650-RICR-20-00-1
650-RICR-20-00-1. Red Book (version Amendment, 03/08/2012 to 09/05/2013)
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 1 of 7
Section 300.6
Section 300.6
Treatment of Sewage and Stormwater
A. Definitions
1. Sewage: Pursuant to R.I.G.L. § 46-12-1, sewage means “fecal material and human waste, or wastes
from toilets and other receptacles intended to receive or retain body waste, and any wastes, including
wastes from human households, commercial establishments, and industries, and storm water
runoff…” For purposes of the Coastal Resources Management Program, “sewage” is further defined
to include freshwater discharges, including stormwater runoff that may significantly alter the salinity
of tidal waters or salt ponds; the terms “wastewater” and “septage”, as defined by the DEM OWTS
Rules; and discharges of heated waters to tidal waters of the state.
2. Onsite wastewater treatment systems (OWTS): means any system of piping, tanks, dispersal areas,
alternative toilets or other facilities designed to function as a unit to convey, store, treat or disperse
wastewater by means other than discharge into a public sewer system.
3. Point source discharges: means any discernible, confined, and discrete conveyance, including, but
not limited to, any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock,
concentrated animal feeding operation, or vessel or other floating craft from which sewage is or may
be discharged.
4. Sewage treatment plants: sewage collection and treatment facilities, including state, municipal, or
privately owned and operated collection, pumping, treating, disposal or dispersion facilities designed
for the treatment of sewage from residences, commercial buildings, industrial plants and institutions,
together with any groundwater, surface water, or surface runoff that may be present in the waste
stream.
5. Stormwater runoff: that portion of precipitation that does not naturally infiltrate into the landscape
(e.g., without human influence) but rather travels overland as surface flow. It is also commonly
referred to as "stormwater". Stormwater runoff is a significant contributor of pollutants such as
sediments, bacteria, nutrients (nitrogen and phosphorus), hydrocarbons (oil and grease), metals, and
other substances that adversely affect water quality and the coastal environment. In addition,
significant discharges of stormwater may alter salinity and thereby, adversely impact the coastal
environment, especially in poorly flushed estuaries and embayments.
6. Stormwater management plan: A plan describing the proposed methods and measures to prevent or
minimize stormwater runoff (water quality and quantity) impacts associated with a development
project both during and after construction. It identifies selected low impact development (LID) source
controls and treatment practices to address those potential impacts, the engineering design of the
treatment practices, and maintenance requirements for proper performance of the selected practices.
The stormwater management plan details how a project complies with the eleven (11) minimum
stormwater management standards and performance criteria detailed in the most recent version of the
Rhode Island Stormwater Design and Installation Standards Manual. When such a plan is
implemented, it provides protection and restoration of receiving waters by reducing pollutant loadings
and other negative impacts associated with changes in land use (i.e., urbanization).
7. Redevelopment: is defined as any construction, alteration, or improvement that disturbs a total of
10,000 square feet or more of existing impervious area where the existing land use is commercial,
industrial, institutional, governmental, recreational, or multi-family residential.
8. Low Impact Development (LID): is a site planning and design strategy aimed at maintaining or
replicating the predevelopment hydrology through the use of site planning, source control, and small-
scale practices integrated throughout a site to prevent, infiltrate, and manage stormwater runoff as
close to its source as possible. LID achieves natural resource protection by replenishing groundwater
supplies, minimizing the stormwater runoff volume discharged to surface waters, and improving
water quality. Examples of LID practices include bioretention, vegetated swales, stormwater planters,
porous pavement or concrete, greenroofs, rainwater collection systems for water reuse, and other
similar methods.
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 2 of 7
Section 300.6
9. Water quality volume (WQv): the storage needed to capture and treat 90% of the average annual
stormwater runoff volume, and in Rhode Island this equates to one (1)-inch of runoff from
impervious surfaces.
10. Maximum extent practicable: means the applicant has made all reasonable efforts to meet the
standard, including the evaluation of alternative methods to achieve the same level of treatment. To
show that a proposed development has met a standard to the maximum extent practicable, the
applicant must demonstrate the following: (1) all reasonable efforts have been made to meet the
standard in accordance with current local, state, and federal regulations; (2) a complete evaluation of
all possible management measures has been performed; and (3) if full compliance cannot be achieved,
the highest practicable level of management is being implemented.
