Cite as S.D. Admin. R. 61:08:09:37

The blowdown of the boiler must be demonstrated to the inspector in a sufficient amount to ensure that the valve is functioning properly. The valve must be attached as described in ยง61:08:09:20 or the boiler must be equipped as original.