650-RICR-20-00-1
650-RICR-20-00-1. Red Book (version Amendment, 07/18/2002 to 10/09/2003)
Rhode Island Coastal Resources Management Program
Rev. Pg. 10/28/99
Page 1
Section 300.2
Section 300.2.
Filling, Removing, or Grading
of Shoreline Features
A. Definitions
1. Filling is the deposition of materials of upland
origin onto shoreline features or their contiguous
areas (see Section 300.9 for inland disposal of
dredged materials).
2. Removing is the process of taking away,
including excavation, blasting, or mining, any
portion of a shoreline or its contiguous area.
3. Grading is the process whereby fill or the soils
of a shoreline or its contiguous area are
redistributed or leveled.
Established agricultural practices in areas
contiguous to shoreline features are excluded from
this section.
4. Erosion and Sediment Control Plan: An
erosion and sediment control plan is a description
of the proposed best management practices,
detailed site plans, and written narrative that, when
implemented, provides protection and restoration
of coastal resources by reducing erosion and
controlling sediment onsite as well as minimizing
other negative impacts associated with land
development activities.
B.
Policies
1. All filling, removing or grading activities
shall be done in accordance with the policies and
standards of this section and the standards and
specifications set forth in the most recent edition of
the Rhode Island Soil Erosion and Sediment
Control Handbook.
2. All new activities subject to Section 300.3
(residential, commercial, and industrial structures),
Section 300.13 , Section 320, or those activities
which disturb more than 5,000 square feet of land
on a site shall prepare and implement an erosion
and sediment control plan approved by the Council
which references all necessary practices for erosion
and sediment control. All erosion and sediment
control plans shall be consistent with applicable
policies and standards contained in the Rhode
Island Coastal Resources Management Program
and the standards and specifications set forth in the
most recent edition of the Rhode Island Soil
Erosion and Sediment Control Handbook. All
erosion and sediment control plans shall be strictly
adhered to.
3. The Council recognizes the most recent
version of the Rhode Island Soil Erosion and
Sediment Control Handbook, and its amendments,
published jointly by the Rhode Island Department
of Environmental Management and the United
States Department of Agriculture (USDA),
Natural Resources conservation Service (NRCS),
as containing appropriate “Best Management
Practices” (BMP) for use within the CRMC’s
jurisdiction. All erosion and sediment control plans
shall be consistent with this manual. Applicants
are also encouraged to consult the most recent
version of the Rhode Island Stormwater Design
and Installation Standards Manual during the
preparation of their erosion and sediment control
plan in order to ensure consistency with the
Council’s stormwater management requirements
(Section 300.6).
4. Routine filling, removing, or grading of bulk
materials (e.g. coal, salt, etc.) that occurs as part of
the normal operations of an existing bulk transfer
facility (e.g., the Port of Providence) which is
adjacent to type 6 waters is excluded from the
provisions of this section provided that all filling,
removing or grading activities are done in
accordance with applicable guidance manuals
which specify the appropriate best management
practices for Rhode Island. Any filling, removing
or grading that will result in a modification of an
existing bulk transfer facility’s infrastructure shall
be subject to the policies and standards in this
section.
5. Filling, removing, or grading activities shall be
reviewed at the Category B level when (a) the
filling or removing involves more than 10,000
cubic yards of material, (b) the affected area is
greater than two acres, or (c) the affected area is a
designated historic area or archaeologically
sensitive site.
C. Prohibitions
1. Filling, removing, or grading is prohibited on
beaches, dunes, undeveloped barrier beaches,
coastal wetlands, cliffs and banks, and rocky
shores adjacent to Type 1 and 2 waters unless the
primary purpose of the alteration is to preserve or
enhance the feature as a conservation area or
natural buffer against storms.
Rhode Island Coastal Resources Management Program
Rev. Pg. 10/28/99
Page 2
Section 300.2
2. Filling, removing, or grading on coastal
wetlands is prohibited adjacent to Type 1 and 2
waters, and in coastal wetlands designated for
preservation adjacent to Type 3, 4, 5 and 6 waters,
unless
a
consequence
of
an
approved
mosquito-control ditching project (Section 300.12).
3. On-site beach materials (cobbles, sand, etc.)
may not be used as construction material.
4. Mining is prohibited on coastal features.
D. Standards
1. The following standards apply in all cases
where filling, removal, or grading is undertaken:
(a) Fill slopes shall have a maximum grade
of 30 percent.
(b) All excess excavated materials, excess
fill, excess construction materials, and debris
shall be removed from the site and shall not
be disposed in tidal waters or on a coastal
feature.
(c) Disturbed uplands adjacent to a
construction site shall be graded and re-
vegetated or otherwise stabilized to prevent
erosion
during
or
immediately
after
construction. Nutrients shall be applied at
rates necessary to establish and maintain
vegetation
without
causing
significant
nutrient runoff to surface waters.
