510-RICR-00-00-3
510-RICR-00-00-3. RISBC-3 Rhode Island Plumbing Code (version Amendment, 07/01/2013 to 07/01/2013)
RHODE ISLAND
STATE BUILDING CODE
SBC-3 State Plumbing Code
Effective July 1, 2013
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS
Department of Administration
BUILDING CODE STANDARDS COMMITTEE
One Capitol Hill
Providence, RI 02908-5859
(401) 222-3033
FAX NO. (401) 222-2599
www.ribcc.ri.gov
11th edition
SBC-3 2013
1
Regulation SBC-3
State Plumbing Code
July 1, 2013
The Building Code Standards Committee, in accordance with the rule making authority
of Title 23, Chapter 23-27.3, Section 109.1, paragraphs a through c inclusive, has
formally adopted and promulgated as the Rhode Island State Building Code, the
provisions of the International Plumbing Code, 2012 edition, as published by the
International Code Council, Inc. (I.C.C.), together with amendments thereto hereinafter
set forth to the articles and sections of this code:
The provisions of Title 23, Chapter 27.3 of the General Laws of Rhode Island
establishing administration and enforcement are hereby incorporated by reference.
Regulatory Administration Chapter 1 immediately follows and is supplemental to the
General Laws.
Editorial Note: Code users please note:
When purchasing or using the Plumbing 2009 code, please take note of the particular printing
edition. Errata to that printing edition is available on-line directly at no charge at
www.iccsafe.org/cs/codes/pages/errata.aspx or call the office of the State Building Code
Commissioner at 401-222-1129 for further information.
Printed copies of the administrative and enforcement provisions of Title 23, Chapter 27.3 are
available at the Office of the State Building Code Commission or on-line at
http://www.rilin.state.ri.us/Statutes/TITLE23/23-27.3/INDEX.HTM.
The International Plumbing Code, 2012 Edition, is protected by the copyright that has been issued
to the ICC. As a result, the State Building Code is not available in complete form to the public in
an electronic format. The International Plumbing Code 2012 edition that is referred to within is
contained in a printed volume and is also in an electronic format that have been published by the
ICC under an exclusive license.
The Office of the State Building Code Commissioner has purchased volumes of these codes and
they shall be distributed to Rhode Island cities and towns during the month of June 2013 so that
local officials will have access to the code prior to the implementation of these rules on July 1,
2013.
In order to assure public access to this code the Office of the State Building Code Commissioner
shall provide a copy of this code to the Rhode Island State Library, which is located on the
second floor of the State House. In addition, all codes may be viewed during business hours at
the Department of Administration’s Library which is located on the fourth floor of the William E.
Powers Building, One Capitol Hill, Providence.
The Legislative Regulation Committee approved adoption of this code on July 1, 2013
By:
John P. Leyden
Executive Secretary
Rhode Island Building Code Standards Committee
SBC-3 2013
1
STATE OF RHODE ISLAND
BUILDING CODE STANDARDS COMMITTEE
CHAIRMAN
VICE CHAIRMAN
William J. Nash, Jr.
Building Official
Bernard J. Bernard, III
Electrical Inspector
EXECUTIVE COMMITTEE
Michael A. Newman
Master Plumber
James Fink
Electrical Engineer
Doris Aschman
Public Health Official
Bruce Davey, PE
Structural Engineer
Scott Caron
Fire Official
Michael Daley
Builders Trades Council
Stephen C. Turner, PE
Public Member
Peter Scorpio, III
Building Official
Dana Newbrook
Architect
James R. Carlson, RA
Public Member
Fred Sarno
Building Official
G. Thomas Chabot
Electrical Contractor
David F. Palmisciano
Building Trades Council
Randy Collins, Jr., RLA
Landscape Architect
Gordon W. Preiss, PE
Mechanical Engineer
Robert E. DeBlois, Jr.
Builder
Craig Sutton
Builder
Paul DePace, PE
Representative for the Disabled
Russell Brown
Representative for the Disabled
Robert M. Stillings
Architect
John P. Leyden, CBO
State Building Commissioner
Executive Secretary
Wayne Pimental, CBO
Minimum Housing Inspector
Thomas Coffey
Legal Counsel
SBC-3 2013
1
STATE BUILDING CODE REGULATIONS - 2013
The following list includes all regulations promulgated by the State Building Code
Standards Committee. All regulations are available for a fee at the State Building
Commission.
1.
Building Code
SBC-1-2013
2..
One and Two Family Dwelling Code
SBC-2-2013
3.
Plumbing Code
SBC-3-2013
4.
Mechanical Code
SBC-4-2013
5.