B. Policies
1. It is the Council's policy to maintain and, where possible, improve the quality of coastal wetlands,
contiguous freshwater wetlands, freshwater wetlands in the vicinity of the coast, groundwater
resources and tidal and salt pond surface waters. In so doing, the Council requires the use of low
impact development (LID) strategies as the primary method of stormwater management to reduce the
volume of stormwater runoff to surface waters, recharge groundwater supplies, and improve overall
water quality.
2. It is the Council's policy to minimize the amount of onsite wastewater treatment system (OWTS)-
derived nitrates and other potential contaminants which may leach into salt ponds and all other Type
1, 2, and 3 waters.
3. The Council encourages applicants for a CRMC Assent to install, alter or repair an OWTS to meet on
site with CRMC staff prior to undertaking of OWTS groundwater and soil tests to discuss the location
of the system and buffer zones, where applicable.
4. It is the Council's policy to require the proper management and treatment of stormwater through the
preparation and implementation of a stormwater management plan in accordance with the most recent
version of the Rhode Island Stormwater Design and Installation Standards Manual, and which
satisfies the requirements of the RICRMP and any applicable Special Area Management Plan.
5. The most recent version of the Rhode Island Stormwater Design and Installation Standards Manual
provides the appropriate methods for the preparation of stormwater management plans and the
treatment of stormwater using LID practices and methods within the CRMC's jurisdiction. The
Council also recognizes that the most recent version of the Rhode Island Soil and Erosion and
Sediment Control Handbook, and its amendments, published jointly by the Rhode Island Department
of Environmental Management and the United States Department of Agriculture (USDA), Natural
Resources Conservation Service (NRCS) provides additional guidance and supplemental information
with respect to the management and treatment of stormwater.
6. It is the Council’s policy that all stormwater management plans shall take into consideration all
potential impacts associated with the discharge of stormwater runoff into the coastal environment.
Potential impacts include, but are not limited to, the following: (i) impacts to salt marshes such as
changes in species composition due to the introduction of freshwater to high marsh areas; (ii) changes
in the salinity of receiving waters; (iii) thermal impacts to receiving waters; (iv) the effects of
introducing stormwater runoff to receiving waters with low dissolved oxygen concentrations; and (v)
other potential water quality impacts.
7. The Council’s policy is to ensure that all projects are planned, designed, and developed in order to:
(1) protect areas that provide important water quality benefits and/or are particularly susceptible to
erosion and sediment loss; (2) limit increases of impervious surface areas, except where absolutely
necessary; (3) limit land disturbance activities such as clearing and grading and cut and fill to reduce
erosion and sediment loss; and (4) limit disturbance of natural drainage features and vegetation.
Additionally, stormwater management practices should be designed as landscape amenities to include
native plant species on project sites. The Council recommends applicants to use the “Rhode Island
Coastal Plant Guide,” an interactive, web-based plant list prepared by the URI Cooperative Extension
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 3 of 7
Section 300.6
Education Center in consultation with the CRMC and available online at:
www.crmc.ri.gov/coastallandscapes.html.
C. Prerequisites
1. Applicants seeking a Council Assents to construct, alter, or repair onsite wastewater treatment
systems or point source discharges shall first obtain the requisite permit(s) from the Department of
Environmental Management.
2. The discharge standards, effluent limitations and pretreatment standards established for the discharge
of pollutants to waters of the State under the Rhode Island Pollutant Discharge Elimination System
(RIPDES) program, and administered by the Department of Environmental Management (DEM), are
the State’s water pollution control requirements. Applicants for projects for which an Individual
RIPDES Permit is required shall obtain said permit from DEM and submit the Individual RIPDES
Permit with the CRMC Assent application. Note: Projects that are eligible to submit a Notice of
Intent (NOI) for coverage under a RIPDES General Permit are not required to submit the RIPDES
Authorization with the CRMC Assent application. Applicants for such projects, however, are
encouraged to file a Notice of Intent (NOI) with DEM concurrently with their CRMC application to
allow a coordinated review between the agencies.
3. The Council shall formally review proposed actions only after all other applicable state/local
requirements have or will be met. The Council, however, will comment on preliminary plans for
major facilities to assist in the planning process.
4. The Executive Director or the Council may require that an applicant obtain a DEM System Suitability
Determination, as provided in the DEM OWTS Rules, for onsite wastewater treatment systems that
pre-date 1968.
