwater runoff volume. In
Rhode Island, this equates to 1-inch of runoff from impervious
surfaces.
164. "Watershed inches"
means a measurement used to compare stormwater volume requirements
between sites of varying sizes. Required volumes in acre-feet can be
converted to watershed inches by dividing by the total site area in
acres and multiplying by 12 inches/feet.
165. "Wet swale"
means an open drainage channel or depression, explicitly designed to
retain water or intercept groundwater for water quality treatment.
166. "Wet vegetated
treatment system" or "WVTS" means shallow, constructed
pools that capture stormwater and allow for the growth of
characteristic emergent vegetation. See also definition of shallow
WVTS and gravel WVTS.
8.6 Stormwater Management
Standards and Performance Criteria Overview
A. Applicants for all
applicable new and redevelopment projects in the State of Rhode
Island are required to meet the eleven minimum standards and comply
with the specific performance criteria in §§ 8.6 through
8.17 of this Part. In the case of restoration or retrofitting,
deviation from these standards may be appropriate at the discretion
of the approving agency.
B. All applicable project
proposals must include a stormwater management site plan for review
by State and local government. The plan must address the minimum
standards in §§ 8.6 through 8.17 of this Part.
C. When a project’s
stormwater management system is designed, installed, and maintained
in accordance with the requirements of this Part, its runoff impacts
will be presumed to be in compliance with applicable state regulatory
standards and requirements.
D. Unless otherwise noted, all
storm events referred to herein are 24 hours in duration and utilize
US Natural Resources Conservation Service Type III precipitation
distribution. Rainfall amounts for Rhode Island for various return
frequencies are provided in § 8.6(E) of this Part and shall be
used for design unless otherwise specified.
E. Design Rainfall Amounts for
Rhode Island: All Rhode Island County rainfall values were obtained
from the Northeast Regional Climate Center (NRCC) using regional
rainfall data processed by NRCC from the period of record through
December 2008.
RI
County
24-hour
(Type III) Rainfall Amount (inches)
1-Year
2-Year
5-Year
10-Year
25-Year
50-Year
100-Year
Providence
County
2.7
3.3
4.1
4.9
6.1
7.3
8.7
Bristol
County
2.8
3.3
4.1
4.9
6.1
7.3
8.6
Newport
County
2.8
3.3
4.1
4.9
6.1
7.3
8.6
Kent
County
2.7
3.3
4.1
4.8
6.2
7.3
8.7
Washington
County
2.8
3.3
4.1
4.9
6.1
7.2
8.5
F. If the standard or
criterion is not used or achieved, a written technical justification
that is acceptable to the approving agency must be provided.
G. The design practices
described in this Part shall be implemented by an individual with a
demonstrated level of professional competence, such as a professional
engineer licensed to practice in the State of Rhode Island.
8.7 Minimum Standard 1: Low Impact
Development (LID) Site Planning and Design Strategies
A. LID site planning and
design strategies must be used to the maximum extent practicable in
order to reduce the generation of the water runoff volume for both
new and redevelopment projects.
B. Applicants need to document
that the full list of approved LID methods and/or procedures were
explored at the site and need to supply a specific rationale in the
event LID strategies are rejected as infeasible. The site planning
process must be documented and include how the proposed project will
meet the following measures and/or methods to:
1. Protect as much undisturbed
open space as possible to maintain pre-development hydrology and
allow precipitation to naturally infiltrate into the ground;
2. Maximize the protection of
natural drainage areas, streams, surface waters, wetlands, and other
regulated areas;
3. Minimize land disturbance,
including clearing and grading, and avoid areas susceptible to
erosion and sediment loss;
4. Minimize soil compaction
and restore soils compacted as a result of construction activities or
prior development;
5. Provide low-maintenance,
native vegetation that encourages retention and minimizes the use of
lawns, fertilizers, and pesticides;
6. Minimize impervious
surfaces;
7. Minimize the decrease in
the "time of concentration" from pre-construction to post
construction, where "time of concentration" means the time
it takes for runoff to travel from the hydraulically most distant
point of the drainage area to the point of interest within a
watershed;
8. Infiltrate precipitation as
close as possible to the point it reaches the ground using vegetated
conveyance and treatment systems;
9. Break up or disconnect the
flow of runoff over impervious surfaces; and
10. Provide source controls to
prevent or minimize the use or exposure of pollutants into stormwater
runoff at the site in order to prevent or minimize the release of
those pollutants into stormwater runoff.
8.8 Minimum Standard 2:
Groundwater Recharge
A. Stormwater must be
recharged within the same subwatershed to maintain baseflow at
pre-development recharge levels to the maximum extent practicable in
accordance with the requirements described in §§ 8.8(D)
through (H) of this Part. Applicants may be required to provide a
water budget analysis for proposed groundwater dewatering. Recharge
volume is determined as a function of annual pre-development recharge
for site-specific soils or surficial materials, average annual
rainfall volume, and amount of impervious cover on a site. Recharge
must occur in a manner that protects groundwater quality.
B. Stormwater runoff from a
LUHPPL is not allowed to infiltrate into groundwater. The stormwater
recharge requirement may be specifically waived if an applicant can
demonstrate a physical limitation that would make implementation
impracticable or where unusual geological or soil features may exist
such as significant clay deposits or ledge, where recharge does not
currently occur; fill soils; or areas of documented slope failure.
C. Maintaining pre-development
groundwater recharge conditions may also be used to reduce the volume
requirements dictated by other sizing criteria (water quality,
channel protection, and overbank flood control) and the overall size
and cost of stormwater treatment practices.
D. The recharge criterion
(Rev) requires that the following volume of stormwater be recharged
based on the amount of impervious area. The groundwater recharge
requirement may be waived or reduced by applying the LID Stormwater
Credit outlined in § 8.18 of this Part. Recharge requirements
are based on hydrologic soil group (HSG) as follows:
Rev
= (1 inch) (F) (I)/12
Where:
Rev
= groundwater recharge volume (acre feet)
F
= recharge factor, see table below in § 8.8(F) of this
Part
I
= impervious area (acres)
E. Recharge Factors Based on
Hydrologic Soil Group (HSG)
HSG
Recharge
Factor (F)
A
0.60
B
0.35
C
0.25
D
0.10
F. The recharge volume is
considered as part of the total water quality volume that must be
provided at a site and must be achieved by disconnection of
impervious areas (see § 8.18 of this Part), a structural
practice that infiltrates stormwater into the underlying soils or
substratum, or a combination of the two.
G. Roof runoff may be
infiltrated without pretreatment unless the roof is deemed to have a
higher potential pollution load pursuant to § 8.14(C) of this
Part. Recharged roof runoff can be subtracted from WQv but not from
larger storm calculations, unless applicant verifies that the
drywells are sized for the 100-year, 24-hour Type III storm event.
8.9 Minimum Standard 3: Water
Quality
A. Stormwater runoff must be
treated before discharge. The amount that must be treated from each
rainfall event is known as the required water quality volume (WQv).
The required WQv is calculated as described in §§ 8.9(E)
through (J) of this Part and excludes LID credits allowed under §
8.18 of this Part.
B. The WQv must be treated by
at least one of the structural BMPs listed in §§ 8.19
through 8.25 of this Part at each location where a discharge of
stormwater will occur. Structural BMPs are generally required to
achieve the following minimum average pollutant removal efficiencies:
85% removal of total suspended solids, 60% removal of pathogens, 30%
removal of total phosphorus for discharges to freshwater systems, and
30% removal of total nitrogen for discharges to saltwater or tidal
systems. Based upon results published in the scientific literature,
the structural BMPs listed in §§ 8.19 through 8.25 of this
Part will meet these standards when properly designed, constructed,
and maintained. Pretreatment is required for water quality treatment
practices where specified in §§ 8.19 through 8.25 of this
Part.
C. BMPs targeted to remove
other pollutant(s) of concern and/or to achieve higher pollutant
removal efficiencies may be required for impaired receiving waters,
drinking water reservoirs, bathing beaches, shellfishing grounds,
Outstanding National Resource Waters, Special Resource Protection
Waters, tributaries thereto, and for those areas where watershed
plans, including Special Area Management Plans or Total Maximum Daily
Loads, have been completed. In some cases, the permitting agencies
may require that an applicant prepare and submit a pollutant loading
analysis developed in accordance with the provisions of §§
8.36 through 8.38 of this Part.
D. Applicants or other
interested parties may petition DEM and CRMC to add one or more BMPs
to the list of acceptable structural stormwater controls described in
§§ 8.19 through 8.25 of this Part by submitting monitoring
results and supporting information developed in accordance with the
provisions of the Technology Assessment Protocol in §§ 8.39
and 8.40 of this Part.
E. The required WQv, which
results in the capture and treatment of the entire runoff volume for
90% of the average annual storm events, is equivalent to the runoff
associated with the first 1.2 inches of rainfall over the impervious
surface (i.e., 1 inch of runoff). The water quality volume
requirement may be waived or reduced by applying the LID Stormwater
Credit outlined in § 8.18 of this Part. The WQv is calculated
using the following equation:
WQv
= (1”) (I) / 12
Where:
WQv
= water quality volume (in acre-feet)
I
= impervious area (acres)
F. A minimum WQv value of 0.2
watershed inches (0.2 inches over the entire disturbed area) is
required, which requires the calculation of the total site
disturbance. This minimum treatment volume is necessary to fully
treat the runoff from pervious surfaces on sites with low impervious
cover, i.e., less than 20% of the disturbed area. However, this
requirement does not imply that every pervious subarea of disturbance
must be treated with a structural water quality BMP.
G. For facility sizing
criteria, the basis for hydrologic and hydraulic evaluation of
development sites should be as follows:
1. Impervious cover is
measured from the site plan and includes all impermeable surfaces;
and
2. Off-site areas shall be
assessed based on their “pre-development condition” for
computing the water quality volume (i.e., treatment of only on-site
areas is required). However, if an off-site area drains to a proposed
BMP, flow from that area must be accounted for in the sizing of a
specific practice.
H. Acceptable water quality
treatment BMPs are described in detail in §§ 8.19 through
8.25 of this Part. Other practices may be used to meet other
criteria, such as recharge or flood control, but only the practices
§§ 8.19 through 8.25 of this Part may be used to meet the
water quality criterion. In addition, disconnection of impervious
areas (see § 8.18 of this Part) may be used to meet some or all
of the WQv, including the minimum WQv.
I. Although most of the
stormwater treatment practices in this Rule are sized based on WQv,
flow diversion structures for off-line stormwater treatment practices
must be designed to bypass flows greater than the WQf. The WQf shall
be calculated using the WQv described above and a modified curve
number (CN) for small storm events.
1. The following equation
shall be used to calculate a modified CN. This modified CN can then
be used in a traditional TR-55 model, incorporated above at §
8.4(A) of this Part, or spreadsheet in order to estimate peak
discharges for small storm events. Using the water quality volume, a
corresponding CN is computed utilizing the following equation:
CN
= 1000 / [10 + 5P +10Q - 10(Q² + 1.25 QP) ½ ]
Where:
P
= rainfall, in inches (use 1.2 inches for the Water Quality Storm
that produces 1 inch of runoff)
Q
= runoff volume, in watershed inches (equal to WQv
total drainage area)
2. When using a
hydraulic/hydrologic model for facility sizing and WQf determination,
designers must use this adjusted CN for the drainage area to generate
runoff equal to the WQv for the 1.2-inch precipitation event.
3. Designers can also use a
TR-55 model, incorporated above at § 8.4(A) of this Part,
spreadsheet to find the WQf. Using the computed CN from the equation
above, the time of concentration (tc), and drainage area (A); the WQf
for the water quality storm event can be computed with the following
steps:
a. Read initial abstraction
(Ia) from TR-55, incorporated above at § 8.4(A) of this Part,
Table 4.1 or calculate using Ia = 200/CN – 2
b. Compute Ia/P (P = 1.2
inches)
c. Approximate the unit peak
discharge (qu) from TR-55, incorporated above at § 8.4(A) of
this Part, Exhibit 4-III using tc and Ia/P
d. Compute the peak discharge
(WQf) using the following equation:
WQf
= qu * A * Q
Where:
WQf
= the peak discharge for water quality event, in cubic feet per
second
qu
= the unit peak discharge, in cubic feet per second/square
mile/inch
A
= drainage area, in square miles
Q
= runoff volume, in watershed inches (equal to WQv
A)
8.10 Minimum Standard 4:
Conveyance and Natural Channel Protection
A. Open drainage and pipe
conveyance systems must be designed to provide adequate passage for
flows leading to, from, and through stormwater management facilities
for at least the peak flow from the 10-year, 24-hour Type III design
storm event. Protection for natural channels downstream must be
supplied by providing 24-hour extended detention of the 1-year,
24-hour Type III design storm event runoff volume.
B. The channel protection
volume (CPv) is the 24-hour extended detention of the
post-development runoff volume from the 1-year, 24-hour Type III
design storm event. If a stormwater discharge is proposed within 200
feet of streams and any contiguous natural or vegetated wetlands in
watersheds draining to cold-water fisheries, surface detention
practices are prohibited (underground detention or infiltration
practices will be required). Consult DEM’s Water Quality
Regulations to determine if a project is in a watershed directly
draining to a cold-water fishery. Discharges beyond 200 feet shall
be designed to discharge up to the CPv through an underdrained gravel
trench outlet.
C. For facility sizing
criteria, the basis for hydrologic and hydraulic evaluation of
development sites are as follows:
1. The models TR-55,
incorporated above at § 8.4(A) of this Part, or TR-20,
incorporated above at § 8.4(B) of this Part, (or approved
equivalent) shall be used for determining the CPv.
2. The Rational Method may be
used for sizing the conveyance system.
3. Off-site areas draining to
proposed facility shall be modeled as “present condition”
for the 1-year storm event.
4. The length of sheet flow
used in time of concentration (tc) calculations is limited to no more
than 100 feet for post-development conditions.
5. The required minimum CPv
shall be computed using either §§ 8.10(C)(5)(a) or (b) of
this Part below:
a. A modified version of the
TR-55, incorporated above at § 8.4(A) of this Part, short-cut
sizing approach.
(1) This modification
(Harrington, 1987. Design Procedures for Stormwater Management
Extended Detention Structures. Maryland Department of Environment,
Dundalk, MD) is for applications where the peak discharge is very
small compared with the uncontrolled discharge. This often occurs in
the 1-year, 24-hour Type III detention sizing. Using TR-55,
incorporated above at § 8.4(A) of this Part, the unit peak
discharge (qu) can be determined based on the curve number and time
of concentration. Knowing qu and T (extended detention time), qo/qI
(peak outflow discharge/peak inflow discharge) can be estimated from
Figure in § 8.10(C)(5)(a)((2)) of this Part. Figure in §
8.10(C)(5)(a)((3)) of this Part can also be used to estimate Vs/Vr.
When qo/qI is <0.1 and off the graph, Vs/Vr can also be calculated
using the following equation for Type II/III rainfall distributions:
Vs/Vr
= 0.682 – 1.43 (qo/qI) + 1.64 (qo/qI)2 – 0.804
(qo/qI)3
Where:
Vs
= required storage volume (acre-feet)
Vr
= runoff volume (acre-feet)
qo
= peak outflow discharge (cubic feet per second)
qI
= peak inflow discharge (cubic feet per second)
(2) Detention Time vs.
Discharge Ratios. (Maryland Stormwater Design Manual. Maryland
Department of the Environment (MDE) 2000)
(3) Approximate Detention
Basin Routing For Rainfall Types I, IA, II, and III. (TR-55,
incorporated above at § 8.4(A) of this Part)
b. By calculating 65% of the
direct runoff volume from the post-development 1-year, 24-hour Type
III storm based on one of the approved models listed above, using the
following equation:
Vs
= 0.65 * Vr
Where:
Vs
= CPv = required channel protection storage volume; and
Vr
= runoff volume from 1-year, 24-hour Type III storm.
6. The CPv shall be released
at roughly a uniform rate over a 24-hour duration. To determine the
average release rate, use the following equation:
Average
release rate = Vr / T
Where:
Vr
= defined above; and
T
= extended detention time (24 hours)
D. The CPv criterion can be
waived for sites that:
1. Direct discharge to a large
river (4th-order stream or larger), bodies of water > 50 acres in
surface area, or tidal waters.
2. Small facilities with
impervious cover less than or equal to 1 acre.
3. Projects when the
post-development peak discharge from the facility without attenuation
is less than 2 cubic feet per second for the 1-year, 24-hour Type III
design storm event.
8.11 Minimum Standard 5: Overbank
Flood Protection (Qp)
A. Downstream overbank flood
protection must be provided by attenuating the post-development peak
discharge rate to the pre-development levels for the 10-year and
100-year, 24-hour Type III design storm events. In addition,
designers must demonstrate that runoff from the site for storms up to
the 100-year, 24-hour Type III design storm events actually reach
proposed structural practices designed to meet this criterion.
B. Peak flow attenuation is
required for the 10-year and 100-year, 24-hour Type III design storm
events.
C. For facility sizing
criteria, the basis for hydrologic and hydraulic evaluation of
development sites are as follows:
1. The models TR-55,
incorporated above at § 8.4(A) of this Part, and TR-20,
incorporated above at § 8.4(B) of this Part, (or approved
equivalent) will be used for determining the required storage and
outlet structures for attenuating the peak flows from the 10-year and
100-year, 24-hour Type III design storms.
2. The standard for
characterizing pre-development land use for on-site areas shall be
woods, meadow, or rangeland. For agricultural land, use a CN
representing rangeland.
3. For purposes of computing
runoff, all pervious lands prior to development shall be assumed to
be in good condition regardless of conditions existing at the time of
computation.
4. If an off-site area drains
to a facility, an applicant must also demonstrate safe passage of the
100-year event, based on actual conditions upstream.
5. The length of sheet flow
used in tc calculations is limited to no more than 150 feet for
pre-development conditions and 100 feet for post-development
conditions.
6. An applicant must
demonstrate that flows from the 100-year event will be safely
conveyed to a practice designed to manage the 100-year event.
D. The Overbank Flood
Protection criterion can be waived for sites that:
1. Direct discharge to a large
river (4th-order stream or larger), bodies of water > 50.0 acres
in surface area, or tidal waters.
2. A downstream analysis
indicates that peak discharge control would not be beneficial or
would exacerbate peak flows in a downstream tributary of a particular
site (i.e., through coincident peaks).
