260-RICR-30-10-2
260-RICR-30-10-2. Boiler and Pressure Vessel Inspection (version Amendment, 04/28/2019 to 01/04/2022)
2.1 AUTHORITY
This regulation is
promulgated pursuant to the authority granted in R.I. Gen. Laws §§
28-25-5 and 28-25-9.
2.2 PURPOSE
To provide the public with
information pertaining to the inspection of boilers and pressure
vessels.
2.3 INCORPORATED MATERIALS
These regulations hereby
adopt and incorporate code of rules published by the American Society
of Mechanical Engineers and the National Board of Boiler and Pressure
Vessel Inspectors (2017) by reference, not including any further
editions or amendments thereof and only to the extent that the
provisions therein are not inconsistent with these regulations.
2.4 DEFINITIONS
A. “Act” means the
Boiler and Pressure Vessel Safety Act which was enacted as R.I. Gen.
Laws Chapter 28-25.
B. “Administrator”
means the Administrator of the Division of Occupational Safety is
appointed by the Director of Labor and is responsible for
implementation and enforcement of all provisions under R.I. Gen. Laws
Chapter 28-20.
C. “Alteration”
means a change in any item described on the original Manufacturer's
Data Report which affects the pressure capability of the boiler or
pressure vessel. Non-physical changes such as an increase in the
maximum allowable working pressure (internal or external) or design
temperature of a boiler or pressure vessel shall be considered an
alteration. A reduction in minimum temperature such that additional
mechanical tests are required shall also be considered an alteration.
D. “API-ASME code”
means the American Petroleum Institute (API) in conjunction with the
ASME Code as used in these rules and regulations shall mean the Code
for unfired pressure vessels for petroleum liquids and gases.
E. “Approved”
means approved by the Code Commission for Occupational Safety and
Health.
F. “ASME” means
the American Society of Mechanical Engineers (ASME), 345 E. 47th
Street, New York, New York 10017.
G. “Authorized
inspection agency” means any of the following:
1. a department or division
established by a jurisdiction which has adopted and does administer
one or more sections of the ASME Code, one of which shall be Section
I as a legal requirement, and whose inspectors hold valid commissions
issued by The National Board of Boiler and Pressure Vessel
Inspectors;
2. an insurance company which
has been licensed or registered by the appropriate authority of a
State of the United States or a Province of Canada to write and does
write boiler and pressure vessel insurance and to provide inspection
service of boilers and pressure vessels in such State or Province.
H. “Boiler” means
a closed vessel in which water or other liquid is heated, steam or
vapor is generated, steam or vapor is superheated, or any combination
thereof, under pressure or vacuum, for use external to itself, by the
direct application of energy from combustion of fuels, electricity or
solar energy. The term boiler includes fired units for heating or
vaporizing liquids other than water where these units are separate
from processing systems and complete within themselves. The term
boiler also shall include the apparatus used by which heat is
generated and all controls and safety devices associated with such
apparatus or the closed vessels.
1. “Power boiler”
means a boiler in which steam or other vapor is generated at a
pressure of more than 15 psi.
2. “High pressure
boiler” or “High-temperature boiler” means a boiler
in which water, oil, or other fluid is heated and intended for
operation at pressures in excess of 160 psi and/or temperatures in
excess of 250 degrees Fahrenheit.
3. “Heating boiler”
means a steam or vapor boiler operating at a pressure not exceeding
15 psi steam pressure or a hot water boiler in which water or other
fluid is heated and intended for operation at pressures not exceeding
160 psi or temperatures not exceeding 250 degrees Fahrenheit.
4. “Electric boiler”
means a power boiler or heating boiler in which the source of heat is
electricity.
5. “Miniature boiler”
means a power boiler or high-temperature water boiler which does not
exceed the following limits:
a. 16" inside diameter of
shell;
b. 20 sq. ft. heating surface
(not applicable to electric boilers);
c. 5 cu. ft. gross volume
exclusive of casing and insulation.
d. 100 psi maximum allowable
working pressure.
6. “Unfired power
boiler” means an unfired steam or other vapor generating system
using heat from the operation of a processing system or other
indirect heat source.
7. “Hot water supply
boiler” means a boiler completely filled with water used for
storage and/or supply of hot water to be used externally to itself at
pressures not exceeding 160 psi or at temperatures not exceeding 250
degrees Fahrenheit at or near the boiler outlet.
8. “Portable boiler”
means a boiler which is primarily intended for temporary location and
the construction and usage permits it to be readily moved from one
location to another.
I. “Certificate of
competency” means a certificate issued to a person who has
passed the examination prescribed by the Administrator - See R.I.
Gen. Laws § 28-25-4.
J. “Certificate of
inspection” means a certificate issued by the Administrator for
the operation of a boiler, pressure vessel or nuclear system as
required by the Act.
K. “Certificate
inspection” means an inspection, the report of which is used by
the Administrator as justification for issuing, withholding or
revoking the inspection certificate. This certificate inspection
shall be an internal inspection when required; otherwise, it shall be
as complete an inspection as possible.
L. “Internal
inspection” means as complete an examination as can reasonably
be made of the internal and external surfaces of a boiler or pressure
vessel while it is shut down and manhole plates, handhole plates or
other inspection opening closures are removed as required by the
inspector.
M. “External
inspection” means an inspection made when a boiler or pressure
vessel is in operation, if possible.
N. “Chief inspector”
means the Chief Boiler and Pressure Vessel Inspector in the Division
of Occupational Safety is appointed by the Director of Labor and is
charged to administer and implement the provisions of this Chapter.
The Chief Inspector is responsible to the Administrator of
Occupational Safety as outlined in R.I. Gen. Laws § 28-25-3.
O. “Commission-National
Board” means the commission issued by The National Board of
Boiler and Pressure Vessel Inspectors to a holder of a certificate of
competency who desires to make shop inspections or field inspections
in accordance with the National Board Bylaws and whose employer
submits the inspector's application to the National Board for such
commission.
P. “Code commission”
means the State of Rhode Island Code Commission on Occupational
Safety and Health.
Q. “Condemned boiler”
and “Condemned pressure vessel” means a boiler or
pressure vessel that has been inspected and declared unsafe, or
disqualified by legal requirements, by an inspector and a stamping or
marking designating its condemnation has been applied by the Chief or
Authorized Inspector.
R. “Director”
means the Director of Labor or his duly authorized representative.
S. “Division”
means the Division of Occupational Safety within the State Department
of Labor.
T. “Existing
installation” means any boiler or pressure vessel constructed,
installed, placed in operation, or contracted for before July 1,
1985.
U. “Inspector”
means the Chief Inspector, or any Authorized Inspector, or Owner-User
Inspector.
1. “Chief inspector”
means the Chief Boiler and Pressure Vessel Inspector appointed under
the Act.
2. “Authorized
inspector” means an Inspector employed by the State of Rhode
Island or an Authorized Insurance Company holding a Rhode Island
Certificate of Competency, and who is regularly employed by the State
or an Insurance Company authorized to insure against loss from
explosion of boilers or pressure vessels in this State.
3. “Owner-user
inspector” means an Inspector who holds a valid National Board
Owner-User Commission who has passed the examination prescribed by
the Administrator and who is continuously employed as an inspector by
an owner-user inspection agency.
V. “Jurisdiction”
means a State, commonwealth, county or municipality of the United
States or a Province of Canada which has adopted one or more sections
of the ASME Code, one of which is Section I, and maintains a duly
constituted department, bureau or division for the purpose of
enforcement of such Code.
W. “Lined potable water
heater” means a water heater with a corrosion resistant lining
used to supply potable hot water.
X. “National Board”
means the National Board of Boiler and Pressure Vessel Inspectors,
(NB) l055 Crupper Avenue, Columbus, Ohio 43229, whose membership is
composed of the Chief Inspectors of jurisdictions who are charged
with the enforcement of the provisions of the ASME Code.
Y. “National Board
inspection code” means the manual for boiler and pressure
vessel inspectors published by the National Board from which copies
may be obtained.
Z. “New boiler” or
“New pressure vessel installation” means all boilers and
pressure vessels constructed, installed, placed in operation or
contracted for after July, 1986.
AA. “Nonstandard boiler
or pressure vessel” means a boiler or pressure vessel that does
not bear the ASME stamp, the API-ASME stamp, or the stamp of any
jurisdiction which has adopted a standard of construction equivalent
to that required by the Department.
BB. “Owner” or
“User” means any person, firm or corporation legally
responsible for the safe installation, operation and maintenance of
any boiler or pressure vessel within the jurisdiction.
CC. “Owner-user
inspection agency” means an owner or user of pressure vessels
who maintains a regularly established inspection department, whose
organization and inspection procedures meet the requirements of the
National Board rules and are acceptable to the Division.
DD. “Pressure vessel”
means a vessel in which the pressure is obtained from an external
source, or by the application of heat from an indirect source, or
from a direct source other than those boilers defined in §
2.4(H) of this Part.
EE. “PSI” means
pounds per square inch gauge.
FF. “Reinstalled boiler”
or “Reinstalled pressure vessel” means a boiler or
pressure vessel removed from its original setting and reinstalled at
the same location or at a new location without change or ownership.
GG. “Relief valve”
means a pressure relief valve actuated by inlet static pressure
having a gradual lift generally proportional to the increase in
pressure over opening pressure. It may be provided with an enclosed
spring housing suitable for closed discharge system application and
is primarily used for liquid service.
HH. “Repair” means
the work necessary to restore a boiler or pressure vessel to a safe
and satisfactory condition, provided there is no deviation from the
original design.
II. “Repair of pressure
relief valve” means the replacement, re-machining or cleaning
of any critical part, lapping of seat and disk or any other operation
which may affect the flow passage, capacity function or pressure
retaining ability of the valve. Disassembly, reassembly and/or
adjustments which affect the pressure relief valve function are also
considered a repair.
JJ. “Safety relief
valve” means a pressure relief valve characterized by rapid
opening or pop action, or by opening in proportion to the increase in
pressure over opening pressure, depending on application.
KK. “Safety valve”
means a pressure relief valve actuated by inlet static pressure and
characterized by rapid opening or pop action.
LL. “Second-hand boiler”
or “Second-hand pressure vessel” means a boiler or
pressure vessel which has changed both location and ownership since
primary use.
MM. “Standard boiler”
or “Standard pressure vessel” means a boiler or pressure
vessel which bears the stamp of this State, the ASME stamp, the
API-ASME stamp, both the ASME and National Board stamp, or the stamp
of another jurisdiction which has adopted a standard of construction
equivalent to that required by the Board.
NN. “Water heater”
means a closed vessel used exclusively to supply potable water which
is heated by the combustion of fuels, electricity or any other source
and withdrawn for use external to the system at pressures not
exceeding 160 psi and shall include all controls and devices
necessary to prevent water temperatures from exceeding 210 degrees
Fahrenheit as well as storage vessel connected to the water.
2.5 ADMINISTRATION
2.5.1 Minimum Construction
Standards for Boilers and Pressure Vessels:
A. All boilers, pressure
vessels, water heaters and storage tanks, unless otherwise exempt,
shall be registered with the Department of Labor and Training. All
new boilers, pressure vessels, water heaters, and storage tanks
unless otherwise exempt, to be operated in this jurisdiction, shall
be designed, constructed, inspected, stamped and installed in
accordance with the 2017 ASME Code and the latest addenda including
code cases in effect, and these rules and regulations. Boilers and
pressure vessels for which an ASME Manufacturers' Data Report is
required shall bear the manufacturer's "NB" number as
registered with the National Board. A copy of the Manufacturers' Data
Report, signed by the manufacturer's representative and the National
Board commissioned inspector shall be filed with the Chief Inspector
through the National Board.
B. State Special - If, due to
a valid impediment to full ASME Code compliance, a boiler or pressure
vessel cannot bear the ASME and National Board stamping, details in
the English language and United States customary units of the
proposed construction material specifications and calculations
approved by a Registered Professional Engineer experienced in boiler
and pressure vessel design shall be submitted to the Administrator by
the owner or user for approval as "State Special" which
must be obtained from the Administrator before construction is
started.
