440-RICR-10-00-3
440-RICR-10-00-3. Rules and Regulations for Underground Utility Contractors (version Adoption, 02/23/2015 to 09/02/2015)
Summary of Emergency Adoption of Regulation
Underground Utility License
• Pursuant to Rhode Island General Law title 5, Chapter 5-65.3
the Board has the responsibility to regulate underground utility
contractors and to issue a license.
• Emergency rules and regulations have been promulgated to
expedite this process and to assure that the public is properly
protected.
Conditions for issuing licenses are as follows:
• Completed Pre-Application (no fee for those who are
grandfathered). Designated license number will be assigned upon
completing this form.
• Grandfather clause is good from 1/1/15 to 06/30/15 and must
show proof of license held for last 5 years from city or town in
Rhode Island.
• Completed Application.
• Affidavit signed acknowledging general laws and regulations.
• $20, 000.00 Bond made out to State of Rhode Island Contractors
Registration and Licensing Board pursuant to RIGL 5-65.3-10.
• $1,000,000.00 Insurance policy single limit public liability and
property damage pursuant to RIGL 5-65.3-9. Contractors Board
must be listed as the holder of certificate.
• Workers Compensation Insurance if employees.
• Verification of filings with Secretary of State’s office.
• $200.00 Fee for two years and $10.00 fee for picture ID card.
• Heavy duty equipment operators license from DLT pursuant to
5-65.3-4 (a) (1).
• Proof of passing grade on written examination provided by third
party testing company PSI pursuant to 5-65.3-4 (a) (2).
• A conditional certificate of license will be provided upon meeting
all qualifications and when the rules and regulations are
promulgated by the Board a picture identification card will be
issued. Licensee will be required to return to Board for picture
and issuance of new card.
Underground Utilities Contractors License Regulations
Page 2 of 10
• New rules and regulations will be developed with the help of the
industry over the next few months and a public hearing will be
conducted to assure participation of those who will be regulated
and affected by this new licensing requirement.
Underground Utilities Contractors License Regulations
Page 3 of 10
State of Rhode Island Providence Plantations
Department of Administration
Rhode Island Contractors’ Registration and Licensing Board
Rhode Island Underground Utility Contractors Licensing
Regulations
DEPARTMENT OF ADMINISTRATION
CONTRACTORS’ REGISTRATION AND LICENSING BOARD
One Capitol Hill Providence, Rhode Island 02908-5859
(401) 222-1268
FAX No. (401) 222-1940
WEB SITE: www.crb.ri.gov
Effective Date: February 23, 2015
Underground Utilities Contractors License Regulations
Page 4 of 10
UNDERGROUND UTILITY CONTRACTORS LICENSE
Emergency Regulations
Purpose:
The purpose of these rules and regulations is to establish provisions, qualifications and
procedures for licensing underground utility contractors engaged in the laying or repairing
of underground utilities.
Statutory Authority:
These rules and regulations are promulgated pursuant to Title 5, Chapters 65.3, and in
accordance with Chapter 42-35, Administrative Procedures Act of the Rhode Island
General Laws of 1956, as amended.
Section 1: Licensing:
1. LICENSE GENERALLY
The following licensing requirements are set forth by the Contractors’ Registration and
Licensing Board (“Board”) and pertain to the licensing of underground utility contractors,
pursuant to R.I.G.L. § 5-65.3-1 et seq. Licensing requirements for other disciplines are contained
in the respective Rules and Regulations.
1.1. License Required
An underground utility contractor’s license shall be required for commercial and residential
underground utility work as established by law, and may be issued by the Board. A license will
be issued to only one person. Other persons shall not be included in that license, but each shall be
separately licensed and shall separately meet the underground utility contractor licensing
requirements. Each applicant for an underground utility contractor’s license must also be of good
moral character and be in good standing with the Contractors’ Registration and Licensing Board.
No entity or person may perform work subject to R.I.G.L. Chapter 5-65.3 through the use of
another person’s license.
1.2. Public Utility Exemption to License Requirement
Any public utility, or agent thereof, regulated by the public utilities commission or the division
or public utilities and carriers shall be exempt from underground utility contractor licensing
requirements. R.I.G.L. § 5-65.3-3(c).
1.3. Change of Entity Type/Ownership – Terminates License
Underground utility licenses are not transferable or assignable; the license becomes
automatically invalid upon a change of ownership, or on suspension/revocation of license.