E. A downstream analysis is
required for projects meeting the project size and impervious cover
characteristics in the table in § 8.11(E)(1) of this Part, or
when deemed appropriate by the approving agency when existing
conditions are already causing a problem, to determine whether peak
flow impacts are fully attenuated by controlling the 10- and 100-year
events. The criterion used for the limit of the downstream analysis
is referred to as the “10% rule.” Under the 10% rule, a
hydrologic and hydraulic analysis is extended downstream to the point
where the site represents 10% of the total drainage area.
1. Table 3-5. Projects for
Which a Downstream Analysis Is Required
Area
of Disturbance Within the Subwatershed (acres)
Impervious
Cover (%)
(I
/ disturbed area contributing to discharge locations)
>5
to10
>75
>10
to 25
>50
>25
to 50
>25
>50
all
projects
2. If flow rates and
velocities (for Qp) with the proposed detention facility increase by
less than 5% from the pre-developed condition, and no existing
structures are impacted, then no additional analysis is necessary. If
the flow rates and velocities increase by more than 5%, then the
designer must redesign the detention structure, evaluate the effects
of no detention structure, or propose corrective actions to the
impacted downstream areas. Additional investigations may be required
by the approving agency on a case-by-case basis depending on the
magnitude of the project, the sensitivity of the receiving water
resource, or other issues such as past drainage or flooding
complaints.
3. Stormwater designers must
be able to demonstrate that runoff will not cause downstream flooding
within the stream reach to the location of the 10% rule. The absence
of on-site detention shall not be perceived to waive or eliminate
groundwater recharge (Rev), water quality control (WQv), or stream
channel protection requirements (CPv).
4. A typical downstream
analysis will require a hydrologic investigation of the disturbed
area draining to a proposed detention facility and of the
contributory watershed to the location of the 10% rule for the 10-
and 100-year, 24-hour Type III storms. The approving agency may also
request analysis of the 1-year, 24-hour Type III storm on a
case-by-case basis. A hydraulic analysis of the stream channel below
the facility to the location of the 10% rule will also be necessary.
Depending on the magnitude of the impact and the specific conditions
of the analysis, additional information and data may be necessary
such as collecting field run topography, establishing building
elevations and culvert sizes or investigating specific drainage
concerns or complaints.
8.12 Minimum Standard 6:
Redevelopment and Infill Projects
A. Redevelopment does not
apply to projects or portions of projects when the total existing
impervious area disturbed is less than 10,000 square feet. However,
specific regulatory programs may impose additional requirements. Any
creation of new impervious area over portions of the site that are
currently pervious is required to comply fully with the requirements
of this Part. In no case on a redevelopment project shall the levels
of stormwater treatment and recharge be less than the levels prior to
initiation of the proposed project.
1. The permitting authority
may take into consideration prior projects or multi-phase projects in
determining if the redevelopment threshold has been met.
2. Building demolition is
included as an activity defined as redevelopment, but building
renovation is not.
3. Removal of roadway
materials down to the erodible soil surface is an activity defined as
redevelopment, but simply resurfacing of a roadway surface is not.
4. Pavement excavation and
patching that is incidental to the primary project purpose, such as
replacement of a collapsed storm drain, is not classified as
redevelopment.
B. Redevelopment Stormwater
Requirements: In order to determine the stormwater requirements for
redevelopment projects, the percentage of the site covered by
existing impervious areas must be calculated.
1. For sites with less than
40% existing impervious surface coverage, the stormwater management
requirements for redevelopment will be the same as for new
development. The applicant, however, can meet those requirements
either on-site or at an approved off-site location within the same
watershed provided the applicant satisfactorily demonstrates that
impervious area reduction, LID strategies, and/or structural BMPs
have been implemented on-site to the maximum extent practicable. An
approved off-site location must be identified, the specific
management measures identified, and an implementation schedule
developed in accordance with local review and with DEM/CRMC
concurrence, as appropriate. The applicant must also demonstrate that
there are no downstream drainage or flooding impacts as a result of
not providing on-site management.
2. For redevelopment sites
with 40% or more existing impervious surface coverage, only Standards
2, 3, and 7-11 (§§ 8.8, 8.9 and 8.13 through 8.17 of this
Part) must be addressed. However, the approving agency may require
peak flow control on a case-by-case basis within a watershed with a
history of flooding problems. Recharge and stormwater quality shall
be managed for in accordance with one or more of the following
techniques:
a. Reduce existing impervious
area by at least 50% of the redevelopment area;
b. Implement other LID
techniques to the maximum extent practicable to provide recharge and
water quality management for at least 50% of the redevelopment area;
c. Use on-site structural BMPs
to provide recharge and water quality management for at least 50% of
redevelopment area;
d. Any combination of
impervious area reduction, other LID techniques, or on-site
structural BMPs for at least 50% of redevelopment area; or
e. If none of the above
options are practical in terms of water quality management,
alternatives may be proposed that would achieve an equivalent
pollutant reduction by using a combination of other types of BMPs and
strategies, including treating 100% of the redevelopment area by BMPs
with a lesser pollutant removal efficiency than stipulated in §
8.9 of this Part (Standard 3: Water Quality).
3. Off-site structural BMPs to
provide recharge and water quality management for an area equal to or
greater than 50% of redevelopment areas may be used to meet these
requirements provided that the applicant satisfactorily demonstrates
that impervious area reduction, LID strategies, and/or on-site
structural BMPs have been implemented to the maximum extent
practicable. An approved off-site location must be identified, the
specific management measures identified, and an implementation
schedule developed in accordance with local review and with DEM/CRMC
concurrence, as appropriate. The applicant must also demonstrate that
there are no downstream drainage or flooding impacts as a result of
not providing on-site management for large storm events.
C. Infill Project Stormwater
Management Requirements: For infill sites, the stormwater management
requirements will be the same as for new development except that
existing impervious area may be excluded from the stormwater
management plan (unless subject to local approval or necessary for
mitigation by regulation) and only Standards 2, 3, and 7-11 (§§
8.8, 8.9 and 8.13 through 8.17 of this Part) need be applied. The
applicant, however, can meet the recharge and water quality
requirements either on-site or at an approved off-site location
within the same watershed, provided the applicant satisfactorily
demonstrates that impervious area reduction, LID strategies, and/or
structural BMPs have been implemented on-site to the maximum extent
practicable. An approved off-site location must be identified, the
specific management measures identified, and an implementation
schedule developed in accordance with local review and with DEM/CRMC
concurrence, as appropriate. The applicant must also demonstrate that
there are no downstream drainage or flooding impacts as a result of
not providing on-site management.
8.13 Minimum Standard 7: Pollution
Prevention
All development sites require
the use of source control and pollution prevention measures to
minimize the impact that the land use may have on stormwater runoff
quality. These measures shall be outlined in a stormwater pollution
prevention plan.
8.14 Minimum Standard 8: Land Uses
with Higher Potential Pollutant Loads
A. Stormwater discharges from
land uses with higher potential pollutant loads (LUHPPLs) require the
use of specific source control and pollution prevention measures and
the specific stormwater BMPs approved for such use. Allowable BMPs
for LUHPPLs are included in the Table in § 8.14(D) of this Part.
Many LUHPPLs require additional special permits such as a RIPDES
Multi-Sector General Permit, and sector-specific required BMPs are
included in Section VI of the Multi-Sector General Permit.
B. Stormwater runoff from a
LUHPPL shall not be recharged to groundwater, unless it has been
adequately treated for the pollutant of concern as determined by the
approving agency. The recharge prohibition at LUHPPLs applies only to
stormwater discharges that come into contact with the area or
activity on the site that may generate the higher potential pollutant
load. In addition, infiltration practices should not be used where
subsurface contamination is present from prior land use due to the
increased threat of pollutant migration associated with increased
hydraulic loading from infiltration systems, unless the contamination
is removed and the site has been remediated, or if approved by DEM.
C. The following land uses and
activities are considered stormwater LUHPPLs:
1. Areas within an industrial
site (as defined in §
1.4(A)(111) of this Subchapter ) that are the location of
activities subject to the RIPDES Multi-Sector General Permit (except
where a No Exposure Certification for Exclusion from RIPDES
Stormwater Permitting has been executed);
2. Auto fueling facilities;
3. Exterior vehicle service,
maintenance and equipment cleaning areas;
4. Road salt storage and
loading areas (if exposed to rainfall);
5. Outdoor storage and
loading/unloading of hazardous substances; and
6. Disposal sites as defined
in § 8.5 of this Part.
8.15 Minimum Standard 9: Illicit
Discharges
All illicit discharges to
stormwater management systems are prohibited, including discharges
from OWTS, and sub-drains and French drains near OWTSs that do not
meet the State’s Rules Establishing Minimum Standards Relating
to Location, Design, Construction and Maintenance of Onsite
Wastewater Treatment Systems.
8.16 Minimum Standard 10:
Construction Activity Soil Erosion, Runoff, Sedimentation, and
Pollution Prevention Control Measure Requirements
A. Soil Erosion and
sedimentation control measures must be utilized during the
construction phase as well as during any land disturbing activities.
B. All soil erosion, runoff,
sedimentation, and construction activity pollution prevention control
measures must be designed and implemented in accordance with the SESC
Plan requirements outlined in the Performance Criteria in §
8.16(D) of this Part. The Rhode Island Soil Erosion and Sediment
Control Handbook provides the recommended and primary means to
achieve the performance criteria. The component of the Stormwater
Management Plan that addresses this standard is referred to as a SESC
Plan.
C. For all land disturbance
activities that require a permit from the RI DEM or the CRMC, a
qualified SESC Plan preparer shall be a Rhode Island Registered
Professional Engineer, a Certified Professional in Erosion and
Sediment Control, a Certified Professional in Storm Water Quality, or
a Rhode Island Registered Landscape Architect who certifies that the
SESC Plan meets the Performance Criteria in § 8.16(D) of this
Part. The Preparer shall have the specific credentials and
experience needed to select the appropriate practices for the
application. If the project involves significant land grading
or requires an engineered site design, then the SESC Plan must be
prepared by a Professional Engineer licensed in the State of RI.
D. SESC measures must be
utilized during the construction phase as well as during any land
disturbing activities. Owners and operators must design, install, and
maintain effective soil erosion, runoff, and sediment controls. SESC
plans must document how the proposed activities are consistent with
the following Performance Criteria:
1. Avoid and Protect Sensitive
Areas and Natural Features: Areas of existing and remaining
vegetation and areas that are to be protected during construction
must be clearly marked on the plans. Throughout planning, design, and
construction the Applicant must demonstrate that the activities are
consistent with § 8.7 of this Part (Minimum Standard 1, Low
Impact Development Site Planning and Design Strategies).
2. Minimize Area of
Disturbance:
a. Limits of Disturbance (LOD)
shall be clearly marked on all SESC plans. The SESC Plan must
identify how the Applicant has minimized the area of disturbance by
locating sites in less sensitive areas in accordance with § 8.7
of this Part (Minimum Standard 1, Low Impact Development Site
Planning and Design Strategies).
b. Construction activity shall
be phased to minimize the amount of area that is being actively
disturbed. Activities disturbing greater than five acres must include
phasing in combination with other controls.
c. Adequate temporary controls
must be installed on previous phases prior to initiating the land
disturbance in subsequent phases until final site stabilization is
achieved and post-construction control measures are brought on-line.
3. Minimize the Disturbance of
Steep Slopes: Construction activities should be avoided on steep
slopes to the Maximum Extent Practicable to comply with § 8.7 of
this Part.
4. Preserve Topsoil: Site
owners and operators must preserve existing topsoil on the
construction site to the maximum extent feasible and as necessary to
support healthy vegetation. If it is determined that preserving
native topsoil is infeasible, the reasons why this was determined
must be addressed in the SESC Plan.
5. Stabilize Soils:
Stabilization of disturbed areas must, at a minimum, be initiated
immediately whenever any clearing, grading, excavating or other earth
disturbance activities have permanently ceased on any portion of the
site, or temporarily ceased on any portion of the site and will not
resume for a period exceeding 14 calendar days. Stabilization must be
completed using vegetative stabilization measures or using
alternative measures whenever vegetative measures are deemed
impracticable or during periods of drought. All disturbed soils
exposed prior to October 15th shall be seeded by that date. Any such
areas which do not have adequate vegetative stabilization by November
15th must be stabilized through the use of non-vegetative erosion
control measures. If work continues within any of these areas during
the period from October 15th through April 15th, care must be taken
to ensure that only the area required for that day’s work is
exposed, and all erodible soil must be restabilized within 5 working
days. In limited circumstances, stabilization may not be required if
the intended function of a specific area of the site necessitates
that it remain disturbed.
6. Protect Storm Drain Inlets:
If there is a stormwater discharge from the construction site to a
storm drain inlet under the project’s control, the site owner
and operator must install inlet protection measures that remove
sediment from discharge prior to entry into the storm drain inlet.
The operator must clean, or remove and replace, the protection
measures as sediment accumulates, the filter becomes clogged, and/or
performance is compromised. Accumulated sediment adjacent to the
inlet protection measures must be removed by the end of the same work
day in which it is found or by the end of the following work day if
removal by the same work day is not feasible.
7. Protect Storm Drain
Outlets: Outfall protection must be used to prevent scour and
erosion at discharge points through the protection of the soil
surface, reduction of discharge velocity, and the promotion of
infiltration.
8. Establish Temporary
Controls for the Protection of Post-Construction Stormwater Control
Measures: Temporary measures shall be installed to protect permanent
or long-term stormwater control and treatment measures as they are
installed and throughout the construction phase of the project so
that they will function properly when they are brought online. The
plan shall identify areas where infiltration measures are proposed
and provide measures to restrict construction activity to prevent
compaction of the area. In cases where this is not possible to avoid
the area the Plan must include methods to restore the infiltration
capacity of the soils.
9. Establish Sediment
Barriers: Sediment control measures must be installed along the
perimeter areas of the site that will receive stormwater from earth
disturbing activities. The Rhode Island Soil Erosion and Sediment
Control Handbook provided the recommended and primary means to
achieve this performance criteria.
10. Divert or Manage Run-on
from Up-gradient Areas: Structural control measures must be used to
limit stormwater flow from coming onto the project area, and to
divert and slow on-site stormwater flow from exposed soils to limit
erosion, runoff, and the discharge of pollutants from the site.
11. Properly Design
Constructed Stormwater Conveyance Channels: Temporary conveyance
practices must be sized to handle the peak flow from the 10-year,
24-hour Type III design storm. Temporary conveyance measures may be
required to be sized to handle the peak flow from larger design
storms as determined on a case-by-case basis.
12. Retain Sediment On-Site
a. The SESC Plan shall contain
a combination of practices that control erosion, control run-off, and
control sediment. The combination of practices must be designed to
prevent discharges of sediment. All plans shall include inlet
protection, construction entrances, and containment of stockpiled
materials.
b. For Disturbed Areas <1
Acre: Those areas with a common drainage location that serves an area
with less than 1 acre disturbed at one time, a combination of
phasing, stabilization and conveyances that provide run-off control
will be sufficient.
c. For Disturbed Areas 1 to 5
Acres: Those areas with a common drainage location that serves an
area between 1 and 5 acres disturbed at one time, a temporary
sediment trap must be provided where attainable and where the
sediment trap is only intended to be used for a period of 6 months or
less. For longer term projects with a common drainage location that
serves between 1 and 5 acres disturbed at one time, a temporary
sediment basin must be provided where attainable. Temporary sediment
trapping practices must be sized to have a total storage volume
capable of storing 1 inch of runoff from the contributing area or 134
cubic yards per acre of drainage area. A minimum of 50% of the total
volume shall be storage below the outlet (wet storage). The Rhode
Island Soil Erosion and Sediment Control Handbook provides the
recommended and primary means to achieve this performance criteria.
d. For Disturbed Areas > 5
Acres: Those areas with a common drainage location that serves an
area with greater than 5 acres disturbed at one time, a temporary (or
permanent) sediment basin must be provided where attainable until
final stabilization of the site is complete. The Rhode Island Soil
Erosion and Sediment Control Handbook provides the recommended and
primary means to achieve this performance criteria. The volume of wet
storage shall be at least twice the sediment storage volume and shall
have a minimum depth of 2 feet. Sediment storage volume must
accommodate a minimum of 1 year of predicted sediment load. See the
sediment volume formula in the Rhode Island Soil Erosion and Sediment
Control Handbook as the recommended and primary means to achieve this
performance criteria. In addition to sediment storage volume and wet
storage volume, the sediment basin shall provide adequate residence
storage volume to provide a minimum 10 hours residence time for a 10
-year frequency, 24 hour duration, Type III distribution storm. To
the maximum extent practicable, outlet structures must be utilized
that withdraw water from the surface of temporary sedimentation
basins, if required or specified by the designer, for the purpose of
minimizing the discharge of pollutants. Exceptions may include
periods of extended cold weather, where alternative outlets are
required during frozen periods. If such a device is infeasible for
portions of or the entire construction period justification must be
made in the SESC Plan.
13. Control Temporary
Increases in Stormwater Velocity, Volume, and Peak Flows:
a. The Plan must identify all
discharge points and propose a combination of practices to ensure
control of both peak flow rates and total runoff volume to minimize
flooding, channel erosion, and stream bank erosion in the immediate
vicinity of discharge points. The plan must identify if discharge
points from the site discharge directly to a surface water or to an
off-site conveyance. The designer must ensure that the proposed
combination of practices are adequate to protect the receiving waters
and downstream conveyances from the excessive velocities that would
cause scouring or channel erosion.
b. In most cases, the
combination of practices that control erosion, control run-off, and
control sediment used to retain sediment on-site will be adequate to
control temporary increases in volume and peak flows. However, the
designer must evaluate if conditions warrant the use of additional
retention/detention practices beyond those required to address §
8.16(D)(12) of this Part. The evaluation must include a description
of site conditions and proposed on-site controls and conveyances for
all discharge points. For those projects proposing a common drainage
location that serves an area with greater than 5 acres disturbed at
one time, the approving agency may require peak flow control on a
case-by-case basis.
14. Construction Activity
Pollution Prevention Control Measures: The SESC Plan must describe
the pollution prevention measures that will be implemented to control
pollutants in stormwater. The owner and operator must design,
install, implement, and maintain effective pollution prevention
measures to minimize the discharge of pollutants. The Rhode Island
Soil Erosion and Sediment Control Handbook provides the recommended
and primary means to achieve this performance criteria.
