250-RICR-150-20-2
250-RICR-150-20-2. Rules and Regulations for the Priority Determination System for Federal and State Assistance to Local Governmental Units for Construction of Water Pollution Abatement Projects (version Amendment, 10/24/2017 to 01/04/2022)
2.1 Purpose
A. The Priority Determination
System is designed to achieve optimum water quality management
results from the Rhode Island Department of Environmental
Management's (DEM) water pollution abatement project construction
assistance programs, consistent with the powers and duties of the
Department denoted in Chapters 42-17.1, 46-12, and 46-12.2 of the
Rhode Island General Laws as amended, and the Federal Water Pollution
Control Act [33 U.S.C. Sec. 1251 et seq ., as amended],
commonly called the Clean Water Act.
B. The Priority Determination
System describes procedures for annually determining the priority
rating and ranking of all categories of identified water pollution
abatement projects proposed by local governmental units and persons,
which may receive federal and/or state funding assistance from the
State Revolving Fund (SRF) and the Interceptor Bond Fund (IBF)
account of the Rhode Island Clean Water Act Environmental Trust Fund.
C. Eligibilities and actual
assistance awards are determined by the criteria and methodology
contained in the rules and regulations for each specific assistance
program.
2.2 Authority
These Rules and Regulations
are promulgated pursuant to R.I. Gen. Laws §§ 42-17.1-1 et seq .,
46-12-1 et seq ., and 46-12.2-1 et seq .; and in
accordance with R.I. Gen. Laws §42-35-1 et seq .
2.3 Application
The terms and provisions of
these Rules and Regulations shall be liberally construed to permit
the Department to effectuate the purposes of state law, goals, and
policies.
2.4 Definitions
A. For the purposes of these
Regulations, the following terms shall have the following meanings:
1. "Bank" or "RIIB"
means the Rhode Island Infrastructure Bank established by R.I. Gen.
Laws § 46-12.2-1 et seq.
2. "Areawide Waste
Treatment Management Plan" or "208 Plan" means the
plan prepared by the State pursuant to Section 208 of the Clean Water
Act.
3. "Chief Executive
Officer" means the mayor in any city, the president of the town
council in any town, or the executive director of any authority or
commission unless some other officer or body is designated to perform
the functions of a chief executive officer under the provisions of a
local charter or other law.
4. "Clean Water Act"
or "CWA" means the Federal Water Pollution Control Act,
codified at 33 U.S.C Sec. 1251 et seq. , as amended.
5. "Community
Comprehensive Plan” or "CCP" means a plan prepared
pursuant to the Rhode Island Comprehensive Planning and Land Use
Regulation Act, R.I. Gen. Laws § 45-22.2-1 et seq.
6. "Comprehensive
Conservation and Management Plan" or "CCMP" means a
plan prepared pursuant to the requirements of Section 320 of the
Clean Water Act.
7. "Construction"
means any one or more of the following: Preliminary planning to
determine the feasibility of treatment works, engineering,
scientific, architectural, legal, fiscal, or economic investigations
or studies, surveys, designs, plans, working drawings,
specifications, procedures, or other necessary actions, erection,
building, acquisition, alteration, rehabilitation, improvement, or
extension of treatment works, or the administration, inspection, or
supervision of any of the foregoing items.
8. "Combined Sewer"
means a sewer which serves as a sanitary sewer and a storm sewer.
9. "Combined Sewer
Overflow" or "(CSO)" means flow from a combined sewer
in excess of the interceptor or regulator capacity that is discharged
into a receiving water without going to a WWTF. A CSO occurs prior
to reaching a WWTF and is distinguished from bypasses which are
intentional diversions of waste streams from any portion of a WWTF.
10. "Costs" means
any or all costs relating to the planning, designing, acquiring,
constructing and carrying out and placing in operation a water
pollution abatement project including, but not limited to, the
following: planning, design, acquisition, construction, expansion,
improvement and rehabilitation of facilities; acquisition of real or
personal property; demolitions and relocations; labor, materials,
machinery and equipment; services of architects, engineers,
scientists, environmental and financial experts and other
consultants; feasibility studies; rate/cost recovery/user charge
studies; borings, survey, and other preliminary engineering costs;
plans and specifications; administrative costs; legal costs; all
costs related to project financing; and any and all other expenses
necessary or incidental to the financing and construction of a water
pollution abatement project.
