1.1 Authority
These Rules and Regulations
are promulgated and adopted pursuant to the requirements and
provisions of R.I. Gen. Laws §§ 42-64-13.2; 39-2-1.2; and
R.I. Gen. Laws Chapter 39-26 .
1.2 Purpose, Scope and
Applicability
A. The purpose and scope of
the Renewable Energy Development Fund as set forth in R.I. Gen. Laws
Chapter 4 2 - 6 4
are as follows:
1. To develop an integrated
organizational structure to secure for the State of Rhode Island and
its people the full benefits of cost-effective renewable energy
development from diverse sources.
2. The Rhode Island Commerce
Corporation ("RICC") shall, in the furtherance of its
responsibilities to promote and encourage economic development,
establish and administer a Renewable Energy Development Fund as
provided for in R.I. Gen. Laws § 39-26-7, may exercise the
powers set forth in that chapter, as necessary or convenient to
accomplish this purpose, and shall provide such administrative
support as may be needed for the coordinated administration of the
renewable energy standard as provided for in R.I. Gen. Laws Chapter
39-26 and the renewable energy program established by R.I. Gen. Laws
§ 39-2-1.2.
3. The Corporation seeks to
fulfill its legal obligations by providing and administering
programs in seven (7) areas as part of the renewable energy
fund:
a. Small-scale Solar
b. Commercial Scale
c. Community Renewables
d. Pre-development Feasibility
Studies
e. Early Stage
Commercialization
f. Workforce Development
g. Brownfields Solar
1.3 Key Definitions
A. For the purposes of these
regulations, the following terms shall have the following meanings:
1. “Add-on systems”
means adding solar panels to an existing solar photovoltaic or solar
hot water system.
2. “Affordable housing”
means any affordable housing or low and moderate income housing as
defined in R.I. Gen. Laws Chapters 42-128 or 45-53, or such other
superseding statutes as may be implemented by the State of Rhode
Island from time to time.
3. “Brownfield”
means a property with which the expansion, redevelopment, or reuse
may be complicated by the presence or potential presence of a
hazardous substance, pollutant, or contaminant.
4. “Clean energy”
means the renewable energy resources defined in R.I. Gen. Laws
Chapter 39-26.
5. “Clean energy
internship program” means the internship program created in
partnership with RICC and the Rhode Island Office of Energy Resources
that matches interns with clean energy companies and provides
reimbursement to the company for the period of the internship.
6. “Community
renewables” or “Community solar” or “Community
remote net metering system” means a facility, owned by the
primary electrical account holder or a third party, generating
electricity using an eligible net-metering resource which allocates
net metering credits to a minimum of one eligible credit recipient
account for systems associated with low or moderate income housing,
or three (3) eligible credit recipient accounts for other systems.
7. “Corporation”
and “RICC” mean the Rhode Island Commerce Corporation or
any successor corporation or new corporation empowered to perform the
functions currently served by the Rhode Island Commerce Corporation.
8. “Department of
Environmental Management” or “DEM” means the entity
established in the executive branch of State government pursuant to
R.I. Gen. Laws § 42-17.1-1;
9. “Early stage
commercialization” means an innovative renewable energy
technology or innovative business model with the ability to transform
the renewable energy business sector. Technologies have completed or
have nearly completed early research stages.
10. “Emerging
technology” means new technologies in renewable energy that
will come to market within the next two (2) – five (5) years
which have the ability to transform the renewable energy business
sector.
11. “Innovative business
model” means a novel business structure with the ability to
help commercialize an emerging or existing renewable energy
technology.
12. “Internship period”
means the Spring, Summer, or Fall semester months of the Clean Energy
Internship program.
13. “Microgrid”
means a local energy grid with control capability allowing it to
disconnect from the traditional grid and operate autonomously.
14. “Rhode Island Office
of Energy Resources” or “OER” means the office
created and established pursuant to R.I. Gen. Laws § 42-140-2.
15. “One-line electrical
drawing” means a diagram showing the number of photovoltaic
panels with voltage and kilowatt output, all disconÂnects, all
combiners, all inverters with input and output ratings, the size of
the main electrical panel bussing in amperes, the size of the main
service disconnect, the size of the PV circuit breaker in amperes,
size and type of all raceways and the size and type of all
conductors.