R.I.G.L. § 5-65.3-11. If a person licensed as an individual, partnership, limited liability
Company, or corporation seeks to change to another type of entity, the license will be terminated
and the new entity must license anew. If a person requests to maintain the same license number
for the new entity, the Board may assign that number to the new entity once a form established
by the Board is completed. The responsibility for all work performed by the previous entity over
the last year will be assumed by the new entity.
Underground Utilities Contractors License Regulations
Page 5 of 10
1.4. Partners Must Be on Record with Board
All partners within a partnership shall be on record with the Board. Partnerships consisting of
spouses shall be treated as are partnerships consisting of unrelated persons. Notification must be
made to the Board for any change in the composition of that partnership; except for the
reallocation of interest among the existing partners.
1.5. No Advertising or Working Without Valid License
No person shall advertise or otherwise hold out to the public that person’s services as an
underground utility contractor unless that person holds a current, valid license; nor shall any
person claim by advertising or by any other means to be licensed unless that person holds a
current, valid license.
1.6. Proposals, Invoices (Must Use License Number)
a) All forms of advertising, inclusive of newsprint classified advertising, newsprint
display advertising, pamphlets, telephone directory space ads, and display ads for
work subject to R.I.G.L. Chapter 5-65.3, prepared by an underground utility
contractor or at the underground utility contractor's request or direction, shall
clearly show/display the underground utility contractor’s license number.
b) All written contracts subject to R.I.G.L. Chapter 5-65.3 shall show the
underground utility contractor’s license number. All contracts exceeding
$1,000.00 must be in writing and failure to adhere to this will result in the
assessment of fines.
1.7. Change of License Information
A licensee must provide the Board with any changes to the information contained in the
application and license, such as change of address, change of responsible party, agent of
service change, etc. and failure to do so will result in fines and possible suspension of
license. (Change of Address Form, Change of Responsible Person Form, Change of
Ownership and Company Name Change Form).
2. APPLICATIONS FOR UNDERGROUND UTILITY CONTRACTOR LICENSE
Each applicant for an underground utility contractor’s license must submit the following
application, information, documentation, and fees:
2.1. NEW APPLICANTS
In order to obtain an underground utility contractor’s license a new applicant must submit to the
Contractors’ Registration and Licensing Board the following:
a) Pre-License Application – If applicant has never previously applied for or held an
underground utility contractor’s license, the applicant must submit a pre-license
application in addition to the application below. The purpose of the pre-license
application is to process the applicant for testing through the Board’s third-party
testing provider and to issue a tracking number for the license. The Pre-License
Application shall include:
i. Name of applicant;
ii. Business address;
Underground Utilities Contractors License Regulations
Page 6 of 10
iii. Driver’s license state and number;
iv. Date of birth;
v. Home, business, and cell phone number;
vi. E-mail address (if applicable);
vii. $50.00 pre-license application fee.
b) Application - The Application, on proper form as prescribed by the Board, must
include the following:
i. Name;
ii. Home address;
iii. Driver’s license state and number;
iv. Date of birth;
v. E-mail address (if applicable);
vi. Home, business, and cell phone number
vii. Business name (list all business names under which business as an
underground utility contractor is to be conducted, inclusive of fictitious
names);
viii. Name of principal responsible;
ix. Business address;
x. If non-resident underground utility contractor, must provide power of
attorney constituting and appointing a registered agent in Rhode Island;
xi. A true and accurate 1” x 1” photograph of applicant, or digitized photograph
taken by the Board for additional fee of $10.00;
xii. $200.00 application/license fee for two year period.
c) Hoisting License or other similar evidence - The applicant must also provide a
current Department of Labor and Training Hoisting Engineers License (R.I.G.L. Ch.
28-26) or other similar license or certification as evidence that the underground utility
contractor is capable of installing, repairing, alternating, or replacing sewer lines,
storm drainage lines or waterlines, and services in accordance with approved plans
and specifications pursuant to R.I.G.L. § 5-65.3-4(1).
d) Bond - The applicant must obtain and provide the Board with a bond in the amount of
twenty thousand dollars ($20,000) with the CRLB as the holder for a two-year period
and conditioned on the language contained in R.I.G.L. § 5-65.3-10.
e) Insurance - The applicant must obtain and provide the Board with documentation of
public liability and property damage insurance covering the work of the underground
utility contractor and in the amount of one million dollars ($1,000,000) (combined
single limit, bodily injury, and property damage) as required by R.I.G.L. § 5-65.3-9.
