ARSD 20:44:20:03

ARSD 20:44:20:03. Inspection fee for circuit installations or alterations

Last amended: 2025Year: 2026Length: 110 wordsOfficial source

Cite as S.D. Admin. R. 20:44:20:03

The inspection fee for circuit installations or alterations is sixty-five dollars per circuit. Any fee calculated in this section may not exceed the calculated fee for a new installation of the same ampere capacity in ยงยง 20:44:20:01 and 20:44:20:02. A minimum fee of one hundred fifty dollars must be imposed if the total fee calculated under this section is less than one hundred fifty dollars. A one-circuit or two-circuit installation or alteration includes one inspection. An installation or alteration of three-or-more circuits includes two inspections. Additional requested inspections or reinspections to address corrections detailed in a report for a rough-in or final inspection will be assessed fees under ยง 20:44:20:10.
ARSD 20:44:20:03: ARSD 20:44:20:03. Inspection fee for circuit installations or alterations | Justis AI