510-RICR-00-00-5
510-RICR-00-00-5. RISBC-5 Rhode Island Electrical Code (version Technical Revision, 08/01/2014 to 08/01/2019)
5.1 Authority
The Building Code Standards
Committee, in accordance with the rule making authority of R.I. Gen.
Laws §§ 23-27.3-109.1(a) through (c) inclusive hereby
adopts the provisions of the National Electrical Code, 2014 edition,
as published by the National Fire Protection Association, as the
Rhode Island State Electrical Code, together with the amendments
thereto hereinafter set forth to the chapters and sections of said
code.
5.2 Incorporated Materials
A. The Building Code Standards
Committee, in accordance with the rule making authority of R.I. Gen.
Laws §§ 23-27.3-109.1(a) through (c) inclusive, has
formally adopted and promulgated as the Rhode Island State Electrical
Code, the provisions of the National Electrical Code, 2014 edition,
as published by the National Fire Protection Association (NFPA)
together with amendments thereto hereinafter set forth to the
articles and sections of this code:
B. The provisions of R.I. Gen.
Laws Chapter 23-27.3 establishing administration and enforcement are
hereby incorporated by reference. § 5.3 of this Part (General)
immediately follows and is supplemental to the General Laws.
Editorial Note: Code users please note:
1. When purchasing or using
the NEC 2014 code, please take note of the particular printing
edition. Errata to that printing edition is available on-line
directly at no charge at www.necdirect.org
or the office of the State Building Code Commissioner or call
401-889-5487 for further information.
2. Printed copies of the
administrative and enforcement provisions of R.I. Gen. Laws Chapter
23-27.3 are available at the Office of the State Building Code
Commission or on-line at www.rilim.state.ri.us/statutes/title23/23
27.3/index.htm.
3. The National Electrical
Code, 2014 Edition, is protected by the copyright that has been
issued to NPFA. As a result, the State Electrical Code is not
available in complete form to the public in an electronic format. The
National Electrical Code 2014 edition that is referred to within is
contained in a printed volume and is also in an electronic format
that have been published by NFPA under an exclusive license.
4. The Office of the State
Building Code Commissioner has purchased volumes of these codes and
they shall be distributed to Rhode Island cities and towns during the
month of June 2014 so that local officials will have access to the
code prior to the implementation of these rules on August 1, 2014.
5. In order to assure public
access to this code the Office of the State Building Code
Commissioner shall provide a copy of this code to the Rhode Island
State Library, which is located on the second floor of the State
House. In addition, all codes may be viewed during business hours at
the Department of Administration’s Library which is located on
the fourth floor of the William E. Powers Building, One Capitol Hill,
Providence.
C. The Legislative Regulation
Committee approved adoption of this code on August 1, 2014.
5.3 General
Delete all references to IEC
and substitute Rhode Island Electrical Code SBC-5-2014.
Delete all reference to any
other International Code (IBC, IRC, IMC, etc.) and refer to
appropriate SBC regulations. (See Amendment 2701.6 of SBC-1-2013)
NFPA 70-14 may also be
referenced as NEC 14 and are one and the same document.
5.3.1 ARTICLE 90
90.1 Add the following to
90.1.
E) The installation of all
work shall be accomplished by persons licensed by the State of Rhode
Island, Department of Labor and Training, Division of Professional
Regulation of Electricians, R.I. Gen. Laws Chapter 5-6 and
Telecommunications, R.I. Gen. Laws Chapter 5-70.
90.4 Delete 90.4 and
substitute the following:
90.4 Enforcement. This Code
is intended to be suitable for mandatory application by governmental
bodies that exercise legal jurisdiction over electrical installations
and for use by insurance inspectors. The Committee shall have the
responsibility for deciding upon the approval of New Materials and
Methods of Construction in accordance with Part
12 of this Subchapter . The Commissioner shall have the
responsibility to issue official interpretations in accordance with
Part
10 of this Subchapter . The authority having jurisdiction will
have the responsibility for granting special permission contemplated
in a number of the rules.