C. Before a second-hand boiler
or pressure vessel, is installed, application for permission to
install it shall be filed by the owner or user with the Chief
Inspector and his approval obtained.
D. The following shall be
exempt from the 2017 ASME Code construction requirements of §
2.5.1(A) of this Part.
1. Water heaters and water
storage tanks where none of the following limitations are exceeded:
a. Heat input of 200,000
BTU/Hr;
b. Water temperature of 210
degrees Fahrenheit;
c. Nominal water capacity of
120 gallons; except that they shall be provided with one or more
safety relief valves meeting the requirements of § 2.7.6 of this
Part.
2. Continuous coil type hot
water boilers used only for "steam vapor" cleaning of such
things as machinery, equipment and building when none of the
following limitations are exceeded:
a. 3/4" diameter tubing
or pipe size with no drums or headers attached;
b. Nominal water containing
capacity does not exceed six (6) gallons;
c. Water temperature does not
exceed 350 degrees Fahrenheit.
d. Steam is not generated
within the coil, except that they shall be provided with one or more
safety relief valves meeting the requirements of § 2.6.6 of this
Part.
3. In any circumstances other
than the above, the owner or user shall contact the Chief Inspector.
2.5.2 Frequency of
Inspections of Boilers and Pressure Vessels
A. Power boilers and
high-pressure, high temperature water boilers shall receive an
inspection annually which shall be an internal inspection where
construction permits; otherwise, it shall be as complete an
inspection as possible. Such boilers shall also be inspected
externally annually while under normal operating conditions.
B. Low pressure boilers, hot
water heaters, and hot water storage tanks shall receive an
inspection biennially.
1. Steam or vapor boilers
shall have an external inspection and an internal inspection
biennially where construction permits.
2. Hot water heating and hot
water supply boilers shall have an external inspection biennially and
where construction permits, an internal inspection at the discretion
of the inspector.
3. Water Heaters including hot
water storage tanks shall have an external inspection biennially and
shall include the function of all controls and devices.
C. Except as provided for in
§§ 2.5.2(D) and (E) of this Part, unfired pressure vessels
shall receive an inspection triennially. This inspection shall be
internal where construction permits. Pressure vessels not subject to
internal corrosion shall be inspected externally.
D. Pressure vessels that are
under the supervision of an owner-user inspection agency shall be
inspected at the same interval unless otherwise agreed upon by the
Chief Inspector with that Agency.
E. Based upon documentation of
safe service conditions by the owner or user of the operating
equipment and after an external inspection by the Chief Inspector,
said Chief Inspector may, in his discretion, permit variations in the
inspection frequency requirements as provided in these Rules and
Regulations.
2.5.3 Notification of
Inspection
A. Certificate inspection, as
required in § 2.5.2 of this Part, shall be carried out prior to
the expiration date of the certificate at a time mutually agreeable
to the inspector and owner or user.
B. External inspections may be
performed by the inspector during reasonable hours and without prior
notification in accordance with R.I. Gen. Laws § 28-25-7.
C. When as a result of
external inspection or determination by other objective means it is
the inspector's opinion that continued operation of the boiler or
pressure vessel constitutes a menace to public safety, the inspector
may request an internal inspection or an appropriate pressure test or
both to evaluate conditions. In such instances the owner or user
shall prepare the boiler or pressure vessel for such inspections or
tests as the inspector designates in accordance with R.I. Gen. Laws §
28-25-7.
2.5.4 Examination for an
Inspector's Certificate of Competency
A. Examination for an
inspector's certificate of competency may be held at the office of
the Division or at any other location to be selected by the
Administrator. An applicant for an examination shall have education
and experience equal to at least one of the following:
1. a degree in mechanical
engineering plus one year of experience in design, construction,
operation or inspection of high-pressure boilers and pressure
vessels;
2. a degree in a branch of
engineering, other than mechanical engineering or an associate degree
in mechanical technology plus two years of experience in design,
construction, operation inspection of high pressure boilers and
pressure vessels;
3. the equivalent of a high
school education plus three years of experience:
a. in high pressure boiler and
pressure vessel construction or repair; or
b. as an operating engineer in
charge of high-pressure boiler operation; or
c. as an inspector of
high-pressure boilers and pressure vessels.
B. Applications for
examination shall be in writing on a form to be furnished by the
Administrator stating the education of the applicant, a list of his
employers, his period of employment and position held with each
employer. Applications containing willful falsifications or
untruthful statements shall be cause for rejection. Applications
shall be submitted to the Chief Inspector at least 45 days prior to
the date of examination.
C. If the applicant's
education and experience are acceptable to the Administrator, he
shall be given a written examination dealing with the design,
construction, maintenance and repair of boilers and pressure vessels
and their appurtenances, and the applicant shall be accepted or
rejected on the merits of this examination. If the applicant is
successful in meeting the requirements of the Division, a certificate
of competency will be issued by the Administrator, when the applicant
is employed by an authorized inspection agency. Upon the expiration
of 90 days, an applicant who failed to pass the examination will be
permitted to take another written examination and his acceptance or
rejection will be determined by the Administrator on the basis of
this examination.
2.5.5 Examination Fees
A fee of sixty dollars
($60.00) will be charged for each applicant taking the examination
for a certificate of competency.
2.5.6 Certificate of
Competency and Identification Card
A. Upon request of his
employer, a certificate of competency and an identification card may
be issued by the Administrator to:
1. a boiler and pressure
vessel inspector employed by the State of Rhode Island.
2. an inspector who is
employed by an insurance company which is authorized to insure and
does insure against loss from explosions of boilers and pressure
vessels in the State of Rhode Island.
3. an inspector employed as
described in either §§ 2.5.6(A)(1) or (2) of this Part who
conducts shop or field inspections of new boilers or pressure vessels
in accordance with the 2017 ASME Code requirements.
4. an inspector who is
continuously employed by a company which operates pressure vessels in
this State and has a valid owner-user inspection agency agreement as
provided in § 2.5.11 of this Part, provided that the applicant
has satisfactorily passed the examination as set forth in §
2.5.11 of this Part or provided that (s)he holds a valid commission
or certificate of competency from a State that has a standard of
examination substantially equal to that of this jurisdiction and a
valid commission and a current commission card issued by the National
Board. The request for the certificate of competency and
identification card shall be completed on forms to be provided by the
Administrator and shall be accompanied by, when applicable, a
facsimile of the applicant's commission and commission card,
certificate of competency and identification card as named above, and
a fee of sixty dollars ($60.00).
5. The certificate of
competency and valid identification card shall be returned to the
Administrator when the inspector to whom they were issued is no
longer employed by the organization employing him at the time that
the certificate was issued.
6. Each person holding a valid
certification of competency and who conducts inspections as provided
by the Act shall apply to the Administrator on forms provided and
obtain a renewal identification card annually, not later than March
31 of each year. A fee of $30.00 for each card shall accompany each
application.
7. An inspector's certificate
of competency may be suspended by the Administrator after due
investigation and recommendation by the Chief Inspector for adequate
and just cause. Written notice of any such suspension shall be given
by the Administrator, within not more than 10 days, to the inspector
and his employer. Persons whose certificates of competency have been
suspended shall be entitled to an appeal to the Administrator as
provided for in the Act and to be present in person and represented
by counsel at the hearing of the appeal.
2.5.7 Conflict of Interest
An inspector shall not engage
in the sale of any services, article or device relating to boilers,
pressure vessels, or their appurtenances.
2.5.8 Inspection Reports to
be Submitted by Inspectors
A. Inspectors employed by an
Insurance Company shall, within one year of the effective date of
these rules and regulations for boilers and three years for pressure
vessels, submit to the Chief Inspector an inspection report on Form
NB-5 of NATIONAL BOARD INSPECTION CODE for each boiler and pressure
vessel subject to inspection in this State. Complete data shall be
submitted on Form NB-5 for each non-standard boiler or pressure
vessel.
B. Subsequent inspections by
authorized insurance inspectors, of both standard and non-standard
boilers and pressure vessels shall be reported on Form NB-6 and NB-7
of the NATIONAL BOARD INSPECTION CODE.
C. Inspection reports are
required in §§ 2.5.8(A) and (B) of this Part above shall be
submitted within 21 days from date of the completion of the
inspection.
D. Owner-user inspection
agencies shall report in accordance with §§ 2.5.8(B) and
(C) of this Part or upon forms acceptable to the Chief Inspector or
Administrator, which shall be filed as provided in § 2.5.11 of
this Part.
2.5.9 Insurance Companies
to Notify Chief Inspector of New, Cancelled or Suspended Insurance on
Boilers or Pressure Vessels
All insurance companies shall
notify the Chief Inspector within 30 days, of all boilers or pressure
vessels on which insurance is written, cancelled, not renewed or
suspended because of unsafe conditions.
2.5.10 Authorized
Inspectors to Notify Chief Inspector of Unsafe Boilers or Pressure
Vessels
If an authorized inspector,
upon first inspection of a new risk, finds that a boiler or pressure
vessel or any appurtenance thereof, is in such condition that his
company would refuse insurance or that it does not comply with
jurisdictional rules, the company shall immediately notify the Chief
Inspector and submit a report on the defects. If, upon inspection, an
authorized inspector finds a boiler or pressure vessel to be unsafe
for further operation, he shall promptly notify the owner or user,
stating what repairs or other corrective measures are required to
bring the object into compliance with these rules and regulations.
Unless the owner or user makes such repairs or adopts such other
corrective measures promptly, the authorized inspector shall
immediately notify the Chief Inspector. Until such corrections have
been made no further operation of the boiler or pressure vessel
involved shall be permitted. If an inspection certificate for the
object is required and is in force, it shall be suspended by the
Chief Inspector. When re-inspection establishes that the necessary
repairs have been made or corrective actions have been taken and that
the boiler or pressure vessel is safe to operate, the Chief Inspector
shall be notified by report. At that time an inspection certificate,
where applicable, will be issued.
2.5.11 Owner-User
Inspection Agency
A. Any person, firm
partnership, or corporation operating pressure vessels in this
jurisdiction may seek approval and registration as an owner-user
inspection agency by filing an application with the Administrator on
prescribed forms and request approval by the Division. Each such
application shall be accompanied by a fee of sixty dollars (60.00)
bond in the penal sum of twenty-five thousand dollars ($25,000) which
shall continue to be valid during the time the approval and
registration of the company as an owner-user inspection agency is in
effect.
B. Application and
registration shall show the name of such agency and its principal
address in this State, and the name and address of the person or
persons having supervision over inspections made by said agency.
Changes in supervisory personnel shall be reported to the
Administrator with 30 days after any such change.
C. Each owner-user inspection
agency as required by the provisions of the Act and these rules and
regulations shall:
1. conduct inspections of
pressure vessels, not exempt by the Act, utilizing only qualified
inspection personnel, as provided in § 2.5.6 of this Part.
2. retain on file at the
location where the equipment is inspected, a true record or copy of
each of the latest inspection reports signed by the inspector;
3. execute and deliver to the
Chief Inspector and those responsible for the operation of the
pressure vessel, a true report of each inspection together with
appropriate requirements or recommendations that result from such
inspections;
4. promptly notify the Chief
Inspector of any pressure vessel which does not meet the requirements
for safety;
5. maintain inspection records
which will include a list of each pressure vessel covered by the Act,
showing a serial number and such abbreviated descriptions as may be
necessary for identification, the date of last inspection of each
unit and approximate date for the next inspection, arrived at by
applying the appropriate rules to all data available at the time such
inspection record is compiled.
6. Regarding frequency and
type of inspection, see § 2.5.2 of this Part. Such inspection
record shall be readily available for examination by the Chief
Inspector or his authorized representative during business hours.
2.5.12 Defective Conditions
Disclosed at Time of External Inspection
If, upon an external
inspection, there is evidence of a leak or crack, sufficient covering
of the boiler or pressure vessel shall be removed to permit the
inspector to satisfactorily determine the safety of the boiler or
pressure vessel. If the covering cannot be removed at that time, he
may order the operation of the boiler or pressure vessel stopped
until such time as the covering can be removed and proper examination
made.
