ARSD 20:44:23:02
ARSD 20:44:23:02. Wiring permit required for modular homes and modular structures
Cite as S.D. Admin. R. 20:44:23:02
Wiring permits must be obtained from the commission office and provided with each individual modular home or modular structure manufactured in this state or transported into this state. A qualified person, pursuant to ยง 20:44:20:02.01, must fill out and sign the wiring permit, completely describing the installation as required on the forms. The white copy of the wiring permit along with the required inspection fee must be forwarded to the commission office before the modular home or structure leaves the place of manufacture in South Dakota or is transported into South Dakota. The address of the destination and the name of the South Dakota dealer or the party purchasing the modular structure must also be provided. The blue copy of the wiring permit may be retained by the company. The hard copy of the wiring permit shall be posted near the service entrance disconnect switch location.