15. Control Measure
Installation, Inspections, Maintenance, and Corrective Actions:
a. The installation of
temporary erosion, runoff, sediment, and pollution prevention control
measures must be completed by the time each phase of
earth-disturbance has begun.
b. Construction sites must be
inspected by or under the supervision of the owner and operator at
least once every 7 calendar days and within 24 hours after any storm
event which generates at least 0.25 inches of rainfall per 24 hour
period and/or after a significant amount of runoff.
c. If an inspection reveals a
problem, the operator must initiate work to fix the problem
immediately after discovering the problem, and complete such work by
the close of the next work day, if the problem does not require
significant repair or replacement, or if the problem can be corrected
through routine maintenance.
d. When installation of a new
control or a significant repair is needed, site owners and operators
must ensure that the new or modified control measure is installed and
made operational by no later than 7 calendar days from the time of
discovery where feasible. If it is infeasible to complete the
installation or repair within 7 calendar days, the reasons why it is
infeasible must be documented in the SESC Plan along with the
schedule for installing the stormwater control measure(s) and making
it operational as soon as practicable after the 7-day timeframe.
e. If corrective actions are
required, the site owner and operator must ensure that all corrective
actions are documented on the inspection report in which the problem
was first discovered. Corrective actions shall be documented, signed,
and dated by the site operator once all necessary repairs have been
completed.
8.17 Minimum Standard 11:
Stormwater Management System Operation and Maintenance
A. The stormwater management
system, including all structural stormwater controls and conveyances,
must have an Operation and Maintenance Plan to ensure that it
continues to function as designed. The Operation and Maintenance Plan
shall identify measures for implementing maintenance activities in a
manner that minimizes stormwater runoff impacts.
B. The long-term Operation and
Maintenance Plan shall at a minimum include:
1. Stormwater management
system(s) owners;
2. The party or parties
responsible for operation and maintenance, including how future
property owners will be notified of the presence of the stormwater
management system and the requirement for proper operation and
maintenance;
3. The routine and non-routine
maintenance tasks for each BMP to be undertaken after construction is
complete and a schedule for implementing those tasks;
4. A plan that is drawn to
scale and shows the location of all stormwater BMPs in each treatment
train along with the discharge point;
5. A description and
delineation of public safety features;
6. An estimated operation and
maintenance budget; and
7. Funding source for
operation and maintenance activities and equipment.
8.18 LID Stormwater Credit:
Rooftop, Roadway, Driveway or Parking Lot Runoff Directed to
Qualifying Pervious Areas (QPAs)
A. The LID Stormwater Credit
using QPAs may be used to reduce the required Recharge Volume and
Water Quality Volume, provided that any pervious surfaces used to
treat and infiltrate stormwater runoff meet the requirements set
forth herein. The application of the Credit does not relieve the
design engineer or reviewer from meeting the remaining minimum
standards described in §§ 8.6 through 8.17 of this Part or
the standard of engineering practice associated with safe conveyance
of stormwater runoff and good drainage design.
B. Stormwater Credit shall not
be applied:
1. At sites where stormwater
runoff is directed to non-permeable soils, such as bedrock and soils
classified as Hydrologic Soil Group D;
2. At sites with urban fill,
soils classified as contaminated, and soils with a seasonal high
groundwater elevation within 18 inches of the land surface.
C. QPAs are natural or
landscaped vegetated areas fully stabilized, with runoff
characteristics at or lower than the US Natural Resources
Conservation Service Curve Numbers in the table below in §
8.18(D) of this Part. All QPAs must be shown on site plans, must
have a minimum of 4 inches of topsoil or organic material, and must
be located outside of regulated wetland areas and regulated buffer to
a waterbody or wetland. In order for lawns to be considered as QPAs,
they must consist of low-maintenance grasses adapted to the New
England region.
D. Maximum US Natural
Resources Conservation Service Hydrologic Soil Group (HSG) Runoff
Curve Numbers for QPAs
Cover
Type
HSG
A
HSG
B
HSG
C
Natural:
Woods Good Condition
30
55
70
Natural:
Brush Good Condition
30
48
65
Landscaped:
Good Condition (grass cover > 75% or equivalent herbaceous
plants)
39
61
74
E. A LID Stormwater Credit is
available when rooftop, roadway, driveway, or parking lot runoff is
directed to a QPA where it can either infiltrate into the soil or
flow over it with sufficient time and reduced velocity to allow for
adequate filtering. QPAs are generally flat locations, where the
discharge is directed via sheet flow and not as a point source
discharge. The credit may be obtained by grading the site to induce
sheet flow over specially designed, gently sloped vegetated areas
that can treat and infiltrate the runoff. This credit is available
for impervious cover associated with all land uses, except for runoff
from that portion of a LUHPPL that may generate runoff with a higher
potential pollutant load.
F. If runoff from impervious
areas is adequately directed to a QPA, the area can be deducted from
total impervious area, therefore reducing the required Water Quality
Volume and the size of the structural BMPs used to meet the removal
requirement of § 8.9 of this Part (Standard 3). Redirected
runoff can also be used to meet the recharge requirement as a
non-structural practice.
G. The LID Stormwater Credit
is subject to the following restrictions:
1. To prevent compaction of
the soil in the QPA, construction vehicles must not be allowed to
drive over the area. If it becomes compacted, the soil must be
suitably amended, tilled, and re-vegetated once construction is
complete to restore infiltration capacity.
2. The QPA must be designed to
not cause basement seepage. To prevent basement seepage, at a
minimum, runoff must be directed away from the building foundation
and be infiltrated at least 10 feet away from the foundation.
3. The rooftop area
contributing runoff to any one downspout and/or the non-rooftop
impervious areas draining to any one discharge location cannot exceed
1,000 square feet.
4. The length of the QPA (in
feet) shall be equal to or greater than the contributing rooftop area
(in square feet) divided by 13.3 and the maximum contributing flow
path from non-rooftop impervious areas shall be 75 feet.
5. For non-rooftop runoff, the
length of the QPA must be equal to or greater than the length of the
contributing impervious area.
6. For roof runoff, the width
of the QPA (in feet) shall be equal to or greater than the roof
length.
7. For non-roof runoff, the
width of the QPA shall be no less than the width of the contributing
impervious surface.
8. Although they may abut,
there shall be no overlap between QPAs. They shall not be directed
to the same area.
9. The lot must be greater
than 6,000 square feet.
10. The slope of the QPA shall
be less than or equal to 5.0%.
11. Where provided, downspouts
must be at least 10 feet away from the nearest impervious surface to
prevent reconnection to the stormwater management system.
12. Where provided, downspouts
must have appropriate provisions to induce sheet flow.
13. Where a gutter/downspout
system is not used, the rooftop runoff must be designed to sheet flow
at low velocity away from the structure housing the roof.
14. A DEM-licensed Class IV
Soil Evaluator or RI-registered Professional Engineer shall confirm
that the depth to the seasonal high groundwater table is 18 inches or
greater. The soil evaluation must identify the soil texture, HSG
(from US Natural Resources Conservation Service soil maps), and depth
to the seasonal high groundwater table.
15. If a QPA is located in
less permeable soils (HSG “C”), the water table depth and
soil texture shall be evaluated by a DEM-licensed Class IV Soil
Evaluator or RI-registered Professional Engineer to determine if a
level spreading device is needed to sheet flow stormwater over
vegetated surfaces.
16. Runoff from driveways,
roadways, and parking lots may be directed over soft shoulders,
through curb cuts, or level spreaders to QPAs. Measures must be
employed at the discharge point to the QPA to prevent erosion and
promote sheet flow.
17. To take credit for rooftop
disconnection associated with a LUHPPL, the rooftop runoff must not
commingle with runoff from any paved surfaces or activities or areas
on the site that may generate higher pollutant loads.
18. The Operation and
Maintenance Plan required by § 8.17 of this Part (Minimum
Standard 11) must include measures to inspect the QPA at least yearly
to remove any deposited sediment.
19. The QPA must be owned or
controlled by the property owner.
20. In locations where there
is a history of groundwater seepage and/or basement flooding, the
credit shall not be utilized.
H. The impervious areas
contributing runoff to the QPA can be deducted from the impervious
surfaces used to calculate the WQv, and can meet the Rev requirement
if enough area is disconnected in accordance with the Percent Area
Method, described below.
1. The amount of impervious
area that needs to be disconnected to meet the recharge requirement
is referred to as the recharge area. It is equivalent to the
recharge volume but can be achieved by filtration of sheet flow over
a QPA. Recharge area is calculated according to the equation below:
Recharge
area = (F) (I)
Where:
Recharge
area = Required impervious area to be directed to a QPA (acres)
F
= Recharge factor based on HSG (dimensionless) § 8.8(F) of
this Part
I
= Impervious area (acres)
2. If only a portion of the
recharge area can be directed to a QPA due to site constraints, a
designer must use a structural BMP to recharge the difference. This
amount can be determined by the following approach:
a. Calculate both the Rev and
recharge area for the site;
b. The site impervious area
draining to a QPA is subtracted from the recharge area calculation
from Credit Step 1, above in § 8.18(H)(1) of this Part;
c. The remaining recharge area
is divided by the original recharge area to calculate a pro-rated
percentage that must be directed to structural infiltration BMPs; and
d. The pro-rated percentage is
multiplied by the original Rev to calculate a new Rev that must be
met by an approved structural practice(s).
8.19 Structural Stormwater
Treatment Practices for Meeting Water Quality -- Overview
A. §§ 8.20 through
8.25 of this Part provide the requirements for acceptable structural
BMPs that can be used to meet the water quality criteria in §
8.9 of this Part. Sediment volumes do not need to be calculated for
sizing of the BMPs in §§ 8.20 through 8.25 of this Part.
B. Minimum Design Criteria for
BMPs: If required design criteria for a particular BMP cannot be met
at a site, an alternative BMP must be selected, or adequate
justification must be provided to the approving agency why the
particular criteria is not practicable. Design requirements are
provided for the following 6 categories:
1. Feasibility: Identify site
considerations that may restrict the use of a practice.
2. Conveyance: Convey runoff
to the practice in a manner that is safe, minimizes erosion and
disruption to natural channels, and promotes filtering and
infiltration.
3. Pretreatment: Trap coarse
elements before they enter the facility, thus reducing the
maintenance burden and ensuring a long-lived practice.
4. Treatment/Geometry:
Provide the required water quality treatment through design elements
that provide the maximum pollutant removal.
5. Environmental/Vegetation:
Reduce secondary environmental impacts of facilities through features
that minimize disturbance of natural stream systems and comply with
environmental regulations. Provide vegetation that enhances the
pollutant removal and aesthetic value of the practice.
6. Maintenance: Maintain the
long-term performance of the practice through regular maintenance
activities, and through design elements that ease the maintenance
burden.
8.20 Wet Vegetated Treatment
Systems (WVTS)
A. Feasibility
1. WVTS designs shall not be
located within jurisdictional waters, including wetlands; except that
on already developed sites, WTVS designs may be allowed in
jurisdictional upland buffers in areas already altered under existing
conditions, if acceptable to the approving agency.
2. WVTS designs shall not be
located within stream channels in order to prevent habitat
degradation caused by these structures.
3. Assess the hazard
classification of the structure and consider alternative
placement and/or design refinements to reduce or eliminate the
potential for the structure being subject to the RI DEM Rules and
Regulations for Dam Safety, Part
130-05-1 of this Title .
4. The use of WVTS designs in
watersheds draining to cold-water fisheries is restricted to prohibit
discharges within 200 feet of streams and any contiguous natural or
vegetated wetlands. Discharges beyond 200 feet shall be designed to
discharge up to and including the CPv through an underdrained gravel
trench outlet. Additional storage for Qp may be discharged through
traditional outlet structures.
5. WVTS designs specified to
manage LUHPPL runoff require a 3-foot separation to groundwater. All
other land uses do not require groundwater separation.
6. The volume below the
surface elevation of the permanent pool shall not be included in
storage calculations for peak flow management (CPv/Qp).
7. Setbacks for WVTS designs
from OWTSs shall be consistent with the setbacks in DEM’s Rules
Establishing Minimum Standards Relating to Location, Design,
Construction and Maintenance of Onsite Wastewater Treatment Systems.
B. Conveyance
1. Flow paths from the inflow
points to the outflow points of WVTS shall be maximized through the
use of BMP geometry and features such as berms and islands.
2. The channel immediately
below a WVTS outfall shall be modified to prevent erosion and conform
to natural dimensions in the shortest possible distance, typically by
use of appropriately sized riprap placed over filter cloth.
3. A stilling basin or outlet
protection shall be used to reduce flow velocities from the principal
spillway to non-erosive velocities (3.5 to 5.0 feet per second).
4. A subsurface water level
must be maintained in the gravel WVTS through the design of the
outlet elevation (invert just below the surface). The outlet invert
location must be open or vented to prevent a siphon that would drain
the WVTS.
5. For discharges beyond 200
feet from streams (and any contiguous natural or vegetated wetlands)
in cold-water fisheries, the underdrained gravel trench shall be
designed to meet the following requirements:
a. Shall be sized to release
the CPv over at least 12 hours and not more than 24 hours to provide
adequate cooling of stormwater runoff discharging from the WVTS;
b. Shall be 4 feet wide,
located at least 2 feet from the WVTS permanent pool, and located at
the furthest location opposite from the principal inflow location to
the facility;
c. The trench shall have a
length of 3 feet per 1,000 cubic feet of CPv storage volume, have a
depth of at least 3 feet, and maintain 2 feet of gravel cover over a
6-inch diameter perforated pipe outlet (Rigid Schedule 40 PVC or
SDR35);
d. Shall utilize geotextile
fabric placed between the gravel trench and adjacent soil; and
e. Shall utilize clean
poorly-graded gravel (i.e., uniform stone size).
C. WVTS Liners: When a WVTS
is located in medium to coarse sands and above the average
groundwater table, a liner shall be used to sustain a permanent pool
of water. If geotechnical tests confirm the need for a liner (soils
with an infiltration rate of 0.05 inches/hour or greater), acceptable
options include:
1. 6 to 12 inches of clay soil
(minimum 15% passing the #200 sieve and a minimum permeability of 1 x
10-5 cm/sec);
2. A 30 mil poly-liner;
3. Bentonite; or
4. Use of chemical additives.
D. Pretreatment - Sediment
Forebay
1. Each WVTS shall have a
sediment forebay or equivalent upstream pretreatment. The forebay
shall consist of a separate cell.
2. The forebay shall be sized
to contain a minimum of 10% of the WQv, and shall be at least 3 feet
deep. The forebay storage volume counts toward the total WQv
requirement.
3. A forebay shall be provided
at each inlet, unless the inlet provides less than 10% of the total
design storm inflow to the WVTS.
4. The forebay shall be
designed with non-erosive outlet conditions.
5. Direct access for
appropriate maintenance equipment shall be provided to the forebay.
E. Minimum Water Quality
Volume (WQv)
1. The surface area of a
shallow WVTS shall be at least 1.5% of the contributing drainage
area; the gravel WVTS surface area shall be at least 0.35% of
contributing drainage area.
2. For a shallow WVTS: A
minimum of 35% of the total surface area shall have a depth of 6
inches or less, and at least 65% of the total surface area shall be
shallower than 18 inches. At least 10% of the WQv shall be provided
in a sediment forebay or other pretreatment practice, and at least
25% of the WQv shall be provided in “deep water zones”
with a depth equal to or greater than 4 feet. The remaining 65% of
the WQv shall be provided in some combination of shallow permanent
pool (depth less than 4 feet) and the ED storage volume above the
permanent pool, as applicable. ED storage volume shall not exceed
50% of the WQv and shall drain over 24 hours.
3. For a gravel WVTS: At
least 10% of the WQv shall be provided in a sediment forebay or other
pretreatment practice. The remaining 90% of the WQv shall be
provided in some combination of one or more basins or chambers filled
with a minimum 24-inch gravel layer and the open, ED storage volume
above the gravel, as applicable. ED storage volume shall not exceed
50% of the WQv and shall drain over 24 hours.
F. Minimum WVTS Geometry
1. Flow paths from the inflow
points to the outflow points of WVTS shall be maximized through the
use of BMP geometry and features such as berms and islands. The
minimum length to width ratio for a shallow WVTS is 2:1.
2. For a gravel WVTS: length
to width ratio of 1:1 or greater is needed for each treatment cell
with a minimum flow path within the gravel substrate of 15 feet.
G. Shallow WVTS Benches: The
perimeter of all deep pool areas (four feet or greater in depth)
shall be surrounded by two benches as follows:
1. Except when side slopes are
4:1 (h:v) or flatter, provide a safety bench that generally extends
15 feet outward (a 10 foot minimum bench is allowable on sites with
extreme space limitations at the discretion of the approving agency)
from the normal water edge to the toe of the WVTS side slope. The
maximum slope of the safety bench shall be 6%; and
2. Incorporate an aquatic
bench that generally extends up to 15 feet inward from the normal
edge of water, has an irregular configuration, and a maximum depth of
18 inches below the normal pool water surface elevation.
H. Planting Plan
1. A planting plan for a WVTS
and its setback shall be prepared to indicate how aquatic and
terrestrial areas will be stabilized and established with vegetation.
Minimum elements of a plan include: delineation of pondscaping
zones, selection of corresponding plant species, plant locations,
sequence for preparing WVTS bed (including soil amendments, if
needed), and sources of plant material. Donor plant material must not
be from natural wetlands.
2. Donor soils for WVTS mulch
shall not be removed from natural wetlands.
I. WVTS Setbacks
1. A WVTS setback shall be
provided that extends 25 feet outward from the maximum design water
surface elevation of the WVTS.
2. Woody vegetation shall not
be planted or allowed to grow on a dam, or within 15 feet of a
dam or toe of the embankment, or within 25 feet of a principal
spillway outlet.
J. Maintenance
1. Maintenance responsibility
for a WVTS and its setback shall be vested with a responsible
authority by means of a legally binding and enforceable maintenance
agreement that is executed as a condition of plan approval.
2. General inspections shall
be conducted on an annual basis and after storm events greater than
or equal to the 1-year, 24-hour Type III precipitation event.
3. The principal spillway
shall be equipped with a removable trash rack, and generally
accessible from dry land.
4. A maintenance and operation
plan must specify that sediment removal in the forebay shall occur
every 5 years or after 50% of total forebay capacity has been lost,
whichever occurs first.
5. An operation and
maintenance plan shall specify that if a minimum vegetative coverage
of 50% is not achieved in the planted areas after the second growing
season, a reinforcement planting is required.
6. Sediment and organic
build-up shall be removed from a gravel WVTS every 2 years, as
needed.
