S.C. Code Regs. 103-324

S.C. Code Regs. 103-324. Meter Seal

Last amended: 2008Year: 2026Length: 44 wordsOfficial source
Immediately after the pre-installation or field test of a meter, the manufacturer or the electrical utility shall affix a seal or locking device in order to avoid tampering. The meter installation shall be sealed or locked to help prevent tampering or theft of current.
S.C. Code Regs. 103-324: S.C. Code Regs. 103-324. Meter Seal | Justis AI