650-RICR-20-00-1
650-RICR-20-00-1. Red Book (version Periodic Refile, 10/09/2003 to 01/17/2005)
Rhode Island Coastal Resources Management Program
Rev. Pg. 1/25/99
Page 1
Section 300.6
Section 300.6.
Treatment of
Sewage and Stormwater
A. Definitions
1. Sewage: The Council has adopted the
definition of sewage set forth under Title 46,
Chapter 12, Section 1 or the General Laws, to wit:
"... any human or animal excremental liquid or
substance, any decomposed animal or vegetable
matter, garbage, offal, filth, waste, chemicals, acid,
dyestuff, starch, coloring matter, oil and tar,
radioactive substances and any compound solution,
mixture or product thereof, and every substance
which may be injurious to public health or comfort,
or which would injuriously affect the natural and
healthy propagation, growth or development of any
fish or shellfish in the waters of this state, or of the
nourishment of the same, or which would
injuriously affect the flavor, taste, or value of food
of any such fish or shellfish or which would defile
said waters or injure or defile any vessel, boat,
wharf, pier, or any public or private property upon,
in or under said waters or any shore thereof.”
For purposes of the Coastal Resources
Management Program, "sewage" is further defined
to include freshwater discharges including runoff
that may significantly alter the salinity of tidal
waters or salt ponds. The term "sewage" also
includes discharges of heated waters.
2. Individual sewage disposal system (ISDS):
any arrangement for sanitary sewage disposal by
means other than discharge into a public sewer
system.
3. Point source discharges: any conveyance
including, but not limited to, any pipe, ditch,
channel, tunnel, conduit, container, transport
vehicle or vessel from which sewage is or may be
discharged.
4. Sewage treatment plants: sewage collection
and treatment facilities, including state, municipal,
or privately owned and operated collection,
pumping, treating, disposal or dispersion facilities
designed for the treatment of sewage from
residences, commercial buildings, industrial plants
and institutions, together with any groundwater,
surface water, or surface runoff that may be
present in the waste stream.
5.
Stormwater
runoff:
that
portion
of
precipitation that does not naturally infiltrate into
the landscape (e.g., without human influence) but
rather travels overland as surface flow. It is also
commonly
referred
to
as
"stormwater".
Stormwater runoff can be a significant contributor
of pollutants including sediments, bacteria,
nutrients
(e.g.,
nitrogen
and
phosphorus),
hydrocarbons (e.g., oil and grease), metals, and
other substances which can adversely affect water
quality and the coastal environment. In addition,
significant discharges of stormwater may alter
salinity and thereby adversely impact the coastal
environment, especially in poorly flushed estuaries
and embayments.
6. Stormwater management plan: A stormwater
management plan is a description of the proposed
best management practices, detailed site plans, and
written narrative that, when implemented, provides
protection and restoration of receiving waters by
reducing pollutant loadings and other negative
impacts associated with changes in land use (i.e.,
urbanization).
7. Large Projects: For the purposes of the
stormwater management requirements contained in
this section, large projects are defined as any one of
the following: subdivision of six (6) units or more;
any structure serviced by an on-site sewage
disposal system serving 2000 gallons or more per
day; any activity which results in the creation of
one (1) acre or more of parking facilities,
roadways, or impervious surfaces; all new roads,
highways, and bridges; all improvement projects to
roads, highways, and bridges (excluded from these
requirements are projects consisting only of
pavement resurfacing, minor roadway repairs, or
emergency roadway and drainage repairs); any
activity which is subject to the RIPDES general
permit requirements for construction activities or
industrial activities; any activity subject to Section
300.8; any activity subject to Section 300.13; and
any activity subject to Section 320.
8. Small Projects: For the purposes of the
stormwater management requirements contained in
this section, small projects are defined as all new
development and redevelopment or modification of
existing commercial and industrial structures, or
residential subdivisions of 5 units or less. In
addition, activities which are classified as
maintenance, and projects which receive a finding
of no significant impact (FONSI) are excluded
from these requirements.
Rhode Island Coastal Resources Management Program
Rev. Pg. 1/25/99
Page 2
Section 300.6
B. Policies
1. It is the Council's policy to maintain and,
where possible, improve the quality of groundwater
and tidal and salt pond surface waters.
2. It is the Council's policy to minimize the
amount of ISDS-derived nitrates and other
potential contaminants which may leach into salt
ponds and all other Type 1, 2, and 3 waters.
3. Applicants for Assents for ISDS' are
encouraged to meet on site with CRMC staff prior
to undertaking of ISDS groundwater and soil tests
to discuss the location of the system and buffer
zones.
