510-RICR-00-00-5
510-RICR-00-00-5. RISBC-5 Rhode Island Electrical Code (version Amendment, 08/01/2011 to 08/01/2011)
RHODE ISLAND
STATE BUILDING CODE
SBC-5 STATE ELECTRICAL CODE
Effective August 1, 2011
Replaces Regulation SBC-5-2008
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS
Department of Administration
BUILDING CODE STANDARDS COMMITTEE
One Capitol Hill
Providence, Rhode Island 02908-5859
(401) 222-3033
FAX NO (401) 222-2599
www.ribcc.ri.gov
Regulation SBC-5 - 2011
August 1, 2011
The Building Code Standards Committee, in accordance with the rule making authority of Title 23,
Chapter 23-27.3, Section 109.1, paragraphs a through c inclusive hereby adopts the provisions of
the National Electrical Code, 2011 edition, as published by the National Fire Protection
Association, as the Rhode Island State Electrical Code, together with the amendments thereto
hereinafter set forth to the chapters and sections of said code:
State Electrical Code
Regulation SBC-5-2011
August 1, 2011
The Building Code Standards Committee, in accordance with the rule making authority of
Title 23, Chapter 23-27.3, Section 109.1, paragraphs a through c inclusive, has formally
adopted and promulgated as the Rhode Island State Electrical Code, the provisions of the
National Electrical Code, 2011 edition, as published by the National Fire Protection
Association (NFPA) together with amendments thereto hereinafter set forth to the articles and
sections of this code:
The provisions of Title 23, Chapter 27.3 of the General Laws of Rhode Island establishing
administration and enforcement are hereby incorporated by reference. Regulatory
Administration Chapter 1 immediately follows and is supplemental to the General Laws.
Editorial Note: Code users please note:
When purchasing or using the NEC 2011 code, please take note of the particular printing edition.
Errata to that printing edition is available on-line directly at no charge at www.necdirect.org or
the office of the State Building Code Commissioner or call 401-222-3033 for further information.
Printed copies of the administrative and enforcement provisions of Title 23, Chapter 27.3 are
available at the Office of the State Building Code Commission or on-line at
www.rilim.state.ri.us/statutes/title23/23 27.3/index.htm.
The National Electrical Code, 2011 Edition, is protected by the copyright that has been issued to
NPFA. As a result, the State Electrical Code is not available in complete form to the public in an
electronic format. The National Electrical Code 2011 edition that is referred to within is
contained in a printed volume and is also in an electronic format that have been published by
NFPA under an exclusive license.
The Office of the State Building Code Commissioner has purchased volumes of these codes and
they shall be distributed to Rhode Island cities and towns during the month of July 2011 so that
local officials will have access to the code prior to the implementation of these rules on August 1,
2011.
In order to assure public access to this code the Office of the State Building Code Commissioner
shall provide a copy of this code to the Rhode Island State Library, which is located on the second
floor of the State House. In addition, all codes may be viewed during business hours at the
Department of Administration’s Library which is located on the fourth floor of the William E.
Powers Building, One Capitol Hill, Providence.
The Legislative Regulation Committee approved adoption of this code on , 2011.
By:
John P. Leyden
Executive Secretary
Rhode Island Building Code Standards Committee
STATE OF RHODE ISLAND
BUILDING CODE STANDARDS COMMITTEE
CHAIRMAN
VICE CHAIRMAN
Robert M. Stillings
Architect
John Pagliaro
Building Official
EXECUTIVE
COMMITTEE
William J. Nash, Jr.
Building Official
Bernard J. Bernard, III
Electrical Inspector
Michael A. Newman
Master Plumber
Doris Aschman
Public Health Official
William Howe
Fire Official
Allen Durand
Builders Trades Council
Bruce Davey, PE
Structural Engineer
Russell Brown
Building Official
Dana Newbrook
Architect
James R. Carlson, RA
Public Member
Stephen C. Turner, PE
Public Member
G. Thomas Chabot
Electrical Contractor
David F. Palmisciano
Building Trades Council
Randy Collins, Jr., RLA
Landscape Architect
Gordon W. Preiss, PE
Mechanical Engineer
Robert E. DeBlois, Jr.
