ARSD 74:29:02:04
ARSD 74:29:02:04. Mining and milling methods
Cite as S.D. Admin. R. 74:29:02:04
For SDCL 45-6B-6(8), a permit application is considered procedurally complete if the following items are included:
(1) A narrative description of the mining and milling techniques to be employed;
(2) A narrative description of and plan view maps depicting the premining contours and proposed postmining topography;
(3) A narrative description of the proposed depth and direction of mining and representative cross-sections depicting the premining and proposed postmining land surface;
(4) A map depicting the proposed locations of tailings dams, waste dumps, ore stockpiles, or other mine spoil material;
(5) A stability analysis for all critical earth structures; and
(6) A description of the proposed blast procedures and a proposed program for mitigating resulting fugitive dust, noise, and potential structural or stability damage outside the permit area.