2.5.13 Owner or User to
Notify Chief Inspector of Accident
When an accident occurs to a
boiler, pressure vessel, power piping or process piping, the owner or
user shall promptly notify the Chief Inspector by submitting a
detailed report of the accident. In the event of a personal injury or
any explosion, notice shall be given immediately by telephone,
telegraph or messenger, and neither the boiler, pressure vessel,
power piping or process piping, nor any parts thereof, shall be
removed or disturbed before permission has been granted by the Chief
Inspector, except for the purpose of saving human life and limiting
consequential damage.
2.5.14 Inspection
Certificate and Inspection Fees
A. Certificate Inspection by
Authorized Insurance Inspectors or State Inspectors
1. If, after inspection by an
authorized insurance inspector or state inspector, a boiler or
pressure vessel is found to be safe and in conformance with these
rules and regulations, the owner or user shall pay directly to the
jurisdiction a biennial certificate fee of sixty ($60.00) dollars for
each boiler which shall include hot water heaters. A triennial
certificate fee of forty-five ($45.00) shall be assessed for each
unfired pressure vessel inspected under the provisions of R.I. Gen.
Laws Chapter 28-25.
B. Certificate Inspection by
Authorized Owner/User Inspection Agency
1. If a boiler or pressure
vessel after inspection, by an authorized owner/user inspection
agency is found to be suitable and to conform to these rules and
regulations, the owner or user shall pay directly to the jurisdiction
a fee of sixty dollars ($60.00) for each boiler or pressure vessel
required to be inspected under the Act upon which an inspection
certificate shall be issued in accordance with R.I. Gen. Laws §§
28-25-10 and 28-25-11. Checks and money orders for payment of
inspection certificate fees should be made payable to the Department
of Labor, Division of Occupational Safety, Boiler Unit.
C. Certificate Inspection by
State Inspector
1. The owner or user of a
boiler or pressure vessel required by this Act to be inspected by the
Chief Inspector, or by an authorized State inspector, shall pay
directly to the Division of Occupational Safety, upon completion of
inspection, fees in accordance with the following schedule:
2. Power boilers and high
pressure, high temperature water boilers: $96.00
a. External Inspections Fees:
$60.00
3. Heating Boilers
a. Certificate and Inspection
Fees: $60.00 Biennially
(1) A fee shall be assessed
for inspections of boilers and storage tanks at the same location not
to exceed $240.00 biennially per location.
4. For boilers where the only
source of heat is electrical energy, the fee shall be $60.00
biennially.
5. Pressure Vessels
a. Certificate and Inspection
Fees
(1) Each pressure vessel shall
be subject to inspection every three (3) years and shall be charged
at a rate of $45.00.
(2) A group of pressure
vessels, such as the rolls of a paper machine or dryer operating as a
single machine or unit, shall be considered as one pressure vessel.
(3) Not more than one fee
shall be charged or collected for any and all inspections as above of
any pressure vessels in any required inspection period except as
provided below.
6. Hydrostatic tests
a. When it is necessary to
make a special trip to witness the application of a hydrostatic test,
an additional fee based on the scale of fees outlined in §
2.5.14(C)(7) of this Part below shall be charged.
7. All other inspections,
including reviews and surveys, shop inspections, special inspections,
and inspections of second-hand or used boilers, or pressure vessels
made by the Chief Inspector or authorized inspector employed by the
State of Rhode Island shall be charged at the rate of not less than
$190.00 for 1/4 day (2 Hrs.), $275.00 1/2 day (4 Hrs.), or $500.00
for one full day, including travel time, plus all expenses, including
traveling, meals and lodging, where applicable. Minimum charge shall
be 1/4 day ($190.00).
D. Disposition of fees - The
Administrator shall account for and transfer all fees so received to
the Treasurer of the State.
E. If the owner or user of a
boiler or pressure vessel or system, which is required to be
inspected refuses to allow an inspection to be made or refuses to pay
the fee stipulated above, the inspection certificate shall be
suspended by the Chief Inspector until the owner or user complies
with the requirements.
F. The owner or user who
causes a boiler or pressure vessel or system to be operated without a
valid certificate shall be subject to the penalty as provided for in
the Act.
G. Fees for Services
1. Hydrostatic tests by state
inspections $100.00
2. Repair and alteration
permit $100.00
3. Return visits for
violations/charged to contractors $100.00
4. Return check fee $25.00
5. Overdue invoices $25.00
6. Certificate replacement
fee $10.00
7. Portable boiler
permits $300.00
2.5.15 Validity of
Inspection Certificate
An inspection certificate,
issued in accordance with § 2.5.14 of this Part shall be valid
until expiration unless some defect or condition affecting the safety
of the boiler or pressure vessel is disclosed provided, however, that
a certificate issued for a boiler or pressure vessel inspected by an
authorized inspector employed by an insurance company shall be valid
only if the boiler or pressure vessel for which it was issued
continues to be insured by a duly authorized insurance company.
2.5.16 Restamping Boilers
and Pressure Vessels
When the stamping on a boiler
or pressure vessel becomes indistinct, the inspector shall instruct
the owner or user to have it re-stamped. Request for permission to
re-stamp the boiler or pressure vessel shall be made to the Chief
Inspector and proof of the original stamping shall accompany the
request. The Chief Inspector may grant such authorization.
Re-stamping authorized by the Chief Inspector shall be done only in
the presence of an authorized inspector, and shall be identical with
the original stamping except for the ASME Code Symbol Stamp. Notice
of completion of such stamping shall be filed with the Chief
Inspector by the inspector who witnessed the stamping on the boiler
or pressure vessel together with a facsimile of the stamping applied.
2.5.17 Penalty for
Operation of Unsafe Boilers or Pressure Vessels
A. If, upon inspection, a
boiler or pressure vessel is found to be in such condition that it is
unsafe to operate, the inspector shall notify the Chief Inspector and
the inspection certificate may be suspended by the Chief Inspector.
B. Any person, firm,
partnership or corporation causing such objects to continue to be
operated shall be subject to the penalty provided in the Act.
2.5.18 Condemned Boilers
and Pressure Vessels
A. Any boiler or pressure
vessel having been inspected and declared unfit for further service
by an inspector shall be stamped by the Chief Inspector or a deputy
inspector on either side of the State number with the letters "XXX"
as shown by the following facsimile, which will designate a condemned
boiler or pressure vessel:
B. Any person, firm,
partnership, or corporation using or offering for sale a condemned
boiler or pressure vessel for operation within this State shall be
subject to the penalties provided by the Act.
2.5.19 Reinstallation of
Boilers or Pressure Vessels
When a standard boiler or
pressure vessel located in this jurisdiction is to be moved outside
the jurisdiction for temporary use or for repair, alteration, or
modification, application shall be made by the owner or user to the
Chief Inspector for permission to reinstall the boiler or pressure
vessel in the jurisdiction. When a non-standard boiler or pressure
vessel is removed from this State, it shall not be reinstalled within
this State.
2.5.20 Installation,
Operation, Sale or Offering for Sale of Non-Standard Boilers or
Pressure Vessels
The installation, operation,
sale or the offering for sale of non-standard boilers or pressure
vessels in this jurisdiction is prohibited without permission from
the Chief Inspector.
2.5.21 Installation of Used
or Second-Hand Boilers or Pressure Vessels
Before a used or second-hand
boiler or pressure vessel can be shipped for installation in this
State, an inspection must be made by an inspector qualified by this
jurisdiction or by an inspector holding a valid National Board
Commission, and data submitted by him shall be filed by the owner or
user of the boiler or pressure vessel with the Chief Inspector for
his approval. Such boilers and pressure vessels when installed in the
jurisdiction shall be equipped with fittings and appurtenances that
comply with the rules and regulations for new construction.
2.5.22 Reinstalled Boilers
or Pressure Vessels
When a stationary boiler or
pressure vessel is moved and reinstalled, the attached fittings and
appurtenances shall comply with these rules and regulations for new
installations.
2.5.23 Working Pressure for
Existing Installations
Any authorized inspector may
decrease the working pressure on any existing installation if the
condition of the boiler or pressure vessel warrants it. If the owner
or user does not concur with the inspector's decision, the owner or
user may appeal to the Administrator who may request a joint
inspection by the Chief Inspector and the authorized inspector. The
Chief Inspector shall render his report to the Administrator and the
Administrator shall render the final decision, based upon the data
contained in the inspector's reports.
2.5.24 Repairs and
Alterations to Boilers & Pressure Vessels
A. Repairs and alterations to
boilers and pressure vessels shall be made in accordance with the
rules of the National Board Inspection Codes latest edition. Repairs
shall be made by a repair organization having one of the following
types of authorization:
1. an organization in
possession of a valid Certificate of Authorization for use of the "R"
Symbol Stamp, issued by the National Board.
2. an organization in
possession of a valid ASME Certificate of Authorization provided such
repairs are within the scope of the organization's Quality Control
System.
3. an organization working
within the State provided authorization for the organization to
perform such repairs has been issued by the Chief Inspector.
B. Alterations to a boiler or
pressure vessel shall be made by an organization in possession of a
valid ASME Certificate of Authorization.
2.5.25 Repairs to Pressure
Relief Valves
A. Repairs to pressure relief
valves shall be made only by an organization which holds a valid
Certification of Authorization for use of the National Board Pressure
Relief Valve Repair "VR" Symbol Stamp. The initial
installation testing and adjustments of a new pressure relief valve
on a boiler or pressure vessel are not considered a repair, if made
by the manufacturer or assembler of the valve.
B. The Chief Inspector may
authorize properly trained and qualified employees of boiler and
pressure vessel users or their designees to make adjustments to set
pressure and/or blow-down to pressure relief valves owned by them,
provided the adjusted settings and/or capacities and the date of the
adjustment are recorded on a metal tag secured to the seal wire. All
external adjustments shall be resealed showing the identification of
the organization making the adjustments. A record of all external
adjustments shall be maintained and made available to the inspector.
C. No person shall attempt to
remove or do any work on any safety appliance prescribed by these
rules and regulations while the appliance is subject to pressure.
D. Should any of these
appliances be removed for repair during an outage of a boiler or
pressure vessel, they must be reinstalled and in proper working order
before the object is again placed in service.
E. No person shall alter any
safety or safety relief valves or pressure relief devices in any
manner to maintain a working pressure in excess of that stated on the
boiler or pressure vessel inspection certificate.
2.5.26 Riveted Patches
In applying riveted patches,
the design of the patch and method of installation shall be in
accordance with the National Board Inspection Code, 1973 Edition.
Approval for such repairs must be obtained from the chief inspector
prior to making such repairs.
2.5.27 Requirements for New
Installations
A. In accordance with R.I.
Gen. Laws § 28-25-10, any person erecting or installing a new or
second-hand boiler or pressure vessel shall first make application
for a permit to install to the Division of Occupational Safety,
Boiler Unit. A permit fee of one hundred twenty dollars ($120.00)
will be required for all heating boilers (low pressure) and a fee of
three hundred dollars ($300.00) for all power boilers (high
pressure). The installer of such installations must record his/her
Pipefitter Master I license number on the permit application.
B. All new and second-hand
item installations shall comply with the general requirements of
these regulations. In addition, applicable sections of these
regulations that pertain to the specific requirements for items
falling into categories outlined in § 2.5.3 of this Part, shall
be followed.
1. No boiler or pressure
vessel shall hereafter be installed in this State unless it has been
constructed in accordance with ASME Code, incorporated above,
registered with the National Board and installed in conformity with
these rules and regulations except:
a. those exempt by the Act;
b. those outlined in §
2.5.1(B) of this Part
2. The stamping shall not be
concealed by lagging or paint and shall be exposed at all times
unless a suitable record is kept of the location of the stamping so
that it may be readily uncovered at any time this may be desired.
2.5.28 Application of State
Serial Numbers
A. Upon completion of the
installation of a boiler or pressure vessel, or at the time of the
initial certificate inspection of an existing installation each
boiler or pressure vessel shall be identified by the inspector with a
serial number of the State, consisting of letters and figures to be
not less than 5/16 inch in height and arranged as follows:
B. All cast iron, low-pressure
heating boilers shall have securely attached to the front of the
boiler a corrosion resistant metal tag or suitable tag allowed by
construction code which shall have the serial number of the State
stamped thereon. All pressure vessels constructed of cast iron, or of
material of such thickness that it should not be stamped, shall have
securely attached a corrosion resistant metal tag and or suitable tag
allowed by the construction code, which shall have the serial number
of the State stamped thereon.
