ARSD 74:02:09:02

ARSD 74:02:09:02. Requirements for chemigation users

Last amended: 2000Year: 2026Length: 118 wordsOfficial source

Cite as S.D. Admin. R. 74:02:09:02

Persons applying any chemical through an irrigation system shall do the following for each system: (1) Provide the following information to the chief engineer prior to using chemigation: (a) The water permit or right number issued pursuant to SDCL 46-1-14; (b) The name, address, and telephone number of the water permit or right owner; (c) The name, address, and telephone number of the system operator if not the same as the water permit or right owner; and (d) The legal description of the lands on which the system is located; (2) Install and maintain functional antipollution devices; and (3) Indicate to the chief engineer on the annual irrigation questionnaire required by § 74:02:01:14.02 whether any chemical is applied.
ARSD 74:02:09:02: ARSD 74:02:09:02. Requirements for chemigation users | Justis AI