D. Prohibitions
1. Point source discharges of sewage and/or stormwater runoff are prohibited on unconsolidated coastal
banks and bluffs.
2. New and enlarged stormwater discharges to the high salt marsh environment bordering Type 1 and
Type 2 waters and within salt marshes designated for preservation which border Type 3, 4, 5, and 6
waters are prohibited. Stormwater discharges to existing well flushed tidal channels within high
marshes shall not be subject to this prohibition. All such discharges, however, shall meet the
applicable standards contained herein.
3. Point source discharges of sewage are prohibited in Type 1 waters.
E. Standards
1. For Onsite Wastewater Treatment Systems (OWTS):
(a) See standards given in “Filling, Removing, or Grading” (Section 300.2).
(b) The construction, repair or alteration of all OWTS and components shall conform to the standards
set forth in the most recent Rules Establishing Minimum Standards relating to Location, Design,
Construction and Maintenance of Onsite Wastewater Treatment Systems promulgated by the
Department of Environmental Management (referred to herein as DEM OWTS Rules).
(c) Site grading around the OWTS shall direct the flow of surface runoff water away from the OWTS
and meet all applicable requirements of the DEM OWTS Rules.
(d) Sub-drains constructed to lower groundwater levels in an area where an OWTS will be located
shall: (1) conform to all applicable DEM rules; (2) have no piping located between the anticipated
OWTS and the shoreline; and (3) have exposed outfalls suitably protected against shoreline
erosion and scour.
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 4 of 7
Section 300.6
(e) When new construction, renovation or a change of use is proposed for existing buildings, an
OWTS Suitability Determination shall be obtained by the applicant from the Department of
Environmental Management to indicate that the existing OWTS meets all applicable DEM
OWTS Rules or the applicant shall submit a building official document indicating that a DEM
OWTS Suitability Determination is not required.
(f) Connections to OWTS and cesspools that are abandoned shall be removed, blocked, or otherwise
disconnected, and abandoned cesspools and septic tanks shall be pumped dry and filled with
clean fill in accordance with all applicable DEM OWTS Rules.
(g) Where necessary, barriers shall be constructed to prevent vehicles from passing or parking over
septic systems, unless permissible in accordance with DEM OWTS Rules.
(h) The repair of OWTS along the Rhode Island south shore from Watch Hill to Narragansett shall
conform to the DEM “OWTS Repair Guidance in Critical Erosion areas.”
2. The 1993 Rhode Island Stormwater Design and Installation Standards Manual (“Stormwater
Manual”) will be superseded by the 2010 Stormwater Manual upon effective date of adoption by the
Council. Unless otherwise provided in subsections (a) or (b), the requirements of the 2010
Stormwater Manual, as amended, shall apply to all CRMC applications submitted on or after January
1, 2011.
(a) Applicants for projects which have a currently valid and vested Master Plan approval from a local
planning board or commission on or before March 31, 2011 may elect to comply with the 1993
Stormwater Manual instead of the 2010 Stormwater Manual provided that a complete application
for the project is submitted to the CRMC on or before June 30, 2011. Any project applicant that
received Master Plan approval who submits an application to the CRMC after June 30, 2011 shall
comply with the 2010 Stormwater Manual, including any future phases of a phased project
having received Master Plan approval as of March 31, 2011. Applicants shall, at the time of
application, submit a copy of the Master Plan approval document(s) demonstrating eligibility
under this subsection. This subsection applies only to those projects which are required to obtain
local Master Plan approval pursuant to R.I.G.L. § 45-23-40.
(b) In the case of any RIDOT project or a local government road or bridge project, the applicant may
elect to comply with the 1993 Stormwater Manual instead of the 2010 Stormwater Manual
provided that a complete application for the project is submitted to the CRMC on or before June
30, 2011. Any application submitted to the CRMC after June 30, 2011 shall comply with the
2010 Stormwater Manual.
3. For stormwater management the Council requires, in accordance with the “Smart Development for a
Cleaner Bay Act of 2007” (R.I.G.L. § 45-61.2), that all applicable projects meet the following
requirements:
(a) Maintain pre-development groundwater recharge and infiltration on site to the maximum extent
practicable;
(b) Demonstrate that post-construction stormwater runoff is controlled, and that post-development
peak discharge rates do not exceed pre-development peak discharge rates; and
(c) Use low impact-design techniques as the primary method of stormwater control to the maximum
extent practicable.