Electrical Code
SBC-5-2011
6.
Property Maintenance Code
SBC-6-2013
7.
Reserved
8.
Energy Conservation Code
SBC-8-2013
9
Enforcement and Implementation Procedures for
Projects Under the Jurisdiction of The State of
Rhode Island
SBC-9
10.
Code Interpretations
SBC-10
11.
Certification of Building Officials,
Building, Electrical, Plumbing and Mechanical
Inspectors
SBC-11-2010
12.
New Materials and Methods of Construction
SBC-12
13.
State Building Code for Existing Schools
SBC-13
14.
Reserved
15.
Reserved
16.
Reserved
17.
Public Buildings Accessibility Meeting Standards
SBC-17
18.
Native Lumber
SBC-18
19.
Fuel Gas Code
SBC-19-2013
20.
The State of Rhode Island Rehabilitation
Building and Fire Code for Existing Buildings
and Structures
SRC-1-2002
SBC-3 2013
1
Chapter 1
ADMINISTRATON
Delete IPC section 101.1, Title, and substitute the following:
101.1 Title.
These regulations shall be known as the Rhode Island State Plumbing Code Regulation
SBC-3 – 2013 hereafter referred to as "this code".
Add the following new section 101.1.1 Referenced Codes.
101.1.1 Referenced Codes.
The other codes referenced elsewhere in this code shall be considered part of the
requirements of this code to the prescribed extent of each such reference.
1.
Electrical. The provisions of Rhode Island State Electrical Code SBC-5-2011
shall apply wherever referenced in this code as the ICC Electrical Code, and shall
apply to the installation of electrical systems, including alterations, repairs,
replacement, equipment, appliances, fixtures, fittings, and appurtenances thereto.
2.
Mechanical. The provisions of the Rhode Island State Mechanical Code SBC-4-
2013 shall apply wherever referenced in this code as the International Mechanical
Code and shall apply to the installation, alterations, repairs and replacement of
mechanical systems, including equipment, appliances, fixtures, fittings and/or
appurtenances, including ventilating, heating, cooling, air-conditioning and
refrigeration systems, incinerators and other energy-related systems.
3.
Plumbing. The provisions of Rhode Island State Plumbing Code SBC-3-2013
shall apply wherever referenced in this code as the International Plumbing Code,
and shall apply to the installation, alteration, repair and replacement of plumbing
systems, including equipment, appliances, fixtures, fittings and appurtenances,
and where connected to a water or sewage system and all aspects of a medical gas
system
4.
Property Maintenance. The provisions of the Rhode Island State Property
Maintenance Code SBC-6-2013 Provides requirements for continued use and
maintenance buildings and property, and of related plumbing, mechanical,
electrical and fire protection systems in existing residential and non-residential
structures.
5.
Fire Prevention Code. Wherever and whenever provisions of the International
Fire Code 2012 editions are referenced, the appropriate Rhode Island Fire Safety
Code requirements shall apply.
SBC-3 2013
1
6.
Energy. The provisions of the Rhode Island State Energy Code SBC-8-2013
shall apply wherever referenced in this code as International Energy Conservation
Code, and shall apply to all matters governing the design, alterations and
construction of buildings and systems for energy efficiency.
7.
Building Code. The provisions of the Rhode Island State Building Code SBC-1-
2013 shall apply wherever referenced in this code as the International Building
Code.
8.
Residential Code. The provisions of the Rhode Island One and Two Family
Dwelling Code SBC-2-2013 shall apply wherever referenced in this code as the
International Residential Code.
9.
Existing Building Code. The provisions of the Rhode Island State Building Code
SBC-1-2013 in conjunction with the State Rehabilitation Code SRC-1 and the
Rhode Island Fire Safety Code shall apply wherever referenced in this code as the
International Existing Building Code.
Delete IPC Sections 102.8, 103, 104, 106.4 through 106.6.3, 108 and 109 and refer to the
appropriate sections of SBC-1-2013 and RIGL 23-27.3-100 et al.
102.10 Contractor's responsibilities. It shall be the duty of every contractor who
enters into contracts for the installation or repair of plumbing systems for which a permit
is required to comply with adopted state and local rules and regulations concerning
licensing.
Any building owner, authorized agent, person or contractor who installs, modifies or
repairs plumbing systems for which a permit is required shall comply with all state laws
and regulations regarding licensing.
SBC-3 2013
2
Chapter 3
General Regulations
Add the following section to IPC section 301.4
301.4.1 Prohibited Connections. The use of potable water as an open loop,
single pass heat exchange fluid for the refrigeration cycle of HVAC equipment is
prohibited.