16. “Pre-development
feasibility study” means the completion of project tasks prior
to construction of a renewable energy project. These tasks shall not
include initial feasibility assessments. Pre-development activities
occur after a project is deemed worthy of development and before
construction takes place. Examples of Pre-Development Activities
include but are not limited to:
a. Local and State Permitting.
b. Structural and Electrical
Engineering.
c. National Grid
Interconnection Studies.
d. National Grid Impact
Studies.
e. Detailed Financial
Analyses.
f. Request for Proposal (RFP)
Preparations.
17. “Renewable energy
fund” and “REF” means the Renewable Energy
Development Fund.
18. “R.I. Gen. Laws”
means the Rhode Island General Laws.
19. “ROI” means
Return on Investment.
20. “Solar plus
storage” means solar photovoltaic plus battery storage.
21. “Solar water heaters
or solar domestic hot water” or “SDHW” means a
system that includes storage tanks and solar collectors, while using
the sun's thermal energy to heat water.
22. “Training”
means providing additional skills, knowledge, or experience to clean
energy workers.
23. “Workforce
development” means activities related to providing training and
career development opportunities to facilitate clean energy job
growth and support a more qualified clean energy workforce.
1.4 Funding
A. All Funds will be awarded
and disbursed through solicitations except for workforce development,
issued by the Corporation in the Program areas under § 1.2 of
this Part above. Workforce development funds will be awarded and
disbursed through reimbursement funding after the completion period.
Approximate release dates for each solicitation will be available on
the Corporation’s website at the start of each calendar year.
All dates are subject to change depending on availability of funds
and demand for each program. Each solicitation will specify the
specific incentive level, detailed instructions on how to apply,
program requirements, and the deadlines to apply.
B. In each calendar year, a
maximum funding level cap of the REF’s income will be available
to eligible projects in each Program area. The Corporation, at its
discretion, may choose to contribute more money to a particular
program based on demand for a particular program, available funds, or
other factors. The maximum funding level cap for the REF can be found
on the RICC website under the REF section.
C. If the maximum funding
level cap for all programs is not awarded during the calendar year,
funds will roll over into the following calendar year.
1.5 General
Requirements
A. Entities eligible to apply
for REF programs shall submit a complete REF application.
Applications shall be found on the Corporations website. Information
for those programs that are established and implemented in
partnership with the OER or other state agencies shall be found on
the websites of the agencies involved.
B. Applications for programs
listed under § 1.2 of this Part will only be accepted during
open solicitation periods. Solicitations and schedules for future
solicitations can be found on the Corporation’s website.
C. Incomplete applications
will be returned to the applicant and will not be considered for
approval until the Corporation receives a complete version.
D. All applicants seeking
funding through the REF for renewable energy projects must install
projects in Rhode Island and generate electricity for use in Rhode
Island. Companies must also be registered to do business in Rhode
Island to be eligible.
E. All applications must be
for new projects. No projects underway or complete at the time of
applying shall be eligible for funding unless approved otherwise.
“Add-on systems” to an existing interconnected project
which received REF funding since January 2013 on the same meter will
not be allowed.
F. Projects participating in
the National Grid Renewable Energy Growth Program will not be
eligible for the REF programs.
G. REF funding may be
combined with Regional Greenhouse Gas Initiative (RGGI) funding
programs and/or renewable energy funding programs administered by the
Federal Government.
H. Award Process (excluding
workforce development)
1. The Corporation board of
directors may approve projects. The board may also delegate approval
to the Corporation staff to the greatest extent permissible by law.
2. Award letters shall be sent
to applicants after approval.
3. Contracts in a form
acceptable to the Corporation shall be executed between the
Corporation and the Applicant
4. Work may begin on Projects
after the contract has been executed
5. All grants for construction
projects will be paid in full after successful completion and
inspection of the Project.
6. All loan disbursements will
be made in manner that is mutually acceptable to the Corporation and
the borrower as agreed to in the loan agreement.
7. The Corporation in its sole
discretion may cancel an award if mutually agreeable terms cannot be
met.
I. If an applicant fails to
provide and/or complete requested documentation within 60 days of the
award letter being issued, the award shall be cancelled.
1.6 Small-Scale
Solar
A. Solicitations for funding:
1. Solicitations shall include
all project requirements which are subject to change between funding
periods.
2. Solicitations shall include
all deadlines for application submission.
3. Funding will be issued in
the form of grants
B. Eligible Sectors:
1. Residential.
2. Businesses.
3. Affordable housing.
4. Non-profits.
5. State Facilities.
6. Municipalities.
C. Eligible Technologies:
1. Solar Photovoltaic (PV).
2. Solar Domestic Hot Water
(SDHW).