4. Residential, commercial, industrial or public recreational structures as defined in Section 300.3 shall
provide treatment and management of stormwater runoff for all new structural footprint expansions,
including building rooftops, greater than six (600) hundred square feet in size and any new
impervious pavement, driveways, sidewalks, or parking areas, regardless of size. Applicable projects
shall submit a stormwater management plan that demonstrates compliance with the eleven (11)
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 5 of 7
Section 300.6
minimum stormwater management standards and performance criteria as detailed in the most recent
version of the Rhode Island Stormwater Design and Installation Standards Manual. Single-family
dwelling projects, however, may meet these provisions as detailed in 300.6.E.8 below.
5. Roadways, highways, bridges, and other projects subject to Section 300.13 shall provide treatment
and management of stormwater runoff for all new impervious surfaces. These projects shall submit a
stormwater management plan that demonstrates compliance with the eleven (11) minimum
stormwater management standards and performance criteria as detailed in the most recent version of
the Rhode Island Stormwater Design and Installation Standards Manual. Any improvement projects
to existing roads, highways and bridges and other projects subject to Section 300.13 that result in the
creation of new impervious surfaces shall provide treatment and management of stormwater as above
for all new impervious surfaces. Maintenance activities such as pavement resurfacing projects,
replacement of existing drainage systems, minor roadway repairs, or emergency roadway and
drainage repairs are excluded from these requirements provided the project does not result in an
expansion of the existing impervious surface area, new or enlarged stormwater discharges, or the
removal of roadway materials down to the erodible soil surface of 10,000 square feet or more of
existing impervious area.
6. Unless exempted as a maintenance activity herein, any redevelopment that disturbs 10,000 square
feet or more of existing impervious surface coverage shall comply with Minimum Stormwater
Standard 6 (Redevelopment and Infill Projects) of the most recent version of the Rhode Island
Stormwater Design and Installation Standards Manual. Maintenance activities subject to Section
300.14 are excluded from these requirements provided there is no expansion of the existing
impervious surface area and no new or enlarged stormwater discharges resulting from the
maintenance activity.
7. All stormwater management plans shall take into consideration potential impacts associated with the
discharge of stormwater runoff into the coastal environment. Applicants shall address these potential
impacts to include, but not limited to, the following: (i) impacts to coastal wetlands such as changes
in species composition due to the introduction of freshwater to high marsh areas; (ii) changes in the
salinity of tidal receiving waters; (iii) thermal impacts to receiving waters; (iv) effects of introducing
stormwater runoff to receiving waters that have low dissolved oxygen concentrations; and (v) other
potential water quality impacts as may be identified by CRMC staff.
8. Applicants for single-family residential dwellings and accessory structures shall treat the stormwater
runoff water quality volume (WQv) from all new building rooftops greater than six (600) hundred
square feet in size and any new impervious driveways and parking areas, regardless of size, as
indicated in (a) and (b) below. All dwelling and accessory structure rooftop expansions constructed
within a 12-month period shall be counted towards the 600 square foot threshold. Once the 600
square foot threshold is exceeded, stormwater management must be provided for all rooftop
expansions constructed within that 12-month period. Applicants for single-family dwelling projects
may use the design guidance and performance criteria in the most recent version of the Rhode Island
Stormwater Design and Installation Standards Manual or the most recent version of the RI
Stormwater Management Guidance for Individual Single-Family Residential Lot Development.
Applicants for single-family dwellings and accessory structures on CRMC-designated barriers shall
manage stormwater runoff as provided in (a) below. Pretreatment of stormwater runoff is not required
for single-family residential applications.
(a) Applicants for single-family dwellings and accessory structures located on CRMC-designated
barriers shall manage stormwater runoff as follows:
(1) Runoff from rooftops shall be directed by non-erosive sheet flow onto vegetated areas
surrounding the dwelling or accessory structure; and
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 6 of 7
Section 300.6
(2) Construction of driveway and parking surfaces shall be limited to crushed stone, crushed
shell, open plastic grid systems filled with sand, gravel or vegetation, or any combination of
the preceding, to prevent damage to other properties during major storm events. Stormwater
runoff shall be directed by non-erosive sheet flow onto vegetated areas along side the
driveway or parking area.