Delete IPC section 305.6.1 and substitute the following
305.6.1 Sewer Depth: Building sewers that connect to private sewage disposal
systems shall meet the requirements of the Department of Environmental Management's
Regulations for Onsite Sewage Waste Water Treatment Systems. Building sewers
connecting to a public sewer shall be a minimum of 36" inches below grade.
Delete IPC section 312.1 and substitute the following:
312.1. Required Tests: The permit holder shall make the applicable tests
prescribed in Sections 312.2 through 312.9 to determine compliance with the provisions
of this code. The permit holder shall give reasonable advance notice to the code official
when the plumbing work is ready for tests. The equipment, material, power and labor
necessary for the inspection and test shall be furnished by the permit holder and the
permit holder shall be responsible for determining that the work will withstand the test
pressure prescribed in the following tests. All plumbing system piping shall be tested
with either water or air in accordance with sections 312.3 or 312.5. Under no
circumstances is plastic to be tested with air pressure above 5 psi. After the plumbing
fixtures have been set, their traps filled with water, the entire drainage system shall have
been subjected to testing. The code official shall require the removal of any cleanouts if
necessary to ascertain whether the pressure has reached all parts of the system.
SBC-3 2013
3
Chapter 6
Water Supply and Distribution
Add the following sections to section 601 General:
601.5 Water Meters: Every building connected to a public metered water supply
shall have a water meter installed before a Certificate of Occupancy is issued.
601.6 Individual Water Supply: An individual water supply serving an
occupied building shall be tested and certified potable prior to issuance of a temporary or
permanent certificate of occupancy.
601.7 Public Water Supply: Any water supply serving at least twenty-five (25)
individuals at least sixty days (60) out of the year, or having fifteen (15) or more service
connections may be subject to approval and licensure by the Rhode Island Department of
Health as per the Rules and Regulations Pertaining to Public Drinking Water {R-46-13-
DWQ].
Delete IPC 603.2 and substitute the following:
603.2 Separation of water service and building drain/sewer. Water service
pipe and building drain/sewer shall be separated by 10 feet (3048mm) of undisturbed or
compacted earth.
Exceptions:
1.
The required separation distance shall not apply where the bottom of the
water service pipe within 10 feet (3048mm) of the sewer is a minimum of
12 inches (305 mm) above the top of the highest point of the sewer and the
pipe materials conform to Section 703.1.
2.
Water service pipe is permitted to be located in the same trench with a
building drain, provided such drain is constructed of materials listed in
Table 702.2
3.
The required separation distance shall not apply where a water service
pipe crosses a sewer pipe provided the water service pipe is sleeved at
least 10 feet (3048 mm) with a watertight seal horizontally from the sewer
pipe centerline, on both sides of such crossing with pipe materials listed in
Table 605.3, Table 702.2 or Table 702.3.
SBC-3 2013
4
Delete IPC Table 608.17.1 and substitute the following:
TABLE 608.17.1
DISTANCE FROM SOURCES OF CONTAMINATION TO
PRIVATE WATER SUPPLIES AND PUMP SUCTION LINES
Source of Contamination
Distance (feet) a, b
Sewer
50
Septic Tank
50
Pasture
100
Sewer (leaded or mechanical
joints or approved plastic)
10
Subsurface pits
100c
Seepage pits
100
Cesspools
100
Barnyard
100
Farm silo
25
Pump house floor drain of cast iron draining
2
to ground surface
Note a.
1 foot=304.8mm
Note b
These distances constitute minimum separation and shall be
increased in areas of crevice rock or limestone, or where the
direction of the ground water is from sources of contamination
toward the well. These distances shall be increased as required by
the Rhode Island Department of Environmental Management,
Division of Land Resources (SDS Regulations or local zoning
ordinances).
Note c.
When approved by the authority having jurisdiction and under
special soil conditions, this distance may be reduced; however, a
minimum separation of not less than 50 feet shall be maintained.
SBC-3 2013
5
Chapter 7
Sanitary Drainage
Delete IPC 701.2 and substitute the following:
701.2 Sewer required. Every building in which plumbing fixtures are installed
and all premises having drainage piping shall be connected to a public sewer in
accordance with the authority having jurisdiction where available, or an approved private
sewage disposal system.
Delete IPC Section 701.5 and substitute the following:
701.5 Damage to drainage system or public sewer. Wastes detrimental to the
public sewer system or detrimental to the functioning of the individual private sewerage
disposal system shall be treated and disposed of in accordance with Section 1003 as
directed by the code official and in accordance with the authority having jurisdiction.
