ARSD 74:27:12:22

ARSD 74:27:12:22. Construction quality assurance plan

Last amended: 1993Year: 2026Length: 114 wordsOfficial source

Cite as S.D. Admin. R. 74:27:12:22

The applicant shall develop a construction quality assurance plan that addresses all aspects of facility construction. The plan shall include the following: (1) A description of the responsibilities and authorities of key personnel; (2) A description of the required level of experience, training, and duties of the contractor, the contractor's crew, and the quality assurance inspectors; (3) A description of the testing protocols for every major phase of construction, including the frequencies of inspections, field testing, and sampling for laboratory testing; (4) The sampling and field testing procedures and the equipment to be used; (5) The calibration of field testing equipment; (6) The laboratory procedures to be used; and (7) Documentation to be maintained.
ARSD 74:27:12:22: ARSD 74:27:12:22. Construction quality assurance plan | Justis AI