ARSD 74:27:09:04

ARSD 74:27:09:04. Solid waste incinerator permit application -- Contents

Last amended: 1993Year: 2026Length: 193 wordsOfficial source

Cite as S.D. Admin. R. 74:27:09:04

Solid waste incinerator permit applications shall include complete information on the following: (1) The general information required in subdivision 74:27:09:03(1); (2) The applicable design and construction details required in subdivision 74:27:09:03(2), except subdivision 74:27:09:03(2)(c), and the following: (a) A description of how the facility meets the design and construction requirements of ยง 74:27:14:02, including copies of the construction quality assurance plan and the ash management plan; (b) A copy of the air quality permit application required by articles 74:35 and 74:36; and (c) Stack performance tests required and results, if available; (3) The applicable maps required in subdivision 74:27:09:03(3); (4) An operational plan that addresses each of the requirements in ยง 74:27:14:03 and in ยง 74:27:14:04, if applicable, including the sources, types, and amounts of wastes to be handled. A copy of the recordkeeping log to be used, a copy of the contingency plan, a description of waste screening methods, and a description of the personnel training plan must be included with the operational plan; (5) The applicable miscellaneous information required in subdivision 74:27:09:03(4)(b); (6) The closure and postclosure plans required by chapter 74:27:15; and (7) Financial assurance information required by chapter 74:27:16.
ARSD 74:27:09:04: ARSD 74:27:09:04. Solid waste incinerator permit application -- Contents | Justis AI