Builder
Barrie K. Balemian
Builder
Paul DePace, PE
Representative for the Disabled
Vacant
Representative for the Disabled
James Fink, PE
Electrical Engineer
John P. Leyden, CBO
State Building Commissioner
Executive Secretary
Donald Gagnon
Minimum Housing Inspector
Thomas Coffey
Legal Counsel
STATE BUILDING CODE REGULATIONS
The following list includes all regulations promulgated by the State Building Code
Standards Committee. All regulations are available for a fee at the State Building
Commission.
1.
Building Code
SBC-1-2010
2..
One and Two Family Dwelling Code
SBC-2-2010
3.
Plumbing Code
SBC-3-2010
4.
Mechanical Code
SBC-4-2010
5.
Electrical Code
SBC-5-2011
6.
Reserved
7.
Reserved
8.
Energy Conservation Code
SBC-8-2010
9
Enforcement and Implementation Procedures for Projects
Under the Jurisdiction of The State of Rhode Island
SBC-9-2010
10.
Code Interpretations
SBC-10-2007
11.
Certification of Building Officials,
Building, Electrical, Plumbing and Mechanical Inspectors
SBC-11-2010
12.
New Materials and Methods of Construction
SBC-12
13.
State Building Code for Existing Schools
SBC-13
14.
Property Maintenance Code
SBC-14
15.
Reserved
16.
Reserved
17.
Public Buildings Accessibility Meeting Standards
SBC-17
18.
Native Lumber
SBC-18
19.
Fuel Gas Code
SBC-19-2010
GENERAL
Delete all references to IEC and substitute Rhode Island Electrical Code SBC-5-2011.
Delete all reference to any other International Code (IBC, IRC, IMC, etc.) and refer to appropriate
SBC regulations. (See Amendment 2701.6 of SBC-1-2010)
NFPA 70-11 may also be referenced as NEC 11 and are one and the same document.
ARTICLE 90
90.1
Add the following to 90.1.
E) The installation of all work shall be accomplished by persons licensed by the
State of Rhode Island, Department of Labor and Training, Division of
Professional Regulation of Electricians, Title 5, Chapter 6, and
Telecommunications Chapter 5-70 of the General Laws of the State of Rhode
Island.
90.4
Delete 90.4 and substitute the following:
90.4 Enforcement. This Code is intended to be suitable for mandatory
application by governmental bodies that exercise legal jurisdiction over electrical
installations and for use by insurance inspectors. The Committee shall have the
responsibility for deciding upon the approval of New Materials and Methods of
Construction in accordance with SBC-12. The Commissioner shall have the
responsibility to issue official interpretations in accordance with SBC-10. The
authority having jurisdiction will have the responsibility for granting special
permission contemplated in a number of the rules.
The authority having jurisdiction may waive specific requirements in this Code or
permit alternate methods where it is assured that equivalent objectives can be
achieved by establishing and maintaining effective safety.
This Code may require new products, constructions, or materials that may not yet be
available at the time the Code is adopted. In such event, the authority having
jurisdiction may permit the use of the products, constructions, or materials that
comply with the most recent previous edition of this Code adopted by the
jurisdiction.
90.6 Delete 90.6 and substitute the following:
90.6 Formal Interpretations. To promote uniformity of interpretation and application
of the provisions of this Code, formal interpretation procedures have been
established and are found in the NFPA Regulations Governing Committee Projects.
Formal interpretations issued by the NFPA are advisory in nature and are not binding
on the local authority having jurisdiction unless reissued as a formal opinion by the
State Building Code Commissioner.
90.10 Add the following new Article 90.10:
90.10 Other Provisions. The provisions of Chapter 27 of SBC-1-2010 are herein
incorporated by reference and are considered part of this code. See SBC-1-2010 for
any future amendments.
110.2 Add the following new paragraph after the Informational Note:
Except as modified by the authority enforcing this Code, plans, specifications,
schedules and calculations in sufficient detail shall be filed with the authority
enforcing this Code, showing the location, and capacity of all lighting facilities, and
all electrically operated equipment including power circuits required for all electrical
service equipment of the building or structure. Details shall include available fault
current at each protective device. Details shall include showing all raceways, cables
and or circuiting on plans.