11. "Department" or
"DEM" means the Department of Environmental Management of
the State of Rhode Island.
12. "Director" means
the Director of the Rhode Island Department of Environmental
Management or his/her designee.
13. "Fiscal Year"
means the State of Rhode Island fiscal year: 1 July to 30 June.
14. "Growth Center"
means a designated area, consistent with the state-approved local
Community Comprehensive Plan, where compact, mixed-use development is
accommodated without depleting a community's natural, historic and
cultural resources.
15. "Infiltration/Inflow"
or "(I/I)" means the total flow from both infiltration and
inflow without distinguishing the source.
16. "Landfill" means
any site where the disposal of wastes and/or sludge occurs or has
occurred by placing them in or on the land, compacting, and covering
with a layer of soil.
17. "Local Governmental
Unit" means any city, town, district, commission, agency,
authority, board or other political subdivision or instrumentality of
the state or of any political subdivision thereof responsible for the
ownership or operation of a water pollution abatement project(s),
including the Narragansett Bay Water Quality Management District
Commission.
18. “Materials" means
product(s) employed in or by-products generated by industrial,
commercial, and/or agricultural processes.
19. "Materials Storage
Area" means any pile, impoundment, compound, facility or other
area where materials are contained, held or otherwise stored in such
a manner which causes, contributes to, or contaminates runoff.
20. "Nonpoint Source
Management Plan" or "NPS" means a plan prepared
pursuant to the requirements of Section 319 of the Clean Water Act.
21. "Onsite Wastewater
Treatment System" or "(OWTS)" means any system of
piping, tanks, disposal areas, alternative toilets or other
facilities designed to function as a unit to convey, store, treat
and/or dispose of sanitary sewage by means other than discharge into
a public sewage collection system.
22. "Person" means
an individual, trust, firm, joint-stock company, corporation
(including a quasi-governmental corporation), partnership,
association, syndicate, fire district, club, non-profit agency
commission, or of any interstate body and any agent or employee
thereof.
23. "Pollution"
means the man-made or man-induced alteration of the chemical,
physical, biological, thermal, and radiological integrity of water.
24. "Project" or
"Water Pollution Abatement Project" means any project that
contributes to the prevention, removal, curtailment, or mitigation of
pollution of the surface waters or groundwater of the state, or the
restoration of the quality of said waters, and conforms with any
applicable planning document which has been approved and/or adopted.
This definition shall be construed to include the planning, design,
construction or any other distinct stage or phase of a project, as
well as efforts to educate or raise the awareness of the general
public towards pollution or a project.
25. "Project Priority
List" or "PPL" means an annual ranked listing based on
relative priority ratings of all water pollution abatement projects
in all categories for which federal or state assistance is requested
from DEM's assistance programs.
26. "Raw Sewage
Discharge" means any discharge to a receiving water of untreated
sanitary sewage.
27. "Runoff" means
water that drains from an area as surface flow.
28. "Sanitary Sewer"
means a sewer which conveys wastewater from residences, commercial
buildings, industrial plants, and institutions.
29. "State Guide Plan"
or "SGP" means goals, policies, or plan elements for the
physical, economic, and social development of the state, adopted by
the State Planning Council in accordance with R.I. Gen. Laws §
42-11-10.
30. "Storm Sewer"
means a sewer intended to convey only storm waters, surface runoff,
street wash waters, and drainage.
31. "Total Maximum Daily
Load" or "TMDL" means the amount of a pollutant that
may be discharged into a waterbody and still maintain water quality
standards. The TMDL is the sum of the individual wasteload
allocations for point sources and the load allocations for nonpoint
sources and natural background taking into account a margin of
safety.
32. "Underground Storage
Tank" means any one or a combination of tanks (including
underground pipes connected thereto) which is used to contain an
accumulation of petroleum product or hazardous materials, and the
volume of which (including the volume of the underground pipes
connected thereto) is ten percent (10%) or more beneath the surface
of the ground.
33. "Wastewater
Facilities Plan" or "WWFP" means a plan prepared
pursuant to the requirements of Section 201 of the federal Clean
Water Act which is a detailed 20-year wastewater treatment,
conveyance, and disposal plan, including an assessment of the
environmental impacts of the plan, and which also contains
information to meet the statutory and regulatory requirements of the
DEM for systems to prevent pollution and the consistency requirements
of the Comprehensive Planning and Land Use Regulation Act (R.I. Gen.