7. In a gravel WVTS, vertical
cleanouts must be constructed that are connected to the distribution
and collection subdrains at each end.
8. For discharges beyond 200
feet from streams (and any contiguous natural or vegetated wetlands)
in cold-water fisheries, the gravel trench outlet shall be inspected
after every storm in the first 3 months of operation to ensure proper
function. Thereafter, the trench shall be inspected at least once
annually. Inspection shall consist of verifying that the WVTS is
draining to the permanent pool elevation within the 24-hour design
requirement and that potentially clogging material, such as
accumulation of decaying leaves or debris, does not prevent the
discharge through the gravel. When clogging occurs, at least the top
8 inches of gravel shall be replaced over with new material.
Sediments shall be disposed of in an acceptable manner.
9. A maintenance right of way
or easement shall extend to a WVTS from a public or private road.
10. A low-flow orifice or weir
shall be provided when a WVTS is sized for the CPv. The low-flow
orifice or weir shall be designed to ensure that no clogging shall
occur.
11. The outlet control
structure shall be located within the embankment for maintenance
access, safety and aesthetics.
12. Except where local slopes
prohibit this design, each WVTS shall have a drain pipe that can
completely or partially drain the practice. The drain pipe shall have
an elbow or protected intake within the WVTS to prevent sediment
deposition, and a diameter capable of draining the permanent pool
within 24 hours.
13. Access to the drain pipe
shall be secured by a lockable structure to prevent vandalism and/or
accidental draining of the pond, which could pose a safety hazard due
to high drainage velocities.
K. Safety Features
1. Proposed graded side slopes
to the WVTS shall not exceed 3:1 (h:v), and shall terminate on the
safety bench.
2. The principal spillway
opening shall not permit access by small children, and endwalls above
pipe outfalls greater than 48 inches in diameter shall be fenced to
prevent a hazard.
3. Token or emergency
spillways (those placed above the water elevation of the largest
managed storm) are required if not already provided as part of the
conveyance of the 100-year storm event and must be a minimum 8 feet
wide, 1 foot deep, with 2:1 channel side slopes.
8.21 Stormwater Infiltration
Practices
A. Stormwater infiltration
practices in this section capture and temporarily store the WQv
before allowing it to infiltrate into the soil over a maximum period
of 48 hours. The requirements for stormwater infiltration practices
in this section apply to infiltration basins, infiltration trenches,
subsurface chambers and dry wells. This section does not apply to
those practices that infiltrate stormwater into the soil addressed in
§ 8.22 of this Part (Permeable Pavement), § 8.23 of this
Part (Filtering Systems), and § 8.25 of this Part (Open Channel
Systems).
B. Feasibility
1. Roof runoff from non-LUHPPL
sites can be infiltrated directly, without pretreatment, and counted
toward both Rev and WQv requirements.
2. In order to meet the water
quality standard, the bottom of infiltration practices must be
located in the soil profile. Where a TMDL or CRMC goal requires
maximum treatment of runoff, the bottom of infiltration practices
shall be within the uppermost soil horizons (A or B) or another BMP
is required.
3. To be suitable for
infiltration, underlying soils shall have an in-situ infiltration
rate of at least 0.5 inches per hour, as initially determined from US
Natural Resources Conservation Service soil textural classification,
and subsequently confirmed by field geotechnical tests in accordance
with § 8.21(E)(4)(b) of this Part. The minimum geotechnical
testing at the site of a proposed infiltration practice is 1 test
hole per 5,000 square feet, with a minimum of 1 boring or test pit
(taken within the proposed limits of the facility). However, for
residential rooftop runoff, testing requirements are reduced to 1
infiltration test and 1 test pit per 5 lots assuming consistent
terrain and within the same US Natural Resources Conservation Service
soil series. If terrain and soil series are not consistent, then
requirements increase to 1 infiltration test and 1 test hole per 1
lot.
4. Soils shall also have a
clay content of less than 20% and a silt content of less than 60%.
5. The bottom of infiltration
practices cannot be located in fill with the exception for strictly
residential land uses, for which the bottom of practices may be
located in up to 2 feet of fill consisting of material suitable for
long-term infiltration after placement. Practices for
non-residential sites that cannot be placed in natural soil may be
designed as filtering systems. Such cases shall meet the media
requirements of sand filters as described in § 8.23 of this
Part.
6. To protect groundwater from
possible contamination, runoff from designated LUHPPLs or activities
shall not be directed to an infiltration facility.
7. The bottom of the
infiltration facility shall be separated by at least 3 feet
vertically from the SHGT and the bedrock layer (when treating WQv),
as documented by on-site soil testing. The SHGT elevation in the
area of each infiltration facility must be verified by a DEM-licensed
Class IV Soil Evaluator or RI-registered Professional Engineer. The
distance may be reduced to 2 feet for strictly residential land uses,
excluding roadways.
8. Infiltration practices that
are designed for the 10-year storm event or greater and have a
separation from the bottom of the system to the seasonal high
groundwater of less than four feet shall provide a groundwater
mounding analysis.
a. The groundwater mounding
analysis must show that the groundwater mound that forms under the
infiltration system will not break out above the land or
jurisdictional water.
b. Infiltration practices
designed for residential rooftops ≤ 1,000 ft 2 are
exempt from this requirement.
9. Infiltration practices
cannot be placed in locations that cause water problems (such as
seepage which may cause slope failure) to downgrade properties.
10. Infiltration facilities
must meet the minimum horizontal setbacks in the table below:
Minimum
Horizontal Setbacks
From
small-scale facilities serving residential properties (feet)
From
all other infiltration facilities (feet)
Public
Drinking Water Supply Well – Drilled (rock), Driven, or Dug
200
200
Public
Drinking Water Supply Well – Gravel Packed, Gravel
Developed
400
400
Private
Drinking Water Wells
50
100
Surface
Water Drinking Water Supply Impoundment with Supply Intake1
100
200
Tributaries
that Discharge to the Surface Drinking Water Supply Impoundment1
50
100
Coastal
Features
50
50
All
Other Surface Waters
50
50
Up-gradient
from Natural slopes > %15
25
50
Down-gradient
from Building Structures2
10
25
Up-gradient
from Building Structures2
10
50
Onsite
Wastewater Treatment Systems
15
25
1
Refer to DEM Rules Establishing Minimum Standards Relating to
Location, Design, Construction and Maintenance of Onsite
Wastewater Treatment Systems, Figures 14-16 for maps of the
surface water drinking water impoundments.
2
Setbacks from building structures applies only where basement or
slab is below the ponding elevation of the infiltration facility.
C. Conveyance
1. Adequate stormwater
outfalls shall be provided for the overflow associated with the
1-year design storm event (non-erosive velocities on the down-slope).
2. The overland flow path of
surface runoff exceeding the capacity of the infiltration system
shall be evaluated to preclude erosive concentrated flow during the
overbank events. If computed flow velocities exiting the system
overbank exceed erosive velocities (3.5 to 5.0 feet/second) for the
1-year storm event, an overflow channel and/or level spreader shall
be provided.
3. All infiltration systems
shall be designed to fully de-water the entire WQv within 48 hours
after the storm event.
4. If runoff is delivered by a
storm drain pipe or along the main conveyance system, the
infiltration practice must be designed as an off-line practice,
except when used exclusively to manage CPv and Qp.
D. Pretreatment
1. For infiltration basins,
chambers, and trenches, a minimum pretreatment volume of at least 25%
of the WQv must be provided to protect the long-term integrity of the
infiltration rate. This must be achieved by using one of the
following options (see §§ 8.26 through 8.31 of this Part):
a. Grass channel;
b. Filter strip;
c. Sediment forebay; or
d. Deep sump catch basin and
one of the following:
(1) Upper sand layer (6 inch
minimum with filter fabric at the sand/gravel interface);
(2) Washed pea gravel (1/8
inch to 3/8 inch); or
(3) Proprietary device.
2. Exit velocities from
pretreatment chambers flowing over vegetated channels shall be
non-erosive (3.5 to 5.0 feet/second) during the 1-year design storm.
E. Treatment
1. If the in-situ infiltration
rate for the underlying soils is greater than 8.3 inches per hour,
100% of the WQv shall be treated by an acceptable water quality
practice prior to entry into an infiltration facility.
2. Infiltration practices
shall be designed to exfiltrate the entire WQv through the floor of
each practice, unless the depth is greater than ½ the square
root of the bottom surface area.
3. The construction sequence
and specifications for each infiltration practice shall be precisely
followed.
4. Design infiltration rates
shall be determined by using either §§ 8.21(E)(4)(a) or (b)
of this Part:
a. Design Infiltration Rates
for Different Soil Textures (from Rawls, W. I., D. L. Brakensiek, and
K. E. Saxton. 1982. Soil water characteristics. Trans. ASAE,
25(5):13l6-1328.)
US
Department of Agriculture Soil Texture
Design
Infiltration Rate (inches/hour)
Design
Infiltration Rate (feet/minute)
Sand
8.27
0.0115
Loamy
Sand
2.41
0.0033
Sandy
Loam
1.02
0.0014
Loam
0.52
0.0007
Silt
Loam
0.27
0.0004
b. In-situ rates established
by one of the approved methods listed below in §§
8.21(E)(4)(b)((1)) through ((4)) of this Part. Rates derived from
standard percolation tests are not acceptable. Field test methods to
assess saturated hydraulic conductivity must simulate the
"field-saturated" condition and must be conducted at the
depth of the bottom of the proposed infiltrating practice. Design
infiltration rates shall be determined by using a factor of safety of
2 from the field-derived value. The saturated hydraulic conductivity
analysis must be conducted by a DEM-licensed Class IV Soil Evaluator
or RI-registered Professional Engineer.
(1) Guelph permeameter - ASTM
D5126 - 16e1 Standard Guide for Comparison of Field Methods for
Determining Hydraulic Conductivity in Vadose Zone, incorporated above
at § 8.4(C) of this Part.
(2) Falling head permeameter –
ASTM D5126 - 16e1 Standard Guide for Comparison of Field Methods for
Determining Hydraulic Conductivity in Vadose Zone, incorporated above
at § 8.4(C) of this Part.
(3) Double ring permeameter or
infiltrometer - ASTM D3385 - 18 Standard Test Method for Infiltration
Rate of Soils in Field Using Double-Ring Infiltrometer, incorporated
above at § 8.4(D) of this Part; ASTM D5093 - 15e1 Standard Test
Method for Field Measurement of Infiltration Rate Using a Double-Ring
Infiltrometer with a Sealed-Inner Ring, incorporated above at §
8.4(E) of this Part; ASTM D5126 - 16e1 Standard Guide for Comparison
of Field Methods for Determining Hydraulic Conductivity in Vadose
Zone, incorporated above at § 8.4(C) of this Part.
(4) Amoozemeter or Amoozegar
permeameter (Amoozegar, A. 1992. Compact constant head permeameter: a
convenient device for measuring hydraulic conductivity. In G.C. Topp
et al., Eds. Advances in Measurement of Soil Physical Properties:
Bringing Theory into Practice. Soil Science Society of America
Special Publication, 30. Soil Science Society of America, Madison,
WI, pp. 31–42)
F. Vegetation: Upstream
construction shall be completed and stabilized before connection to a
downstream infiltration facility. A dense and vigorous vegetative
cover shall be established over the contributing pervious drainage
areas before runoff can be accepted into the facility.
G. Maintenance
1. A legally binding and
enforceable maintenance agreement shall be executed between the
facility owner and the responsible authority to ensure the following:
2. Infiltration practices
shall never serve as a sediment control device during site
construction phase. Great care must be taken to prevent the
infiltration area from compaction by marking off the location before
the start of construction at the site and constructing the
infiltration practice last, connecting upstream drainage areas only
after construction is complete, and the contributing area is
stabilized. In addition, the SESC plan for the site shall clearly
indicate how sediment will be prevented from entering the site of an
infiltration facility.
3. An observation well shall
be installed in every infiltration trench or chamber system,
consisting of an anchored 4- to 6-inch diameter perforated PVC pipe
with a lockable cap installed flush with the ground surface. The
approving agency may require multiple observation wells for large
underground chamber systems.
4. Infiltration practices
shall be inspected annually and after storms equal to or greater than
the 1-year, 24-hour Type III storm event.
5. If sediment or organic
debris build-up has limited the infiltration capabilities
(infiltration basins) to below the design rate, the top 6 inches
shall be removed and the surface roto-tilled to a depth of 12 inches.
8.22 Permeable Paving
A. There are two major types
of permeable paving:
1. Porous asphalt and pervious
concrete. Although they appear to be the same as traditional asphalt
or concrete pavement, they have 10%-25% void space and are
constructed over a base course that doubles as a reservoir for the
stormwater before it infiltrates into the subsoil or is directed to a
downstream facility.
2. Pavers. Three alternative
paver configurations will be acceptable to the approving agency as
water quality BMPs. These are as follows:
a. Permeable solid blocks or
reinforced turf: This type of permeable paving surface includes
permeable solid blocks (where the blocks have a minimum void ratio of
15%) and contain open-cell grids filled with either ASTM D448 - 12
Standard Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No. 8
washed aggregate for (paving blocks) or sandy soil and planted with
turf (for reinforced turf applications), set on a prepared base
course consisting of a minimum of 1.5 inches of ASTM D448 - 12
Standard Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No. 8
washed aggregate, over a minimum of 4 inches of ASTM D448 - 12
Standard Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No.
57 washed stone. ASTM D448 - 12 Standard Classification for Sizes of
Aggregates for Road and Bridge Construction, incorporated above at §
8.4(F) of this Part, No. 2 washed stone is used as a reservoir course
as necessary to manage variable storm sizes or provide other
functions.
b. Solid blocks with open-cell
joints > 15% of surface: This type of paver surface includes
interlocking impermeable solid blocks or open grid cells that must
contain permeable void areas (between the impermeable blocks)
exceeding 15% of the surface area of the paving system. Permeable
void areas are to be filled with ASTM D448 - 12 Standard
Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No. 8
washed aggregate and compacted with a minimum 5,000 lbf plate
compactor. Pavers are set on prepared base course materials
consisting of a minimum of 1.5 inches of ASTM D 448 - 12 Standard
Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No. 8
washed aggregate, over a minimum of 4 inches of ASTM D448 - 12
Standard Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No.
57 washed stone. ASTM D448 - 12 Standard Classification for Sizes of
Aggregates for Road and Bridge Construction, incorporated above at §
8.4(F) of this Part, No. 2 washed stone is used as a reservoir course
as necessary to manage variable storm sizes or provide other
functions.
c. Solid blocks with open-cell
joints < 15% of surface: This type of paver surface includes
interlocking impermeable solid blocks or open grid cells that must
contain permeable void areas (between the impermeable blocks) less
than 15% of the surface area of the paving system. Permeable void
areas are to be filled with ASTM D448 - 12 Standard Classification
for Sizes of Aggregates for Road and Bridge Construction,
incorporated above at § 8.4(F) of this Part, No. 8 washed
aggregate and compacted with a minimum 5,000 lbf plate compactor. In
order to meet the water quality treatment requirements of § 8.9
of this Part, these types of systems must be designed to provide one
inch of surface storage above the permeable pavement system. Pavers
are set on prepared base course materials consisting of a minimum of
1.5 inches of ASTM D448 - 12 Standard Classification for Sizes of
Aggregates for Road and Bridge Construction, incorporated above at §
8.4(F) of this Part, No. 8 washed aggregate, over a minimum of 4
inches of ASTM D448 - 12 Standard Classification for Sizes of
Aggregates for Road and Bridge Construction, incorporated above at §
8.4(F) of this Part, No. 57 washed stone. ASTM D448 - 12 Standard
Classification for Sizes of Aggregates for Road and Bridge
Construction, incorporated above at § 8.4(F) of this Part, No. 2
washed stone is used as a reservoir course as necessary to manage
variable storm sizes or provide other functions.
B. Treatment Suitability:
Permeable paving practices might not be able to provide overbank
flood control (Qp) storage. Combine with other practices to handle
runoff from large storm events, when required. Extraordinary care
shall be taken to assure that clogging does not occur through the use
of performance bonds, post-construction inspection and long-term
maintenance.
C. There are two categories of
permeable pavement:
1. Infiltration Facility: The
base stores water and drains to underlying soil. There are no
perforated drain pipes at bottom of base; however, they may have
overflow pipes for saturated conditions and extreme storm events; and
2. Detention Facility: This
design includes an impermeable liner at the bottom of the base
aggregate, which then flows to a downstream facility for additional
treatment and storage. This category is useful in sites with high
groundwater, bedrock, LUHPPL, and areas with fill soils. If designed
as a detention system, infiltration restrictions noted in §
8.22(D) of this Part do not apply.
D. Feasibility
1. In order to meet the water
quality standard, the bottom of infiltrating permeable pavement
practices must be located in the soil profile. Where a TMDL or CRMC
goal requires maximum treatment of runoff, the bottom shall be within
the uppermost soil horizons (A or B) or another BMP is required.
2. To be suitable for
infiltration, underlying soils shall have an in-situ infiltration
rate of at least 0.5 inches per hour, as initially determined from US
Natural Resources Conservation Service soil textural classification,
and subsequently confirmed by field geotechnical tests. The minimum
geotechnical testing at the site of a proposed infiltrating practice
is one test hole per 5,000 square feet, with a minimum of one boring
or test pit per infiltration facility (taken within the proposed
limits of the facility).
3. For infiltrating permeable
paving practices, underlying soils shall also have a clay content of
less than 20% and a silt content of less than 60%.
4. The bottom of an
infiltrating permeable pavement practice cannot be located in fill
with the exception for strictly residential land uses, for which the
bottom may be located in up to 2 feet of fill consisting of material
suitable for long-term infiltration. Practices for non-residential
sites that must be placed in fill shall meet the media requirements
of sand filters as described in § 8.23 of this Part.
5. To protect groundwater from
possible contamination, runoff from designated LUHPPL land uses or
activities must not be directed to permeable pavement unless designed
as a detention facility (with an impermeable liner).
6. To avoid excessive nitrogen
loading to coastal embayments, permeable pavements are not permitted
to receive runoff from other areas. They shall only be used to
manage precipitation that falls directly on the permeable pavement
area.
7. The bottom of an
infiltrating permeable pavement practice shall be separated by at
least 3 feet vertically from the SHGT or bedrock layer (when treating
WQv), as documented by on-site soil testing. The SHGT elevation in
the area of an infiltrating permeable pavement facility must be
verified by a DEM-licensed Class IV Soil Evaluator or RI-registered
Professional Engineer. The distance may be reduced to 2 feet in
strictly residential areas.