3. Solar plus storage.
D. Minimum Submission
Requirements:
1. The following requirements,
at a minimum, shall be evaluated:
a. One-line electrical drawing
(for PV only),
b. Layout drawing including
location of all major components,
c. Executed turnkey contract.
E. Minimum Evaluation
Criteria:
1. The following criteria, at
a minimum, shall be evaluated:
a. Technical Feasibility.
b. Financial Feasibility,
c. Adherence to the Minimum
Technical Requirements that are periodically updated on the RICC
website under the REF section.
d. The REF has the discretion
to prohibit installer companies from participating in the REF
programs where such companies have had a serious life safety report
or have unresolved inspection deficiency issues.
F. A complete list of updated
program application requirements can be found on the RICC website
under the REF section.
1.7 Commercial Scale
A. Solicitations for funding:
1. Solicitations shall include
all project requirements, which are subject to change between funding
periods.
2. Solicitations shall include
all deadlines for application submission.
3. Funding will be issued in
the form of grants.
B. Eligible Sectors:
1. Businesses.
2. Institutions.
3. Non-profits.
4. Municipalities.
5. State Facilities.
C. Eligible Technologies:
1. Those technologies set
forth in R.I. Gen. Laws § 39-26-5.
2. Projects that have the
ability to generate electricity or aid in electricity usage.
3. Solar Water Heaters or
Solar Domestic Hot Water (SDHW).
D. Minimum Submission
Requirements:
1. The following requirements,
at a minimum, shall be evaluated:
a. One-line electrical
drawing.
b. Layout drawing including
location of all major components.
c. Executed turnkey contract.
E. Minimum Evaluation
Criteria:
1. The following criteria, at
a minimum, shall be evaluated:
a. Technical Feasibility.
b. Financial Feasibility.
c. Minimum technical
requirements that are periodically updated on the RICC website under
the REF section.
d. The REF has the discretion
to prohibit installer companies from participating in the REF
programs where such companies have had a serious life safety report
or have unresolved inspection deficiency issues.
F. A complete list of updated
program application requirements can be found on the RICC website
under the REF section.
1.8 Community Renewables
A. Solicitations for funding:
1. All program requirements
shall be available on the Corporation’s website.
2. Funding will be issued in
the form of grants.
B. Eligible sectors
1. National Grid customers
with an A60 or A16 rate code
2. All other sectors must be
approved by REF staff.
C. Eligible Technologies:
1. Solar Photovoltaic (PV).
2. All other innovative
technologies must be approved administratively by the REF staff
pursuant to R.I. Gen. Laws § 39-26-7.
D. Minimum Submission
Requirements:
1. The following requirements,
at a minimum, shall be evaluated:
a. Executed agreement/contract
b. Subscriber Electricity Bill
c. A Submitted interconnection
application
E. Minimum Evaluation
Criteria:
1. The following criteria, at
a minimum, shall be evaluated:
a. Technical Feasibility.
b. Financial Feasibility.
c. Adherence to the Minimum
Technical Requirements that are periodically updated on the RICC
website under the REF section.
d. The REF has the discretion
to prohibit installer companies from participating in the REF
programs where such companies have had a serious life safety report
or have unresolved inspection deficiency issues.
F. A complete list of updated
program application requirements can be found on the RICC website
under the REF section.
1.9 Pre-Development Feasibility
Studies
A. Solicitations for Funding:
1. All program requirements
shall be available on the Corporation’s website.
2. All awards will be funded
as low-interest loans contingent upon the ability for the project to
be successful.
B. Eligible Sectors:
1. Businesses.
2. Institutions.
3. Non-profits.
4. Municipalities.
5. State Facilities.
C. Eligible Technologies:
1. Those technologies set
forth in R.I. Gen. Laws § 39-26-5.
2. Technologies being studied
must have the ability to generate electricity or provide a direct
benefit to the electric grid, or aid in electricity usage.
3. Microgrids with
demonstrated study requirements associated with necessary control
systems or projects with new applications with necessary control
systems that are designed to generate electricity or aid in
electricity usage.
4. Solar Photovoltaic (PV) and
Solar Domestic Hot Water (SDHW) are not eligible, unless approved
otherwise.
5. All other innovative
technologies must be approved administratively by the REF staff
pursuant to R.I. Gen. Laws § 39-26-7.
