ARSD 20:44:25:06
ARSD 20:44:25:06. Switch requirements
Cite as S.D. Admin. R. 20:44:25:06
The switch or switches installed in the cogeneration system as required by power supplier systems must be so arranged that only authorized persons have control of these switches. Authorized persons shall be designated by the power supplier system.