The authority having
jurisdiction may waive specific requirements in this Code or permit
alternate methods where it is assured that equivalent objectives can
be achieved by establishing and maintaining effective safety.
This Code may require new
products, constructions, or materials that may not yet be available
at the time the Code is adopted. In such event, the authority having
jurisdiction may permit the use of the products, constructions, or
materials that comply with the most recent previous edition of this
Code adopted by the jurisdiction.
90.6 Delete 90.6 and
substitute the following:
90.6 Formal Interpretations.
To promote uniformity of
interpretation and application of the provisions of this Code, formal
interpretation procedures have been established and are found in the
NFPA Regulations Governing Committee Projects.
Formal interpretations issued
by the NFPA are advisory in nature and are not binding on the local
authority having jurisdiction unless reissued as a formal opinion by
the State Building Code Commissioner.
90.10 Add the following new
Article 90.10:
90.10 Other Provisions.
The provisions of Chapter 27
of SBC-1-2013 are herein incorporated by reference and are considered
part of this code. See Part
1 of this Subchapter for any future amendments.
110.2 Add the following new
paragraph after the Informational Note:
Except as modified by the
authority enforcing this Code, plans, specifications, schedules and
calculations in sufficient detail shall be filed with the authority
enforcing this Code, showing the location, and capacity of all
lighting facilities, and all electrically operated equipment
including power circuits required for all electrical service
equipment of the building or structure. Details shall include
available fault current at each protective device. Details shall
include showing all raceways, cables and or circuiting on plans.
Informative Annexes A, B, C,
D, F, G and I may be used and are included for informational purpose
only.
Informative Annex E refers to
construction types in NFPA 220 which do not correlate directly with
construction types and hourly ratings specified in Part
1 of this Subchapter . Refer any questions to the building code
authority having jurisdiction.
Informative Annex H is
deleted. See the provisions of R.I. Gen. Laws § 23-27.3-100 et
al for administration and enforcement provisions.
Revise 210.25 as follows;
210.25 Branch Circuits in
Buildings with More Than One Occupancy.
a. Dwelling Unit Branch
Circuits. Branch circuits in each dwelling unit shall supply only
loads within that dwelling unit or loads associated only with that
dwelling unit.
b. Common Area Branch
Circuits. Branch circuits installed for the purpose of lighting,
central alarm, signal, communications, or other purposes for public
or common areas of a two-family dwelling, a multifamily dwelling, or
a multi occupancy building shall not be supplied from equipment that
supplies an individual dwelling unit or tenant space.
c. Common Area Branch Circuits
of Existing Three- Family Dwellings. Branch circuits installed for
the purpose of associated smoke and carbon monoxide detection
required for three (3) family dwellings located in the common areas
of a three (3) family dwelling shall be permitted to be supplied from
equipment that supplies an individual dwelling unit. Written
documentation shall be supplied that there will be no interruption in
service to said common area smoke and carbon monoxide devices.
Informational Note: See R.I.
Gen. Laws § 23-28.1-2(b)(2)(i) and Section 8, Chapter 25 of the
Rhode Island Life Safety Code of the Rhode Island State Fire Code for
requirements regarding the Installation of Smoke and Carbon Monoxide
Alarms.
D. Modifications to Existing
Electric Service. When the electric service to a three-family
dwelling with branch circuits installed in accordance with 210.25(C)
is upgraded, or an electric meter is added for any other purpose,
said property shall comply with 210.25 (A) and (B).
Substantiation: R.I. Gen. Laws
§ 23-28.1-2(b)(2)(i) has been adopted by the General Assembly.
This statute directed the State Fire Board to provide reasonable
standards for the installation of smoke and carbon monoxide devices
in all existing three (3) family dwellings. The deadline for such
installation was set to be on or before July 1, 2008. The State Fire
Board then developed and implemented the above-referenced standards
as Section 8, Chapter 25 of the Rhode Island Life Safety Code. These
further regulations directed compliance with the State Building Code
and both NFPA 72 and 720.