4. It is the Council's policy to require the proper
management and treatment of stormwater through
the preparation and implementation of a
stormwater management plan which satisfies the
requirements of the RICRMP. All activities which
meet the definition of a large project must prepare
and implement a stormwater management plan
which satisfies the requirements of Section
300.6.E.2.. All activities which meet the definition
of small project must satisfy the stormwater
management standards contained in Section
300.6.E.3.
5. The most recent version of the Rhode Island
Stormwater Design and Installation Standards
Manual provides the appropriate methods for the
preparation of stormwater management plans and
the
treatment
of
stormwater
with
"Best
Management Practices" (BMP) within the CRMC's
jurisdiction. However, applicants are encouraged
to consult other appropriate guidance and technical
stormwater design manuals such as Schueler
(1987) and Schueler (1992). The Council also
recognizes that the most recent version of the
Rhode Island Soil and Erosion and Sediment
Control Handbook, and its amendments, published
jointly by the Rhode Island Department of
Environmental Management and the United States
Department
of
Agriculture
(USDA),
Soil
Conservation Service (SCS) provides additional
guidance and supplemental information with
respect to the management and treatment of
stormwater.
6. After construction has been completed and the
site has been permanently stabilized, the average
annual total suspended solid loadings (TSS) shall
be reduced by 80 percent. In addition, to the
maximum extent practicable, the post development
peak runoff rate and the average volume from
2-year, 25-year, and 100-year storm events shall be
maintained at pre-development levels unless: i) the
applicant has obtained local or state approval
which certifies that the existing storm drain system
has the capacity to accommodate the additional
stormwater runoff; or ii) the stormwater runoff is
conveyed, preferably without hardened channels,
non-erosive to tidal waters.
7. All stormwater management plans required by
the Council should clearly describe the Best
Management Practices (BMP) as found in Rhode
Island's Stormwater Design and Installation
Standards Manual that will be used to treat and
mitigate adverse environmental impacts associated
with stormwater runoff. In addition, all
stormwater management plans shall take into
consideration all potential impacts associated with
the discharge of stormwater runoff into the coastal
environment. Potential impacts include, but are not
limited to, the following: (i) impacts to coastal
wetlands such as changes in species composition
due to the introduction of freshwater to high marsh
areas; (ii) changes in the salinity of receiving
waters; (iii) thermal impacts to receiving waters;
(iv) effects of introducing stormwater runoff to
receiving waters that has low dissolved oxygen
concentrations; and (v) other potential water
quality impacts.
8. All sites should be planned, designed, and
developed in order to: (1) Protect areas that provide
important water quality benefits and/or are
particularly susceptible to erosion and sediment
loss; (2) limit increases of impervious surface
areas, except where necessary; (3) limit land
disturbance activities such as clearing and grading
and cut and fill to reduce erosion and sediment
loss; and (4) limit disturbance of natural drainage
features and vegetation.
C.
Prerequisites
1. Applicants for Council Assents to construct,
alter, or extend individual sewage disposal systems
or point source discharges shall first obtain a
permit from the Department of Environmental
Management.
2.
All
federal
water
pollution
control
requirements established by the Federal Water
Pollution Control Act (Clean Water Act), as
amended, or established by the federal government
Rhode Island Coastal Resources Management Program
Rev. Pg. 1/25/99
Page 3
Section 300.6
or by any state or local government pursuant to
such act, are the water pollution control require-
ments of the Rhode Island Coastal Resources
Management Program. Accordingly, all discharge
standards, effluent limitations and/or pretreatment
standards established pursuant to the Clean Water
Act for discharges of pollutants to the waters of
Rhode Island under the Rhode Island Pollutant
Discharge Elimination System (RIPDES) shall be
met (Rhode Island is an EPA delegated state with
respect to the NPDES program). In addition,
applicants shall obtain an Underground Injection
Control (UIC) permit from the Rhode Island
Department of Environmental Management when
applicable. Applicants subject to RIPDES general
permit requirements for construction activities and
industrial activities shall apply to the Council prior
to submitting an application to the RIDEM.
3. The Council shall formally review proposed
actions only after all other applicable state/local
requirements have or will be met. However, the
Council will comment on preliminary plans for
major facilities to assist in the planning process.
4. The Executive Director or the Council may
require that a System Suitability Determination
from RIDEM be obtained for septic systems that
pre-date 1968.
D. Prohibitions
1. Point source discharges of sewage and/or
stormwater runoff are prohibited on unconsolidated
coastal banks and bluffs.
2. New and enlarged stormwater discharges to
the high salt marsh environment bordering Type 1
and Type 2 waters and within salt marshes
designated for preservation which border Type
3,4,5, and 6 waters are prohibited. Stormwater
discharges to existing well flushed tidal channels
within high marshes shall not be subject to this
prohibition. However, all such discharges shall
meet the standards contained in Section 300.6.E.2.
