S.C. Code Regs. 63-707
S.C. Code Regs. 63-707. Guidelines for Selection of Set Aside Projects
In selecting and designing contracts suitable for set aside projects, the Department will consider a number of factors including, but not limited to, the following:
A. Availability of certified DBEs within 100 miles of work to be performed;
B. Capabilities of the available certified DBEs in relation to the type of work required by the contract;
C. Limitation of estimated value of contract to $250,000.00 in most cases;
D. Limitation of the work of a single contract to a maximum of four roads within a reasonable distance of each other;
E. Equitable geographic distribution of contracts throughout the State, insofar as is possible with available contracts;
F. Availability of technical assistance for contract;
G. The requirement of Section 12-28-2930(c) that the Department shall advertise a number of highway construction projects at each regularly scheduled highway letting to be bid exclusively by DBEs.