Serious questions arose as to
installation methods. It was determined that Part
5 of this Subchapter Section 210.25 required that these devices,
located in the common areas of the three (3) family building, would
not be allowed to draw power from a dwelling unit. This led to the
initial unanticipated expense of installing a separate electrical
meter in the building. A second unanticipated expense resulted from
compliance with the electrical service provider's standing policy
that new meters could only be installed on the exterior of the
building. Accordingly, the owner of an existing three (3) family
house could now incur thousands of dollars in unanticipated
additional expenses for the installation of Smoke and CO devices that
were originally anticipated to cost far less.
This amendment is limited to
those owners of three (3) family dwellings who are simply complying
with the provisions of R.I. Gen. Laws § 23-28.1-2(b)(2)(i) and
Section 8, Chapter 25 of the Rhode Island Life Safety Code. Any such
owner who utilizes this amendment is advised that his or her failure
to maintain the electrical power to the Smoke and CO devices located
in his or her three (3) family dwelling will result in a violation of
the State Fire Code and subject the above owner to fines of five
hundred dollars ($500.00) a day under the provisions of R.I. Gen.
Laws § 23-28.3-9.
For the purpose of R.I. Gen.
Laws § 23-28.1-2(b)(2)(i) and Section 8, Chapter 25 of the Rhode
Island Life Safety Code of the Rhode Island State Fire Code the
requirement of SBC-5 NEC 2011 Section 210.25 shall be amended as
follows:
Delete 230.24(A) Exception No.
5
Substantiation for deletion
of 230.24(A) Exception No. 5
This exception to the 2011
National Electrical Code (NEC) will permit overhead service
conductors with a vertical clearance of not less than 3 ft to pass
over the surface of a flat roof, if the roof area is guarded or
isolated. The justification for this exception was to correlate the
NEC with allowances in the National Electrical Safety Code (NESC).
Currently, the NESC allows conductors to be a minimum of 900 mm (3
ft) above the roof, if the area is guarded or isolated. However, this
justification is flawed, because the NEC applies to installations on
the load side of the service point and the NESC applies to
installations on the supply side of the service point.
Section 230.24(A) applies to
Overhead Service Conductors, which are defined in the NEC as the
overhead conductors between the service point and the first point of
connection to the service- entrance conductors at the building or
other structure. Service-Entrance Conductors of an overhead system
are defined in the NEC as the service conductors between the
terminals of the service equipment and a point usually outside the
building, clear of building walls, where joined by tap or splice to
the service drop or overhead service conductors. Clearly, under these
definitions, overhead service conductors are within the scope of the
NEC and not the NESC.
It is the opinion of this
committee that when conductors pass over roof surfaces other than
those addressed in Exceptions 2, 3, and 4, the minimum vertical
clearance of not less than 2.5 m (8 ft) should be maintained, because
guarding and isolation in locations that are not under the exclusive
control of the utility will not provide equivalent safety as
currently allowed in Exceptions 2, 3 and 4. As an example: The flat
roof of a strip mall that is enclosed by a fence, with a locked gate
is considered “isolated”. Equipment such as HVAC and CATV
is mounted on the roof and those servicing this equipment have access
(a key) to the roof and may come in contact with the conductors.
If the NEC Technical
Committee CMP-4 feels the need to correlate these documents,
modifications should have been made to the less restrictive NESC and
not the NEC.
Conductors installed and
maintained by the electric utility on the supply side of the service
point are beyond the scope of the NEC. The NESC applies to utility
work and its requirements are different from those of the NEC because
these installations are fundamentally different than those for
premises wiring. And the three elements that make that so are is that
the utility has exclusive control, restricted access and qualified
persons maintain the installation.
