ARSD 61:08:09:42. Tests following major repairs

Last amended: 1997Year: 2026Length: 51 wordsOfficial source

Cite as S.D. Admin. R. 61:08:09:42

The inspector may require a hydrostatic pressure test or another method of testing for leaks acceptable to the inspector after a boiler has had major repairs made on it. Tests must be carried out as described in ยงยง 61:08:09:25 to 61:08:09:28, inclusive, for hydrostatic tests and ยง 61:08:09:29 for ultrasonic tests.