9. New or enlarged stormwater discharges to salt marshes and well flushed tidal channels within high
marshes shall only be permitted when the applicant can clearly demonstrate that no reasonable
alternatives exist (e.g., no other discharge locations having a gravity flow outlet are available and
impervious surfaces have been kept to an absolute minimum) and when no adverse impacts to the salt
marsh will result. In these instances, the applicant shall meet all applicable standards contained in the
most recent version of the Rhode Island Stormwater Design and Installation Standards Manual. This
standard does not apply to low salt marsh environments with an average width along the property of
less than 35 feet.
10. Stormwater open drainage and pipe conveyance systems must be designed to provide adequate
passage for flows leading to, from, and through stormwater management facilities for at least the 10-
year, 24-hour Type III storm event. Applicants may not be required to control post-development peak
discharge rates at pre-development peak discharge rates provided the project design provides for non-
erosive stormwater discharges to tidal waters.
11. Applicants may be required to submit a pollutant loading analysis to demonstrate that a proposed
project will not unduly contribute to, or cause, water resource degradation when such projects are
located in sensitive coastal resource areas. When a pollutant loading analysis is required, the applicant
shall use the method detailed in Appendix H of the most recent version of the Rhode Island
Stormwater Design and Installation Standards Manual. If the Council determines that any proposed
stormwater discharge will result in an unacceptable discharge of pollutants to the tidal waters of
Rhode Island, the Council shall require the applicant to mitigate the pollutant loads to acceptable
levels using the practices detailed in the stormwater manual. Frequently, this can be accomplished
using these practices in series to achieve higher pollutant removal efficiencies.
12. The use of proprietary hydrodynamic (swirl) separator or filter devices shall be limited to pre-
treatment applications only, unless the device has met the requirements of the Technology
Assessment Protocol (TAP) as detailed in the most recent version of the Rhode Island Stormwater
Design and Installation Standards Manual. The CRMC may, however, approve such devices in
situations where end-of-pipe retrofit solutions are the only alternative available when site constraints
limit the use of standard low impact development methods for the treatment and management of
stormwater runoff. In such circumstances, however, the use of such proprietary devices shall conform
to the standards and performance criteria set forth in the most recent version of the Rhode Island
Stormwater Design and Installation Standards Manual to the maximum extent practicable.
13. For outfalls:
(a) Work on outfalls, drainage channels, etc., shall proceed from the shoreline toward the upland in
order that no unfinished or un-stabilized lower channel portions be subjected to
erosion-producing velocities from upstream. If this cannot be accomplished, all flow shall be
diverted from the unfinished areas until stabilization is completed.
(b) Where possible, outfall pipe slopes shall be designed for an exit velocity of less than 5 feet per
second.
(c) Screens or grates shall be placed over the end of large outfalls to trap debris.
(d) Beaches or other coastal features in front of outfalls shall be returned to original grade.
(e) Riprap placed on beaches shall not increase the grade of the beach higher than one foot in order
to maintain lateral access below mean high water.
(f) Riprap shall be compact, hard, durable, angular stone, with an approximate unit weight of 165
Rhode Island Coastal Resources Management Program
Adopted: February 14, 2012
Page 7 of 7
Section 300.6
lbs./cubic foot.
(g) Riprap shall be placed with an adequate bedding of crushed rock or other suitable filtering
material.
14. Applicants with projects subject to the stormwater management provisions herein shall submit the
following information:
(a) New or modified single-family dwelling projects shall submit the following:
(1) 8.5 x 11 inch site plan depicting the location of all structural stormwater (LID or otherwise)
components; and
(2) Operation & Maintenance Plan consistent with CRMC guidance to ensure long-term
maintenance and operation of the stormwater structural practice(s) on the site.
(b) All other projects
(1) 8.5 x 11 inch site plan depicting the location of all structural stormwater (LID or otherwise)
components;
(2) Operation & Maintenance Plan that meets the specifications detailed in the most recent
version of the Rhode Island Stormwater Design and Installation Standards Manual; and
(3) Following completion of the approved project, a post-construction certification by a Rhode
Island registered P.E. and Rhode Island registered Landscape Architect, where required,
demonstrating that all stormwater structures, LID components, and requisite planting
materials necessary for the function of the stormwater management system were installed in
accordance with the approved permit, specifications and approved site plans.