ARSD 74:12:02:14

ARSD 74:12:02:14. Blowout prevention equipment required

Last amended: 2012Year: 2026Length: 59 wordsOfficial source

Cite as S.D. Admin. R. 74:12:02:14

In all drilling operations, precautions must be taken for keeping the well under control, including the use of blowout preventers and high pressure fittings attached to a cemented casing string. If the drilling operation is in an area where a blowout preventer may not be needed, an exception to the blowout preventer requirement may be granted by the secretary.