ARSD 20:53:02:22.01

ARSD 20:53:02:22.01. Concealment and final inspection

Last amended: 2020Year: 2026Length: 65 wordsOfficial source

Cite as S.D. Admin. R. 20:53:02:22.01

No permittee may conceal any drainage, waste, or vent system until the final inspection has been completed and the inspector has approved that portion of the system. Backfilling is considered concealment. A system that has been conealed prior to inspection must be unconcealed by the permittee prior to an inspection. Upon completion of the entire drainage, waste, or vent system a final inspection is required.
ARSD 20:53:02:22.01: ARSD 20:53:02:22.01. Concealment and final inspection | Justis AI