2.5.29 Variations
A. Any person who believes the
rules and regulations promulgated under R.I. Gen. Laws Chapter 28-25
impose an undue burden upon the owner or user, may request a
variation from such rule or regulation. The request for variation
shall be made to the Administrator of Occupational Safety in writing
and shall specify how equivalent safety is to be maintained. The
Administrator, after investigation and such hearing as it may direct,
may grant such variation from the terms of any rule or regulation
provided such special conditions as may be specified are maintained
in order to provide equivalent safety.
B. Any person denied a
variance under § 2.5.30 of this Part may grieve such
determination by submitting such appeal in writing to the
Occupational Safety and Health Review Board. Said board, created by
R.I. Gen. Laws Chapter 28-20, shall hear evidence concerning such
action and determine whether said variation does, in fact, provide
for equivalent safety.
C. When there is a reason to
believe, or upon receipt of a complaint that a variation does not
provide freedom from danger equivalent to the published rule or
regulation, the Administrator or Chief Inspector by direction after
notice to the owner or user and complainant, and after hearing and
investigation as it may direct, may continue in force, suspend,
revoke, or modify the conditions specified in any variation. No
declaration, act or omission of the Administrator or of the Chief
Inspector, or authorized inspectors other than a written order
authorizing a variation as permitted above, shall be deemed to
exempt, either wholly or in part, expressly or implied, any owner or
user from full compliance with the terms of any rule or regulation.
2.5.30 Penalties
Any person, firm or
corporation violating any of the provisions of these rules and
regulations shall be charged with a violation and may be subject to a
fine not to exceed $500.00 per day for each such violation. The
Department of Labor shall impose said fine on the installer of new
construction or the owner/user of existing boilers or pressure
vessels as provided for in R.I. Gen. Laws § 28-25-16. Each day
of such operation in violation of the provisions shall be considered
a separate offense.
2.6 EXISTING INSTALLATION: POWER
BOILERS
2.6.1 EBO-1 Age Limit of
Existing Boilers
A. The age limit of any boiler
of nonstandard construction, installed prior to the date the Act
became effective, shall be 30 years except that, a boiler having
other than lap-riveted longitudinal joint, after a thorough internal
and external inspection, and when required by the inspector, a
hydrostatic pressure test of 1-1/2 times the allowable working
pressure held for a period of at least 30 minutes during which no
distress or leakage develops, may be continued in operation at the
working pressure determined by § 2.6.3 of this Part.. The age
limit of any nonstandard boiler having lap-riveted longitudinal
joints and operating at a pressure in excess of 50 psi shall be 20
years. This type of boiler, when removed from an existing setting,
shall not be reinstalled for a pressure in excess of 15 psi. A
reasonable time for replacement, not to exceed one year, may be given
at the discretion of the Chief Inspector.
B. The age limit of boilers of
standard construction installed prior to the date this law became
effective shall be dependent on thorough internal and external
inspection and where required by the inspector, a hydrostatic
pressure test not exceeding 1-1/2 times the allowable working
pressure. If the boiler, under these test conditions, exhibits no
distress or leakage, it may be continued in operation at the working
pressure determined by § 2.6.2 of this Part.
C. The shell or drum of a
boiler in which a lap seam crack develops along a longitudinal
lap-riveted joint shall be condemned. A lap seam crack is a crack
found in lap seams extending parallel to the longitudinal joint and
located either between or adjacent to rivet holes.
2.6.2 EBO-2 Maximum
Allowable Working Pressure for Standard Boiler
The maximum allowable working
pressure for standard boilers shall be determined in accordance with
the applicable provisions of the edition of the ASME Code under which
they were constructed and stamped.
2.6.3 EBO-3 Maximum
Allowable Working Pressure for Nonstandard Boilers
A. The maximum allowable
working pressure for boilers fabricated by riveting shall be
determined by the applicable rules of the 1971 Edition of Section I
of the ASME Code.
B. The lowest factor of safety
permissible on existing installations shall be 5.0, except for
horizontal-return- tubular boilers having continuous longitudinal lap
seams more than 12 ft. in length, the factor of safety shall be 8.
When this latter type of boilers is removed from its existing
setting, it shall not be reinstalled for pressures in excess of 15
psi.
C. The maximum allowable
working pressure for boilers of welded construction in service may
not exceed that allowable in Section I of the 2017 ASME Code,
incorporated above, for new boilers of the same construction.
D. The maximum allowable
working pressure on the shell of a boiler or drum shall be determined
by the strength of the weakest course computed from the thickness of
the plate, the tensile strength of the plate, the efficiency of the
longitudinal joint, the inside diameter of the course, and the factor
of safety allowed by these rules in accordance with the following
formula:
1. TStE = maximum allowable
working pressure, psi RFS where:
a. TS = specified minimum
tensile strength of shell plate material. When the tensile strength
of steel or wrought-iron shell plate is not known, it shall be taken
as 55,000 psi for steel and 45,000 psi for wrought-iron.
b. t = minimum thickness of
shell plate in weakest course, in inches.
c. E = efficiency of
longitudinal joint, method of determining which is given in Paragraph
PG-27 of Section I of the ASME Code.
d. R = inside radius of the
weakest course of the shell or drum, in inches.
e. FS = factor of safety which
shall be at least 5.0.
E. The inspector may increase
the factor of safety, if the condition and safety of the boiler
warrants it.
2.6.4 EBO-4 Cast Iron
Headers and Mud Drums
The maximum allowable working
pressure on a water tube boiler, the tubes of which are secured to
cast iron or malleable iron headers, or which have cast iron mud
drums, shall not exceed 160 psi.
2.6.5 EBO-5 Pressure on
Cast Iron Boilers
The maximum allowable working
pressure for any cast iron boiler, except hot water boilers, shall be
15 psi. See §§ 2.7.1, 2.7.2, and 2.7.4 of this Part.
2.6.6 EBO-6 Safety Valves
A. The use of weighted-lever
safety valves or safety valves having either the seat or disc of cast
iron are prohibited; valves of this type of construction shall be
replaced by direct spring loaded, pop-type valves that conform to the
requirements of 2017 ASME Code, Section I.
B. Each boiler shall have at
least one ASME/NB Stamped and certified safety valve, and if it has
more than 500 sq. ft. of water-heating surface, or an electric power
input of more than 1100 KW, it shall have two or more safety valves
of the same type.
C. The valve or valves shall
be connected to the boiler, independent of any other steam
connection; and attached as close as possible to the boiler, without
unnecessary intervening pipe or fittings. Where alteration is
required to conform to this requirement, owners or users shall be
allowed reasonable time in which to complete the work as permitted by
the Chief Inspector.
D. No valves of any
description shall be placed between the safety valve and the boiler
nor on the escape pipe, if used. When an escape pipe is used, it
shall be at least the full size of the safety valve discharge and
fitted with an open drain to prevent water lodging in the upper part
of the safety valve or in the escape pipe. When an elbow is placed on
a safety valve escape pipe, it shall be located close to the safety
valve outlet or the escape pipe shall be anchored and supported
securely. All safety discharges shall be so located or piped as to be
carried clear from walkways or platforms.
E. The safety valve capacity
of each boiler shall be such that the safety valve or valves will
discharge all the steam that can be generated by the boiler without
allowing the pressure to rise more than six percent (6%) above the
highest pressure to which any valve is set, and in no case to more
than six percent (6%) above the maximum allowing working pressure.
F. One or more safety valves
on every boiler shall be set at or below the maximum allowable
working pressure. The remaining valves may be set within a range of
three percent (3%) above the maximum allowable working pressure, but
the range of setting of all the safety valves on a boiler shall not
exceed ten percent (10%) of the highest pressure to which any valve
is set.
G. When boilers of different
maximum allowable working pressures with minimum safety valve
settings varying more than six percent are so connected that steam
can flow toward the lower pressure units, the latter shall be
protected by additional safety valve capacity, if necessary, on the
lower pressure side of the system. The additional safety valve
capacity shall be based upon the maximum amount of steam which can
flow into the lower pressure system.
H. In those cases where the
boiler is supplied with feed-water directly from water mains without
the use of feeding apparatus (not to include return traps), no safety
valve shall be set at a pressure greater than 94 percent of the
lowest pressure obtained in the supply main feeding the boiler.
I. The relieving capacity of
the safety valves on any boiler shall be checked by one of the three
following methods and, if found to be insufficient, additional valves
shall be provided:
1. by making an accumulation
test, which consists of shutting off all other steam discharge
outlets from the boiler and forcing the fires to the maximum. The
safety valve capacity shall be sufficient to prevent a rise of
pressure in excess of six percent (6%) of the maximum allowable
working pressure. This method should not be used on a boiler with a
super-heater or re-heater;
2. by measuring the maximum
amount of fuel that can be burned and computing the corresponding
evaporative capacity (steam generating capacity) upon the basis of
the heating value of this fuel. These computations shall be made as
outlined in the Appendix of the 2017 ASME Code, Section I;
3. by measuring the maximum
amount of feed-water that can be evaporated;
J. When either of the methods
outlined in § 2.6.6(I)(2) and (3) of this Part is employed, the
sum of the safety valve capacities shall be equal to or greater than
the maximum evaporative capacity (maximum steam generating capacity)
of the boiler.
2.6.7 EBO-7 Boiler Feeding
A. Each boiler shall have a
feed supply which will permit it to be fed at any time while under
pressure.
B. A boiler having more than
500 sq. ft. of water heating surface shall have at least two suitable
means of feeding, at least one of which shall be a feed pump. A
source of feed at a pressure 6 percent greater than the set pressure
of the safety valve with the highest setting may be considered one of
the means. Boilers fired by gaseous, liquid, or solid fuel in
suspension may be equipped with a single means of feeding water
provided means are furnished for the shutoff of heat input prior to
the water level reaching the lowest safe level.
C. The feed-water shall be
introduced into a boiler in such a manner that the water will not be
discharged directly against surfaces exposed to gases of high
temperature or to direct radiation from the fire. For pressures of
400 psi or over, the feed-water inlet through the drum shall be
fitted with shields, sleeves, or other suitable means to reduce the
effects of temperature differentials in the shell or head.
D. The feed piping to the
boiler shall be provided with a check valve near the boiler and a
valve or cock between the check valve and the boiler. When two or
more boilers are fed from a common source, there shall also be a
valve on the branch to each boiler between the check valve and the
source of supply. Whenever a globe valve is used on feed piping, the
inlet shall be under the disc of the valve.
E. In all cases where returns
are fed back to the boiler by gravity, there shall be a check valve
and stop valve in each return line, the stop valve to be placed
between the boiler and the check valve, and both shall be located as
close to the boiler as is practicable. It is recommended that no stop
valves be placed in the supply and return pipe connections of a
single boiler installation.
F. Where de-aerating heaters
are not employed, it is recommended that the temperature of the
feed-water be not less than 120 degrees Fahrenheit to avoid the
possibility of setting up localized stress. Where de-aerating heaters
are employed, it is recommended that the minimum feed-water
temperature be not less than 215 degrees Fahrenheit so that dissolved
gases may be thoroughly released.
2.6.8 EBO-8 Water Level
Indicators
A. Each boiler, except
forced-flow steam generators with no fixed steam and waterline, and
high-temperature water boilers of the forced circulation type that
have no steam and water-line, shall have at least one water gage
glass. Boilers operated at pressures over 400 psi shall be provided
with two water gage glasses which may be connected to a single water
column or connected directly to the drum.
B. Two independent remote
level indicators may be provided instead of one of the two required
gage glasses for boiler drum water level indication in the case of
power boilers with all drum safety valves set at or above 900 psi.
When both remote level indicators are in reliable operation, the
remaining gage glass may be shut off, but shall be maintained in
serviceable condition.
