South Dakota · Regulations
Chapter 74:02:04 — Well construction standards
83 sections
83 sections
- ARSD 74:02:04:01ARSD 74:02:04:01. Transferred to § 74:02:04:20Transferred
- ARSD 74:02:04:02ARSD 74:02:04:02. Transferred to § 74:02:04:22Transferred
- ARSD 74:02:04:03ARSD 74:02:04:03. Transferred to § 74:02:04:41Transferred
- ARSD 74:02:04:04ARSD 74:02:04:04. Transferred to § 74:02:04:42Transferred
- ARSD 74:02:04:05ARSD 74:02:04:05. Transferred to § 74:02:04:50Transferred
- ARSD 74:02:04:06ARSD 74:02:04:06. Transferred to § 74:02:04:51Transferred
- ARSD 74:02:04:07ARSD 74:02:04:07. Transferred to § 74:02:04:58Transferred
- ARSD 74:02:04:08ARSD 74:02:04:08. Transferred to § 74:02:04:60Transferred
- ARSD 74:02:04:09ARSD 74:02:04:09. Requirements for water surface measuring devicesRepealed
- ARSD 74:02:04:10ARSD 74:02:04:10. Transferred to § 74:02:04:61Transferred
- ARSD 74:02:04:11ARSD 74:02:04:11. Transferred to § 74:02:04:64Transferred
- ARSD 74:02:04:12ARSD 74:02:04:12. Transferred to § 74:02:04:65Transferred
- ARSD 74:02:04:13ARSD 74:02:04:13. Pump installers to make and file pump installation recordsRepealed
- ARSD 74:02:04:14ARSD 74:02:04:14. Pump installers to make and file measuring tube recordsRepealed
- ARSD 74:02:04:15ARSD 74:02:04:15. Additional requirements for artesian wellsRepealed
- ARSD 74:02:04:16ARSD 74:02:04:16. Requirements for grouting of casing in artesian wellsRepealed
- ARSD 74:02:04:17ARSD 74:02:04:17. Requirements for placement of screens in artesian wellsRepealed
- ARSD 74:02:04:18ARSD 74:02:04:18. Requirements for placement of pumps in artesian wellsRepealed
- ARSD 74:02:04:19ARSD 74:02:04:19. Wells to be constructed to have reasonable life of 20 yearsRepealed
- ARSD 74:02:04:20ARSD 74:02:04:20. Definitions
- ARSD 74:02:04:21ARSD 74:02:04:21. Permits required before construction of certain wells
- ARSD 74:02:04:22ARSD 74:02:04:22. Requirements for all wells
- ARSD 74:02:04:23ARSD 74:02:04:23. Intent of South Dakota well construction standards
- ARSD 74:02:04:23.01ARSD 74:02:04:23.01. Construction of adequate well required
- ARSD 74:02:04:24ARSD 74:02:04:24. Well locations
- ARSD 74:02:04:25ARSD 74:02:04:25. Wells to be accessible
- ARSD 74:02:04:26ARSD 74:02:04:26. Well construction prohibited along sections of Whitewood Creek and sections of Belle Fourche River -- Variance
- ARSD 74:02:04:27ARSD 74:02:04:27. Upper well terminal -- Wells in pits prohibited
- ARSD 74:02:04:28ARSD 74:02:04:28. Minimum grouting requirements for wells -- Exceptions
- ARSD 74:02:04:29ARSD 74:02:04:29. Dakota or Newcastle aquifer and shallower artesian aquifer well grouting requirementsRepealed
- ARSD 74:02:04:30ARSD 74:02:04:30. Public water supply well grouting requirementsRepealed
- ARSD 74:02:04:31ARSD 74:02:04:31. Driven well casing to be sealed with bentonite
- ARSD 74:02:04:32ARSD 74:02:04:32. Hard rock well construction
- ARSD 74:02:04:33ARSD 74:02:04:33. Minimum cement grouting requirements for wells finished in bedrock aquifers below Dakota -- ExceptionsRepealed
- ARSD 74:02:04:34ARSD 74:02:04:34. Locations of aquifers and formations
- ARSD 74:02:04:34.01ARSD 74:02:04:34.01. Wells producing water from more than one aquifer prohibited
- ARSD 74:02:04:35ARSD 74:02:04:35. Alternative well construction requirements for certain Dakota aquifer wells
- ARSD 74:02:04:36ARSD 74:02:04:36. Alternative well construction requirements for certain Inyan Kara wells
- ARSD 74:02:04:37ARSD 74:02:04:37. Well driller to correct well defective within one year
