ARSD 74:29:02:04

ARSD 74:29:02:04. Mining and milling methods

Last amended: 1988Year: 2026Length: 126 wordsOfficial source

Cite as S.D. Admin. R. 74:29:02:04

For SDCL 45-6B-6(8), a permit application is considered procedurally complete if the following items are included: (1) A narrative description of the mining and milling techniques to be employed; (2) A narrative description of and plan view maps depicting the premining contours and proposed postmining topography; (3) A narrative description of the proposed depth and direction of mining and representative cross-sections depicting the premining and proposed postmining land surface; (4) A map depicting the proposed locations of tailings dams, waste dumps, ore stockpiles, or other mine spoil material; (5) A stability analysis for all critical earth structures; and (6) A description of the proposed blast procedures and a proposed program for mitigating resulting fugitive dust, noise, and potential structural or stability damage outside the permit area.
ARSD 74:29:02:04: ARSD 74:29:02:04. Mining and milling methods | Justis AI