Laws § 45-22.2).
34. "Wastewater Treatment
Facility (WWTF)" means any equipment, devices, and systems for
preventing, abating, reducing, storing, conveying, treating,
separating, recycling, reclaiming, or disposing of sanitary or
combined sewage.
35. "Watershed Action
Plan" means a document that identifies watershed goals and
management objectives along with specific action items that are
needed. The plan is developed in consultation with all key
stakeholders within the watershed including, but not limited to,
federal, state and local governmental agencies, non-governmental
organizations and the private sector.
2.5 Project Priority List
A. A project cannot receive
funding from any DEM assistance program which utilizes the Priority
Determination System unless it is on the approved Project Priority
List. The DEM, Office of Water Resources must receive a letter of
intent or equivalent document requesting that the proposed project be
placed upon the Project Priority List. To be rated and ranked under
the project priority system, the letter of intent for a requested
project must include:
1. Documentation that the
requested project is, at a minimum, not inconsistent with: the State
Guide Plan; a Community Comprehensive Plan; the Non-Point Source
Management Plan; the Areawide Waste Treatment Management Plan or
Plans; the Comprehensive Conservation and Management Plan; an
approved Wastewater Facilities Plan. EXCEPTION: this requirement does
not necessarily apply to request for assistance for planning or
scientific investigations/studies.
2. A total cost estimate of
all costs relating to the project.
3. A project description and
schedule.
B. The Director shall annually
prepare and publish a ranked priority list of all water pollution
abatement projects for which assistance has been properly requested.
2.6 Project Rating
A. The Director shall rate
each project according to the project rating criteria in Appendix I
of these Regulations. In order to rate a project, the Director must
determine that the project will contribute to achieving the State
water quality policy goals and objectives. The numerical scores in
Appendix I are based on the following:
1. The existing conditions
that cause the pollution.
2. The benefits of the
proposed project, including improvements in overall efficiency and
service.
3. Improvements to water
quality.
4. Intergovernmental needs,
requirements, or mandates identified in: the State Guide Plan; a
Community Comprehensive Plan; the Non-Point Source Management Plan;
the Areawide Waste Treatment Management Plan; the Comprehensive
Conservation and Management Plan; a Special Area Management Plan; an
approved Total Maximum Daily Load or Watershed Action Plan, or an
approved Wastewater Facilities Plan.
5. The degree to which a
project is ready to proceed.
B. For every project, the
Director shall assign points to each project rating criterion based
upon the most current information available to the Department,
including information received prior to or during the public notice
period required under § 2.8 of this Part.
C. Point values have been
assigned to subcategories based on needs and priorities identified in
but not limited to: the State Guide Plan; a Community Comprehensive
Plan; the Nonpoint Source Management Plan; the Areawide Waste
Treatment Management Plan; the Comprehensive Conservation and
Management Plan; DEM Water Quality Regulations; RIDEM Rules and
Regulations for Groundwater Quality; and an approved Wastewater
Facilities Plan.
D. The Director shall annually
evaluate the rating of each project and make such changes as deemed
necessary.
2.7 Project Ranking
Projects will be ranked based
upon points accumulated pursuant to § 2.6 of this Part. The
Director shall not place projects on the PPL and shall remove
projects from the PPL when it is determined that the projects will
not contribute to achieving applicable state water quality goals,
policies, standards, or objectives.
2.8 Review and Adoption of
Priority List
A. The Director shall make
available for written comments the proposed PPL prior to its
adoption.
B. Public notice of the
availability of the proposed PPL shall be published in a newspaper of
the State with statewide circulation, or on the Department’s
website, for up to thirty (30) calendar days, or as required by R.I.
Gen. Laws § 42-35, to afford all interested persons reasonable
opportunity to submit data, views, or arguments concerning the
proposed PPL. The public notice shall indicate the location where
copies of the draft PPL may be obtained and/or reviewed by interested
parties.
C. The Director shall accept
written comments on the draft PPL. The Director shall consider fully
all written submissions respecting the proposed PPL, and make any
changes deemed necessary to serve the purposes of these Regulations.
D. The Director will adopt a
final PPL. Upon adoption of the final PPL, if requested to do so by
an interested person, the Director will issue a concise statement of
the principal reasons for and against its adoption, incorporating
therein the reasons for overruling the considerations urged against
its adoption.