The insurance must be continuously in effect throughout the period of licensure;
failure to maintain insurance shall invalidate registration and may result in a fine to
the licensee. Applicants must provide verification of a minimum of six (6) month’s
insurance coverage from the date of application. A certificate of insurance constitutes
satisfactory evidence of insurance coverage so long as it lists the Board as the holder
and the policy number.
Underground Utilities Contractors License Regulations
Page 7 of 10
Failure to secure and maintain insurance coverage may result in the imposition of
fines and penalties.
f) Workers’ Compensation Coverage – If the applicant states that he/she has one or
more employees, the applicant must provide the Board with proof of proper workers’
compensation coverage as required under R.I.G.L. 28-29 or documentation of waiver
of workers’ compensation coverage.
g) Examination Certification – As required by R.I.G.L. 5-65.3-4(2), the applicant must
take and pass a written examination (unless grandfathered pursuant to R.I.G.L. 5-
65.3-7 – see Section 2.2). The examination will test the applicant’s understanding of
the rules and regulations, and his/her ability to read and interpret approved plans and
specifications. Upon passage of the examination, the applicant must submit to the
Board with his/her application certification of passage of the examination. If the
applicant fails an examination, he/she is permitted to take further examinations to
obtain a passing grade upon payment of the prescribed fee for each examination. The
Board will ensure that third-party testing company conducts at least three test sessions
a year. Testing locations, dates, and times will be posted on the Board’s website. The
applicant is responsible for all fees associated with the written examination, including
study materials.
h) Corporate Documents – If the company is a corporation or LLC, the corporation or
LLC must be properly registered with and certified by the Secretary of State’s Office.
The applicant must provide the corporate documents to the Board as proof that the
corporation or LLC is properly registered with the Secretary of State. Any lapse or
revocation of corporate status with the Secretary of State may result in the imposition
of fines and/or action on the license, including suspension, revocation, or
invalidation.
i) Photo – If not included in pre-testing application, the applicant must provide the
Board with a true and accurate 1” x 1” photograph or digitalized photograph taken by
the Board for an additional fee of $10.00.
j) Proof of Rhode Island Residency – The applicant must provide the Board with
proof that the applicant is a resident of Rhode Island (utility bill, tax form, other
official document with applicant’s current address). Out-of-state applicants must
provide a power of attorney constituting and appointing a registered agent in Rhode
Island (Agent of Service/ Power of Attorney Form).
k) Affidavit – The applicant must submit a notarized affidavit attesting to the
applicant’s knowledge of the relevant governing laws: Underground Utility
Contractor Law (§5-65.3-1 et seq.) and the Contractors’ Registration Act (§5-65-1 et
seq.). (Affidavit Form).
Underground Utilities Contractors License Regulations
Page 8 of 10
2.2. APPLICANTS PREVIOUSLY LICENSED BY A RHODE ISLAND
CITY/TOWN (GRANDFATHER CLAUSE)
Between January 1, 2015 and June 30, 2015, the grandfather clause of R.I.G.L. § 5-65.3-7 will
allow those who previously were licensed by a Rhode Island city or town within the previous
five (5) years to obtain an underground utility contractor’s license without having to take the
written examination.
An applicant previously licensed by a city or town in Rhode Island as an underground contractor
must complete the above requirements in Section 2.1(a) – (f) and (h) – (k) for new applicants and
must also provide documentation of the previous city/town issued license. Such applicant is not
subject to the $50.00 pre-license application fee in 2.1(a)(vii).
After June 31, 2015, the grandfather clause is no longer applicable and all applicants must
comply with the New Applicant procedures as outlined above in Section 2.1.
2.3. INCOMPLETE APPLICATIONS
The Board may return an incomplete application for license to the applicant with an explanation
of the deficiencies. Returned applications may be subject to late filing fees.
2.4. DENIED APPLICATIONS
When an application for a license is denied, a hearing shall be granted to the applicant provided
the aggrieved applicant requests such a hearing in writing and within ten (10) days of the denial
with the Board. R.I.G.L. § 5-65.3-12(b). The hearing shall be held in accord with R.I.G.L. § 42-
35-1 et seq.