230.82. Revise this section to
read as follows:
230.82. Equipment Connected
to the Supply Side of Service Disconnect. Only equipment included in
this section shall be permitted to be connected to the supply side of
the service disconnecting means.
a. Supply Side Equipment.
(1) Cable limiters or other
current-limiting devices.
(2) Meters and meter sockets
nominally rated not in excess of 1000 volts provided all metal
housings and service enclosures are grounded in accordance with Part
VII and bonded in accordance with Part V of Article 250.
(3) Instrument transformers
(current and voltage), impedance shunts, load management devices,
surge arresters, and Type 1 surge-protective devices.
(4) Taps used only to supply
load management devices, circuits for standby power systems, fire
pump equipment, and fire and sprinkler alarms, if provided with
service equipment and installed in accordance with requirements for
service-entrance conductors.
(5) Solar photovoltaic
systems, fuel cell systems, or interconnected electric power
production sources.
(6) Control circuits for
power-operable service disconnecting means, if suitable overcurrent
protection and disconnecting means are provided.
(7) Ground-fault protection
systems or Type 2 surge protective devices, where installed as part
of listed equipment, if suitable overcurrent protection and
disconnecting means are provided.
(8) Connections used only to
supply listed communications equipment under the exclusive control of
the serving electric utility, if suitable overcurrent protection and
disconnecting means are provided. For installations of equipment by
the serving electric utility, a disconnecting means is not required
if the supply is installed as part of a meter socket, such that
access can only be gained with the meter removed.
b. Meter Disconnect. A
disconnecting means shall be permitted to be located ahead of the
service equipment provided the installation complies with 230.82(B)
(1) through 230.82(B) (3). A separate service disconnecting means
that complies with Part V of Article 230 shall be installed, and
shall be located as provided in 230.70(A) (1).
(1) Rating. A meter disconnect
shall be capable of interrupting the load served. It shall have a
short-circuit current rating not less than the available
short-circuit current.
(2) Marking. A meter
disconnect shall be legibly field marked on its exterior in a manner
suitable for the environment substantially as follows:
METER DISCONNECT NOT SERVICE
EQUIPMENT
Informational Note: This rule
does not specify whether the meter disconnect is on the line or load
side of the meter because either side is acceptable and will be
governed by the policies of the serving utility.
(3) Grounding. A meter
disconnect shall be grounded in accordance with Part VII and bonded
in accordance with Part V of Article 250. The grounding connections
shall be permitted to be in accordance with 250.142(A)(1).
Substantiation:
The proposed amendment to
section 230.82, which is the same as a Massachusetts amendment was to
address meter disconnects. These disconnects are required by some
utilities, because of the greater safety they provide for their
service personnel. They are installed either "hot sequence"
(meter ahead of the switch) or "cold sequence" (switch
ahead of the meter). Section 230.82(3) of the Code addresses meter
disconnects on the supply side of the service disconnect, but the
problem is when these meters disconnects are installed the Authority
Having Jurisdiction (AHJ) is treating it as a service disconnecting
means. This interpretation invokes all the rules for services
including the need for a grounding electrode at the metering location
and the classification of the conductors supplied by the switch as
feeders and not a continuation of the service conductors. As a feeder
an additional conductor would be required to be run to the building
and a grounding electrode installed at the meter/disconnect means
location. When the meter and disconnect means is a distance from the
building being served, which is often the case, an additional
electrode that meets code would accomplish very little in terms of
safety, since there would be no electrical loads at the remote
metering point. It would be like requiring a grounding electrode
conductor to be brought to every conventional meter socket.
This proposed amendment would
require that the disconnect means be legibly field marked as a meter
disconnect, be capable of interrupting the load served and have a
short-circuit current rating not less than the available
short-circuit current. The amendment will also require the meter
disconnect to be grounded in accordance with Part VII and bonded in
accordance with Part V of Article 250. Most importantly this
amendment will clarify the purpose of this disconnect means and
establish the rules for their installation.