E. The Director shall
permanently retain a copy of the PPL development record which shall
include a copy of the final PPL, copies of all comments, and any
statement by the Director regarding the comments on or adoption of
the final PPL.
F. The Director shall include
such information in the PPL for each project as required by the EPA
pursuant to the Clean Water Act and guidance issued pursuant thereto.
2.9 Project Priority List Revision
A. The Director shall review
the PPL for changes in estimated project schedules, project costs
and/or scope, annually. The Director may propose modification of the
PPL at any time according to these procedures:
1. Addition to the list:
projects can only be added to the PPL after a public notice period as
described in Rule 2.8 (250-RICR-150-20-2).
2. Removal from the list:
a. The Director may remove a
project completely from the Project Priority List if is determined:
that it is fully funded by other assistance programs; that it is not
consistent with an approved WWFP or applicable comprehensive
management plan; or that significant deficiencies exist in the
project scope of work or costs analysis.
b. The Director shall notify
by certified mail the person or local governmental unit whose project
will be removed and the basis for the removal. The person or local
governmental unit shall have ten (10) calendar days from receipt of
the letter to submit evidence to the DEM showing that its project
should not be removed.
c. The Director shall review
his/her decision based on the information submitted by the person or
local governmental unit and shall revise his/her decision if deemed
necessary.
d. A person or local
governmental unit whose project is removed after such review by the
Director may request that the Director reverse his/her decision to
remove the project only if substantial rights of the applicant have
been prejudiced because the administrative findings, inferences,
conclusions, or decisions are without factual basis or are an unfair
interpretation of the Rules and Regulations.
3. Revisions of a Clerical
Nature: Revisions of a clerical nature require neither a public
hearing nor documentation.
2.10 Severability
If any provision of these
Rules and Regulations, or the application thereof to any local
governmental unit or circumstances, is held invalid by a court of
competent jurisdiction, the validity of the remainder of the Rules
and Regulations shall not be affected thereby.
2.11 Superseded Rules and
Regulations
On the effective date of
these Rules and Regulations, all previous Rules and Regulations, and
any policies regarding the administration and enforcement of the
Priority Determination System shall be superseded. However, any
enforcement action taken by, or application submitted to, the
Department prior to the effective date of these Rules and Regulations
shall be governed by the Rules and Regulations in effect at the time
the enforcement action was taken, or application filed.
2.12
Appendix I - Project Rating Criteria
APPLICANT:
Point
Values
Actual
Rating
Item
#
PROJECT:
I.
EXISTING
CONDITIONS CRITERIA †
A.
Direct
Raw Sewage Discharge/Sanitary Sewer Overflow
7
A
B-1
Failing
OWTS. - Documented Water Quality Degradation
7
B-1
B-2
Failing
OWTS - Other
3
B-2
C-1
Untreated/uncontrolled
runoff - Documented Water Qual. Degrad. (Pathogen impacts)
5
C-1
C-2
Untreated/uncontrolled
runoff - Documented Water Qual. Degrad. (Non-path. impacts)
3
C-2
C-3
Untreated/uncontrolled
runoff - Other
2
C-3
D-1
Wastewater
Treatment Facility
3
D-1
D-2
Collection
System/Pump Station
1
D-2
E.
Combined
Sewer Overflows
10
E
F.
Landfill
- Closure imminent or closed
3
F
G-1
Underground
Storage Tank - Leaking
3
G-1
G-2
Underground
Storage Tank - Potential to leak (single wall construction)
2
G-2
H.
Materials
Storage Area
3
H
I-1
Sub-surface
Discharge - non-sanitary wastewater
2
I-1
I-2
Sub-surface
Discharge - stormwater only
1
I-2
J.
Stormwater
treatment/management facility
3
J
K.
Atmospheric
Deposition
1
K
L.
Excessive
Flows - exceeds design flow or operational capacity
3
L
M.
Streambank
erosion or scouring
3
M
N.
Stream
continuity/connectivity impaired
3
N
O.
Drinking
water well contamination
3
O
Section
I - Total Points
_____
II.
PROPOSED
PROJECT BENEFITS CRITERIA † *
A.
Regional
Project (i.e. project serves more than one community)
5
A
B
Treatment
of Septage at Existing WWTF
3
B
C.
