S.C. Code Regs. 21-22
S.C. Code Regs. 21-22. Withdrawals from Pre-Construction Fund
The seller shall be entitled to withdraw all funds from the pre-construction fund after the Cemetery Board is satisfied that construction has been completed; provided, however, during construction of the mausoleum or bank of belowground crypts, the Cemetery Board shall authorize a specific percentage of the funds to be withdrawn when the cemetery company certifies that at least an equivalent percentage of construction has been completed.