Informative Annexes A, B, C, D, F, G and I may be used and are included for informational purpose
only.
Informative Annex E refers to construction types in NFPA 220 which do not correlate directly with
construction types and hourly ratings specified in SBC-1-2010. Refer any questions to the building
code authority having jurisdiction.
Informative Annex H is deleted. See the provisions of RIGL 23-27.3-100 et al for administration
and enforcement provisions.
Revise 210.25 as follows;
210.25 Branch Circuits in Buildings with More Than One Occupancy.
(A) Dwelling Unit Branch Circuits. Branch circuits in each dwelling unit shall supply only loads
within that dwelling unit or loads associated only with that dwelling unit.
(B) Common Area Branch Circuits. Branch circuits installed for the purpose of lighting, central
alarm, signal, communications, or other purposes for public or common areas of a two-family
dwelling, a multifamily dwelling, or a multi occupancy building shall not be supplied from
equipment that supplies an individual dwelling unit or tenant space.
(C) Common Area Branch Circuits of Existing Three- Family Dwellings. Branch circuits
installed for the purpose of associated smoke and carbon monoxide detection required for three (3)
family dwellings located in the common areas of a three (3) family dwelling shall be permitted to be
supplied from equipment that supplies an individual dwelling unit. Written documentation shall be
supplied that there will be no interruption in service to said common area smoke and carbon
monoxide devices.
Informational Note: See Rhode Island General Law( RIGL) 23-28.l-2(b)(2)(i) and Section 8,
Chapter 25 of the Rhode Island Life Safety Code of the Rhode Island State Fire Code for
requirements regarding the Installation of Smoke and Carbon Monoxide Alarms.
(D) Modifications to Existing Electric Service. When the electric service to a three family
dwelling with branch circuits installed in accordance with 210.25(C) is upgraded or an electric
meter is added for any other purpose, said property shall comply with 210.25 (A) and (B).
Substantiation: Rhode Island General Law section 23-28.1-2(b)(2)(i) has been adopted by the
General Assembly. This statute directed the State Fire Board to provide reasonable standards for the
installation of smoke and carbon monoxide devices in all existing three (3) family dwellings. The
deadline for such installation was set to be on or before July 1, 2008. The State Fire Board then
developed and implemented the above-referenced standards as Section 8, Chapter 25 of the Rhode
Island Life Safety Code. These further regulations directed compliance with the State Building
Code and both NFPA 72 and 720.
Serious questions arose as to installation methods. It was determined that SBC-5 NEC 2011 Section
210.25 required that these devices, located in the common areas of the three (3) family building,
would not be allowed to draw power from a dwelling unit. This led to the initial unanticipated
expense of installing a separate electrical meter in the building. A second unanticipated expense
resulted from compliance with the electrical service provider's standing policy that new meters
could only be installed on the exterior of the building. Accordingly, the owner of an existing three
(3) family house could now incur thousands of dollars in unanticipated additional expenses for the
installation of Smoke and CO devices that were originally anticipated to cost far less.
This amendment is limited to those owners of three (3) family dwellings who are simply complying
with the provisions of RIGL 23-28.1-2(b)(2)(i) and Section 8, Chapter 25 of the Rhode Island Life
Safety Code. Any such owner who utilizes this amendment is advised that his or her failure to
maintain the electrical power to the Smoke and CO devices located in his or her three (3) family
dwelling will result in a violation of the State Fire Code and subject the above owner to fines of five
hundred dollars ($500.00) a day under the provisions of RlGL 23-28.3-9.
For the purpose of RlGL 23-28.1-2(b)(2)(i) and Section 8, Chapter 25 of the Rhode Island Life
Safety Code of the Rhode Island State Fire Code the requirement of SBC-5 NEC 2011 Section
210.25 shall be amended as follows;
Delete 230.24(A) 5Exception No.
Substantiation for deletion of 230.24(A) Exception No. 5
This exception to the 2011 National Electrical Code (NEC) will permit overhead service conductors
with a vertical clearance of not less than 3 ft to pass over the surface of a flat roof, if the roof area is
guarded or isolated. The justification for this exception was to correlate the NEC with allowances in
the National Electrical Safety Code (NESC). Currently, the NESC allows conductors to be a
minimum of 900 mm (3 ft) above the roof, if the area is guarded or isolated. However, this
justification is flawed, because the NEC applies to installations on the load side of the service point
and the NESC applies to installations on the supply side of the service point.