E.
Standards
1. For individual sewage disposal systems (ISDS):
(a) See standards given in "Filling, Removing,
or Grading" (Section 300.2).
(b) Grading around the ISDS shall direct the
flow of surface runoff water away from the
ISDS.
(c) Subdrains constructed to lower groundwater
levels in an area where an ISDS shall be built
shall (1) have a minimum pipe diameter of 6
inches, (2) have no piping located between the
anticipated ISDS and the shore, (3) be
constructed so as to prevent clogging by soil
fines, and (4) have outfalls suitably protected
against shoreline erosion and scour.
(d) When existing buildings are changed from
seasonal to year-round use, or expanded by
adding one or more rooms, certification shall be
obtained from the Department of Environmental
Management's ISDS Office that the existing
ISDS is capable of treating sewage effluent
adequately.
(e) Connections to ISDS' and cesspools that are
abandoned shall be removed, blocked, or
otherwise disconnected, and abandoned cesspools
and septic tanks shall be pumped dry and filled
with clean fill.
(f)
Where
necessary,
barriers
shall
be
constructed to prevent vehicles from passing over
septic systems.
2. Stormwater Management for Large Projects
(a) All stormwater management plans shall be
consistent with the Best Management Practices
(BMP) and the stormwater design and
performance standards found in the Rhode Island
Stormwater Design and Installation Standards
Manual.
In
addition,
all
stormwater
management plans shall take into consideration
all potential impacts associated with the
discharge of stormwater runoff into the coastal
environment. Potential impacts include, but are
not limited to, the following: (i) impacts to
coastal wetlands such as changes in species
composition due to the introduction of freshwater
to high marsh areas; (ii) changes in the salinity of
receiving waters; (iii) thermal impacts to
receiving waters; (iv) effects of introducing
stormwater runoff to receiving waters that has
low dissolved oxygen concentrations; and (v)
other potential water quality impacts.
(b) After construction has been completed and
the site is permanently stabilized, the average
annual total suspended solid loadings (TSS) shall
be reduced by 80 percent. In addition, to the
maximum
extent
practicable,
the
post
development peak runoff rate and the average
volume from 2-year, 25-year, and 100-year
Rhode Island Coastal Resources Management Program
Rev. Pg. 1/25/99
Page 4
Section 300.6
storm
events
shall
be
maintained
at
pre-development levels unless: i) the applicant
has obtained local or state approval which
certifies that the existing storm drain system has
the capacity to accommodate the additional
discharge of stormwater runoff; or ii) the
stormwater runoff is conveyed, preferably
without using hardened channels, non-erosive to
tidal waters.
(c) The discharge from any stormwater facility
must be conveyed through properly constructed
watercourses to provide for non-erosive flows
during all storm events. The proposed
stormwater conveyance system consisting of
open channels, pipes, etc. shall, at a minimum,
accommodate the runoff associated with a 10-
year storm event or greater if required by other
local, state, or federal regulations. These
stormwater conveyance systems shall provide for
non-erosive flows to receiving waters.
(d) All stormwater detention basins shall be
constructed to safely withstand or pass through
the discharge from the 100-year runoff flows
from
the
contributing
drainage
area.
Specifically,
detention
basins
shall
be
constructed to "withstand" the 100-year runoff
flows and shall be capable of controlling these
flows without failure or damage to the basin
and/or detaining berms. Certification by the
design engineer as to meeting this requirement
shall be provided on the design plans for the
proposal.
(e) New or enlarged stormwater discharges to
salt marshes and well flushed tidal channels
within high marshes shall only be permitted when
the applicant can clearly demonstrate that no
reasonable alternatives exist (e.g., no other
discharge locations having a gravity flow outlet
are available and impervious surfaces have been
kept to an absolute minimum) and when no
adverse impacts to the salt marsh environment
will result. In these instances, the applicant
shall, at a minimum, meet all applicable
standards contained in the Rhode Island
Stormwater Design and Installation Standards
Manual. This standard does not apply to low
salt marsh environments with an average width
along the property of less than 35 feet.
(f) If the Council determines that any proposed
stormwater
discharge
will result
in
an
unacceptable discharge of pollutants to the
waters of Rhode Island, the Council shall require
the applicant to mitigate the pollutant loads to
acceptable levels. Frequently, this can be
accomplished
using
app ropr iate
Best
Management Practices in series in order to
achieve higher pollutant removal efficiencies.
(g) Whenever possible, existing natural
vegetation shall be left intact along natural
drainage easements so as to minimize bank
erosion.