C. When the direct reading of
gage glass water level is not readily visible to the operator in his
working area, two dependable indirect indications shall be provided,
either by transmission of the gage glass image or by remote
indicators.
D. The lowest visible part of
the water gage glass shall be at least 2 in. above the lowest
permissible water level, at which level there will be no danger of
overheating any part of the boiler when in operation at that level.
When remote level indication is provided for the operator in lieu of
the gage glass, the same minimum level reference shall be clearly
marked.
E. Connections from the boiler
to the remote level indicator shall be at least 3/4-inch pipe size to
and including the isolation valve and from there to the remote level
indicator at least 1/2 in. O.D. tubing. These connections shall be
completely independent of other connections for any function other
than water level indication. For pressures of 400 psi or over, lower
connections to drums shall be provided with shields, sleeves, or
other suitable means to reduce temperature differentials in the
shells or heads.
F. Boilers of the horizontal
fire-tube type shall be so set that when the water is at the lowest
reading in the water gage glass there shall be at least 3 in. of
water over the highest point of the tubes, flues, or crown sheets.
G. Boilers of locomotives type
shall have at least one water glass provided with top and bottom
shutoff cocks and lamp, and two gage cocks for boilers 36 in. in
diameter and under, and three gage cocks for boilers over 36 in. in
diameter.
H. The lowest gage cock and
the lowest reading of water glass shall not be less than 2 in. above
the highest point of crown sheet on boilers 36 in. in diameter and
under, nor less than 3 in. for boilers over 36 in. in diameter. These
are minimum dimensions, and on larger locomotives and those operating
on steep grades, the height should be increased, if necessary, to
compensate for change of water level on descending grades.
I. The bottom mounting for
water glass and for water column if used must extend not less than
1-1/2 in. inside the boiler and beyond any obstacle immediately above
it, and the passage therein must be straight and horizontal.
J. Tubular water glasses must
be equipped with a protecting shield.
K. All connections on the gage
glass shall be not less than 1/2 in. pipe size. Each water-gage glass
shall be fitted with a drain cock or valve having an unrestricted
drain opening of not less than 1/4 in. diameter to facilitate
cleaning. When the boiler operating pressure exceeds 100 psi the
glass shall be furnished with a connection to install a valved drain
to the ash pit or other safe discharge point.
L. Each water gage glass shall
be equipped with a top and a bottom shutoff valve of such
through-flow construction as to prevent stoppage by deposits of
sediments. If the lowest valve is more than 7 ft. above the floor or
platform from which it is operated, the operating mechanism shall
indicate by its position whether the valve is open or closed. The
pressure-temperature rating shall be at least equal to that of the
lowest set pressure of any safety valve on the boiler drum and the
corresponding saturated-steam temperature.
M. Straight-run globe valves,
shall not be used on such connection.
N. Automatic shutoff valves,
if permitted to be used, shall conform to the requirements of Section
I of the 2017 ASME Code.
2.6.9 EBO-9 Water Columns
A. The water column shall be
so mounted that it will maintain its correct position relative to the
normal waterline under operating conditions.
B. The minimum size of pipes
connecting the water column to a boiler shall be 1 in. For pressures
of 400 psi or over, lower water column connections to drums shall be
provided with shields, sleeves, or other suitable means to reduce the
effect of temperature differentials in the shells or heads. Water
glass fittings or gage cocks may be connected directly to the boiler.
C. The steam and water
connections to a water column or a water gage glass shall be such
that they are readily accessible for internal inspection and
cleaning. Some acceptable methods of meeting this requirement are by
providing a cross or fitting with a back outlet at each right-angle
turn to permit inspection and cleaning in both directions, or by
using pipe bends or fittings of a type which does not leave an
internal shoulder or pocket in the pipe connection and with a radius
of curvature which will permit the passage of a rotary cleaner.
D. Screwed plug closures using
threaded connections as allowed by Section I of the 2017 ASME Code
are acceptable means of access for this inspection and cleaning. For
boilers with all drum safety valves set at or above 400 psi,
socket-welded plugs may be used for this purpose in lieu of screwed
plugs. The water column shall be fitted with a connection for a drain
cock or drain valve to install a pipe of at least 3/4 in. pipe size
to the ash pit or other safe point of discharge. If the water
connection to the water column has a rising bend or pocket which
cannot be drained by means of the water-column drain, an additional
drain shall be placed on this connection in order that it may be
blown off to clear any sediment from the pipe.
E. The design and material of
a water column shall comply with the requirements of Section I of the
2017 ASME Code. Water column made of cast iron in accordance with
SA-278 may be used for maximum boiler pressures not exceeding 250
psi. Water columns made of ductile iron in accordance with SA-395 may
be used for maximum boiler pressure not exceeding 350 psi. For higher
pressures, steel construction shall be used.
F. Shutoff valves shall not be
used in the pipe connections between a boiler and a water column or
between a boiler and the shutoff valves required for the gage glass,
unless they are either outside-screw-and-yoke or lever-lifting type
gate valves or stopcocks with lever permanently fastened thereto and
marked in line with their passage, or of such other through-flow
construction as to prevent stoppage by deposits of sediment, and to
indicate by the position of the operating mechanism whether they are
in open or closed position; and such valves or cocks shall be locked
or sealed open. Where stop cocks are used, they shall be of a type
with the plug held in place by a guard or gland.
G. No outlet connections,
except for control devices (such as damper regulators and feed-water
regulators), drains, steam gages, or apparatus of such form as does
not permit the escape of an appreciable amount of steam or water
therefrom shall be placed on the pipes connecting a water column or
gage glass to a boiler.
2.6.10 EBO-10 Gage Glass
Connections
A. Gage glasses and gage cocks
that are not connected directly to a shell or drum of the boiler
shall be connected by one of the following methods:
1. The water gage glass or
glasses and gage cocks shall be connected to an intervening water
column.
2. When only water gage
glasses are used, they may be mounted away from the shell or drum and
the water column omitted, provided the following requirements are
met:
3. The top and bottom gage
glass fittings are aligned, supported, and secured so as to maintain
the alignment of the gage glass; and
4. The steam and water
connections are not less than 1 in. pipe size and each water glass is
provided with a valved drain; and
5. The steam and water
connections comply with the requirements of the following:
B. The lower edge of the steam
connection to a water column or gage glass in the boiler shall not be
below the highest visible water level in the water gage glass. There
shall be no sag or offset in the piping which will permit the
accumulation of water; and
C. The upper edge of the water
connection to a water column or gage glass and the boiler shall not
be above the lowest visible water level in the gage glass. No part of
this pipe connection shall be above the point of connection at the
water column.
D. Each boiler (except those
not requiring water level indicators) shall have three or more gage
cocks located within the visible length of the water glass, except
when the boiler has two water glasses located on the same horizontal
lines.
E. Boilers not over 36 in. in
diameter in which the heating surface does not exceed 100 sq. ft.
need have but two gage cocks.
F. The gage cock connections
shall be not less than 1/2 in. pipe size.
2.6.11 EBO-11 Pressure
Gages
A. Each boiler shall have a
pressure gage so located that it is easily readable. The pressure
gage shall be installed so that it shall at all times indicate the
pressure in the boiler. Each steam boiler shall have the pressure
gage connected to the steam space or to the water column or its steam
connection. A valve or cock shall be placed in the gage connection
adjacent to the gage. An additional valve or cock may be located near
the boiler providing it is locked or sealed in the open position. No
other shutoff valves shall be located between the gage and the
boiler. The pipe connection shall be of ample size and arranged so
that it may be cleared by blowing out. For a steam boiler the gage or
connection shall contain a siphon or equivalent device which will
develop and maintain a water seal that will prevent steam from
entering the gage tube. Pressure gage connections shall be suitable
for the maximum allowable working pressure and temperature, but if
the temperature exceeds 406 degrees Fahrenheit, brass or copper pipe
or tubing shall not be used. The connections to the boiler, except
the siphon, if used, shall not be less than 1/4 in. inside diameter
standard pipe size but where steel or wrought-iron pipe or tubing is
used they shall not be less than 1/2 in. The minimum size of a
siphon, if used, shall be 1/4 in. inside diameter. The dial of the
pressure gage shall be graduated to approximately double the pressure
at which the safety valve is set, but in no case to less than 1-1/2
times this pressure.
B. Each forced-flow steam
generator with no fixed steam and water line shall be equipped with
pressure gages or other pressure measuring devices located as
follows:
1. At the boiler or
super-heater outlet (following the last section which involves
absorption of heat), and
2. At the boiler or
economizer inlet (preceding any section which involves absorption of
heat), and
3. Upstream of any shutoff
valve which may be used between any two sections of the heat
absorbing surface.
C. Each high-temperature water
boiler shall have a temperature gage so located and connected that it
shall be easily readable. The temperature gage shall be installed so
that it at all times indicates the temperature in degrees Fahrenheit
of the water in the boiler, at or near the outlet connection.
2.6.12 EBO-12 Stop Valves
A. Each steam outlet from a
boiler (except safety valve and water column connections) shall be
fitted with a stop valve located as close as practicable to the
boiler.
B. When a stop valve is so
located that water can accumulate, ample drains shall be provided.
The drainage shall be piped to a safe location and shall not be
discharged on the top of the boiler or its setting.
C. When boilers provided with
manholes are connected to a common steam main, the steam connected
from each boiler shall be fitted with two stop valves having an ample
free blow drain between them. The discharge of the drain shall be
visible to the operator while manipulating the valves and shall be
piped clear of the boiler setting. The stop valves shall consist
preferably of one automatic non-return valve (set next to the boiler)
and a second valve of the outside-screw-and-yoke type.
2.6.13 EBO-13 Blow-off
Piping
A. A blow-off as required
herein is defined as a pipe connection provided with valves located
in the external piping through which the water in the boiler may be
blown out under pressure, excepting drains such as are used on water
columns, gage glasses, or piping to feed-water regulators, etc., used
for the purpose of determining the operating condition of such
equipment. Piping connections used primarily for continuous
operation, such as de-concentrators on continuous blow-down systems,
are not classed as blow-off’s but the pipe connections and all
fittings up to and including the first shutoff valve shall be equal
at least to the pressure requirements for the lowest set pressure of
any safety valve on the boiler drum and with the corresponding
saturated-steam temperature.
B. A surface blow-off shall
not exceed 2-1/2 in. pipe size, and the internal pipe and the
terminal connection for the external pipe, when used, shall form a
continuous passage, but with clearance between their ends and
arranged so that the removal of either will not disturb the other. A
properly designed steel bushing, similar to or the equivalent of
those shown in Fig. PG-59.1 of Section I of the 2017 ASME Code or a
flanged connection shall be used.
C. Each boiler except
forced-flow steam generators with no fixed steam and waterline and
high-temperature water boilers shall have a bottom blow-off outlet in
direct connection with the lowest water space practicable for
external piping conforming to PG-58.3.6 of Section I of the 2017 ASME
Code.
D. All water walls and water
screens which do not drain back into the boiler, and all integral
economizers, shall be equipped with outlet connections for a blow-off
or drain line and conform to the requirements of PG-58.3.7 of the
2017 ASME Code.
E. Except as permitted for
miniature boilers, the minimum size of pipe and fittings shall be 1
in., and the maximum size shall be 2-1/2 in., except that for boilers
with 100 sq. ft. of heating surface or less, the minimum size of pipe
and fittings may be 3/4 in.
F. Condensate return
connections of the same size or larger than the size herein specified
may be used, and the blow-off may be connected to them. In such case
the blow-off shall be so located that the connection may be
completely drained.
G. A bottom blow-off pipe when
exposed to direct furnace heat shall be protected by firebrick or
other heat resisting material which is so arranged that the pipe may
be inspected.
H. An opening in the boiler
setting for a blow-off pipe shall be arranged to provide free
expansion and contraction.
2.6.14 EBO-14 Repairs and
Renewals of Boiler Fittings and Appliances
Whenever repairs are made to
fittings or appliances or it becomes necessary to replace them, the
work shall comply with the requirements for new installations.
2.6.15 EBO-15 Conditions
Not Covered by These Requirements
All cases not specifically
covered by these requirements shall be treated as new installations
or may be referred to the Chief Inspector for instructions concerning
the requirements.