3. LICENSE CARDS
Each licensee will be issued a license card and/or certificate of license that specifies the person is
an underground utility contractor and contains his/her assigned license number and his/her
photograph.
Licensee must have the license card and/or certificate in his/her possession while performing or
offering to perform work, and the card must be available and presented to Board investigators
upon request.
Additional card holders, for other partners, corporate officers/members, or employees may be
issued upon receipt of a $25.00 fee for each additional card and the cost of digital picture. These
cards may be used for permit applications and license verification or identification and are only
valid if all the criteria established by these rules and regulations as well as law are maintained by
the business entity.
If a license card is lost, misplaced, or destroyed, the licensee shall file an affidavit to that effect
(Lost/Misplaced Card Affidavit Form) and pay a fee of $25.00.
Underground Utilities Contractors License Regulations
Page 9 of 10
4. LICENSE EFFECTIVE DATE, TERM, and LAPSE
4.1. Effective Date
The effective date of a license is when all documents and/or fees required by law and these
regulations have been processed by the Board, including documentation that the applicant has
successfully passed the written examination (if applicable).
4.2. License Term/Expiration
A license is valid for the two year term for which it is issued and expires every two years on the
anniversary date of the license’s issuance, which is the first of the month of issuance. The license
is valid only if the following conditions are met throughout the license period:
a) The insurance required by R.I.G.L. § 5-65.3-9 remains in continuous effect; (if
the Board receives notice of lapse, cancellation or non-renewal of insurance from
the insurance carrier, insurance is considered non-continuous and subject to a
fine); and
b) If the licensee is an individual, survival of that individual; or
c) If the licensee is a partnership, no change in the composition of that partnership,
by death or otherwise; or
d) If the licensee is a corporation or limited liability company, survival of that
corporation or limited liability company, including compliance with all applicable
laws governing corporation; and
e) The license maintains good standing with the Board and has paid all applicable
fees and/or fines.
4.3. Lapsed/Surrendered License
A person whose license has lapsed is considered non-licensed from the date the lapse occurred
until the date the license is renewed, reissued, or reinstated. During a period of lapse, the person
shall not perform the work of an underground utility contractor. If a license becomes invalid or
lapses, the license card must be returned to the Board; at that time, the card will be deemed
surrendered. A license surrendered will not be responsible for any late fees unless an
outstanding violation(s) exists and in that case would be subject to fines as well as other fees.
Surrendering of license must be accompanied by a statement as to why the license is being
surrendered and include the return of the license card to the Board. (Surrendering of
Registration/License Form).
5. RENEWAL AND REISSUANCE OF LICENSE
A license issued by the Board shall expire every two years on the anniversary date of the
license’s issuance (on the first of the month of issuance) and may be renewed on or before that
date for a period of two years. The renewal fee is $200.00; all renewal fees are non-refundable.
A license may be renewed upon the licensee’s completion of the renewal form as prescribed by
the Board and once the licensee provides the Board with up-to-date/current documentation and
information as required by Section 2.1(b)-(f), (h), and (j). The licensee or other card holders may
be required to sign a new affidavit and may be required to have a new digital photograph taken
Underground Utilities Contractors License Regulations
Page 10 of 10
by the Board (fee of $10.00) (as required in Section 2.1(i) and (k)) in order to renew his/her
license.
The effective date of a renewed or reissued license is when all documents and/or fees required by
law and these regulations have been processed by the Board.
If a license card has been surrendered and the licensee wishes to reinstate, no additional charge
will be administered if reinstatement is sought within the license period. If one surrenders his/her
license card it will not be reissued without penalty if the licensee has any outstanding claims
and/or violations.
Severability:
If any provision of these Rules and Regulations, or the application thereof to any person or
circumstances, is held invalid by a court of competent jurisdiction, the validity of the remainder
of the Rules and Regulations shall not be affective thereby.
Effective Date:
The above forgoing rule and regulations related to the Underground Utility Contractors License
of the Rhode Island Contractors’ Registration and Licensing Board, after due notice, are hereby
adopted and filed with the Secretary of State this 23rd day of February, 2015, to become
effective 20 days from filing, unless otherwise indicated below, in accordance with the
provisions of Title 5, Chapter 65.3, and in accordance with Chapter 42-35, Administrative
Procedures Act of the Rhode Island General Laws of 1956, as amended.
Filing date:
February 23, 2015
Effective Date:
February 23, 2015