Operational
Reliability Improvement
2
C
D.
Project
helps to alleviate a Sewer Connection/Extension Ban in the area
served
5
D
E.
Demonstration
or Pilot Projects
2
E
F.
Project
incorporates pollution prevention/waste minimization techniques
2
F
G.
Project
protects or restores a critical aquatic habitat or resource
3
G
H.
Project
provides technical assistance/public education
2
H
I.
Project
improves permitted discharge from interim to final limits
(discharge
is presently in compliance with interim limits)
3
I
J.
Project
addresses/prevents water pollution within a growth center
5
J
K.
Project
incorporates green infrastructure, energy conservation or other
sustainable measures
5
K
L.
Project
implements climate change resiliency measures
5
L
Section
II - Total Points
_____
III.
WATER
QUALITY IMPROVEMENT CRITERIA ‡
A.
Surface
Water Restoration † [Use Integrated 305(b)/303(d) Report]
A-1
Project
affects a Category 4.A or 4.B waterbody
8
A-1
A-2
Project
affects a Category 5 waterbody
6
A-2
A-3
Project
affects a Category 4.C waterbody
4
A-3
Subtotal
III A
_____
B.
Surface
Water Protection † [Use RIDEM Water Qual. Regs. &
305(b)/303(d) Report]
B-1
Project
affects an SRPW drinking water supply waterbody
8
B-1
B-2
Project
affects another SRPW or Category 2 waterbody
6
B-2
Subtotal
III B
_____
C.
Groundwater
Protection Factor [Use Rules and Regulations for Groundwater
Quality] †
C-1
Project
affects a Wellhead Protection Area for Community Water System Well
6
C-1
C-2
Project
affects an area of GAA Groundwater
4
C-2
C-3
Project
affects an area of GA Groundwater
2
C-3
C-4
Project
affects an area of GB Groundwater
1
C-4
Subtotal
III C
_____
Section
III - Total Points
_____
IV.
INTERGOVERNMENTAL
NEEDS CRITERIA ††
A.
Project
is consistent with Community Comprehensive Plan/State Guide Plan
3
A
B.
Project
is consistent with an approved Wastewater Facilities Plan or OWMP
3
B
C.
Project
is consistent with a Special Area Management (SAM) Plan
3
C
D.
Project
is consistent with the Areawide Waste Management Plan (208 Plan)
1
D
E.
Project
is consistent with the Nonpoint Source Management Plan (319 Plan)
3
E
F.
Project
is consistent with the Comp. Conservation and Management Plan
(CCMP)
3
F
G.
Project
is consistent with TMDL or Watershed Action Plan
3
G
H.
Project
is consistent with the local Stormwater Management Plan
3
H
I.
Project
is consistent with the Implications for Climate Change for RI
Wastewater Collection and Treatment Infrastructure
3
I
J.
Population
Served by the Project †
J.
J-1
1
- 14,999
1
J-1
J-2
15,000
- 49,999
2
J-2
J-3
? 50,000
3
J-3
Section
IV - Total Points
_____
V.
READINESS
TO PROCEED CRITERIA
A.
Planning
†
A-1
Remedial
Action Work Plan has been approved
2
A-1
A-2
Wastewater
Facilities Plan or OWMP approved or reaffirmed
2
A-2
A-3
Environmental
Assessment or Categorical Exclusion Approved
2
A-3
A-4
Lake
Management Plan Approved
2
A-4
Subtotal
V A
_____
B.
Design
B-1
Plans
and Specifications approved
2
B-1
Subtotal
V B
_____
C.
Financial/Other
††
C-1
Local
bonding authority approved, system revenues pledged or other local
funds committed
2
C-1
C-2
Pre-application
for SRF Funding complete (i.e. qualified for loan by RIIB)
2
C-2
C-3
Grant
funding has been secured
2
C-3
C-4
Local
ordinance/zoning passed in support of the project
2
C-4
Subtotal
V C
_____
Section
V - Total Points
_____
† -
Select one criterion, at most, for each category. For example,
choose A-1, A-2 or neither as applicable.
† † -
Select each and every criterion which applies.
*
- Points are awarded for projects at the project site if the
criterion is included in the proposed project.
‡ -
For water bodies that are included on the surface water
reclamation and protection lists, the highest total point rating
under either of those lists must be used, but not both.