8. This practice is not
appropriate for high traffic/high speed areas (≥ 1,000 vehicle
trips/day) due to clogging potential.
9. To avoid frost heave,
design base to drain quickly (depth > 24 inches).
10. Use permeable paving only
on gentle slopes (less than 5%).
11. Infiltrating permeable
pavement practices must meet the minimum horizontal setbacks in the
table below:
Minimum
Horizontal Setbacks
From
small-scale facilities serving residential properties OR
non-vehicle surface applications (feet)
For
all other applications (feet)
Public
Drinking Water Supply Well – Drilled (rock), Driven, or Dug
200
200
Public
Drinking Water Supply Well – Gravel Packed, Gravel
Developed
400
400
Private
Drinking Water Wells
25
100
Surface
Water Drinking Water Supply Impoundment with Supply Intake1
100
200
Tributaries
that Discharge to the Surface Drinking Water Supply Impoundment1
50
100
Coastal
Features
50
50
All
Other Surface Waters
50
50
Up-gradient
from Natural slopes > %15
25
50
Down-gradient
from Building Structures2
10
25
Up-gradient
from Building Structures2
10
50
Onsite
Wastewater Treatment Systems
15
25
1
Refer to DEM Rules Establishing Minimum Standards Relating to
Location, Design, Construction and Maintenance of Onsite
Wastewater Treatment Systems, Figures 14-16 for maps of the
drinking water impoundments.
2
Setbacks from building structures does not apply where basement
or slab is at or above the surface elevation of the permeable
pavement.
E. Conveyance
1. The overland flow path of
surface runoff exceeding the capacity of the permeable paving system
shall be evaluated to preclude erosive concentrated flow during the
overbank events. If computed flow velocities exiting the system
over-bank exceed erosive velocities (3.5 to 5.0 feet/second), an
overflow channel shall be provided to a stabilized watercourse.
2. All permeable pavement
systems shall be designed to fully de-water the entire WQv within 24
hours after the storm event.
F. Treatment
1. Permeable pavements used as
infiltration practices shall be designed to exfiltrate the entire WQv
through the floor of each practice (sides are not considered in
sizing).
2. Base course is a reservoir
layer which shall be a minimum 6 inches, but is generally 12 to 24
inches or greater (function of storage needed and frost heave
resistance). Base material must be poorly graded (uniform size
material), must maintain adequate evaluate bearing capacity,
depending on the use, and compaction effort must be adjusted to meet
design storage requirements. Base course also includes a filter
course above reservoir layer (2 to 6 inches of smaller material).
3. The construction sequence
and specifications for permeable pavement areas shall be precisely
followed, particularly for infiltrating permeable paving practices.
Experience has shown that the longevity of any infiltration practice
is strongly influenced by the care taken during construction.
4. For infiltrating permeable
pavements, design infiltration rates should be determined by using
the Table in § 8.21(E)(4)(a) of this Part based on the soil
texture of the underlying soil. These are conservative values that
take into account future clogging as the practice is used over the
years.
5. For permeable paving
practices used for detention only, no runoff reduction is allowed,
i.e., impermeable CNs shall be used in hydraulic and hydrologic
models when calculating CPv and Qp.
G. Vegetation
1. Other adjacent construction
shall be completed and site stabilized before installation of
reservoir materials. A dense and vigorous vegetative cover shall be
established over any contributing pervious drainage areas before
runoff can be accepted into the facility.
2. Pavers that are planted
with grass require species with deep root systems. Follow
manufacturer’s guidelines on appropriate species.
H. Maintenance
1. A legally binding and
enforceable maintenance agreement shall be executed between the
facility owner and the responsible authority.
2. Areas where infiltrating
permeable pavement practices are proposed shall not serve as a
temporary sediment control device during site construction phase.
3. Permeable paving surfaces
require regular vacuum sweeping or hosing (minimum every three months
or as recommended by manufacturer) to keep the surface from clogging.
Maintenance frequency needs may be more or less depending on the
traffic volume at the site.
4. Minimize use of sand and
salt in winter months.
5. Do not repave or reseal
with impermeable materials.
6. The SESC Plan shall specify
at a minimum:
a. How sediment will be
prevented from entering the pavement area;
b. A construction sequence;
c. Drainage management; and
d. Vegetative stabilization.
8.23 Filtering Systems
A. Feasibility
1. The bottom of filtering
systems shall be located at or above the seasonal high groundwater
table. The top of filtering systems shall be located at least 3 feet
above the seasonal high groundwater table.
2. Unlined filtering systems
greater than 1,000 square feet in size shall not be located within 15
feet of any OWTS drainfield.
3. Design criteria for tree
filters is identical to bioretention practices.
B. Conveyance
1. If runoff is delivered by a
storm drain pipe or is along the main conveyance system, the filter
practice shall be designed off-line to the maximum extent
practicable. In these cases, a flow regulator (or flow splitter
diversion structure) shall be supplied to divert the WQv to the
filter practice, and allow larger flows to bypass the practice.
2. An overflow shall be
provided for runoff greater than the WQv to a non-erosive outlet
point.
C. Pretreatment
1. Dry or wet pretreatment
shall be provided prior to filter media equivalent to at least 25% of
the computed WQv.
D. Treatment
1. The entire treatment system
(including pretreatment) shall be sized to temporarily hold at least
75% of the WQv. A porosity value (Vv/Vt) of 0.33 shall be used to
account for storage within the filter media.
2. The filter media for a sand
filter shall consist of a medium sand that meets standards for ASTM
C33/C33M - 18 Standard Specification for Concrete Aggregates concrete
sand, incorporated above at § 8.4(G) of this Part. Media used
for organic filters may consist of peat/sand mix or leaf compost.
Peat shall be a reed-sedge hemic peat.
3. Sand and organic filter
beds shall have a minimum depth of 18 inches.
4. Bioretention systems shall
consist of the following treatment components: A 24 inch to 48 inch
deep planting soil bed (depending on requirements of proposed
vegetation), a surface mulch layer, and a 6 inch to 9 inch deep
surface ponding area. Soils shall consist of United States
Department of Agriculture loamy sand to sandy loam classification and
meet the following graduation: sand 85-88%, silt 8-12%, clay 0-2%,
and organic matter (in the form of leaf compost) 3-5%.
5. The minimum filter area for
sand and organic filters shall be sized based on the principles of
Darcy’s Law. A coefficient of permeability (k) shall be used
as follows:
a. Sand: 3.5 feet/day (City
of Austin. 1988. Water Quality Management. In Environmental Criteria
Manual. Environmental and Conservation Services. Austin, TX)
b. Peat: 2.0 feet/day (Galli,
J., 1990. Peat-Sand filters: A Proposed Stormwater Management
Practice for Urbanized Areas. Metropolitan Washington Council of
Governments)
c. Leaf compost: 8.7 feet/day
(Claytor, R. and T. Schueler. 1996. Design of Stormwater Filtering
Systems. Center for Watershed Protection. Ellicott City, MD)
d. Bioretention soil: 1.0
feet/day for sandy-loam soils
6. The minimum required filter
bed area is computed using the following equation (City of Austin.
1988. Water Quality Management. In Environmental Criteria Manual.
Environmental and Conservation Services. Austin, TX):
Af
= (WQv) (df) / [(k) (hf + df) (tf)]
Where:
Af
= Surface area of filter bed (square feet)
Df
= Filter bed depth (feet)
K
= Coefficient of permeability of filter media (feet/day)
hf
= Average height of water above surface of practice (height above
the uppermost mulch/organic layer) (feet)
tf
= Design filter bed drain time (days) (2 days is the maximum tf
for bioretention)
7. The depth of sand and
organic filters may be reduced to 12 inches on a case-by-case basis
as demonstrated by the designer that 18 inches is not feasible, such
as sites with high groundwater or shallow depth to bedrock or clay
soils, or in retrofit situations where pre-existing site constraints
exist.
8. The depth of bioretention
systems may be reduced to 12 inches on a case-by-case basis as
demonstrated by the designer that the 24 inch to 48 inch range is not
feasible, such as sites with high groundwater or shallow depth to
bedrock or clay soils, or in retrofit situations where pre-existing
site constraints exist. In these cases, the designer should add 20%
(by volume) of well-aged (6-12 months), well-aerated, leaf compost
(or approved equivalent) to the planting soil mixture, and will need
to demonstrate that the facility meets the required 75% WQv storage.
E. Vegetation
1. A dense and vigorous
vegetative cover shall be established over the contributing pervious
drainage areas before runoff can be accepted into the facility.
2. Vegetation is critical to
the performance and function of bioretention areas; therefore, a
planting plan must be provided. The approving agency may require
applicants to retain the services of a qualified professional with
the educational background and/or experience to select appropriate
plants.
F. Maintenance
1. A legally binding and
enforceable maintenance agreement shall be executed between the
facility owner and the responsible authority to ensure the following:
a. Sediment shall be cleaned
out of the sediment forebay when it accumulates to a depth of more
than ½ the design depth. Vegetation within the sediment
forebay shall be limited to a height of 18 inches. The sediment
chamber outlet devices shall be cleaned/repaired when drawdown times
exceed 36 hours. Trash and debris shall be removed as necessary.
b. Silt/sediment shall be
removed from the filter bed when the accumulation exceeds one inch.
When the filtering capacity of the filter diminishes substantially
(water ponds on the surface of the filter bed for more than 48
hours), the top few inches of discolored material shall be removed
and shall be replaced with fresh material. The removed sediments
shall be disposed in an acceptable manner at an approved and
permitted location.
2. For unique installations in
extremely tight sites or redevelopment/infill projects where
pretreatment strips have been downsized, enhanced maintenance shall
be required through more frequent inspections, more frequent sediment
removal, and enhanced landscape maintenance.
3. During the six months
immediately after construction, filter practices shall be inspected
following at least the first two precipitation events of at least 1.0
inch to ensure that the system is functioning properly. Thereafter,
inspections shall be conducted on an annual basis and after storm
events of greater than or equal the 1-year, 24-hour Type III
precipitation event.
8.24 Green Roofs
A. Feasibility
1. The system shall have a
maximum slope of 20%, unless specific measures from the manufacturer
are provided to retain the system on steeper slopes.
2. Green roofs can meet water
quality treatment goals only, and are not appropriate for Rev, CPv,
or Qp.
B. Conveyance
1. The runoff exceeding the
capacity of the green roof system shall be safely conveyed to a
drainage system or BMP without causing erosion. If an overland path
is used, a stabilized channel shall be provided for erosive
velocities (3.5 to 5.0 feet/second) for the 1-year storm event.
2. The green roof system shall
safely convey runoff from the 100-year storm away from the building
and into a downstream drainage system.
C. Treatment: Green roofs
shall be designed to manage the WQv.
D. Maintenance: A legally
binding and enforceable maintenance agreement shall be executed
between the facility owner and the responsible authority to ensure
that the vegetation is maintained and that green roofs are inspected
on a quarterly basis.
8.25 Open Channel Systems
A. Feasibility
1. Open channels shall have a
maximum drainage area of 5 acres draining to any 1 inlet. No maximum
drainage area if flow enters via sheet flow along a linear feature,
such as a road.
2. Open channels shall have a
maximum longitudinal slope of 4%, without check dams.
3. Wet Swales are constructed
in groundwater. The bottom of a Dry Swale shall be located at or
above the seasonal high groundwater table; the top of a Dry Swale
shall be located at least 3 feet above the seasonal high groundwater
table.
4. Wet swales shall be placed
a minimum 50 feet downgradient of any OWTS drainfield.
B. Conveyance
1. The maximum allowable
temporary ponding time within a channel shall be less than 48 hours.
An underdrain system shall be used in the dry swale to ensure this
ponding time, unless designed as an exfilter in which case an
underdrain might not be necessary.
2. The peak velocity for the
1-year storm must be non-erosive (3.5-5.0 feet/second).
3. Open channels shall be
designed to safely convey the 10-year storm.
4. Channels shall be designed
with moderate side slopes (flatter than 3:1) for most conditions.
Designers may utilize a 2:1 maximum side slope, where 3:1 slopes are
not feasible.
5. If the site slope is
greater than 4%, additional measures such as check dams shall be
utilized to retain the water quality volume within the swale system.
C. Pretreatment: Provide 10%
of the WQv in pretreatment.
D. Treatment
1. Wet swale length, width,
depth, and slope shall be designed to temporarily accommodate the WQv
through surface ponding.
2. Dry swales shall consist of
the following treatment components: A 30 inch deep bioretention soil
bed, a surface mulch layer, and no more than a 12 inch deep average
surface ponding depth. Soil media shall meet the specifications
outlined for bioretention areas.
3. The minimum filter area for
dry swales shall be sized based on the principles of Darcy’s
Law. A coefficient of permeability (k) shall be used as follows:1.0
feet/day for sandy-loam soils. The minimum required filter area is
computed using the following equation:
Af
= (WQv) (df) / [(k) (hf + df) (tf)]
Where:
Af
= Surface area of filter bed (square feet)
Df
= Filter bed depth (feet)
K
= Coefficient of permeability of filter media (feet/day)
hf
= Average height of water above dry swale surface (feet)
tf
= Design filter bed drain time (days)
(2
days is maximum tf for dry swales)
4. Swales shall be designed
with a bottom width no greater than 8 feet to avoid potential
gullying and channel braiding, but no less than 2 feet.
5. The bioretention soil depth
of dry swales may be reduced to 12 inches on a case-by-case basis as
demonstrated by the designer that 30 inches is not feasible, such as
sites with high groundwater or shallow depth to bedrock or clay
soils, or in retrofit situations where pre-existing site constraints
exist. In these cases, the designer should add 20% (by volume) of
well-aged (6-12 months), well-aerated, leaf compost (or approved
equivalent) to the bioretention soil mixture and will need to provide
a calculation to demonstrate that an equal WQv is provided as with a
30 inch deep soil bed.
E. Maintenance
1. A legally binding and
enforceable maintenance agreement shall be executed between the
facility owner and the responsible authority.
2. Open channel practices
shall be inspected annually and after storms of greater than or equal
to the 1-year, 24-hour Type III precipitation event.
3. Sediment build-up within
the bottom of the channel or filter strip shall be removed when 25%
of the original WQv volume has been exceeded.
4. Eroded side slopes and
channel bottoms shall be stabilized as necessary.
5. In the absence of evidence
of contamination, removed debris may be taken to a landfill or other
permitted facility.
6. Sediment testing may be
required prior to sediment disposal when a LUHPPL is present.
7. Vegetation in dry swales
shall be mowed as required to maintain grass heights in the 4-6-inch
range, with mandatory mowing once grass heights exceed 10 inches.
8. Woody vegetation in wet
swales shall be pruned where dead or dying branches are observed, and
reinforcement plantings shall be planted if less than 50% of the
original vegetation establishes after two years.
9. If the surface of the dry
swale becomes clogged to the point that standing water is observed on
the surface 48 hours after precipitation events, the bottom shall be
roto-tilled or cultivated to break up any hard-packed sediment, and
then reseeded.
8.26 Pretreatment Practices
Overview
A. Pretreatment BMPs are
designed to improve water quality and enhance the effective design
life of practices by consolidating the maintenance to a specific
location, but do not meet the water quality performance standard in §
8.9 of this Part on their own. Pretreatment practices must be
combined with an acceptable water quality BMP §§ 8.20
through 8.25 of this Part to meet the water quality standard.
B. If required design criteria
for a particular pretreatment BMP cannot be met at a site, an
alternative pretreatment BMP must be selected, or adequate
justification must be provided to the approving agency why the
particular criteria is not practicable.
8.27 Pretreatment - Grass Channel
A. Grass channels are similar
to conventional drainage ditches, with the major differences being
flatter side and longitudinal slopes, as well as a slower design
velocity for small storm events.
B. Sizing of the grass channel
length is based on flow rate from the water quality storm (WQf) and
should be designed to ensure an average residence time of 10 minutes
to flow from the inlet to the outlet of the channel (for linear
projects with no defined primary inflow location, residence time
shall be measured from the mid-point location of the channel).
C. The following maintenance
activities shall be performed on an annual basis or more frequently
as needed:
1. Sediment removal;
2. Mowing and litter and
debris removal; and
3. Stabilization of eroded
side slopes and bottom.
8.28 Pretreatment - Filter Strips
A. The filter strip must abut
the entire length of the contributing area to ensure that runoff from
all portions of the site are treated.
B. Maintenance
1. Ensure that grass has
established; if not, replace with an alternative species.
2. Filter strips shall be
inspected at least quarterly during the first year of operation and
semiannually thereafter. Evidence of erosion and concentrated flows
within the filter strip must be corrected immediately. Eroded spots
must be reseeded and mulched to enhance a vigorous growth and prevent
future erosion problems.
3. The bulk of accumulated
sediments will be trapped at the initial entry point of the filter
strip. These deposited sediments shall be removed manually at least
once per year or when accumulating sediments cause a change in the
grade elevation. Reseeding may be necessary to repair areas damaged
during the sediment removal process.
4. Filter strips, or areas
proposed as such, must be protected by proper SESC control techniques
during all phases of construction. These measures must be properly
maintained until final site stabilization and subsequent removal of
all trapped sediments has occurred.
8.29 Pretreatment - Sediment
Forebay
A. The required surface area
of the sediment forebay shall be determined using the following
equation that is based on Camp-Hazen.
Where:
sedimentation
surface area (square feet)
discharge
from drainage area (cubic feet/second = %WQv/86,400 sec
0.0004 feet/second particle
settling velocity recommended for silt
sediment removal efficiency
(assume 0.9 or 90%)
The
percent of the water quality volume used for the sediment forebay
design depends on which treatment BMP is being used.
Therefore,
for the purposes of this Part, use:
As
= 5,750 * Q
B. The forebay shall have a
minimum length to width ratio of 1:1 and a preferred minimum length
to width ratio of 2:1 or greater. Designers shall calculate scour
potential and provide riprap sizing calculations (diameter required
to effectively dissipate erosive velocities).
C. The forebay shall be sized
to contain at least 10% of the WQv (depending on the requirements of
the treatment BMP) and be of an adequate depth to prevent
resuspension of collected sediments during the design storm, often 4
feet to 6 feet deep. Shallower depths shall be evaluated such that
flow-through velocities do not exceed 2 feet/second for all design
storms up to the 100-year storm. The goal of the forebay is to at
least remove particles consistent with the size of medium sand.