D. Minimum Submission
Requirements:
1. The following requirements,
at a minimum, shall be evaluated:
a. For Municipal Projects:
(1) Any municipality applying
for a pre-development feasibility study must include evidence of a
Town/City Council vote in favor of the proposed project.
(2) The applicant must have
evidence of its legal ability to borrow money on behalf of the
municipality.
b. Detailed scope of work.
c. Detailed project budget.
d. Contracts with all major
subcontractors working on the Study,
e. Clear evidence of
cost-sharing specific to the Study, and
f. The municipality must have
an ordinance in place allowing development of the proposed project.
E. Eligibility Requirements:
1. The following criteria, at
a minimum, shall be evaluated:
a. Technical Feasibility
b. Financial Feasibility
c. Cost per kWh of energy
produced.
d. Experience of Project Team.
F. A complete list of updated
program application requirements can be found on the RICC website
under the REF section.
G. The Corporation may choose
to fund all, part, or none of a Predevelopment Feasibility Study
based on the likelihood of development.
H. Loans will be repaid upon
completion of the project.
I. If the project is found to
be technically and economically feasible but the project is not
commenced or completed within specified time frame, as per
application requirement for the project, the loan must be repaid to
the Corporation.
1.10 Early Stage Commercialization
A. Solicitation for Funding:
1. All program requirements
shall be available on the Corporation’s website.
2. All awards will be funded
as low-interest loans contingent upon the ability for the project to
be successful.
B. Eligible Sectors
1. Businesses
2. Institutions
C. Eligible Technologies:
1. Those technologies set
forth in R.I. Gen. Laws § 39-26-5.
2. Projects may qualify for
funding as an emerging technology or an Innovative business model.
3. All other innovative
technologies must be approved administratively by the REF staff
pursuant to R.I. Gen. Laws § 39-26-7.
D. General Requirements:
1. The following requirements,
at a minimum, shall be evaluated:
a. Applicant must have other
investments secured or be actively pursuing other forms of
investment.
b. Applicant must submit a
business plan.
E. Evaluation Criteria:
1. The following criteria, at
a minimum, shall be evaluated:
a. Other funds leveraged.
b. Technical Merit /
Feasibility.
c. Market Potential.
d. Economic Impact for the
State of Rhode Island,
e. Team credentials and
experience.
f. Scope of Work/Project
Budget.
F. A complete list of updated
program application requirements can be found on the RICC website
under the REF section.
1.11 Brownfields Solar PV Program
A. Solicitations for funding:
1. Solicitations shall include
all project requirements, which are subject to change between funding
periods.
2. Funding will be issued in
the form of grants.
B. Eligible Sectors:
1. Businesses.
2. Institutions.
3. Non-profits.
4. Municipalities.
5. State Facilities.
C. Eligible Technologies:
1. Solar PV
D. Minimum Submission
Requirements:
1. The following requirements,
at a minimum, shall be evaluated:
a. Project location meets the
definition of Brownfield per these Rules and Regulations.
b. Project site location
approval from DEM.
c. One-line electrical
drawing.
d. Layout drawing including
location of all major components.
e. Executed turnkey contract.
E. Minimum Evaluation
Criteria:
1. The following criteria, at
a minimum, shall be evaluated:
a. Technical Feasibility.
b. Adherence to the Minimum
Technical Requirements that are periodically updated on the RICC
website under the REF section.
F. A complete list of updated
program application requirements can be found on the RICC website
under the REF section.
G. The REF has the discretion
to prohibit installer companies from participating in the REF
programs where such companies have had a serious life safety report
or have unresolved inspection deficiency issues.
1.12 Workforce Development
A. Clean Energy Internship
Program
1. Intern eligibility:
a. The following eligibility,
at a minimum, shall be evaluated:
(1) Students need to
demonstrate that they are currently enrolled at a college or
university located in Rhode Island or if the college or university is
located outside of Rhode, can demonstrate proof of residency.
(2) Students must have
completed or will complete at least their freshman year of college
(24 credits) the semester before the internship.
(3) If a student attends a
community college (or 2-year associate program) the student must have
completed at least 24 credits.
(4) Graduate students must be
currently enrolled in a Master’s Degree program.
2. Internship Company
eligibility:
a. The following eligibility,
at a minimum, shall be evaluated:
(1) Must be registered to do
business with the Rhode Island Secretary of State.
(2) Can hire up to two interns
per internship period.
(3) Providing a meaningful
internship with a clear job description.
B. Training
1. RICC, in partnership with
OER, may periodically design, market, and offer trainings to clean
energy workers based on funding and need.