2.7 EXISTING INSTALLATION: HEATING
BOILERS
2.7.1 EHB-1 Standard
Boilers
The maximum allowable working
pressure of standard boilers shall in no case exceed the pressure
indicated by the manufacturer's identification stamped or cast on the
boiler or on a plate secured to it.
2.7.2 EHB-2 Nonstandard
Riveted Boilers
The maximum allowable working
pressure on the shell of a nonstandard riveted heating boiler shall
be determined in accordance with § 2.6.3 of this Part. Power
Boilers, except that in no case shall the maximum allowable working
pressure of a steam heating boiler exceed 15 psi, or a hot water
boiler exceed 160 psi or 250 degrees Fahrenheit temperature.
2.7.3 EHB-3 Nonstandard
Welded Boilers
The maximum allowable working
pressure of a nonstandard steel or wrought iron heating boiler of
welded construction shall not exceed 15 psi for steam. For other than
steam service, the maximum allowable working pressure shall be
calculated in accordance with Section IV of the 2017 ASME Code, but
in no case shall it exceed 30 psi.
2.7.4 EHB-4 Nonstandard
Cast Iron Boilers
A. The maximum allowable
working pressure of a nonstandard boiler composed principally of cast
iron shall not exceed 15 psi for steam service or 30 psi for hot
water service.
B. The maximum allowable
working pressure of a nonstandard boiler having cast iron shell or
heads and steel or wrought iron tubes shall not exceed 15 psi for
steam service or 30 psi for hot water service.
2.7.5 EHB-5 Potable Water
Heaters
A potable water heater shall
not be installed or used as a heating boiler.
2.7.6 EHB-6 Safety Valves
A. Each steam boiler shall
have one or more ASME/National Board certified and stamped safety
valves of the spring pop-type adjusted and sealed to discharge at a
pressure not to exceed 15 psi. Seals shall be attached in a manner to
prevent the valve from being taken apart without breaking the seal.
The safety valves shall be arranged so that they cannot be reset to
relieve at a higher pressure than the maximum allowable working
pressure on the boiler. A body drain connection below seat level
shall be provided by the manufacturer and this drain shall not be
plugged during or after field inspection. For valves exceeding 2 in.
pipe size, the drain hole or holes shall be tapped not less than 3/8
in. pipe size. For valves less than 2 in., the drain hole shall not
be less than 1/4 in. in diameter.
B. No safety valve for a steam
boiler shall be smaller than 1/2 in. No safety valve shall be larger
than 4-1/2 in. The inlet opening shall have an inside diameter equal
to, or greater than, the seat diameter.
C. The minimum relieving
capacity of the valve or valves shall be governed by the capacity
marking on the boiler.
D. The minimum valve capacity
in pounds per hour shall be the greater of that determined by
dividing the maximum BTU output at the boiler nozzle obtained by the
firing of any fuel for which the unit is installed by 1000, or shall
be determined on the basis of the pounds of steam generated per hour
per square foot of boiler heating surface as given in §
2.7.6(D)(1) of this Part in text. In many cases a greater relieving
capacity of valves than the minimum specified by these rules will
have to be provided. In every case, the requirements shall be met.
1. Table
MINIMUM
POUNDS OF STEAM PER HOUR PER SQUARE FOOT OF HEATING SURFACE
Firetube
Boilers
Watertube
Boilers
Boiler
Heating Surface:
Hand
Fired
5
6
Stoker
fired
7
8
Oil,
gas, or pulverized fuel fired
Waterwall
Heating Surface:
Hand
fired
8
8
Stoker
fired
10
12
Oil,
gas, or pulverized fuel
14
16
2. When a boiler is fired only
by a gas giving a heat value not in excess of 200 BTU per cu. ft.,
the minimum safety valve or safety relief valve relieving capacity
may be based on the value given for hand-fired boilers above.
3. The minimum safety valve or
safety relief valve relieving capacity for electric boilers shall be
3-1/2 pounds per hour per kilowatt input.
4. For heating surface
determination see 2017 ASME Code Section IV. paragraph HG-403.
E. The safety valve capacity
for each steam boiler shall be such that with the fuel burning
equipment installed, and operating at maximum capacity, the pressure
cannot rise more than 5 psi above the maximum allowable working
pressure.
F. When operating conditions
are changed, or additional boiler heating surface is installed, the
valve capacity shall be increased, if necessary, to meet the new
conditions and be in accordance with § 2.7.6 of this Part) in
text. When additional valves are required, they may be installed on
the outlet piping provided there is no intervening valve.
G. If there is any doubt as to
the capacity of the safety valve, an accumulation test shall be run.
(See 2017 ASME Code, Section VI, Recommended Rules for Care and
Operation of Heating Boilers.)
H. No valve of any description
shall be placed between the safety valve and the boiler, nor on the
discharge pipe between the safety valve and the atmosphere. The
discharge pipe shall be at least full size and be fitted with an open
drain to prevent water lodging in the upper part of the safety valve
or in the discharge pipe. When an elbow is placed on the safety valve
discharge pipe, it shall be located close to the safety valve outlet
or the discharge pipe shall be securely anchored and supported. All
safety valve discharges shall be so located or piped as not to
endanger persons working in the area.
2.7.7 EHB-7 Safety Relief
Valve Requirements for Hot Water Heating and Hot Water Supply Boilers
A. Each hot water heating and
hot water supply boiler shall have at least one ASME/National Board
stamped and certified safety relief valve set to relieve at or below
the maximum allowable working pressure of the boiler. Each hot water
supply boiler shall have at least one ASME/National Board stamped and
certified safety relief valve of the automatic reseating type set to
relieve at or below maximum allowable working pressure of the boiler.
Safety relief valves ASME/National Board stamped and certified as to
capacity shall have pop action when tested by steam. When more than
one safety relief valve is used on either hot water heating or hot
water supply boiler, the additional valve or valves shall be ASME
rated and may be set within a range not to exceed 6 psi above the
maximum allowable working pressure of the boiler up to and including
60 psi and 5 percent for those having a maximum allowable working
pressure exceeding 60 psi. Safety relief valves shall be spring
loaded. Safety relief valves shall be so arranged that they cannot be
reset at a higher pressure than the maximum permitted by this
paragraph.
B. No materials liable to fail
due to deterioration or vulcanization when subject to saturated steam
temperature corresponding to capacity test pressure shall be used for
any part.
C. No safety relief valve
shall be smaller than 3/4 in. nor larger than 4-1/2 in. standard pipe
size, except that boilers having a heat input not greater than 15,000
BTU per hour may be equipped with a safety relief valve of 1/2 in.
standard pipe size. The inlet opening shall have an inside diameter
approximately equal to, or greater than, the seat diameter. In no
case shall the minimum opening through any part of the valve be less
than 1/4 in. in diameter or its equivalent area.
D. The required steam
relieving capacity, in pounds per hour, of the pressure relieving
device or devices on a boiler shall be the greater of that determined
by dividing the maximum output in BTU at the boiler nozzle obtained
by the firing of any fuel for which the unit is installed by 1,000 or
shall be determined on the basis of pounds of steam generated per
hour per square foot of boiler heating surface as given in §
2.7.6(D)(1) of this Part. In many cases a greater relieving capacity
of valves will have to be provided than the minimum specified by
these rules. In every case, the requirements of § 2.7.7(F) of
this Part shall be met.
E. When operating conditions
are changed, or additional boiler heating surface is installed, the
valve capacity shall be increased, if necessary, to meet the new
conditions and shall be in accordance with § 2.7.7(F) of this
Part. The additional valves required, on account of changed
conditions, may be installed on the outlet piping provided there is
no intervening valve.
F. Safety relief valve
capacity for each boiler shall be such that, with the fuel burning
equipment installed and operated at maximum capacity, the pressure
cannot rise more than 10 percent above the maximum allowable working
pressure for pressure. When more than one safety relief valve is
used, the over pressure shall be limited to 10 percent above the set
pressure of the highest set valve allowed by § 2.7.6(A) of this
Part in text.
G. If there is any doubt as to
the capacity of the safety relief valve, an accumulation test shall
be run. (See 2017 ASME Code, Section VI, Recommended Rules for Care
and Operation of Heating Boilers.)
H. No valve of any description
shall be placed between the safety relief valve and the boiler, nor
on the discharge pipe between the safety relief valve and the
atmosphere. The discharge pipe shall be not less than the diameter of
the safety relief valve and fitted with an open drain to prevent
water lodging in the upper part of the safety relief valve or in the
discharge pipe. When an elbow is placed on the safety relief valve
discharge pipe, it shall be located close to the safety relief valve
outlet or the discharge pipe shall be securely anchored and
supported. All safety relief valve discharges shall be so located or
piped as not to endanger persons working in the area.
2.7.8 EHB-8 Steam Gages
A. Each steam boiler shall
have a steam gage or a compound steam gage connected to its steam
space or to its water column or to its steam connection. The gage or
connection shall contain a siphon or equivalent device which will
develop and maintain a water seal that will prevent steam from
entering the gage tube. The connection shall be so arranged that the
gage cannot be shut off from the boiler except by a cock placed in
the pipe at the gage and provided with a tee or lever handle arranged
to be parallel to the pipe in which it is located when the cock is
open. The connections to the boiler shall be not less than 1/4 in.
standard pipe size, but where steel or wrought iron pipe or tubing is
used, they shall be not less than 1/2 in. standard pipe size. The
minimum size of a siphon, if used, shall be 1/4 in. in inside
diameter. Ferrous and nonferrous tubing having inside diameters at
least equal to that of standard pipe sizes listed above may be
substituted for pipe.
B. The scale on the dial of a
steam boiler gage shall be graduated to not less than 30 psi nor more
than 60 psi. The travel of the pointer from 0 to 30 psi pressure
shall be at least 3 in.
2.7.9 EHB-9 Pressure or
Altitude Gages and Thermometers
A. Each hot water boiler shall
have a pressure or altitude gage connected to it or to its flow
connection in such a manner that it cannot be shut off from the
boiler except by a cock with tee or lever handle, placed on the pipe
near the gage. The handle of the cock shall be parallel to the pipe
in which it is located when the cock is open.
B. The scale on the dial of
the pressure or altitude gage shall be graduated approximately to not
less than 1-1/2 nor more than three times the pressure at which the
safety relief valve is set.
C. Piping or tubing for
pressure-or altitude-gage connections shall be of nonferrous metal
when smaller than 1 in. pipe size.
D. Each hot water boiler shall
have a thermometer so located and connected that it shall be easily
readable when observing the water pressure or altitude. The
thermometer shall be so located that it shall at all times indicate
the temperature in degrees Fahrenheit of the water in the boiler at
or near the outlet.
2.7.10 EHB-10 Water Gage
Glasses
A. Each steam boiler shall
have one or more water gage glasses attached to the water column or
boiler by means of valved fittings not less than 1/2 in. pipe size,
with the lower fitting provided with a drain valve of a type having
an unrestricted drain opening not less than 1/4 in. in diameter to
facilitate cleaning. Gage glass replacement shall be possible under
pressure. Water glass fittings may be attached directly to a boiler.
B. Boilers having an internal
vertical height of less than 10 in. may be equipped with a water
level indicator of the Glass Bull's-Eye type provided the indicator
is of sufficient size to show the water at both normal operating and
low water cutoff levels.
C. The lowest visible part of
the water gage glass shall be at least 1 in. above the lowest
permissible water level recommended by the boiler manufacturer. With
the boiler operating at this lowest permissible water level, there
shall be no danger of overheating any part of the boiler.
D. Each boiler shall be
provided at the time of the manufacture with a permanent marker
indicating the lowest permissible water level. The marker shall be
stamped, etched, or cast in metal; or it shall be a metallic plate
attached by rivets, screws, or welding; or it shall consist of
material with documented tests showing its suitability as a permanent
marking for the application. This marker shall be visible at all
times. Where the boiler is shipped with a jacket, this marker may be
located on the jacket.
E. In electric boilers of the
submerged electrode type, the water gage shall be so located to
indicate the water levels both at startup and under maximum steal
load conditions as established by the manufacturer.