D. Direct access for
appropriate maintenance equipment needs to be provided to the forebay
and may include a ramp to the bottom of the embankment if equipment
cannot reach all points within the forebay from the top of the
embankment. The forebay can be lined with a concrete pad.
8.30 Pretreatment - Deep Sump
Catch Basins
A. Deep sump catch basins
shall not be used in place of an oil grit separator for LUHPPLs that
have the potential to generate runoff with high concentrations of oil
and grease.
B. Feasibility
1. The deep sump catch basin
must be designed in a catch basin-to-manhole configuration (not in a
catch basin-to-catch basin configuration) to be used as pretreatment
for other BMPs. Catch basin-to-catch basin or inlet-to-inlet
configurations are acceptable, but they cannot be counted as a
pretreatment practice.
2. The contributing drainage
area to each deep sump catch basin shall not exceed 0.5 acres of
impervious cover.
C. Design
1. The deep sump shall be a
minimum 4 feet below the lowest pipe invert or 4 times the diameter
of the outlet pipe, whichever value is greater.
2. The inlet grate shall be
sized based on the contributing drainage area to ensure that the flow
rate does not exceed the capacity of the grate. The grate shall not
allow flow rates greater than 3 cubic feet per second for 10-year
storm event to enter the sump.
3. Inlet grates designed with
curb cuts must reach the back of the curb cut to prevent flow bypass.
4. Hooded outlets shall be
used in high litter land uses. Care shall be taken to avoid damaging
and displacing hoods during cleaning.
D. Maintenance
1. Inspections shall be
performed a minimum of 2 times a year (spring/fall). Units shall be
cleaned annually and whenever the depth of sediment is greater than
or equal to half the sump depth.
2. The inlet grate shall not
be welded to the frame so that the sump can be easily inspected and
maintained.
3. Sufficient maintenance
access shall be considered when designing the geometry of deep sump
catch basins.
8.31 Pretreatment - Proprietary
Devices
A. Feasibility
1. To qualify as an acceptable
pretreatment device, proprietary devices shall remove a minimum of
25% TSS, as verified by an independent third-party monitoring group.
In certain retrofit cases and other cases where higher pretreatment
standards may be appropriate, higher removal efficiency for TSS may
be required in order to achieve stormwater treatment goals for the
project.
2. Proprietary devices shall
be designed per the manufacturer’s recommendations.
3. Proprietary devices must be
designed as off-line systems or have an internal bypass to avoid
large flows and resuspension of pollutants in order to be used as
pretreatment for other BMPs.
B. Design
1 Flow-through proprietary
devices shall be designed to treat runoff from the entire WQf. For
these devices, a minimum detention time of 60 seconds is required for
the WQf.
2. A storage proprietary
device shall be sized based on the required pretreatment volume (%
WQv) or a designer must provide documentation that it is sized
appropriately for a verified minimum removal of 25% TSS.
3. For proprietary devices
such as oil/grit separators, all baffles shall be tightly sealed at
sidewalls and at the roof to prevent the escape of oil.
C. Maintenance
1. Proprietary devices shall
be maintained in accordance with manufacturers’ guidelines.
2. Proprietary devices shall
be located such that it is accessible at times for maintenance and/or
emergency removal of oil or chemical spills.
3. Inspections shall be
performed a minimum of 2 times a year. Devices shall be cleaned when
pollutant removal capacity is reduced by 50% or more, or where 50% or
more of the pollutant storage capacity is filled or displaced.
Hazardous debris removed shall be disposed of in accordance with
State and federal regulations by a properly licensed contractor.
8.32 Storage Practices for
Stormwater Quantity Control - Overview
A. The storage practices
included in this section (§ 8.32 of this Part) can be used to
meet channel protection and flood protection, but must be combined
with other BMPs for meeting water quality and recharge criteria.
B. If required design criteria
for a particular storage BMP cannot be met at a site, an alternative
storage BMP must be selected, or adequate justification must be
provided to the approving agency why the particular criteria is not
practicable.
8.33 Quantity Control - Stormwater
Basins
A. Wet basins may be located
in the groundwater table; dry basins do not need a permanent pool and
may be designed such that the groundwater table is at or below the
bottom of the basin.
B. Feasibility
1. Wet Extended Detention
Basins shall have a minimum contributing drainage area of 25 acres,
unless groundwater is intercepted.
2. Stormwater basins shall not
be located within jurisdictional waters, including wetlands, except
that on already developed sites basin designs may be allowed in
jurisdictional upland buffers in areas already altered under existing
conditions, if acceptable to the approving agency.
3. The use of basins in
watersheds draining to cold-water fisheries is restricted to prohibit
discharges within 200 feet of streams and any contiguous natural or
vegetated wetlands. Discharges beyond 200 feet shall be designed to
discharge the CPv through an underdrained gravel trench outlet.
Additional storage for Qp may be discharged through traditional basin
outlet structures.
4. Basins receiving runoff
from LUHPPLs must be lined and shall not intercept groundwater.
5. Basins that do intercept
groundwater (allowed as long as not receiving runoff from LUHPPLs)
shall not include the volume of the permanent pool in storage
calculations.
C. Conveyance
1. The channel immediately
below a basin outfall shall be modified to prevent erosion and
conform to natural dimensions in the shortest possible distance,
typically by use of appropriately sized riprap placed over filter
cloth.
2. A stilling basin or outlet
protection shall be used to reduce flow velocities from the principal
spillway to non-erosive velocities (3.5 to 5.0 feet/second).
3. Outfalls, where needed,
shall be constructed such that they do not increase erosion or have
undue influence on the downstream geomorphology of any natural
watercourse by discharging at or near the stream water surface
elevation or into an energy dissipating step-pool arrangement.
4. All basins shall have an
emergency outlet to accommodate the storm flow in excess of the
100-year storm event maintaining at least one foot of freeboard
between the peak storage elevation and the top of the embankment
crest, and to safely convey the 100-year storm without overtopping
the embankment.
D. Treatment: Stormwater
basins shall not be used for meeting the water quality treatment
standard.
E. Using Basins for Additional
Pollutant Loading Reduction: In order to use the pollutant removal
rates for dry extended detention basins and wet extended detention
basins as listed in § 8.38(E) of this Part, the following design
criteria must be met.
1. Each basin shall have a
sediment forebay or equivalent upstream pretreatment. The forebay
shall be sized to contain 10% of the water quality volume (WQv) sized
per § 8.29 of this Part. The forebay storage volume counts
toward the total WQv requirement.
2. The minimum detention time
for the WQv shall be 24 hours.
3. Storage for the channel
protection volume (CPv) and the WQv shall be computed and routed
separately. The WQv cannot be met simply by providing CPv storage
for the one-year storm.
4. Provide water quality
treatment storage to capture the computed WQv from the contributing
drainage area through a combination of permanent pool and extended
detention, as outlined in the table in § 8.33(F) of this Part.
5. The minimum length to width
ratio for a basin shall be 1.5:1 (length relative to width).
6. Provide a minimum Drainage
Area: Surface Area Ratio of 75:1.
7. Incorporate an aquatic
bench that extends up to 15 feet inward from the normal edge of
water, has an irregular configuration, and a maximum depth of 18
inches below the normal pool water surface elevation.
F. Minimum Required Storage
Volumes for Basins Used for Enhanced Pollutant Removal
Design
Variation
%WQv
Permanent
Pool
Extended
Detention
Dry
Extended Detention Basin
20%
min.
80%
max.
Wet
Extended Detention Basin
50%
min.
50%
max.
G. Vegetation
1. The perimeter of all deep
pool areas (four feet or greater in depth) shall be surrounded by a
safety bench. Except when basin side slopes are 4:1 (h:v) or
flatter, provide a safety bench that generally extends 15 feet
outward (a 10’ minimum bench is allowable on sites with extreme
space limitations at the discretion of the approving agency) from the
normal water edge to the toe of the basin side slope. The maximum
slope of the safety bench shall be 6%.
2. A planting plan for a
stormwater basin and its setback shall be prepared to indicate how
the basin perimeter will be stabilized and established with
vegetation.
H. Basin Setbacks
1. A basin setback from
structures, roads, and parking lots shall be provided that extends 25
feet outward from the maximum water surface elevation of the basin.
2. Woody vegetation shall not
be planted or allowed to grow on a dam, or within 15 feet of a
dam or toe of the embankment, or within 25 feet of a principal
spillway outlet.
I. Maintenance
1. Maintenance responsibility
for a basin and its setback shall be vested with a responsible
authority by means of a legally binding and enforceable maintenance
agreement that is executed as a condition of plan approval.
2. The principal spillway
shall be equipped with a removable trash rack, and generally
accessible from dry land.
3. A maintenance right-of-way
or easement shall extend to a basin from a public or private road.
4. Sediment shall be removed
from stormwater basins when the sediment volume exceeds 10% of the
total basin volume.
5. For discharges beyond 200
feet from streams (and any contiguous natural or vegetated wetlands)
in cold-water fisheries, the gravel trench outlet shall be inspected
after every storm in the first 3 months of operation to ensure proper
function. Thereafter, the trench shall be inspected at least once
every six months. Inspection shall consist of verifying that the wet
basin is draining to the permanent pool elevation within the 24-hour
design requirement and that potentially clogging material, such as
accumulation of decaying leaves or debris, does not prevent the
discharge through the gravel. When clogging occurs, at least the top
8 inches of gravel shall be replaced over with new material.
Sediments shall be disposed of in an acceptable manner.
6. Annual mowing of the basin
setback is only required along maintenance rights-of-way and the
embankment. The remaining setback can be managed as rangeland
(mowing every other year) or forest.
J. Non-clogging Low-flow
Orifice: When CPv is required, a low-flow orifice shall be provided,
with the design of the orifice sufficient to ensure that no clogging
shall occur.
K. Outlet Control Structure
1. The outlet control
structure shall be located within the embankment for maintenance
access, safety and aesthetics.
2. The outlet control
structure shall be sized and designed for CPv and Qp, as required.
3. For discharges beyond 200
feet from jurisdictional waters in cold-water fisheries, the
underdrained gravel trench shall be designed to meet the following
requirements:
a. Shall be sized to release
the CPv over at least 12 hours and not more than 24 hours to provide
adequate cooling of stormwater runoff discharging from the basin;
b. Shall be four feet wide,
located at least 2 feet from the permanent pool, and located at the
furthest location opposite from the principal inflow location to the
facility;
c. The trench shall have a
length of 3 feet per 1,000 cubic feet of CPv storage volume, have a
depth of at least 3 feet, and maintain 2 feet of gravel cover over a
6-inch diameter perforated pipe outlet (Rigid Schedule 40 PVC or
SDR35);
d. Shall utilize geotextile
fabric placed between gravel trench and adjacent soil; and
e. Shall utilize clean
poorly-graded (uniform size material) gravel.
L. Basin Drain
1. Except where local slopes
prohibit this design, each wet basin shall have a drain pipe that can
completely or partially drain the permanent pool. The drain pipe
shall have an elbow or protected intake within the basin to prevent
sediment deposition, and a diameter capable of draining the basin
within 24 hours.
2. Access to the drain pipe
shall be secured by a lockable structure to prevent vandalism and/or
accidental draining of the pond, which could pose a safety hazard due
to high drainage velocities.
M. Safety Features
1. Side slopes to the basin
shall not exceed 3:1 (h:v) and, for wet basins, shall terminate on a
safety bench.
2. The principal spillway
opening shall not permit access by small children, and endwalls above
pipe outfalls greater than 48 inches in diameter shall be fenced to
prevent a hazard.
8.34 Quantity Control -
Underground Storage Devices
A. Conveyance
1. Outfalls to the ground
surface, where needed, shall be constructed such that they do not
increase erosion by discharging near the stream water surface
elevation or into an energy dissipating step-pool arrangement.
2. An emergency overflow
system shall be designed to convey flows larger than the 100-year
storm or to divert water in case system fails for any reason.
B. Design
1. Capacity and discharge rate
shall depend on the CPv and Qp requirements. Storage is a function
of geometry of the structure, which shall be provided by the
manufacturer.
2. Sufficient maintenance
access points (manholes) shall be incorporated in design to
facilitate easy maintenance. Placement shall, at a minimum, occur
near the intake and another at the outlet end of the system. The
number of manholes depends on maintenance methods used.
3. The design shall address
implications of the depth to groundwater at the site. A high water
table can cause structures to displace due to uplift forces if not
designed correctly. Anti-floatation calculations are required when
system designed below the water table.
C. Maintenance
1. Periodic inspections of the
inlet and outlet areas to ascertain correct operation of system and
to clean materials trapped on grates protecting catch basins and
inlet area.
2. Sediment shall be removed
from the system when the sediment volume exceeds 10% of the total
vault volume.
8.35 Stormwater Infiltration
Practices for Recharge/Storage Only
A. On sites where the soil
infiltration rate is high (greater than 8.3 inches/hour),
infiltration practices cannot be used to treat the water quality
volume. However, they may be used to provide recharge (Rev), channel
protection (CPv) and/or overbank flood control (Qp) storage
(applicants must provide treatment of 100% of the WQv prior to direct
infiltration).
B. Feasibility
1. The bottom of the
infiltration facility shall be separated by at least 2 feet
vertically from the SHGT or bedrock layer, as documented by on-site
soil testing, unless a mounding analysis shows that the system will
accept the stormwater without causing breakout or backup into the
system with less than 2 feet vertical separation. The SHGT elevation
in the area of each infiltration facility must be verified by a
DEM-licensed Class IV Soil Evaluator or RI-registered Professional
Engineer.
2. Infiltration practices that
are designed for the 10-year storm event or greater and have a
separation from the bottom of the system to the SHGT of less than 4
feet shall provide a groundwater mounding analysis. The groundwater
mounding analysis must show that the groundwater mound that forms
under the infiltration system will not break out above the land or
jurisdictional water.
3. Infiltration practices
cannot be placed in locations that cause water problems (such as
seepage which may cause slope failure) to downgrade properties.
4. Infiltration facilities
must meet the minimum horizontal setbacks below:
Minimum
Horizontal Setbacks
From
small-scale facilities serving residential properties (feet)
From
all other infiltration facilities (feet)
Public
Drinking Water Supply Well – Drilled (rock), Driven, or Dug
200
200
Public
Drinking Water Supply Well – Gravel Packed, Gravel
Developed
400
400
Private
Drinking Water Wells
50
100
Surface
Water Drinking Water Supply Impoundment with Supply Intake 1
100
200
Tributaries
that Discharge to the Surface Drinking Water Supply Impoundment 1
50
100
Coastal
Features
50
50
All
Other Surface Waters
50
50
Up-gradient
from Natural slopes > %15
25
50
Down-gradient
from Building Structures 2
10
25
Up-gradient
from Building Structures 2
10
50
Onsite
Wastewater Treatment Systems
15
25
1
Refer to DEM Rules Establishing Minimum Standards Relating t
Location, Design, Construction and Maintenance of Onsite
Wastewater Treatment Systems, Figures 14-16 for maps of the
drinking water impoundments.
2
Setbacks from building structures applies only where basement
of slab is below the ponding elevation of the infiltration
facility.
C. Conveyance
1. Adequate stormwater
outfalls shall be provided for the overflow associated with the
1-year design storm event (non-erosive velocities on the down-slope).
2. The overland flow path of
surface runoff exceeding the capacity of the infiltration system
shall be evaluated to preclude erosive concentrated flow during the
overbank events. If computed flow velocities exiting the system
overbank exceed erosive velocities (3.5 to 5.0 feet/second) for the
1-year storm event, an overflow channel and/or level spreader shall
be provided.
D. Design
1. Infiltration practices
shall be designed to exfiltrate the design volume through the floor
of each practice (sides are not considered in sizing), except where
the depth is greater than the square root of the bottom surface area.
2. The construction sequence
and specifications for each infiltration practice shall be precisely
followed.
3. Design infiltration rates
shall be determined in accordance with § 8.21(E)(4) of this
Part.
E. Vegetation: Upstream
construction shall be completed and stabilized before connection to a
downstream infiltration facility. A dense and vigorous vegetative
cover shall be established over the contributing pervious drainage
areas before runoff can be accepted into the facility.
F. Maintenance: A legally
binding and enforceable maintenance agreement shall be executed
between the facility owner and the responsible authority to ensure
the following:
1. Infiltration practices
shall never serve as a sediment control device during site
construction phase. Great care must be taken to prevent the
infiltration area from compaction by marking off the location before
the start of construction at the site and only constructing the
infiltration practice last, connecting upstream areas only after
construction is complete, and the contributing area stabilized. In
addition, the SESC plan for the site shall clearly indicate how
sediment will be prevented from entering the site of an infiltration
facility.
2. An observation well shall
be installed in every infiltration trench or chamber system,
consisting of an anchored 4 to 6 inch diameter perforated PVC pipe
with a lockable cap installed flush with the ground surface. The
approving agency may require multiple observation wells for large
underground chamber systems.
8.36 Pollutant Loading Analyses -
Overview
A. The permitting agency may
require applicants to document that a particular project does not
unduly contribute to, or cause, water resource degradation (generally
for sensitive resource areas or where an elevated concern for water
quality exists) or to document a reduction in pollutant load
(generally, as a consequence of a TMDL requirement). In these cases,
applicants may be required to calculate potential stormwater
pollutant loadings for projects for pre-development and
post-development conditions.
B. When such an analysis is
required of the applicant, the Simple Method (Schueler, T.R. 1987.
Controlling Urban Runoff: A Practical Manual for Planning and
Designing Urban BMPs, Department of Environmental Programs,
Metropolitan Washington Council of Governments, Washington, DC) can
be used to demonstrate urban stormwater pollutant loadings. The
Simple Method requires estimates of annual rainfall, site percent
impervious cover, land use type, and pollutant loading coefficients
based on land use.
C. The table below in §
8.36(D) of this Part provides event mean concentrations in
milligrams per liter (mg/L) for typical pollutants of concern
associated with stormwater runoff (# col/100ml for bacteria). There
may be an interest in calculating the loading rates of other
pollutants not listed in this table. If this is necessary, an
applicant shall use event mean concentration data from a reliable
source, as approved by the approving agency, based on the land use
category. These event mean concentration values must be documented
by scientific studies and referenced by the applicant.