Section 230.24(A) applies to Overhead Service Conductors, which are defined in the NEC as the
overhead conductors between the service point and the first point of connection to the service-
entrance conductors at the building or other structure. Service-Entrance Conductors of an overhead
system are defined in the NEC as the service conductors between the terminals of the service
equipment and a point usually outside the building, clear of building walls, where joined by tap or
splice to the service drop or overhead service conductors. Clearly, under these definitions, overhead
service conductors are within the scope of the NEC and not the NESC.
It is the opinion of this committee that when conductors pass over roof surfaces other than those
addressed in Exceptions 2, 3, and 4, the minimum vertical clearance of not less than 2.5 m (8 ft)
should be maintained, because guarding and isolation in locations that are not under the exclusive
control of the utility will not provide equivalent safety as currently allowed in Exceptions 2, 3 and
4. As an example: The flat roof of a strip mall that is enclosed by a fence, with a locked gate is
considered “isolated”. Equipment such as HVAC and CATV is mounted on the roof and those
servicing this equipment have access (a key) to the roof and may come in contact with the
conductors.
If the NEC Technical Committee CMP-4 feels the need to correlate these documents, modifications
should have been made to the less restrictive NESC and not the NEC.
Conductors installed and maintained by the electric utility on the supply side of the service point are
beyond the scope of the NEC. The NESC applies to utility work and its requirements are different
from those of the NEC because these installations are fundamentally different than those for
premises wiring. And the three elements that make that so are is that the utility has exclusive
control, restricted access and qualified persons maintain the installation.
230.82. Revise this section to read as follows:
230.82. Equipment Connected to the Supply Side of Service Disconnect. Only
equipment included in this section shall be permitted to be connected to the supply side
of the service disconnecting means.
(A) Supply Side Equipment.
(1) Cable limiters or other current-limiting devices.
(2) Meters and meter sockets nominally rated not in excess of 600 volts, provided all
metal housings and service enclosures are grounded in accordance with Part VII and
bonded in accordance with Part V of Article 250.
(3) Instrument transformers (current and voltage), impedance shunts, load
management devices, surge arresters, and Type 1 surge-protective devices.
(4)Taps used only to supply load management devices, circuits for standby power
systems, fire pump equipment, and fire and sprinkler alarms, if provided with service
equipment and installed in accordance with requirements for service-entrance
conductors.
(5) Solar photovoltaic systems, fuel cell systems, or interconnected electric power
production sources.
(6) Control circuits for power-operable service disconnecting means, if suitable
overcurrent protection and disconnecting means are provided.
(7) Ground-fault protection systems or Type 2 surge protective devices, where
installed as part of listed equipment, if suitable overcurrent protection and
disconnecting means are provided.
(8) Connections used only to supply listed communications equipment under the
exclusive control of the serving electric utility, if suitable overcurrent protection and
disconnecting means are provided. For installations of equipment by the serving
electric utility, a disconnecting means is not required if the supply is installed as part
of a meter socket, such that access can only be gained with the meter removed.
(B) Meter Disconnect. A disconnecting means shall be permitted to be located ahead of the service
equipment provided the installation complies with 230.82(B) (1) through 230.82(B) (3). A separate
service disconnecting means that complies with Part V of Article 230 shall be installed, and shall be
located as provided in 230.70(A) (1).
(1) Rating. A meter disconnect shall be capable of interrupting the load served. It
shall have a short-circuit current rating not less than the available short-circuit
current.
(2) Marking. A meter disconnect shall be legibly field marked on its exterior in a
manner suitable for the environment substantially as follows:
METER DISCONNECT
NOT SERVICE EQUIPMENT
Informational Note: This rule does not specify whether the meter disconnect is on the
line or load side of the meter because either side is acceptable and will be governed by
the policies of the serving utility.
(3) Grounding. A meter disconnect shall be grounded in accordance with Part VII
and bonded in accordance with Part V of Article 250. The grounding connections
shall be permitted to be in accordance with 250.142(A) (1).