F. In electric boilers of the
resistance heating element type the lowest visible part of the water
gage glass shall not be below the top of the electric resistance
heating element. Each boiler of this type shall also be equipped with
an automatic low-water electrical power cutoff so located as to
automatically cut off the power supply before the surface of the
water falls below the top of the electrical resistance heating
elements.
G. Tubular water glasses on
electric boilers having a normal water content not exceeding 100 gal.
shall be equipped with a protective shield.
2.7.11 EHB-11 Stop Valves
A. When a stop valve is used
in the supply pipe connection of a single steam boiler, there shall
be one used in the return pipe connection.
B. Stop valves in single hot
water heating boilers shall be located at an accessible point in the
supply and return pipe connections as near the boiler nozzle as is
convenient and practicable, of a single hot water heating boiler
installation to permit draining the boiler without emptying the
system.
C. When the boiler is located
above the system and can be drained without draining the system, stop
valves may be eliminated. A stop valve shall be used in each supply
and return pipe connection of two or more boilers connected to a
common system.
D. All valves or cocks shall
conform with the applicable portions of HF-203 of Section IV of the
2017 ASME Code and may be ferrous or nonferrous.
E. The minimum pressure rating
of all valves or cocks shall be at least equal to the pressure
stamped upon the boiler, and the temperature rating of such valves or
cocks, including all internal components shall be not less than 250
degrees Fahrenheit.
F. Valves or cocks shall be
flanged, threaded or have ends suitable for welding or brazing.
G. All valves or cocks with
stems or spindles shall have adjustable pressure type packing glands
and, in addition, all plug type cocks shall be equipped with a guard
or gland. The plug or other operating mechanism shall be distinctly
marked in line with the passage to indicate whether it is opened or
closed.
H. All valves or cocks shall
have tight closure when under boiler hydrostatic test pressure.
I. When stop valves are used,
they shall be properly designated substantially by tags of metal or
other durable material fastened to them as follows:
1. Supply Valve - Number ( )
2. Do Not Close Without Also
Closing Return Valve - Number ( )
3. Return Valve - Number ( )
4. Do Not Close Without Also
Closing Supply Valve - Number ( )
2.7.12 EHB-12 Feed-Water
Connections
A. Feed-water, makeup water,
or water treatment shall be introduced into a boiler through the
return piping system. Alternatively, makeup water or water treatment
may be introduced through an independent connection. The water flow
from the independent connection shall not discharge directly against
parts of the boiler exposed to direct radiant heat from the fire.
Makeup water or water treatment shall not be introduced through
openings or connections provided for inspection or cleaning, safety
valve, safety relief valve, blow-off, water column, water gage glass,
pressure gage, or temperature gage.
B. The makeup water pipe shall
be provided with a check valve near the boiler and a stop valve or
cock between the check valve and the boiler or between the check
valve and the return pipe system.
2.7.13 EHB-13 Water Column
and Water Level Control Pipes
A. The minimum size of ferrous
or nonferrous pipes connecting a water column to a steam boiler shall
be 1 in. No outlet connections, except for damper regulator,
feed-water regulator, steam gages, or apparatus which does not permit
the escape of any steam or water except for manually operated
blow-downs, shall be attached to a water column or the piping
connecting a water column to a boiler (see HG-705 of Section IV of
the 2017 ASME Code for introduction of feed-water into a boiler).If
the water column, gage glass, low-water fuel cutoff, or other water
level control device is connected to the boiler by pipe and fittings,
no shutoff valves of any type shall be placed in such pipe, and a
cross or equivalent fitting to which a drain valve and piping may be
attached shall be placed in the water piping connection at every
right angle turn to facilitate cleaning. The water column drain pipe
and valve shall be not less than 3/4 in. pipe size.
B. The steam connections to
the water column of a horizontal Fire-tube wrought boiler shall be
taken from the top of the shell or the upper part of the head, and
the water connection shall be taken from a point not above the center
line of the shell. For a cast iron boiler, the steam connection to
the water column shall be taken from the top of an end section or the
top of the steam header, and the water connection shall be made on an
end section not less than 6 in. below the bottom connection to the
water gage glass.
2.7.14 EHB-14 Return Pump
Each boiler equipped with a
condensate return pump shall be provided with a water level control
arranged to automatically maintain the water level in the boiler
within the range of the gage glass.
2.7.15 EHB-15 Repairs and
Renewals of Fittings and Appliances
Whenever repairs are made to
fittings or appliances, or it becomes necessary to replace them, the
repairs must comply with Section IV of the 2017 ASME Code for new
construction.
2.8 EXISTING INSTALLATION:
PRESSURE VESSELS
2.8.1 EPV-1 Maximum
Allowable Working Pressure for Standard Pressure Vessels
The maximum allowable working
pressure for standard pressure vessels shall be determined in
accordance with the applicable provisions of the edition of the ASME
Code or the API-ASME Code under which they were constructed and
stamped.
2.8.2 EPV-2 Maximum
Allowable Working Pressure for Nonstandard Pressure Vessels, Except
as Provided in § 2.8.3 of this Part.
A. The maximum allowable
working pressure of a nonstandard pressure vessel shall be determined
by the strength of the weakest course computed from the thickness of
the plate, the tensile strength of the plate, the efficiency of the
longitudinal joint, the inside diameter of the course and the factor
of safety set by these rules.
1. TStE = maximum allowable
working pressure, psi
2. DDDD
3. RFS
4. where:
a. TS = specified minimum
tensile strength of shell plate material, psi. (When the tensile
strength of carbon steel plate is not known, it may be taken as
55,000 psi for temperatures not exceeding 650 degrees Fahrenheit. For
other materials use the lowest stress values for that material from
Section VIII.)
b. t = minimum thickness of
shell plate of weakest course, inches.
c. E = efficiency of
longitudinal joint depending upon construction.
(1) for riveted joints -
calculated riveted efficiency; for fusion-welded and brazed joints -
the following percentages apply:
(AA) Single lap weld 40%
(BB) Double lap weld 50%
(CC) Single butt weld 60%
(DD) Double butt weld 70%
(EE) Forge weld 70%
(FF) Brazed steel 80%
d. R = inside radius of
weakest course of shell, (inches) provided the thickness does not
exceed 10 percent of the radius. If the thickness is over 10 percent
of the radius, the outer radius shall be used.
e. FS = factor of safety
allowed by these rules.
B. The minimum factor of
safety in no case be less than 5 for existing installations. The
working pressure shall be decreased when deemed necessary by the
inspector to insure the operation of the vessel within safe limits.
The condition of the vessel and the particular service to which it is
subject will be the determining factors.
C. The maximum allowable
working pressure permitted for formed heads under pressure shall be
determined by using the appropriate formulas from 2017 ASME Code
Section VIII, Division 1, and the tensile strength and factors of
safety given in §§ 2.8.1 and 2.8.2 of this Part
D. The maximum allowable
working pressure for nonstandard pressure vessels subjected to
external pressure shall be determined by the rules of Section VIII,
Division 1, of the 2017 ASME Code.
2.8.3 EPV-3 Nonstandard
Pressure Vessels - Use of Other Formulas
Pressure vessels that were
not ASME Code stamped but which were constructed of known materials
and were designed and constructed in accordance with sound
engineering standards, formulas, and practices that provide safety
equivalent to the intent of the Code shall be calculated on the same
basis as used in the original design.
2.8.4 EPV-4 Inspection of
Inaccessible Parts
Where, in the opinion of the
inspector, as the result of conditions disclosed at the time of
inspection, it may be necessary to remove interior or exterior
lining, covering or brickwork to expose certain parts of the vessel
not normally visible, the owner or user shall remove such material to
permit proper inspection and to determine remaining thickness.
2.8.5 EPV-5 Overpressure
Protection
Each pressure vessel shall be
provided with pressure relief devices indicating and controlling
devices as necessary to protect against overpressure. These devices
shall be so constructed, located and installed that they cannot
readily be rendered inoperative. The relieving capacity of such
pressure relief device shall be adequate to prevent a rise in
pressure in the vessel of more than 10 percent or 3 psi, whichever is
greater, above the maximum allowable working pressure except when
multiple relieving devices are provided, they shall prevent the
pressure from rising more than 16 percent or 4 psi, whichever is
greater above the maximum allowable working pressure. When multiple
pressure relieving devices are provided, at least one device shall be
set at or below the maximum allowable working pressure and the
additional devices shall be set no higher than 105% of the maximum
allowable working pressure. Where an additional hazard is involved
due to fire or other unexpected sources of external heat, the
pressure relief devices shall meet the requirements of ASME Code
Section VIII, Division, paragraph UG-125 or Division 2, paragraph
AR-130, whichever is applicable.
2.8.6 EPV-6 Repairs and
Renewals of Fittings and Appliances
Whenever repairs are made to
fittings and appurtenances or it becomes necessary to replace them,
the work must comply with the requirements for new installations.
2.9 GENERAL REQUIREMENTS
2.9.1 GR-1 Inspection of
Boilers and Pressure Vessels
A. All boilers and pressure
vessels not exempted by the Act or by rules and regulations
promulgated under the Act and which are subject to regular
inspections, shall be prepared for such inspections as required in §
2.9.2 of this Part.
B. Approved pressure
vessels(hot water heaters listed by a nationally recognized testing
agency), with approved safety devices including pressure temperature
relief valve, with a nominal water containing capacity of one hundred
twenty (120) gallons or less having a heat input of less than two
hundred thousand (200,000) B.T.U. per hour, used solely for hot water
supply at pressure of one hundred sixty (160) pounds per square inch
or less, and at temperatures of two hundred ten degrees (210°)
Fahrenheit or less, boilers having a heat input of less than 200,000
B.T.U. per hour, steam boilers having a generating capacity of less
than 200 lbs. an hour provided; that such pressure vessels and
boilers are not installed in places of public assembly such as
schools, child care centers, public and private hospitals, nursing
and boarding homes, churches, public buildings, or any similar place
of public assembly (boilers which are less than 200,000 B.T.U. per
hour or steam boilers which generate less than 200 lbs. per hour
capacity and are included in these exemption categories will be
considered residential type boilers and not subject to ASME-CSD-1
rules; these units must still conform to local code ordinance and
manufacturer specifications for proper installation and use.). For
purposes of this section, the following definitions shall apply:
1. “schools” and
such other places of public assembly means every public, private,
parochial or charter school recognized by any Rhode Island city or
town school committee or by the Rhode Island Department of Education;
2. “child care centers”
and such other places of public assembly means any Family Child Care
Home, Group Family Care Home, Child Day Care Center and Child Day
Care Center (School Age) as defined by the State of Rhode Island
Department of Children, Youth and Families regulations for licensure
( 214-RICR-40-00-1 );
3. “public and private
hospitals” and such other places of public assembly means an
Organized Ambulatory Care Facility-Freestanding, Ambulatory Surgery
Center, a Freestanding Ambulatory Surgical Center, Emergency Care
Facility, and a Hospital as defined by the State of Rhode Island
Department of Health regulations for licensure for healthcare
providers (see 216-RICR-40-10 )
and R.I. Gen. Laws § 23-17-1 et seq . and any mental
health, substance abuse and developmental disability residential
treatment facility licensed or certified by the Rhode Island
Department of Behavioral Health Care, Developmental Disabilities and
Hospitals and any Adult Day Care Center licensed by the Rhode Island
Division of Elderly Affairs;
4. “nursing homes”
and such other places of public assembly means Adult Day Care
centers, Assisted Living Residences, Hospice Inpatient Facilities,
Nursing Home Facilities and Rehabilitation Hospital Centers as
defined by the State of Rhode Island Department of Health regulations
for licensure (see 216-RICR-40-10 )
and R.I. Gen Laws § 23-17-1 et seq .;
5. “boarding homes”
means a residential house in which one or more rooms are rented to
members of the general public by the week or month and where lodgers
receive laundry and cleaning services and at least one meal per day;
6. “churches”
means a place of worship or location where a group of people or
congregation comes to perform acts of religious study, honor or
devotion;
7. “public buildings”
means any building owned, leased or controlled in whole or in part by
the State of Rhode Island or any agency or political subdivision
thereof;
8. “similar place of
public assembly” means those places specifically defined
herein.