- ARSD 74:02:04:38ARSD 74:02:04:38. Driller's license required to install closed loop
- ARSD 74:02:04:39ARSD 74:02:04:39. Vertical closed-loop installation
- ARSD 74:02:04:40ARSD 74:02:04:40. Horizontal closed-loop installation
- ARSD 74:02:04:41ARSD 74:02:04:41. Drill hole construction requirements
- ARSD 74:02:04:41.01ARSD 74:02:04:41.01. Construction water requirements
- ARSD 74:02:04:42ARSD 74:02:04:42. General requirements for well casing
- ARSD 74:02:04:43ARSD 74:02:04:43. Thermoplastic casing requirements
- ARSD 74:02:04:44ARSD 74:02:04:44. Thermoplastic casing installation requirements
- ARSD 74:02:04:45ARSD 74:02:04:45. Solvent cementing procedures for thermoplastic connections
- ARSD 74:02:04:46ARSD 74:02:04:46. Precast curbing and concrete casing use limitations
- ARSD 74:02:04:47ARSD 74:02:04:47. Pitless unit or pitless adapter requirements
- ARSD 74:02:04:48ARSD 74:02:04:48. Steel casing specifications
- ARSD 74:02:04:49ARSD 74:02:04:49. Copper casing specifications
- ARSD 74:02:04:50ARSD 74:02:04:50. Requirements for well screens and gravel packs
- ARSD 74:02:04:51ARSD 74:02:04:51. Requirements for length and diameter of screens
- ARSD 74:02:04:52ARSD 74:02:04:52. Requirements for centralizers
- ARSD 74:02:04:52.01ARSD 74:02:04:52.01. Requirements for packers
- ARSD 74:02:04:53ARSD 74:02:04:53. Cement grout requirements
- ARSD 74:02:04:53.01ARSD 74:02:04:53.01. Bentonite grout requirements
- ARSD 74:02:04:54ARSD 74:02:04:54. Cement grout additivesRepealed
- ARSD 74:02:04:55ARSD 74:02:04:55. Minimum grout volumes
- ARSD 74:02:04:56ARSD 74:02:04:56. Bentonite slurry additiveRepealed
- ARSD 74:02:04:57ARSD 74:02:04:57. Minimum hole size for grouting
- ARSD 74:02:04:58ARSD 74:02:04:58. Requirements for development of wells
- ARSD 74:02:04:58.01ARSD 74:02:04:58.01. Disinfection requirements
- ARSD 74:02:04:59ARSD 74:02:04:59. Wells in road ditches to be protected
- ARSD 74:02:04:60ARSD 74:02:04:60. Requirements for pump installations
- ARSD 74:02:04:61ARSD 74:02:04:61. Requirements for well and pump capacities
- ARSD 74:02:04:62ARSD 74:02:04:62. Backflow prevention required for large capacity wells
- ARSD 74:02:04:63ARSD 74:02:04:63. Water analysis required
- ARSD 74:02:04:64ARSD 74:02:04:64. Chief engineer to furnish forms for required records
- ARSD 74:02:04:65ARSD 74:02:04:65. Well drillers to prepare and file well construction records
- ARSD 74:02:04:66ARSD 74:02:04:66. Well drillers to prepare and file well rehabilitation record
- ARSD 74:02:04:67ARSD 74:02:04:67. Requirements for plugging wells or test holes completed into confined aquifers or encountering more than one aquifer
- ARSD 74:02:04:68ARSD 74:02:04:68. Requirements for plugging nonflowing artesian wells or test holesRepealed
- ARSD 74:02:04:69ARSD 74:02:04:69. Requirements for plugging wells or test holes completed into unconfined aquifers with only one aquifer encountered
- ARSD 74:02:04:70ARSD 74:02:04:70. Requirements for plugging other test holes
- ARSD 74:02:04:70.01ARSD 74:02:04:70.01. Requirements for temporary abandonment of wells
- ARSD 74:02:04:71ARSD 74:02:04:71. Well driller to prepare and file well and test hole plugging records
- ARSD 74:02:04:72ARSD 74:02:04:72. Pressure regulator valve required on flowing wells
- ARSD 74:02:04:73ARSD 74:02:04:73. Well driller's responsibilities
- ARSD 74:02:04:74ARSD 74:02:04:74. Well owner's responsibilities
- ARSD 74:02:04:75ARSD 74:02:04:75. Variance
- ARSD 74:02:04:76ARSD 74:02:04:76. Flowing well construction