ARSD 74:31:03:03
ARSD 74:31:03:03. Abatement project designer training course requirements
Cite as S.D. Admin. R. 74:31:03:03
The abatement project designer training course must be at least three days long and must include lectures, demonstrations, a field trip, course review, and a written examination. The following topics must be included:
(1) Background information on asbestos:
(a) Identification of asbestos;
(b) Examples and discussions of the uses and locations of asbestos in buildings;
(c) Physical appearance of asbestos;
(2) Potential health effects related to asbestos exposure:
(a) The nature of asbestos-related diseases;
(b) Routes of exposure;
(c) Dose-response relationships and the lack of a safe exposure level;
(d) The synergistic effect between cigarette smoking and asbestos exposure;
(e) The latency period of asbestos-related diseases;
(f) A discussion of the relationship between asbestos exposure and asbestosis, lung cancer, mesothelioma, and cancer of other organs;
(3) Overview of abatement construction projects:
(a) Abatement as a portion of a renovation project;
(b) OSHA requirements for notification of other contractors on a multiemployer site in 29 C.F.R. ยง 1926.58 (July 1, 1993) as amended by 59 Fed. Reg. 40,964 to 41,162, inclusive (August 10, 1994);
(4) Safety system design specifications:
(a) Design, construction, and maintenance of containment barriers and decontamination enclosure systems;
(b) Positioning of warning signs;
(c) Electrical and ventilation system lockout;
(d) Working techniques for minimizing fiber release;
(e) Entry and exit procedures for the work area;
(f) Use of wet methods;
(g) Use of negative pressure exhaust ventilation equipment;
(h) Use of high efficiency particulate aerosol (HEPA) vacuums;
(i) Clean-up and disposal of asbestos;
(j) Work practices as they apply to encapsulation, enclosure, and repair;
(k) Use of glove bags and a demonstration of glove bag use;
(l) Proper techniques for initial cleaning;
(5) Field trip:
(a) A visit to an abatement site or other suitable building site. For example, a metal pole building without any HVAC systems would not be considered a suitable site. The visit must include:
(i) On-site discussions of abatement design;
(ii)A building walk-through inspection;
(iii) A discussion of rationale for the concept of functional spaces during the walk-through;
(6) Employee personal protective equipment:
(a) Classes and characteristics of respirators;
(b) Limitations of respirators;
(c) Selection, inspection, donning, use, maintenance, and storage procedures;
(d) Methods for field testing of the facepiece-to-face seal (positive and negative pressure fitting tests);
(e) Qualitative and quantitative fit testing procedures;
(f) Variability between field and laboratory protection factors;
(g) Factors that alter respirator fit, for example, facial hair;
(h) Components of a respiratory protection program;
(i) Selection and use of personal protective clothing;
(j) Use, storage, and handling of nondisposable clothing;
(k) Regulations found in subdivision (18) of this section covering personal protective equipment;
(7) Additional safety hazards:
(a) Hazards encountered during abatement activities and how to deal with them, including:
(i) Electrical hazards;
(ii)Heat stress;
(iii) Air contaminants other than asbestos;
(iv) Fire and explosion hazards;
(8) Fiber aerodynamics and control:
(a) Aerodynamic characteristics of asbestos fibers;
(b) Importance of containment barriers;
(c) Settling time for asbestos fibers;
(d) Wet methods in abatement;
(e) Aggressive air monitoring following abatement;
(f) Aggressive air movement and negative pressure exhaust ventilation as a clean-up method;
(9) Designing abatement solutions:
(a) Discussions of removal, enclosure, and encapsulation methods;
(b) Asbestos waste disposal;
(10) Final clearance process:
(a) Discussion of the need for a written sampling rationale for aggressive final air clearance;
(b) Requirements of a complete visual inspection;
(c) Discussion of the relationship of visual inspection to final air clearance;
(11) Budgeting and cost estimation:
(a) Development of cost estimates;
(b) Present costs of abatement versus future operations and maintenance costs;
(c) Setting priorities for abatement jobs to reduce cost;
(12) Writing abatement specifications:
(a) Means and methods specifications versus performance specifications;
(b) Design of abatement in occupied buildings;
(c) Modification of guide specifications to a particular building;
(d) Worker and building occupant health and medical considerations;
(e) Replacement of ACM with a substitute for asbestos;
(f) Preparation of and need for a written project design;
(13) Preparing abatement drawings:
(a) Use of as-built drawings as base drawings;
(b) Use of inspection photographs and on-site reports;
(c) Particular problems in abatement drawings;
(d) Significance and need for drawings;
(e) Methods of preparing abatement drawings;
(f) Diagramming containment barriers;
(g) Relationship of drawings to design specifications;
(14) Contract preparation and administration;
(15) Legal liabilities and defenses:
(a) Insurance considerations;
(b) Bonding;
(c) Hold harmless clauses;
(d) Use of abatement contractor's liability insurance;
(e) Claims made versus occurrence policies;
(16) Replacement of asbestos with asbestos-free substitutes;
(17) Role of other consultants:
(a) Development of technical specification sections by industrial hygienists or engineers;
(b) The multidisciplinary team approach to abatement design;
(18) Occupied buildings:
(a) Special design procedures required in occupied buildings;
(b) Education of occupants;
(c) Extra monitoring recommendations;
(d) Staging of work to minimize exposure to occupants;
(e) Scheduling of renovation to minimize exposure;
(19) Regulatory review -- procedures and standards:
(a) Requirements of AHERA;
(b) National emission standard for hazardous air pollutants in 40 C.F.R. ยง 61, Subparts A (general provisions) and M (national emission standard for asbestos) (July 1, 1993);
(c) OSHA standards for permissible exposure to airborne concentrations of asbestos fibers and respiratory protection in 29 C.F.R. ยง 1910.134 (July 1, 1993) as amended by 59 Fed. Reg. 40,964 to 41,162, inclusive (August 10, 1994);
(d) EPA worker protection rule in 40 C.F.R. ยง 763, Subpart G (July 1, 1993);
(e) OSHA asbestos construction standard in 29 C.F.R. ยง 1926.58 (July 1, 1993) as amended by 59 Fed. Reg. 40,964 to 41,162, inclusive (August 10, 1994);
(f) OSHA hazard communication standard in 29 C.F.R. ยง 1926.59 (July 1, 1993);
(20) Course review -- a review of key aspects of the training course.