2.9.2 GR-2 Preparation for
Inspection
A. The owner or user shall
prepare each boiler or pressure vessel for inspection, and shall
prepare for and apply a hydrostatic or pressure test, whenever
necessary, on the date arranged by the inspector which shall not be
less than seven (7) days after the date of notification.
1. Boilers - The owner or user
shall prepare a boiler for internal inspection in the following
manner:
a. Water shall be drawn off
and the boiler washed thoroughly;
b. Manhole and hand-hole
plates, washout plugs and inspection plugs in water column
connections shall be removed as required by the inspector. The
furnace and combustion chambers shall be cooled and thoroughly
cleaned;
c. All grates of internally
fired boilers shall be removed;
d. Insulation or brickwork
shall be removed as required by the inspector in order to determine
the condition of the boiler, headers, furnace, supports or other
parts;
e. Prior to the inspection,
the owner/user shall make any and all preparations with regards to
asbestos containing materials which are necessary to provide proper
access to equipment and to control exposure to asbestos fibers during
the inspection. The required preparatory work shall be conducted in
accordance with the provisions of the Rhode Island Rules and
Regulations for Asbestos Control ( 216-RICR-50-15-1 );
f. The pressure gage shall be
removed for testing as required by the inspector;
g. Any leakage of steam or hot
water into the boiler shall be prevented by disconnecting the pipe or
valve at the most convenient point or any appropriate means approved
by the inspector;
h. Before opening the manhole
or hand-hole covers and entering any parts of the steam generating
unit connected to a common header with other boilers, the non-return
and steam stop valves must be closed, tagged, and padlocked, and
drain valves or cocks between the two valves opened. The feed valves
must be closed, tagged, and padlocked, and drain valves or cocks
located between the two valves opened. After draining the boiler, the
blow-off valves shall be closed, tagged and padlocked. Blow-off
lines, where practicable, shall be disconnected between pressure
parts and valves. All drains and vent lines shall be opened.
2. Pressure Vessels - Pressure
vessels shall be prepared for inspection to the extent deemed
necessary by the inspector and the applicable procedures outlined in
§ 2.9.2(A)(1) of this Part
2.9.3 GR-3 Boilers and
Pressure Vessels Improperly Prepared for Inspection
If a boiler or pressure
vessel has not been properly prepared for an internal inspection, or
if the owner or user fails to comply with the requirements for a
pressure test as set forth in these rules, the inspector may decline
to make the inspection or test and the inspection certificate shall
be withheld or right to operate revoked, until the owner or user
complies with the requirements.
2.9.4 GR-4 Removal of
Covering to Permit Inspection
If the boiler or pressure
vessel is jacketed so that the longitudinal seams of shells, drums or
domes cannot be seen, sufficient jacketing, setting wall, or other
form of casing or housing shall be removed to permit reasonable
inspection of the seams and other areas necessary to determine the
condition and safety of the boiler or pressure vessel, provided such
information cannot be determined by other means.
2.9.5 GR-5 Lap Seam Crack
The shell or drum of a boiler
or pressure vessel, in which a lap seam crack is discovered along a
longitudinal riveted joint, shall be immediately discontinued from
use. Patching is prohibited. (By lap seam crack is meant a crack
found in lap seams, extending parallel to the longitudinal joint and
located either between or adjacent to rivet holes.)
2.9.6 GR-6 Pressure Test
A. A hydrostatic pressure
test, when applied to boilers or pressure vessels, shall not exceed
1-1/2 times the maximum allowable working pressure. The pressure
shall be under proper control so that in no case shall the required
test pressure be exceeded by more than 2 percent.
B. During a hydrostatic test
the safety valve or valves shall be removed or each valve disc shall
be held to its seat by means of a testing clamp and not by screwing
down the compression screw upon the spring. A plug device designed
for this purpose may be used.
C. It is suggested that the
minimum temperature of the water used to apply a hydrostatic test
shall be not less than 70 degrees Fahrenheit, but the maximum
temperature during inspection shall not exceed 120 degrees
Fahrenheit.
D. When a hydrostatic test is
applied to determine tightness, the pressure shall be equal to the
normal operating pressure but need not exceed the release pressure of
the safety valve having the lowest release setting.
E. When the contents of the
vessel prohibit contamination by any other medium or when a
hydrostatic test is not possible, other testing media may be used
providing the precautionary requirements of the applicable section of
the ASME Code are followed. In such cases, there shall be agreement
between the owner and the inspector.
2.9.7 GR-7 Automatic Low
Water Fuel Cutoff and/or Water Feeding Device
A. Each automatically fired
steam or vapor system boiler shall be equipped with an automatic low
water fuel cutoff so located as to automatically cut off the fuel
supply when the surface of the water falls to the lowest safe water
line. If a water feeding device is installed, it shall be so
constructed that the water inlet valve cannot feed water into the
boiler through the float chamber and so located as to supply
requisite feed-water. The lowest safe water line should not be lower
than the lowest visible part of the water glass.
B. Such fuel or feed-water
control device may be attached direct to a boiler or for low pressure
boilers to the tapped openings provided for attaching a water glass
direct to a boiler, provided that such connections from the boiler
are nonferrous tees or Y's not less than 1/2 in, pipe size between
the boiler and the water glass, so that the water glass is attached
direct and as close as possible to the boiler; the straightway
tapping of the Y or tee to take the water glass fittings, the side
outlet of the Y or tee to take the fuel cutoff or water feeding
device. The ends of all nipples shall be reamed to full size
diameter.
C. Designs embodying a float
and float bowl shall have a vertical straight away valve drain pipe
at the lowest point in the water equalizing pipe connections by which
the bowl and the equalizing pipe can be flushed and the device
tested.
2.9.8 GR-8 Pressure
Reducing Valves
A. Where pressure reducing
valves are used, one or more safety or safety relief valves shall be
provided on the low pressure side of the reducing valve when the
piping or equipment on the low pressure side does not meet the
requirements for the full initial pressure. The safety or safety
relief valves shall be located adjoining or as close as possible to
the reducing valve. Proper protection shall be provided to prevent
injury or damage caused by the escaping fluid from the discharge of
safety or safety relief valves if vented to the atmosphere. The
combined discharge capacity of the safety or safety relief valves
shall be such that the pressure rating of the lower pressure piping
or equipment shall not be exceeded in case the reducing valve fails
in the open position.
B. The use of hand controlled
bypasses around reducing valves is permissible. If a bypass is used
around the reduction valve, the safety valve required on the low
pressure side shall be of sufficient capacity to relieve all the
fluid that can pass through the bypass without over-pressuring the
low pressure side.
C. A pressure gage shall be
installed on the low pressure side of a reducing valve.
2.9.9 GR-9 Boiler Blow-off
Equipment
A. The blow-down from a boiler
or boilers that enters a sanitary sewer system or blow-down which is
considered a hazard to life or property shall pass through some form
of blow-off equipment that will reduce pressure and temperature as
required hereinafter.
B. The temperature of the
water leaving the blow-off equipment shall not exceed 150 degrees
Fahrenheit.
C. The pressure of the
blow-down leaving any type of blow-off equipment shall not exceed 5
psi.
D. All blow-off equipment
shall be fitted with openings to facilitate cleaning inspection.
E. Blow-off equipment shall
conform to the provisions set forth in the recommended rules for
National Board Boiler Blow-off Equipment.
2.9.10 GR-10 Location of
Discharge Piping Outlets
The discharge of safety
valves, blow-off pipes and other outlets shall be located and
supported as to prevent injury to personnel.
2.9.11 GR-11 Supports
Each boiler and pressure
vessel shall be supported by masonry or structural supports of
sufficient strength and rigidity to safely support the boiler or
pressure vessel and its contents. There shall be no excessive
vibration in either the boiler, pressure vessel or its connecting
piping.
2.9.12 GR-12 Boiler Door
Latches
A. A water-tube boiler shall
have the firing doors of the inward opening type, unless such doors
are provided with substantial and effective latching or fastening
devices or otherwise so constructed as to prevent them, when closed,
from being blown open by pressure on the furnace side.
B. These latches or fastenings
shall be of the positive self locking type. Friction contacts,
latches, or bolts actuated by springs shall not be used. The
foregoing requirements for latches or fastenings shall not apply to
coal openings of downdraft or similar furnaces.
C. All other doors, except
explosion doors, not used in the firing of the boiler, may be
provided with bolts or fastenings in lieu of self locking latching
devices.
D. Explosion doors, if used
and if located in the setting walls within 7 ft. of the firing floor
or operating platform, shall be provided with substantial deflectors
to divert the blast.
2.9.13 GR-13 Clearance
When boilers are replaced or
new boilers are installed in either existing or new buildings, a
minimum height of at least 3 ft. shall be provided between the top of
the boiler proper and the ceiling and at least 3 ft. between all
sides of the boiler and adjacent walls or other structures. Boilers
and pressure vessels having manholes shall have 5 ft. clearance from
the manhole opening and any wall, ceiling or piping that will prevent
a person from entering the boiler or vessel. All boilers and pressure
vessels shall be so located that adequate space will be provided for
the proper operation of the boilers and pressure vessels and their
appurtenances, for the inspection of all surfaces, tubes,
water-walls, economizers, piping, valves and other equipment, and for
their necessary maintenance and repair and replacement of tubes.
2.9.14 GR-14 Ladders and
Runways
When necessary for safety,
there shall be a steel runway or platform of standard construction
installed across the tops of adjacent boilers or pressure vessels or
at some other convenient level for the purpose of affording safe
access. All walkways shall have at least two means of exit, each to
be remotely located from the other.
2.9.15 GR-15 Exit from
Boiler Room
All boiler rooms exceeding
500 square feet floor area and containing one or more boilers having
a fuel burning capacity of 1,000,000 BTU, or equivalent electrical
heat input, shall have at least two means of exit. Each exit shall be
remotely located from the other. Each elevation in such boiler room
shall have two means of exit, each remotely located from the other.
2.9.16 GR-16 Suggestions
for Operations
It is suggested that the
Recommended Rules for Care of Power Boilers, Section VII and the
Recommended Rules for Care and Operation of Heating Boilers, Section
VI of the ASME Code, be used as a guide for proper and safe operating
practices.
2.9.17 GR-17 Air and
Ventilation Requirements - Combustion Air Supply and Ventilation of
Boiler Room
A. A permanent source of
outside air shall be provided for each boiler room to permit
satisfactory combustion of the fuel as well as proper ventilation of
the boiler room under normal operating conditions.
1. The total requirements of
the burners for all fired pressure vessels in the boiler room must be
used to determine the louver sizes whether fired by coal, oil or gas;
however, the minimum net free louvered area must not be less than one
square foot. The following table or formula shall be used to
determine the net louvered area in square feet:
INPUT
REQUIRED
AIR
MIN.
NET LOUVERED
BTU/HOUR
CU/FT/MIN.
AREA
SQ. FT.
500,000
125
1.0
1,000,000
250
1.0
2,000,000
500
1.6
3,000,000
750
2.5
4,000,000
1,000
3.3
5,000,000
1,250
4.1
6,000,000
1,500
5.0
7,000,000
1,750
5.8
8,000,000
2,000
6.6
9,000,000
2,250
7.5
10,000,000
2,500
8.3
(BTU/10,000)
X 2.5 = CFM
500CFM
per sq. ft. of net req. area
2. When mechanical ventilation
is used in lieu of § 2.9.17(A)(1) of this Part the supply of
combustion and ventilation air to the boiler room and the firing
device will not operate with the fan off. The velocity of the air
through the ventilating fan shall not exceed 500 feet per minute and
the total air delivered shall be equal to or greater than shown in §
2.9.17(A)(1) of this Part above.
2.9.18 GR-18 Gas Burners
For installations which are
gas fired, the burners used shall conform to the applicable
requirements of the American Gas Association or other nationally
recognized standards.
2.9.19 GR-19 Conditions Not
Covered by These Rules and Regulations
For any conditions not
covered by these requirements, the applicable provisions of the 2017
ASME Code or the 2017 NATIONAL BOARD INSPECTION CODE shall apply.