D. Median Event Mean
Concentration Values for Differing Land Use Categories
Pollutant
(mg/l)
Land
Use Category
Residential
Commercial
Industrial
Highways
Undeveloped/
Rural 3
TSS
100 1
75 1
120 1
150 1
51
TP
0.3 2
0.2 2
0.25 2
0.25
0.11
TN
2.1 2
2.1 2
2.1 2
2.3 2
1.74
Cu
.005 2
.096 2
.002 2
.001 2
-
Pb
.012 2
.018 2
.026 2
.035 2
-
Zn
.073 2
.059 2
.112 2
.051 2
-
BOD
9.0 2
11.0 2
9.0 2
8.0 2
3.0
COD
54.5 2
58.0 2
58.6 2
100.0 2
27.0
Bacteria
(#col/100
ml)
7000 2
4600 2
2400 2
1700 2
300
1
Caraco, D. 2001. The Watershed Treatment Model. Center for
Watershed Projection. Ellicott City, Maryland.
2
Pitt, R. E., Maestre, A., and Center for Watershed Protection.
2005. The National Stormwater Quality Database (NSQD), version
1.1. USEPA Office of Water, Washington, D.C.
3
CDM. 2004. Merrimack River Watershed Assessment Study,
Screening Level Model.
E. The method outlined in §
8.37 of this Part is most often applied to calculating loadings to
surface water bodies. Other pollutant loading methods may be
acceptable, provided the applicant submits the methodology and data
used along with the reasoning for the chosen method. All information
supplied by the applicant will be reviewed by the approving agency to
determine the relevance of the model to the situation.
8.37 Pollutant
Loading Analyses - Overview of the Simple Method
A. Stormwater pollutant export
load (L, in pounds or billion colonies) from a development site can
be determined by solving the following equation:
L
= [(P)(Pj)(Rv)/12](C)(A)(2.72)
Where:
P
= rainfall depth (inches)
Pj
= rainfall correction factor
Rv
= runoff coefficient expressing the fraction of rainfall converted
to runoff
C
= flow-weighted mean concentration of the pollutant in urban
runoff (milligrams/liter)
A
= contributing drainage area of development site (acres)
12,
and 2.72 are unit conversion factors
B. For bacteria, the
conversion factor is modified, so the loading equation is:
L
= 1.03(10 -3 )[(P)(Pj)(Rv)](C’)(A)
Where:
P
= rainfall depth (inches)
Pj
= rainfall correction factor
Rv
= runoff coefficient expressing the fraction of rainfall converted
to runoff
C’
= flow-weighted mean bacteria concentration (#col/100 ml)
A
= contributing drainage area of development site (acres)
1.03
is a unit conversion factor
C. P (depth of rainfall). The
value of P selected depends on the time interval over which loading
estimates are necessary (usually annual rainfall – see figure
in § 8.37(H) of this Part. Appropriate annual rainfall values
for a site specific location can be interpolated from the figure in §
8.37(H) of this Part or obtained from the Northeast Regional Climate
Center. If a load estimate is desired for a specific design storm,
the user can supply the relevant value of P derived from §
8.6(E) of this Part. Caution is required as event mean concentration
values vary as a function of rainfall amount and intensity and those
presented in the table in § 8.36(D) of this Part are median
values from a range of storms more representative of long-term
loading. If a load is desired from a larger storm, applicants shall
provide appropriate documentation of the source of the event mean
concentration used. All rainfall data used in the analysis must be
applicable to site location and referenced for review.
D. Pj (correction factor).
Use a value of 0.9 for Pj. This represents the percentage of annual
rainfall that produces runoff. When solving the equation for
individual storms, a value of 1.0 should be used for Pj.
E. Rv (runoff coefficient).
1. Rv is the measure of site
response to rainfall events and is calculated as:
Rv
= r/p
Where:
r
= storm runoff (inches)
p
= storm rainfall (inches)
2. The Rv for a site depends
on soil type, topography, and vegetative cover. However, for annual
pollutant loading assessments, the primary influence on Rv is the
degree of watershed imperviousness. The following equation has been
empirically derived from the Nationwide Urban Runoff Program studies
(USEPA, 1983) and is used to establish a value for Rv.
Rv
= 0.05 + 0.009(%I)
Where:
%I
= the percent of site impervious
3. A value for I can be
calculated by summing the areas of all impervious surfaces and
dividing this area by the total contributing drainage area. If more
than one land use is present at the site, divide the impervious
portion of each land use by its respective total area.
F. A (drainage area). The
total contributing drainage area (acres) can be obtained from site
plans.
G. C (pollutant
concentration). Choose the appropriate value of C from the table in
§ 8.36(D) of this Part.
H. Average Annual
Precipitation Values for Rhode Island
8.38 Pollutant Loading Analyses -
Stormwater Practice Pollutant Removal Effectiveness
A. Applicants will frequently
need to evaluate the potential pollutant removal effectiveness of
stormwater practices when conducting a pollutant loading analysis.
To do this, applicants can use the rated pollutant removal
effectiveness as listed in the tables in §§ 8.38(D) and (E)
of this Part as a basis of estimating pollutant removal. These
values have been derived from a variety of sources based on actual
monitoring data and modified, where appropriate, to reflect the
specific design and sizing criteria contained in §§ 8.19
through 8.35 of this Part.
B. In some cases, the
pollutant removal rating values use median values from prior
monitoring studies when the studies included a significant number of
facilities of similar design criteria as those required in this Part.
In other cases, the 75th quartile values (or high end) are reported
where it is recognized that the prior monitoring was of insufficient
sample size or was of practices with design criteria not as robust as
those required in this Part. Lastly, in many cases, there is
insufficient prior monitoring of practices for some or all of the
reported pollutants, but primary pollutant removal mechanisms are
similar to other practices; thus, a removal value is assigned, based
on general literature values and/or as a policy decision. In
addition, most of the design criteria for water quality BMPs
incorporate pre-treatment requirements, such as the requirement for a
forebay or grass channel prior to infiltration. In these cases, the
rated removal efficiency of the practice is for the total system.
C. In general, where pollutant
loading assessments are requested, applicants may use the rated
removal values as a basis for estimating pollutant load. However,
other pollutant removal estimates may be acceptable, provided the
applicant submits the source of these estimates and data used. All
information supplied by the applicant will be reviewed by the
approving agency to determine the relevance of the removal estimates
to the situation.
D. Pollutant Removal
Efficiency Rating Values for Water Quality BMPs.
Water
Quality BMPs
(Those
Meeting Minimum Standard 3, § 8.9 of this Part)
Median
Pollutant Removal Efficiency (%)
TSS
TP
TN
Bacteria
WVTS
Shallow
WVTS
85% 2
48% 3
30% 2
60% 2
Gravel
WVTS
86% 3
53% 1
55% 3
85% 2
Infiltration
Practices
Infiltration
Basin
90% 2
65% 3
65% 2
95% 2
Infiltration
Trench
90% 2
65% 3
65% 2
95% 2
Subsurface
Chambers
90% 2
55% 2
40% 2
90% 2
Dry
Well
90% 2
55% 2
40% 2
90% 2
Permeable
Paving
90% 1
40% 1
40% 2
95% 2
Filters
Sand
Filter
86% 3
59% 3
32% 3
70% 2
Organic
Filter
90% 2
65% 2
50% 2
70% 2
Bioretention
90% 1
30% 2
55% 2
70% 2
Tree
Filter
90% 1
30% 2
55% 2
70% 2
Green
Roofs
Green
Roofs
90% 4
30% 4
55% 4
70% 4
Open
Channels
Dry
Swale
90% 1
30% 2
55% 2
70% 2,6
Wet
Swale
85% 3
48% 3
30% 2
60% 2
1
UNHSC, Roseen, R., T. Ballestero, and Houle, J. 2007b. UNH
Stormwater Center 2007 Annual Report. University of New Hampshire,
Cooperative Institute for Coastal and Estuarine Environmental
Technology, Durham, NH.
2
Center for Watershed Protection. 2007. Urban Stormwater Retrofit
Practices. Urban Subwatershed Restoration Manual Series - Manual
3. Ellicott City, Maryland.
3
Fraley-McNeal, T. Schueler, R. Winer., 2007. National Pollutant
Removal Performance Database, v. 3. Center for Watershed
Protection. Ellicott City, MD.
4
Prescribed value based on general literature values and/or
policy decision.
5
50% of reported values of low end for extended detention basins.
6
Presumed equivalent to bioretention; will require diligent
pollutant source control to manage pet wastes in residential
areas.
E. BMP Pollutant Removal
Rating Values for Other BMPs
Other
BMPs
Median
Pollutant Removal Efficiency (%)
TSS
TP
TN
Bacteria
Pretreatment
BMPs
Grass
Channel
70% 1,2
24% 3
40% 2
NT
Sediment
Forebay
25% 4
8% 5
3% 5
12% 5
Filter
Strip
25% 4
ND
ND
ND
Deep
Sump Catch Basin
25% 4
NT
NT
NT
Hydrodynamic
Device
25% 1
NT
NT
NT
Oil
and Grit Separator
25% 4
NT
NT
NT
Storage
BMPs
Dry
Extended Detention Basin
50% 2
20% 2
25% 2
35% 2
Wet
Extended Detention Basin
80% 3
52% 3
31% 3
70% 3
Underground
Storage Vault
20% 2
15% 2
5% 2
25% 2
"ND" means no
data.
"NT" means no
treatment.
1
UNHSC, Roseen, R., T. Ballestero, and Houle, J. 2007b. UNH
Stormwater Center 2007 Annual Report. University of New
Hampshire, Cooperative Institute for Coastal and Estuarine
Environmental Technology, Durham, NH.
2
Center for Watershed Protection. 2007. Urban Stormwater
Retrofit Practices. Urban Subwatershed Restoration Manual Series
- Manual 3. Ellicott City, Maryland.
3
Fraley-McNeal, T. Schueler, R. Winer., 2007. National
Pollutant Removal Performance Database, v. 3. Center for
Watershed Protection. Ellicott City, MD.
4
Prescribed value based on general literature values and/or
policy decision.
5
50% of reported values of low end for extended detention
basins.
6
Presumed equivalent to bioretention; will require diligent
pollutant source control to manage pet wastes in residential
areas.
F. Using the rated
efficiencies from the tables in §§ 8.38(D) and (E) of this
Part, applicants can reduce post-development loadings to receiving
waters when BMPs are designed, installed, and maintained in
accordance with the provisions of this Part.
G. Estimating Pollutant
Removal of BMPs in Series
1. In some cases, applicants
may have one or more BMPs installed in a series as a so-called
“treatment train.” In these cases, available research
has shown that the pollutant removal efficiency of specific BMPs, for
specific pollutants, is reduced for subsequent BMPs in the treatment
train arrangement. As stormwater migrates through the treatment
train, coarser-grained particles are preferentially removed by the
prior BMP, leaving progressively finer particles for practices down
the line. The result is that for pollutants associated with fine
particulates, removal efficiency drops off significantly.
2. To account for this
phenomenon, a widely applied and generally accepted method has been
to discount the rated removal efficiency of the second BMP by a
factor of between 75% and 50%, with subsequent BMPs being reduced
accordingly.
3. The Georgia Manual Method
applies BMP removals as below. This method does not apply to
bacteria, where removal is more a function of die-off than
settling/attenuation; thus, the full efficiency is applied to
subsequent BMPs.
a. 100% of the rated TSS
removal efficiency to the first BMP
(1) If the TSS removal
efficiency > 80% for the first BMP; removal efficiency for the
second BMP = 50% (regardless of the pollutant constituent).
(2) If the TSS removal
efficiency <80% for the first BMP; removal efficiency for the
second BMP = 75% (regardless of the pollutant constituent).
b. For succeeding BMPs,
removal efficiency is applied at either 50% or 75% depending on the
equivalent TSS removal efficiency for the preceding BMPs (regardless
of the pollutant constituent).
8.39 Technology Assessment
Protocol for Innovative and Emerging Technologies - Overview
A. New treatment practices
must undergo a third-party evaluation using the Technology Assessment
Protocol prior to approval for usage for both primary treatment and
pretreatment purposes. Reciprocity is given for practices approved
elsewhere under Technology Acceptance Reciprocity Partnership and
Technology Assessment Protocol – Ecology provided that any
deficiencies are addressed with respect to the eleven Minimum
Standards presented in §§ 8.7 through 8.17 of this Part.
B. The Technology Assessment
Protocol describes testing and reporting procedures to evaluate the
effectiveness of innovative and emerging stormwater treatment
technologies. The objectives of this protocol are to characterize,
with a reasonable level of statistical confidence, an emerging
technology’s effectiveness in removing pollutants from
stormwater runoff for an intended application. The protocol requires
an independent third-party verification that will ensure stormwater
treatment systems meet the stormwater performance goals and criteria
for new development, redevelopment and retrofit situations
established in this Part.
C. Approval will be contingent
on submission of objective, verifiable data that meets the
Performance Standards and Criteria outlined in §§ 8.6
through 8.17 of this Part. Stormwater treatment technologies will be
designated as either i) primary treatment practices for meeting water
quality criteria, or ii) pretreatment, and/or quantity control (CPv
and Qp) stormwater management practices. Achieving primary treatment
designation is dependent upon meeting the Minimum Standard 3 in §
8.9 of this Part. By obtaining accurate and relevant data, the
regulatory community can assess performance claims for a particular
BMP.
D. The Technology Assessment
Protocol strongly recommends parallel testing evaluation under
rigorous and uniform conditions. The utility of parallel testing is
that site characteristics (land use, contaminant loading, sediment
characteristics) are consistent for all tested practices and rainfall
event characteristics (depth, intensity, duration, antecedent dry
period) will be uniform for given performance periods. Identical site
and rainfall characteristics enable rigorous performance evaluations
that would otherwise complicate direct performance comparisons. This
is especially critical given the well know limitations of stormwater
solids sampling and its implications on performance testing.
E. The Technology Assessment
Protocol requires independent third party work for all reports that
contain field data regardless of where this data were collected.
Parties that do not have a direct financial interest in the outcome
of testing a treatment practice are not required to obtain an
independent third party review. At a minimum, an independent
professional must:
1. Complete the data
validation report verifying that monitoring was conducted in
accordance with an approved QAP; and
2. Prepare a Technical
Evaluation Report that includes a testing results, summary,
conclusions, and comparison with the standards and performance
criteria outlined in § 8.9 of this Part (Minimum Standard 3).
F. Treatment Performance Goals
1. Treatment performance goals
are the standards and performance criteria outlined in § 8.9 of
this Part (Minimum Standard 3). These include performance measures
for solids, phosphorous, nitrogen, and bacteria. There are several
categories of solids in stormwater. These include total solids,
total suspended solids, suspended solids concentration, total
dissolved solids, and gross solids. For treatment performance goals,
for the purposes of the Technology Assessment Protocol, performance
is measured with respect to total suspended solids. Total solids
refers to all particles regardless of size.
2. Primary Treatment: The
stormwater performance goals are outlined in § 8.9 of this Part
(Minimum Standard 3). Systems will be approved for primary treatment
if they meet the TSS, bacteria, TP, and TN standards.
3. Pretreatment Applications:
The pretreatment devices do not meet the requirements of § 8.9
of this Part (Minimum Standard 3). They are designed to improve
water quality and enhance the effective design life of practices by
concentrating the maintenance to a specific, easily serviceable
location. The pretreatment applications generally apply to all
treatment systems where pretreatment is needed to assure and extend
performance of the downstream basic or enhanced treatment facilities.
8.40 Technology Assessment
Protocol Methodology
A. The objectives of this
protocol are to characterize, with a reasonable level of statistical
confidence, an emerging technology’s effectiveness in removing
pollutants from stormwater runoff and to compare test results with
proponents’ claims.
B. Primary treatment level
designation is granted based on the information submitted and best
professional judgment. Submitting the appropriate amount of data
does not guarantee that primary treatment designation will be given.
Decisions are based on system performance and other factors such as
maintenance burden, operation, and integrity. Technologies not
granted primary treatment will automatically be considered as
pretreatment or secondary treatment.
C. Quality Assurance Plan:
Before initiating testing, a QAP must be prepared based on this
protocol. The QAP must be submitted for review before conducting
field tests. The QAP must specify the procedures to be followed to
ensure the validity of the test results and conclusions. The QAP
must specify the name, address, and contact information for each
organization and individual participating in the performance testing.
Include project manager, test site owner/manager, field personnel,
consultant oversight participants, and analytical laboratory that
will perform the sample analyses. Identify each study participant’s
roles and responsibilities and provide key personnel resumes. In
addition, provide a schedule documenting when the vendor’s
equipment will be installed, the expected field testing start date,
projected field sampling completion, and final project report
submittal.
D. Field Testing and Site
Characterization: Sites must provide influent concentrations typical
of stormwater for those land use types for the technology's intended
applications. National median stormwater concentrations contains
about 43, 49, 81, and 99 mg/L TSS for commercial, residential,
industrial, and freeway land use classifications respectively (Pitt,
R. E., Maestre, A., and Center for Watershed Protection. 2005. The
National Stormwater Quality Database, version 1.1. USEPA Office of
Water, Washington, D.C.). Include the following information about
the test site:
1. Field test site catchment
area, tributary land uses, (roadway, commercial, high-use site,
residential, industrial, etc.) and amount of impervious cover;
2. Description of potential
pollutant sources in the catchment area;
3. Baseline stormwater quality
information to characterize conditions at the site. For sites that
have already been developed, it is recommended that the investigator
collect baseline data to provide a sizing basis for the practice, and
to determine whether site conditions and runoff quality are conducive
to performance testing;
4. Site map showing catchment
area, drainage system layout, and treatment practice and sampling
equipment locations;
5. Catchment flow rates (i.e.,
water quality design flow, 1-year, 10-year, and 100-year peak flow
rates) at 15-minute and 1-hour time steps as provided by an approved
continuous runoff model;
6. Make, model, and capacity
of the treatment device, if applicable;
7. Location and description of
the closest receiving water body;
8. Description of bypass flow
rates and/or flow splitter designs necessary to accommodate the
treatment technology;
9. Description of pretreatment
system, if required by site conditions or technology operation; and
10. Description of any known
adverse site conditions such as climate, tidal influence, high
groundwater, rainfall pattern, steep slopes, erosion, high spill
potential, illicit connections to stormwater catchment areas,
industrial runoff, etc.
E. Stormwater Data Collection
Requirements: The stormwater data and event requirements are
provided in the table in § 8.40(F) of this Part to assist in
developing the sampling plan.
F. Stormwater Data Collection
Requirements
Item
Stormwater
Data Collection Requirement
1
Water
level in practice shall be continuously recorded throughout the
field testing program, including non-sampled storms and
non-rainfall days.