Delete IPC section 703.1 and substitute the following:
703.1 Building sewer pipe near the water service. Where the building sewer is
installed within 10 feet (3048mm) of the water service, the installation shall comply with
the provisions of Section 603.2.
Delete IPC section 715.5 and substitute the following:
715.5 Location. Backwater valves shall be installed so that access is provided to
the working parts for service and repair in accordance with the authority having
jurisdiction.
SBC-3 2013
6
Chapter 8
Indirect/Special Waste
Add the following exception to IPC section 802.1.1.
Exception: Three-bay sinks served by a grease trap or receptor shall be
permitted to be direct connected. This may require an additional vegetable
washing sink with indirect waste and must have approval of the Rhode Island
Department of Health for licensing of food handling facilities.
Delete IPC section 802.1.4 and substitute the following:
802.1.4 Swimming pools. Where wastewater from swimming pools, backwash
from filters and water from pool deck drains discharge to the building drainage system,
the discharge shall be through an indirect waste pipe by means of an air gap and have
approval of the authority having jurisdiction.
Delete Section 802.1.8 entirely and add the following
802.1.8 Food utensils, dish, pots and pans sinks. Sinks used for the washing,
rinsing or sanitizing of utensils, dishes, pots, pans or service ware used in the preparation,
serving or eating of food shall discharge indirectly through an air gap or an air break or
directly connect to the drainage system
802.2 Installation. Indirect waste piping shall discharge through an air gap or ari
break into a waste receptor. Waste receptors and standpipes shall
be trapped and vented and shall connect to the drainage system.
All indirect waste piping that exceeds 30 inches (762mm) in
developed length measured horizontally, or 54 inches (1372 mm)
in total developed length shall be trapped.
Delete just Exception
Add the following new section:
803.4 Reverse osmosis waste: Discharge piping from reverse osmosis water
shall be in accordance with the manufacturers' installation instructions.
SBC-3 2013
7
Chapter 9
Vents
903.1 Roof extension insert the following.
( 12) inches ( 304.8mm)
Delete IPC section 9043.2 and substitute the following:
903.2 Frost Closure: Each vent extension through a roof shall have a minimum
size of 3” in Providence County and 2” in all others. Where this results in an increase in
size of the vent extension, the change in diameter shall be made inside the building a
minimum of 6" below the roof with an approved fitting.
SBC-3 2013
8
Chapter 10
Traps
Delete IPC section 1002.4 and substitute the following:
1002.4 Trap seals. Each fixture trap shall have a liquid seal of not less than 2
inches ( 51mm) and not more than 4 inches (102 mm), or deeper for special designs
relating to accessible fixtures. Where a trap seal is subject to loss by evaporation, a
deeper seal trap consisting of a minimum 4-inch (102mm) seal or a trap seal primer
valve shall be installed. A trap seal primer valve shall conform to ASSE 1018 or ASSE
1044. Alternative Seals that are in conformance with ASSE 1018 or ASSE 1044 are
acceptable.
Delete IPC section 1003.1 and substitute the following:
1003.1 Interceptors required. Interceptors for oil grease, and sand and other
substances harmful or hazardous to the building drainage system, the public sewer or
sewage treatment plant or processes shall be provided as required by this chapter. Where
food waste grinders connect to grease interceptors, the grease interceptor shall be sized
and rated for the discharge of the food waste grinder. All interceptors shall be installed in
accordance with the rules of the authority having jurisdiction.
Delete IPC section 1003.2 and substitute the following:
1003.2 Approval. The size, type and location of each interceptor and of each
separator shall be designed and installed in accordance with the manufacturer’s
instructions and the requirements of this section based on the anticipated conditions of
use. Wastes that do not require treatment or separation shall not be discharged into any
interceptor or separator. All separators shall be sized and installed in accordance with the
authority having jurisdiction.
SBC-3 2013
9
Chapter 11
Storm Drainage
Delete IPC Figure 1106.1 and utilize a Rhode Island rainfall rate of 2.6 inches per hour
for all the Rhode Island except for Block Island which shall use a rainfall rate 2.7 inches
per hour.
Add the following new section:
1108.2 Approvals. All combined drains and sewer systems must have the
approval of the local or regional sewer authority having jurisdiction.
SBC-3 2013
10
SBC-3 2013
11
Delete Appendices A, B
Appendix C may only be utilized when specifically permitted by a local or
regional sewer authority having jurisdiction, or the Rhode Island Department of
Environmental Management for individual sewage disposal system.
Appendix D is deleted and refer to the Rhode Island Mechanical Code and Rhode
Island Energy Conservation Code.
Appendices E, F and G remain.