(h) No connections to storm, surface, or
subsurface drains shall be made to either a
individual building sanitary sewer or individual
(on-site) sewage disposal system (ISDS), nor
shall any such drains be constructed within 25
feet of an existing ISDS.
(i) Wet ponds must have a permanent pool
volume equal to the water quality volume
calculated by multiplying one-inch by the
impervious surface area.
(j) Extended detention dry ponds must detain the
water quality volume over a 36-hour period
(brim draw-down time).
(k) Infiltration methods must be designed to
retain and exfiltrate the water quality volume
over a maximum 72-hour period.
(l) During the preparation of the stormwater
management plan, the applicant shall: 1) protect
areas that provide important water quality
benefits and/or are particularly susceptible to
erosion and sediment loss; 2) limit increases of
impervious surface
areas,
except
where
necessary; 3) limit land disturbing activities to
reduce erosion and sediment loss; and 4) limit
disturbances of natural drainage features and
vegetation.
(m) All stormwater management plans shall
have a maintenance plan which satisfies the
recommended maintenance procedures outlined
in the most recent version of the Rhode Island
Stormwater Design and Installation Standards
Manual.
3. Stormwater Management for Small Projects
(a) After construction has been completed and
the site is permanently stabilized, the average
annual TSS loadings must be reduced by 80
percent. New construction or modifications to
single-family dwellings are exempt, except when
Rhode Island Coastal Resources Management Program
Rev. Pg. 1/25/99
Page 5
Section 300.6
new impervious driveway surfaces (e.g., asphalt
or concrete) are proposed. In such cases,
adequate treatment of the first 0.5 inches of
runoff from the new impervious driveway
surface must be provided for in accordance with
Section 300.6.E.3(h).
(b) To the maximum extent practicable, the post
development peak runoff rate and average
volume shall be maintained at levels similar to
pre-development levels.
(c) In order to reduce the inflow of pollutants
carried by surface water runoff, all activities or
alterations shall be required to minimize and/or
mitigate any significant adverse impacts
associated with surface runoff from the project.
All applicants must provide appropriate
measures to this end such as the use of
infiltration devices, permeable surfaces, and the
use of overland flow.
(d) Concentrated runoff shall be minimized to
the maximum extent practicable. The use of
sheet flow through vegetated areas shall be
employed whenever practicable to prevent
erosive flows. In addition, roof top runoff shall
be directed away from erosion prone areas.
(e)
Whenever
possible,
existing
natural
vegetation shall be left intact along natural
drainage easements so as to minimize bank
erosion.
(f) At a minimum, all drainage structures shall
be designed to adequately convey the runoff from
a ten-year storm event. In the event that a muni-
cipality in which the structure is located specifies
a greater than 10-year storm event as a minimum
design standard, then such greater design
standard shall apply. The design of the drainage
structure shall consider all impacts on adjacent
properties and mitigate any adverse impacts.
(g) No connections to storm, surface, or
subsurface drains shall be made to either a
individual building sanitary sewer or individual
(on-site) sewage disposal system (ISDS), nor
shall any such drains be constructed within 25
feet of an existing ISDS.
(h) When applicable, the design and installation
standards contained in Section 300.6.E.2 shall be
met and the management of stormwater from
small projects shall be consistent with the BMPs
and the design and installation standards
contained in the most recent version of the Rhode
Island Stormwater Design and Installation
Standards Manual.
4. For catch basins:
(a) Catch basins shall be employed when
necessary to reduce runoff-induced infiltration of
particulates into water bodies.
(b) A maintenance and cleaning program for
catch basins shall be detailed.
(c) Catch basins shall have a minimum sump
depth of 3 feet.
(d) Wherever possible, catch basins with
permeable sides and/or bottoms shall be used so
as to minimize outflow.
5. For outfalls:
(a) Work on outfalls, drainage channels, etc.,
shall proceed from the shoreline toward the
upland in order that no unfinished or un-
stabilized lower channel portions be subjected to
erosion-producing velocities from upstream. If
this cannot be accomplished, all flow shall be
diverted from the unfinished areas until
stabilization is completed.
(b) Where possible, outfall pipe slopes shall be
designed for an exit velocity of less than 5 feet
per second.
(c) Screens or grates shall be placed over the
end of large outfalls to trap debris.
(d) Beaches or other coastal features in front of
outfalls shall be returned to original grade.
(e) Riprap placed on beaches shall not increase
the grade of the beach higher than one foot in
order to maintain lateral access below mean high
water.
(f) Riprap shall be compact, hard, durable,
angular stone, with an approximate unit weight
of 165 lbs./cubic foot.
(g) Riprap shall be placed with an adequate
bedding of crushed rock or other suitable
filtering material.