2
Range
of recorded water levels shall extend below normal, low flow or
dry weather level in practice to above treatment capacity.
3
Recorded
water levels shall be plotted along with rainfall.
4
Include
a description of each maintenance task performed, reason for
maintenance, quantities of sediment removed, and a discussion of
any anomalous, irregular, or missing maintenance data.
5
To
determine practice's required maintenance interval, the minimum
duration of the overall field testing program shall be 1 year
beginning at installation, commissioning or the beginning of the
removal rate testing, whichever is greater.
6
Storm
event must have a minimum total rainfall depth of 0.1 inches.
7
Inter-event
dry period between storms shall begin when runoff from prior storm
ceases.
8
Minimum
of 20 storms sampled, although 25 or more are recommended.
9
Storms
do not need to be consecutive.
10
Peak
runoff of at least 3 storms shall exceed 75% of the practice's
capacity.
11
Minimum
total rainfall for all storms sampled shall be 15 inches.
12
Minimum
number of samples collected shall be 10 for storms lasting longer
than 1 hour or more.
13
Minimum
number of samples collected shall be 6 for storms lasting less
than 1 hour.
14
Samples
shall be taken over time to cover a minimum of 70% of total runoff
volume.
15
Rainfall
shall be recorded continuously during events with max time
interval of 5 minutes for runoff collection based on time and max
rainfall interval of 0.01 inches for runoff collection based on
volume.
16
Rainfall
shall be recorded throughout the sampling program.
17
Rainfall
from non-sampled events can be recorded with same gauge or
obtained from a nearby gauge provided that gauge has minimum
recording interval of 1 hour.
18
Maximum
15 minute rainfall intensity shall be 5 inches/hour.
19
Maximum
total rainfall shall be 3 inches.
20
1
storm sampled may exceed previous two requirements.
G. Stormwater Field Sampling
Procedures
1. Sampling methods: Collect
samples using automatic samplers, except for chemical constituents
that require manual grab samples. Use teflon tubing if samples will
be analyzed for organic contaminants. To use automatic sampling
equipment for insoluble total petroleum hydrocarbon/oil, a
determination is needed that any total petroleum hydrocarbon/oil
adherence to the sampling equipment is accounted for and meets QA/QC
objectives. This determination requires support with appropriate
data. The responsible project professional should certify that the
sampling equipment and its location would likely achieve the desired
sample representativeness, aliquots, frequency, and compositing at
the desired influent/effluent flow conditions. The following three
sampling methods have been identified for evaluating whether new
treatment technologies will meet the stormwater treatment goals:
a. Automatic flow-weighted
composite sampling. Collect samples over the storm event duration
and composite them in proportion to flow. This sampling method
generates an event mean concentration and can be used to determine
whether the treatment technology meets the pollutant removal goals on
an average annual basis. For this method, samples should be
collected over the entire runoff period. The greater the number of
aliquots and storm coverage the greater the confidence that the
samples represent the event mean concentration for the entire storm.
b. Discrete flow composite
sampling.
(1) For this method, program
the sampler to collect discrete flow-weighted samples. Combine
samples representing relatively constant inflow periods to assess
performance under specific flow conditions. The monitoring approach
must also address the effect of lag time within the practice that
would affect the comparability of influent and effluent samples
paired for purposes of evaluating a particular flow rate. One way to
achieve this is to set the flow pacing so that each discrete sample
bottle fills when the total runoff volume passing the sampler is
equal to 8 times the treatment unit’s detention volume. Other
ways to account for lag time may also be considered.
(2) Proponents can use this
method to determine whether the treatment technology achieves the
pollutant removal goals at the design hydraulic loading rate. For
this method, collect samples over a flow range that includes the
manufacturer’s recommended treatment system design flow rate.
Sample other flow ranges if needed to characterize the efficiencies
of the practice over a reasonable range of hydraulic loading rates.
Distribute samples over a range of flow rates from 50-150% of the
practice's design loading rate. This technique is necessary for
practices where the influent and effluent flowrate are nearly equal
because the system does not control the effluent flowrate. This
technique is required to verify how the practice functions at varying
flowrates.
c. Combination method. For
flow-through practices, proponents can use a combination of the above
two methods to evaluate treatment goals. For the combination method,
collect discrete flow composite samples as allowed during a single
storm event and process for analysis. Composite the remaining
bottles in the sampler into a single flow-weighted composite sample
to capture the entire runoff event for analysis. Mathematically
combine the results from the discrete flow composite samples and the
single flow-weight composite sample to determine the overall event
mean concentration.
2. Sampling locations
a. Provide a site map showing
all monitoring/sampling station locations and identify the equipment
to be installed at each site. To accurately measure system
performance, samples must be collected from both the inlet and outlet
from the treatment system. Sample the influent to the treatment
technology as close as possible to the treatment practice inlet. To
ensure that samples represent site conditions, design the test site
so that influent samples can be collected from a pipe that conveys
the total influent to the unit. To avoid skewing influent pollutant
concentrations, sample the influent at a location unaffected by
accumulated or stored pollutants in, or adjacent to, the treatment
practice.
b. Influent, effluent, and
bypass sampling shall be conducted upstream and downstream of any
practice diversions and/or bypass so that the entire sampled storm
runoff can be included in sampling. In some instances bypass sampling
may not be possible.
c. Sample the effluent at a
location that represents the treated effluent. If bypass occurs,
measure bypass flows and calculate bypass loadings using the
pollutant concentrations measured at the influent station. In
addition, be aware that the settleable or floating solids, and their
related bound pollutants, may become stratified across the flow
column in the absence of adequate mixing. Collect samples at a
location where the stormwater flow is well-mixed.
3. Sampler installation,
operation, and maintenance. Provide a detailed sampling equipment
description (make and model) as well as equipment installation,
operation, and maintenance procedures. Discuss sampler installation,
automatic sampler programming, and equipment maintenance procedures.
Install and maintain samplers in accordance with manufacturer’s
recommendations. Indicate any deviations from manufacturer’s
recommendations. Provide a sampling equipment maintenance schedule.
When developing the field plan, pay particular attention to managing
the equipment power supply to minimize the potential for equipment
failure during a sampling event.
4. Flow monitoring. Measure
and record flow into and out of the treatment practice on a
continuous basis over the sampling event duration. The appropriate
flow measurement method depends on the nature of the test site and
the conveyance system. Depth-measurement practices and area/velocity
measurement practices are the most commonly used flow measurement
equipment. For offline systems or those with bypasses, measure flow
at the bypass as well as at the inlet and outlet. Describe the flow
monitoring equipment (manufacturer and model number), maintenance
frequency and methods, and expected flow conditions at the test site.
For offline flow, describe the flow splitter that will be used and
specify the bypass flow set point. Identify site conditions, such as
tidal influence or backwater conditions that could affect sample
collection or flow measurement accuracy. Flow is typically logged at
a 5-minute or shorter interval, depending on site conditions.
5. Rainfall monitoring.
Measure and record rainfall at 15-minute intervals or less during
each storm event from a representative site. Indicate the type of
rain gauge used, provide a map showing the rain gauge location in
relation to the test site, and describe rain gauge inspection and
calibration procedures and schedule. Install and calibrate equipment
in accordance with manufacturer’s instructions. At a minimum,
inspect the rain gauge after each storm and if necessary, maintain
it. In addition, calibrate the gauge at least twice during the field
test period. If the onsite rainfall monitoring equipment fails
during a storm sampling event, use data from the next-closest,
representative monitoring station to determine whether the event
meets the defined storm guidelines. Clearly identify any deviations
in the Technical Evaluation Report, required pursuant to §
8.40(I) of this Part. Nearby third party rain gauges may only be
used in the event of individual rain gauge failure and only for the
period of failure. If third party rain gauges are used to fill in
data gaps, establish a regression relationship between site and third
party gauges and use the regression equation to adjust the
third-party data to represent site rainfall when needed.
6. Sampling for TSS, Suspended
Sediment Concentration, Nutrients, and Bacteria
a. Standardized test methods
should be used.
b. This protocol defines TSS
as matter suspended in stormwater, excluding litter, debris, and
other gross solids.
c. Sampling for nutrients will
include dissolved inorganic nitrogen, total Kjeldahl Nitrogen, total
nitrogen (TN), soluble reactive phosphate (orthophosphate), and total
phosphorous.
d. Sampling for bacteria will
include Total Coliform, Enterococci, and Escherichia coli.
e. It is understood that
sampling and analyses for nutrients and bacteria can be problematic
for 6-hour holding times with anything other than grab samples.
Automated samplers will need to maintain sample storage at 1-4°C.
f. To determine percent
reduction, the samples must represent the vertical cross section (be
a homogeneous or well-mixed sample) of the sampled water at the
influent and the effluent of the practice. Select the sampling
location and place and size the sampler tubing with care to ensure
the desired representativeness of the sample and the stormwater
stream. Performance goals apply on an average annual basis to the
entire annual discharge volume (treated plus bypassed).
g. Accumulated Sediment
Sampling Procedures
(1) Measure the sediment
accumulation rate to help demonstrate facility performance and design
a maintenance plan. Practical measurement methods would suffice,
such as measuring sediment depth, immediately before sediment
cleaning and following test completion. Particle size distribution
analyses are determined using wet sieving and hydrometer.
(2) Use several grab samples
(at least four) collected from various locations within the treatment
system to create a composite sample. For QA/QC purposes, collect a
field duplicate sample. Keep the sediment sample at 4 degrees
centigrade during transport and storage prior to analysis. If
possible, remove and weigh (or otherwise quantify) the sediment
deposited in the system. Quantify or otherwise document gross solids
(debris, litter, and other particles). Use volumetric sediment
measurements and analyses to help determine maintenance requirements,
calculate a total sediment mass balance, and determine if the
sediment quality and quantity are typical for the application.
7. Sampling for Particle Size
Distribution
a. To meet the solids removal
goals, treatment technologies must be capable of removing TSS across
the size fraction range typically found in urban runoff. Field data
show most TSS particles are silt sized particles. Particle size
distribution analyses must be performed for 3 paired events per year
for influent, effluent, and accumulated residual sediments at the end
of the monitoring period. Comparisons of particle size distribution
in the influent and effluent and the accumulated residual sediments
will demonstrate the particle range of sediments removed and
un-removed. Particle size distribution data can also provide
information regarding total solids transport during a storm.
b. Of the analytical
procedures available, the Coulter Counter (Model 3) and the
laser-diffraction method are used for samples obtained by
auto-sampler and for measuring smaller particles. Sieving can only
be used to quantify large volume samples with sediment volumes
typically in excess of 500 grams. Due to the potential differences
in precision among analytical procedures, use the same analytical
apparatus and procedure for each evaluation test program. A
recommended particle size distribution analytical procedure using
laser diffraction instrumentation and sieve analysis is included. It
must be recognized that particle size distributions obtained by
optical measure (laser diffraction and Coulter Counter) will have
limited direct comparison with sieving and hydrometer analysis.
H. Field Quality Assurance and
Quality Control. Field QA/QC should include the elements listed
below:
1. Equipment calibration:
Describe the field equipment calibration schedule and methods,
including automatic samplers, flow monitors, and rainfall monitors.
2. Recordkeeping: Maintain a
field logbook to record any relevant information noted at the
collection time or during site visits. Include notations about any
activities or issues that could affect the sample quality. At a
minimum, the field notebook should include the date and time, field
staff names, weather conditions, number of samples collected, sample
description and label information, field measurements, field QC
sample identification, and sampling equipment condition. Also,
record measurements tracking sediment accumulation. In particular,
note any conditions in the tributary basin that could affect sample
quality. Provide a sample field data form in the QAP.
3. Laboratory Quality
Assurance Procedures: Laboratories performing stormwater sample
analysis must be certified by a national or state agency regulating
laboratory certification or accreditation programs. Report results
in the Technical Evaluation Report or use level designation
application. Include a table with the following:
a. Analyte;
b. Sample matrix;
c. Laboratory performing the
analysis;
d. Number of samples;
e. Analytical method (include
preparation procedures as well as specific methods especially when
multiple options are listed in a method); and
f. Reporting limits for each
given analytical method (include the associated units).
4. Data Management Procedures:
Include a quality assurance summary with a detailed case narrative
that discusses problems with the analyses, corrective actions if
applicable, deviations from analytical methods, QC results, and a
complete definitions list for each qualifier used. Specify
field/laboratory electronic data transfer protocols (state the
percent of data that will undergo QC review) and describe corrective
procedures. Indicate where and how the data will be stored.
5. Data Review, Verification,
and Validation
a. Describe procedures for
reviewing the collection and handling of the field samples.
b. Establish the approach that
will be used to determine whether samples meet all flow sampling and
rainfall criteria.
c. Validation requires
thoroughly examining data quality for errors and omissions.
Establish the process for determining whether data quality objectives
have been met. Include a table indicating percent recovery and
relative standard deviation for all QC samples. Determine whether
precision and bias goals have been met. Establish a procedure to
review reporting limits to determine whether non-detected values
exceed reporting limit requirements.
d. Analyze all data for
statistical significance.
I. Technical Evaluation Report
1. After testing has been
completed, submit a Technical Evaluation Report to DEM or CRMC. The
Technical Evaluation Report supports the technologies ability to
obtain a primary treatment level designation. The Technical
Evaluation Report must contain performance data from a minimum of 1
test site, and a statement of the QAP objectives including the
vendor’s performance claims for specific land uses and
applications. A prescriptive reporting approach is provided to
insure completeness of reporting and to facilitate an effective and
rapid review. The framework is listed below.
a. Summary: Executive Summary
with rated performance rating, Study Summary, Data Collection
Summary;
b. Definitions;
c. Site Conditions: longitude,
latitude, land cover type, land use activities, site conditions, site
elevations and slopes, location of sampling equipment, location of
on-site stormwater collection system, and a description of any
upstream BMPs;
d. Technology Description:
(1) The specific device used
(model number, size, operating rate or volumetric flow rate);
(2) Functionality of treatment
mechanisms including pretreatment and bypass requirements;
(3) Physical description:
engineering plans, site installation requirements;
(4) Sizing methodology used
for test: either manufacturers sizing methodology or approving agency
specific sizing requirements (flows, volumes, runoff depth, etc.);
and
(5) Maintenance procedures.
e. Test Methods and
Procedures:
(1) Particle size for
influent, effluent, and residuals, mass based, concentration based;
(2) Water quality parameters
monitored;
(3) Data Quality Objectives,
QA methods, and measurement accuracy for the observations;
(4) Measuring instruments,
sampling frequency, and sampling program information; and
(5) Sampling Locations and
Peak Concentration Timing.
f. Testing and Sampling Event
Characteristics:
(1) Storm date, depth,
antecedent dry period, intensity, duration, season, type of runoff
(precipitation, snowmelt, groundwater, etc.);
(2) Number of influent and
effluent aliquots; storm volume, % storm treated influent, effluent,
peak flow rate, calculation of peak reduction and lag coefficients,
number of storms exceeding design criteria;
(3) Comparisons with Data
Quality Objectives;
(4) System timeline (start and
completion, sample events, rainfall events, maintenance occurrence);
and
(5) Water level within system
and rainfall for testing duration.
g. Performance Results and
Discussion:
(1) Event mean concentrations
for influent and effluent with summary statistics (N, mean, median,
coefficient of variation, standard deviation, one – tailed sign
t-test);
(2) Detection limits and
confidence intervals;
(3) Performance metrics:
removal efficiency for event mean concentration and mass loads,
efficiency ratio;
(4) Statistical Evaluation:
time series plot, box and whisker with confidence intervals, effluent
probability method, linear regression;
(5) Solids characterization:
influent, effluent, residuals particle size analysis;
(6) Accumulated mass
reductions;
(7) Individual Storm Reports
with event characteristics (§§ 8.40 (I)(1)(f)((1)) and
((2)) of this Part), combination event hydrograph and hyetograph with
sample times; system performance characteristics (§§
8.40(I)(1)(g)((1)) through ((3)) of this Part), monitoring details;
(8) Quality Assurance,
rejection criteria and rejection summary; and
(9) Maintenance findings:
discussion on recommended maintenance schedules.
h. Conclusions, performance
claims, and limitations;
i. Appendices: raw data and
credentials; and
j. Third Party Review. The
testing and reporting, if not performed by an independent
professional third party, must be reviewed.
2. Confidential Information
Submitted by the Applicant
a. Certain records or other
information furnished in the Technical Evaluation Report may be
deemed confidential. In order for such records or information to be
considered confidential, the proponent of such technology must
certify that the records or information relate to the processes of
production unique to the manufacturer, or would adversely affect the
competitive position of such manufacturer if released to the public
or to a competitor. The proponent must request that such records or
information be made available only for the confidential use.
b. To make a request for
confidentiality, clearly mark only those pages that contain
confidential material with the words “confidential.”
Include a letter of explanation as to why these pages are
confidential. A notice will be sent granting or denying the
confidentiality request.
3. Treatment Efficiency
Calculation Methods
a. Calculate several
efficiencies, as applicable. Consider lag time and steady-state
conditions to calculate loads or concentrations of effluents that
represent the same hydraulic mass as the influent. State the
applicable performance standard on the table or graph.
b. For technologies sized for
long residence times (hours versus minutes), the proponent must
consider cumulative event mean performance of several storms, wet
season or annual time periods. For short residence times (several
minutes), event mean comparisons are recommended.
c. Method #1: Individual
storm reduction in pollutant concentration. The reduction in
pollutant concentration during each individual storm calculated as:
Where:
A
= flow-weighted influent concentration
B
= flow-weighted effluent concentration
d. Method #2: Aggregate
pollutant loading reduction. Calculate the aggregate pollutant
loading removal for all storms sampled as follows:
Where:
A
= (Storm 1 influent concentration) * (Storm 1 volume) + (Storm 2
influent concentration) * (Storm 2 volume) +… (Storm N
influent concentration) * (Storm N volume)
B
= (Storm 1 Effluent concentration) * (Storm 1volume) + (Storm 2
effluent concentration) +…(Storm N effluent concentration)
* ( Storm N volume)
Concentrations
are flow-weighted and flow = average storm flow or total storm
volume (vendor’s choice)
e. Method #3: Individual
storm reduction in pollutant loading. Calculate the individual storm
reduction in pollutant loading as follows:
Where:
A
= (Storm 1 influent concentration) * (Storm 1 volume)
B
= (Storm 1 effluent concentration) * (Storm 1 volume)