(d) Removal or placement of sediments along
jetties or groins may be permitted only as part
of
an
approved
dredging
or
beach
nourishment project (see Section 300.9).
(e) All fill shall be clean and free of materials
which may cause pollution of tidal waters.
(f) Cutting into rather than filling out over a
coastal bank is the preferred method of
changing upland slopes.
(g) Limit the application, generation, and
migration of toxic substances and ensure that
toxic substances are properly stored and
disposed of onsite in accordance with all
applicable
federal,
state,
and
local
requirements.
2. The following upland and shoreline earthwork
standards shall be required in those cases where the
Council determines that additional measures are
warranted in order to protect the environment of
the coastal region. Such requirements shall be
listed on Assents as stipulations.
(a) For Earthwork on shoreline features:
(1) Prior to initiation of construction, the
contractor may be required to meet on-site
with the CRMC staff to discuss and
clarify the conditions of the permit.
(2) A re-vegetation plan shall be submitted
for review and approval when construction
is undertaken on a barrier beach. This
plan shall describe plant material, methods
of planting, time of planting, soil
amendments, and maintenance.
(3) Construction materials and excavated
soils shall not be placed or stored on any
shoreline feature excepting developed
barrier beaches and manmade shorelines.
(4) All disturbed soils shall be graded
smooth to a maximum 3:1 slope and re-
vegetated immediately after construction,
or temporarily stabilized with mulch, jute
matting, or similar means until seasonal
conditions permit such re-vegetation.
(5) In sensitive areas, work shall be
carried out from areas above slope from
coastal
features.
Machinery
and
construction equipment shall normally not
be allowed to operate on a coastal wetland.
For unavoidable work on a coastal
wetland, a protective cover shall be
deployed to minimize disturbance.
(6) In instances where the CRMC permits
temporary disturbance of a coastal feature,
shoreline slope, buffer zone, or area of
beach grass, the disturbed area shall be
completely restored by the owner under the
guidance of CRMC staff.
(7) Concrete structures which will come
in contact with salt water shall be
constructed with concrete which utilizes a
Type II or Type V air-entraining Portland
cement or an equivalent that is resistant to
sulfate attacks of seawater.
(b) For upland earthwork, measures shall be
taken to minimize erosion:
Rhode Island Coastal Resources Management Program
Rev. Pg. 10/28/99
Page 3
Section 300.2
(1) A line of staked hay bales or other
erosion-preventing
devices
(including
diversion ditches, check dams, holding
ponds, filter barrier fabric, jute or straw
mulch) shall be placed at the downslope
perimeter of the proposed area of
construction prior to any grading, filling,
construction, or other earthwork. Hay
bales shall be toed in to a depth of 3 to 4
inches, and maintained by replacing bales
where necessary until permanent re-
vegetation of the site is completed. No
soils or other materials are authorized to
pass beyond the bale line.
(2) All slopes shall be returned to the
original grade unless otherwise specified.
(3) Where natural or manmade slopes are
or have become susceptible to erosion, the
slopes shall be graded to a suitable slope
and re-vegetated with a thick rooting
brush vegetation. Mulch shall be applied
as necessary to provide protection against
erosion until the vegetation is established.
(4) Construction shall be timed to
accommodate stream and/or runoff flow
and not allow flows over exposed, un-
stabilized soils, or into or through the
excavation. Flows shall not be restricted
in such a manner that flooding or
inhibition or normal flushing occurs.
(5) Any pumping of groundwater which
may be necessary for de-watering shall be
discharged into sediment traps consisting
of a minimum of staked hay bale rings
enclosing crushed stone or trap rock of a
size sufficient to disperse inflow velocity.
Hay bales shall be recessed 4 to 6 inches
into the soil and maintained.
(6) There shall be no discharge of
sediment-laden waters into storm drains.
Storm drains shall be surrounded by
staked hay bales to intercept sediment.
(c) For any disturbance of steep slopes (over
15 percent):
(1) Where such construction is allowed,
the following shall be observed: (1) no fill
shall be allowed on the slope; (2)
excavation shall be kept to an absolute
minimum; and (3) vegetative cover on the
slope shall be permanently maintained to
the maximum extent physically possible.
(2) Where the potential for damage to a
slope exists from runoff, staked hay bales,
berms, or similar diversions shall be
placed at the top and toe of the slope.
Collected
water
shall
be
suitably
discharged through properly constructed
drains or swales. Wherever possible,
drainage swales shall be constructed along
and adjacent to property lines so as to
avoid drainage onto adjacent properties.
Swales shall be capable of handling runoff
from a 10-year-rainfall occurrence.
(3) For excavations on slopes or directly
adjacent to coastal features, the excavated
materials shall be cast upslope of the
trench or excavation so as to minimize
downslope runoff of sediment.
(4) Pedestrian access over steep shoreline
slopes and banks shall be in the form of
field stone or similar stabilized paths or
elevated stairs. Access over bluffs shall
be with elevated stairs only.